You are on page 1of 7

Structural Analysis

Report

Site ID Number
-
Description of Analysis
Analysis for Additional Load Condition
Tower Name
TUDM PERAI
Version
V1.0

Site Type
GBT

Structure Type
Monopole
RAG Status
Structure Details Site Condition: -
24m Monopole
100% Wind Speed Condition: GREEN
Date of Submission
15th July 2021

Report Prepared By
7DSM PROJECTS SDN BHD
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com

Table of Contents
1. Introduction....................................................................................................................................................................... 3
2. Site Details.......................................................................................................................................................................... 3
3. Design Criteria................................................................................................................................................................... 3
4. Equipment and Ancillary Loadings........................................................................................................................... 4
5. Equipment Loading Diagram [Additional Load] ……………………………………………………………………5
6. Summary of Analysis–Additional Load.................................................................................................................... 6
7. Foundation Analysis………………………………………………………………………………………………………………6
8. Conclusion........................................................................................................................................................................... 6

Annexure

A. Tower Profile
B. Results

Page | 2
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com

1. Introduction
This structural analysis report is covered on analysis based on existing loading condition of PDC
Telcommunication tower site at Jalan Teluk Air Tawar, Butterworth, Pulau Pinang .

2. Site Details
The site layout, tower profile, members, bolts & equipment data are referenced from the data
provided by PDC Telecommunication Sdn Bhd .

 Country- Malaysia
 State - Pulau Pinang
 Region- Butterworth
 Site Type- GBT
 Tower Type- Monopole
 Tower Base Height-0.87m
 Base Width- 1.12m OD
 Tower Height- 24m
 Latitude- 5.453097°
 Longitude- 100.383750°

3. Design Criteria
 Design Code
TIA-222 G / BS 5950

 Exposure Category
The site is in Jalan Teluk Air Tawar, Butteworth . There is open terrain around the site. Hence,
we have considered “Exposure C” in analysis.

 Topographic Category
At this site, no abrupt changes in general topography is observed. The site is in flat terrain. So,
we considered “Topographic Category 1”.

 Structure Class
Structure Class II has been considered

 Design Wind Speed


We have considered design wind speed 120kmph/33m/s (3sec Gust); which is operational
wind speed .

 Steel Grade [Monopole]


Tensile strength 350N/mm2

 Bolt Grade
Grade-8.8 bolts has been identified in site.

Page | 3
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com

4. Equipment and Ancillary Loadings

Overall EPA [m2] Total Weight (Kg)

21.12 1181.0

Existing Equipment [from site audit] Site Audit Date:

Dimensions [m]
FPA EPA Weight Height
Type No. (L) (W) (D) Dia Leg Azimuth Antenna Model Number
[m2] [m2] (kg) (m)
GSM 3 2.08 0.3 0.146 - 1.87 2.64 73.50 - 0/90/180 23 missing
GSM 3 2.1 0.58 0.16 - 3.66 5.12 95.40 - 90/180/270 20 missing

GSM 3 2.1 0.58 0.16 - 3.66 5.12 95.40 - 0 /90 24 missing

GSM 1 2.1 0.58 0.16 - 1.22 1.53 38.8 - 180 20 New Antenna
MW 1 - - - 0.67 0.35 0.44 25.6 - 0 23 missing
MW 1 - - - 0.67 0.35 0.44 25.6 - 0 20 missing
MW 1 - - - 0.67 0.35 0.44 25.6 - 270 24 missing
MW 1 - - - 0.67 0.35 0.44 25.6 - 270 20 missing
0/45/90/18 missing
RRU 9 0.4 0.3 0.15 - 1.08 1.35 211.5 - 23
0/215/225
0/45/90/18 missing
RRU 9 0.4 0.3 0.15 - 1.08 1.35 211.5 - 20
0/215/225
0/45/90/18 missing
RRU 9 0.4 0.3 0.15 - 1.08 1.35 211.5 - 24
0/215/225
0/45/90/18 missing
RRU 6 0.4 0.3 0.15 - 0.72 0.9 141 - 20
0/215/225
Summation= 15.77 21.12 1181.0

 FPA- Flat Panel Area;


 EPA-Effective Panel Area;
 22 nos.of 7/8”dia feeder cables to GSM.
 3 nos. of ¼” dia feeder cable to MW.

Page | 4
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com

5. Equipment Loading Diagram [ With Additional Load – 1 antenna 38.8kg]

6. Summary of Analysis–With additional load [ 1 antenna-38.8kg ]


Page | 5
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com

Overall Member Capacities Stress% Status


Maximum Pole Stress Ratio 100% PASS

7. Foundation Analysis
The scope of checking of the reaction and moments induced from the additional load is not within
the scope of the works.

8. Conclusion
The scope of checking of the reaction and moments induced from the additional load is not
within the scope of the works.

1) Tower members and bolts are found to be structurally safe with stresses at 100% with one
(1) additional antenna (38.8kg) at full wind speed condition.

2) The overall EPA is 21.12 m2.

Report Prepared By Report Checked By

Page | 6
Site ID. Perai Monopole Date 15/07/2021
3 Lintang Kurau 5
Taman Chai Leng, 13600 Perai, P Pinang
299, Elephant Road, Dhaka-1205,
+604Bangladesh
3998577
Phone:
E-mail: tskhim@7dsmgroup.com

ANNEXURE

Page | 7
Site ID. Perai Monopole Date 15/07/2021