ENGINEERING ITEMS
LATEST STAGE (16.03.2020)
2.1.6 Infrastructure:
It is submitted that the APREI society has submitted the following proposals from
time to time to the Government to release funds for construction of balance building for
individual schools and also total APR Institutions. The details of works requested to
Government are as follows.
The Government have sanctioned the following funds under varies schemes for
construction of additional buildings in APR Institutions
(Rs. IN LAKHS)
SL Amount
Sanction GOs Name the works Expr Stage of work
No sanctioned
G.O.Rt.No.173, Construction of full-fledged
Completed and
School Education works including compound wall
1 1493.00 1058.51 handed over to the
(TRG) Dept, at S,N.Padu Prakasham
Principal
dt.4.09.2015 District
G.O.Rt.No.1433, Construction of full-fledged
Completed and
School Education works Excluding compound
2 1300.00 889.51 handed over to the
(SE Genl II)Dept, wall at Atmakur, Nellore
Principal
Dt.16.11.2013 District.
2
Dormitory
completed and
handed over, for
G.O.Rt.No.290.
Construction of dormitory, Staff quarters
,School Education
3 Principal Quarters and 4 TSQs 198.00 124.99 flooring, painting
SE Genl II)Dept,
at Vayalpadu, Chittoor District. works are to be
Dt.08.02.2013
completed. Work
stopped for want of
funds
Retenders are to be
called for. Recently
the earlier land was
G.O.Rt.No.351
cancelled and
School Education
Construction of dining hall at allotted new
4 (SE Genl 107.40 0.00
Pileru, Chittoor District. land.(7.00.Acers)
II)Dept,Dt.08.03.20
at Gudarevupalle
13
village, Piler
Mandal, Chittoor
dist.
G.O.Rt.No.22 School Completion of first floor rooms
Education and construction of compound
5 193.00 143.67 Works completed,
(TRG)Dept, wall at Vomaravalli,
Dt.04.02.2015 Srikakulam District.
OHSR Completed,
G.O.Rt.No.103, Repairs to class room, repairs to class
School Education dormitories, construction of rooms, dormitory
6 126.00 45.40
(TRG)Dept, OHSR 40000 Lts at work completed.
Dt.30.04.2015 Bheemunipatnam, Vizag Dt. Final bill pending at
PAO
Budget sanctioned in
2016-17
(U.O.Note.No.440/A Details submitted
7 For construction of buildings 2500.00 2441.51
.III/2016-17, dt: (Annexure A)
04.04.2016) of C &
DSE
Towards maintenance/ Repairs
G.O Rt.No.281,
to the existing Toilet blocks,
School Education Details submitted
8 providing new toilet blocks, 2504.00 1225.80
(TRG) Department, (Annexure B)
improving water supply
dated 28.11.2016
facilities in APR Institutions.
In addition to the above sanctions, the Government have approved the proposals
under NAABARD vide Lr No 26021/1/NAABARD. SP/ 2017 dt 19-06-2017 and allocated an
amount of Rs 50.00 Crores. The DPRs were also submitted by the APREI Society to the
Finance Department for sanction of funds. The orders are awaited.
3
The Government has sanctioned Rs. 50.00 crores to 20 APRE Institutions under NABARD
RIDF-XXIII vide Go No 273. The details are as follows:
Sl. Sanctioned
Types of Buildings Completed progress
No Nos / halls
1 Class rooms 38 26 12
2 Dormitories 57 34 23
3 Kitchen 7 2 5
4 Dining hall 10 4 6
5 Principal Quarters 4 1 3
6 Teaching Quarters 28 15 13
Non-Teaching
7 12 8 4
Quarters
8 Compound wall 3300 1933 1367
2.1.6.1 Buildings:
• Although land was available in respect of five schools, they were running in private
buildings due to non-release of funds for construction of buildings.
EXPLANATORY NOTES:
The Government has sanctioned each Rs. 600.00 lakhs to APR School Nutimadugu
& APR School Chilakaluripeta under NABARD RIDF XXIII towards Construction of full-
fledged buildings. The stages of works are as follows:
Sl. Type of Nos / STAGE OF THE WORKS
NO building Halls NUTIMADUGU CHILAKALURIPETA
01 Class rooms 10 Slab laid Construction Completed
02 Dormitories 04 Basement level Construction Completed
03 Kitchen 01 Construction Completed
04 Dining Hall 01 Construction Completed
Basement level
05 Principal Qr 01 Construction Completed
06 Teaching Qrs 04 Construction Completed
Construction
07 01 Completed Construction Completed
of OHSR
Construction of school building including dormitories, staff quarters for APRS, Atmakur
•
(SPS Nellore district) was sanctioned in 2012-13 at an estimated cost of 13 crores.
