Professional Documents
Culture Documents
Report
Site ID Number
-
Description of Analysis
Analysis for Additional Load Condition
Tower Name
TUDM PERAI
Version
V1.0
Site Type
GBT
Structure Type
Monopole
RAG Status
Structure Details Site Condition: -
24m Monopole
100% Wind Speed Condition: GREEN
Date of Submission
15th July 2021
Report Prepared By
7DSM PROJECTS SDN BHD
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com
Table of Contents
1. Introduction....................................................................................................................................................................... 3
2. Site Details.......................................................................................................................................................................... 3
3. Design Criteria................................................................................................................................................................... 3
4. Equipment and Ancillary Loadings........................................................................................................................... 4
5. Equipment Loading Diagram [Additional Load] ……………………………………………………………………5
6. Summary of Analysis–Additional Load.................................................................................................................... 6
7. Foundation Analysis………………………………………………………………………………………………………………6
8. Conclusion........................................................................................................................................................................... 6
Annexure
A. Tower Profile
B. Results
Page | 2
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com
1. Introduction
This structural analysis report is covered on analysis based on existing loading condition of PDC
Telcommunication tower site at Jalan Teluk Air Tawar, Butterworth, Pulau Pinang .
2. Site Details
The site layout, tower profile, members, bolts & equipment data are referenced from the data
provided by PDC Telecommunication Sdn Bhd .
Country- Malaysia
State - Pulau Pinang
Region- Butterworth
Site Type- GBT
Tower Type- Monopole
Tower Base Height-0.87m
Base Width- 1.12m OD
Tower Height- 24m
Latitude- 5.453097°
Longitude- 100.383750°
3. Design Criteria
Design Code
TIA-222 G / BS 5950
Exposure Category
The site is in Jalan Teluk Air Tawar, Butteworth . There is open terrain around the site. Hence,
we have considered “Exposure C” in analysis.
Topographic Category
At this site, no abrupt changes in general topography is observed. The site is in flat terrain. So,
we considered “Topographic Category 1”.
Structure Class
Structure Class II has been considered
Bolt Grade
Grade-8.8 bolts has been identified in site.
Page | 3
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com
21.12 1181.0
Dimensions [m]
FPA EPA Weight Height
Type No. (L) (W) (D) Dia Leg Azimuth Antenna Model Number
[m2] [m2] (kg) (m)
GSM 3 2.08 0.3 0.146 - 1.87 2.64 73.50 - 0/90/180 23 missing
GSM 3 2.1 0.58 0.16 - 3.66 5.12 95.40 - 90/180/270 20 missing
GSM 1 2.1 0.58 0.16 - 1.22 1.53 38.8 - 180 20 New Antenna
MW 1 - - - 0.67 0.35 0.44 25.6 - 0 23 missing
MW 1 - - - 0.67 0.35 0.44 25.6 - 0 20 missing
MW 1 - - - 0.67 0.35 0.44 25.6 - 270 24 missing
MW 1 - - - 0.67 0.35 0.44 25.6 - 270 20 missing
0/45/90/18 missing
RRU 9 0.4 0.3 0.15 - 1.08 1.35 211.5 - 23
0/215/225
0/45/90/18 missing
RRU 9 0.4 0.3 0.15 - 1.08 1.35 211.5 - 20
0/215/225
0/45/90/18 missing
RRU 9 0.4 0.3 0.15 - 1.08 1.35 211.5 - 24
0/215/225
0/45/90/18 missing
RRU 6 0.4 0.3 0.15 - 0.72 0.9 141 - 20
0/215/225
Summation= 15.77 21.12 1181.0
Page | 4
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com
7. Foundation Analysis
The scope of checking of the reaction and moments induced from the additional load is not within
the scope of the works.
8. Conclusion
The scope of checking of the reaction and moments induced from the additional load is not
within the scope of the works.
1) Tower members and bolts are found to be structurally safe with stresses at 100% with one
(1) additional antenna (38.8kg) at full wind speed condition.
Page | 6
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com
ANNEXURE
Page | 7
Site ID. Perai Monopole Date 15/07/2021