The works remained incomplete at slab level (June 2016) for want of funds after
incurring an amount of 5.23 crore.
EXPLANATORY NOTES:
Regarding construction of buildings at APR School Atmakur Nellore District, it is submitted
that the works are completed and handed over to the Principal. The buildings are put in
use by students and staff.
• Construction of dormitories and staff quarters for APRS, Vayalpadu (Chittoor district) was
sanctioned in 2012-13 at an estimated cost of 1.98 crore. The works remained
incomplete (June 2016) for want of funds after incurring 1 .25 crore.
EXPLANATORY NOTES:
i. It is submitted that regarding construction works at APR School Vayalpadu Chittoor
District, the construction of dormitory block was completed and construction of Principal
Quarters-1 and Teaching Quarters-4 are under progress (plastering, flooring and
4
painting works are in pending). The Executive Engineer APEWIDC Chittoor was
requested for early completion of works.
Sl Type of Nos /
Stage Remarks
NO building Halls
The society has already requested the
01 Dormitories 6 Completed Government to release funds for
completion of Principal quarters and
02 Principal Qr 01 Plastering, flooring teaching quarters vide letter Rc.
and painting works No.Engg/A4/782/2014-21 dt:
Teaching are pending 06.07.2020. After receipt of funds the
03 04
Qrs works will be completed in full shape.
As per the formulation of the Engineering wing of APREIS, each residential school is
required to be provided with 27 rooms for accommodating classes, laboratories, library
etc. Audit scrutiny/ physical verification showed the following.
i) In 29 out of 34 residential schools in the State,
there was a shortage of 314 rooms (34 percent) against the requirement of 918
rooms intended for Classrooms, laboratory, library, etc. In 17 out of 36 schools,
the shortfall was more than 10 rooms.
ii) Although additional classrooms were taken up in Girls' schools at Venkatagiri (two
rooms at Rs. 7.29 lakh) and Ammanabrolu (four rooms at Rs. 12 lakh) in 2010-
11 with Rajiv Vidya Mission (RVM) funds, they remained incomplete due to devoid of
flooring, fitting of doors and windows and electrical works. The Principals stated
(February 2016) that works were not completed for want of funds. Shortages of
class rooms were noticed in both the schools.
EXPLANATORY NOTES:
i) Out of total required 779 Classrooms, Laboratories and other rooms 271 rooms are
proposed to construct for the year 2017-18 from the sanctioned funds by the
Government under various schemes.
Out of 271 classrooms, laboratories and other rooms, the Government have
sanctioned 141 classrooms, laboratories and other rooms from 2016-17. The status of
buildings is as detailed below:
ii) Regarding APR School Ammanabrolu Prakasham District, the APREI Society the
additional class rooms were completed and handed over to the Principal and they are
using.
5
2.1.6.3 Dormitories
As per the data furnished by the Engineering wing of APREIS, each residential school
is required to be provided with 10 dormitories to accommodate the children. Audit scrutiny/
physical verification showed the following:
ii) Dormitories were not at all provided in lives out of 34 schools, and in 29 schools
the shortage was more than five against 10 dormitories. As a result, the
existing classrooms were used as dormitories during night.
EXPLANATORY NOTES:
Out of total required 362 Dormitories 146 dormitories are proposed to construct for
the year 2017-18 from the sanctioned funds by the Government under various schemes.
Out of 146 dormitories, the Government have sanctioned 125 Dormitories from
2016-17 to 2020-21 and the status of progress is as follows:
Audit scrutiny/ physical verification showed that there were shortages of dining
halls were noticed in all the 34 schools. There was shortage of 69 dining halls (68 per
cent) against the requirement of 102 halls in the 34 schools. As a result, it was noticed
that the students were dining in open spaces available in the school premises.
EXPLANATORY NOTES:
Out of total required 109 Dining halls 36 dining halls are proposed to construct for
the year 2017-18 from the sanctioned funds by the Government under various schemes.
In test checked APRS (Girls), Venkatagiri, it was observed that 'overhead tank'
was constructed during 2008-09 at a cost of Rs. 9.50 lakh. However, it was not put to
use for want of new bore well which would cost another Rs.1.50 lakh. Thus, due to the
failure in providing a bore well, the tank built at a cost of Rs. 9.50 lakh remained
unutilized.
EXPLANATORY NOTES: -
The Government in G.O. Rt. No. 281, Dt. 28-11-2016, School Education, (Trg.)
Dept. issued sanction orders for an amount of Rs. 25.04 Crores for maintenance/repairs
to the existing Toilet Block and providing Toilet Blocks and improving the water supply
facilities in APRE Institutions under “Capital Grants” head. Accordingly, administrative
sanction orders for the proposed works were issued by the Society. The works have
been entrusted to the Executive Engineer, SSA of the concerned District.
Further, it is submitted that at APRS (Girls), Venkatagiri a separate bore well was
dug and provided water supply to the Overhead tanks and is put in use.
In 10 out 34 schools the shortfall was more than 20 (29 per cent) against 40 toilets
and bathrooms required. The shortfall was particularly high in five 9 residential schools,
where only less than five toilets were provided against the requirement of 40.
Out of total required 2880 Toilets & Bathrooms 1160 Toilets & Bathrooms are
proposed to construct for the year 2017-18 from the sanctioned funds by the Government
under various schemes.
Further it is submitted that 1120 Toilets & Bathrooms from 2016-17 to 2020-21
were sanctioned and the status of the works is as detailed:
7
Sl.
Types of Buildings Sanctioned Completed Progress To be Grounded
No
1 Toilets & Bath rooms 1120 999 25 96
In the Residential school pattern, the children were to be supervised round the clock
by the teachers where they were treated as loco parents of the students. Hence, staff
quarters are very much essential. Government stipulated that all residential schools should
have adequate staff quarters for Principal, Vice-Principal, teaching and non-teaching
staff.
During test check, it was observed in APRS (Girls), Venkatagiri that construction
of 16 staff quarters was taken up in 2006 at an estimated cost of Rs.1.15 crore. However,
construction remained incomplete at basement/ pillars/ slab level and works were
abandoned (January 2008) for want of funds after incurring Rs.33 lakh
EXPLANATORY NOTES:-
The Society vide proceeding Rc.No. Engg/A4/676/06-16 (18) DT: 26.09.2017 has
issued administrative Sanction for Rs. 50.00 lakhs towards Completion of incomplete
quarters and Repairs to existing school and dormitory buildings, but the Principal vide
letter Rc.no.03-2/B/2018 dt: 05.03.2019 has requested the Secretary APREI Society to
divert the funds for construction of 02 class rooms and 02 Laboratories. The work was not
started by Executive Engineer, SSA and the sanctioned funds are lapsed.
a) Principal Quarters:
Out of total required 40 Principal Quarters 17 Quarters were proposed to construct
for the year 2017-18 and out of 17 only, 09 quarters were sanctioned from 2016-17 to
2020-21.
Sl.
Types of Buildings Sanctioned Completed Progress
No
1 Principal Quarters 7 3 4
b) Teaching staff quarters:
Out of total required 906 Teaching staff Quarters 277 Quarters were proposed to
construct for the year 2017-18 out of 277 only 40 Quarters were sanctioned from 2016-
17 to 2020-21.
Sl.
Types of Buildings Sanctioned Completed Progress
No
1 Teaching Quarters 40 23 17
8
Sl.
Types of Buildings Sanctioned Completed Progress
No
1 Non-Teaching Quarters 20 16 4
Audit scrutiny/physical verification by Audit team showed that compound wall was
not provided in 10 out of 34 residential schools including four 1° girls' schools. In another
15 schools including six 11 girls' schools, compound wall was only partially available.
EXPLANATORY NOTES: -
Out of total required 28 Schools (78427 Mts) 04 Institutions (3100 Mts) are
proposed to construct compound wall for the year 2017-18 from the sanctioned funds by
the Government under various schemes
Out of 78427 Rmts of compound wall the Government have sanctioned 6971 Rmts
from 2016-17 to 2020-21 and the status of progress is as follows:
Sl. Types of To be
Sanctioned Completed Progress
No Buildings Grounded
1 Compound wall 6971 2385 2481 2105
Nine out of 11 Residential colleges (Degree College: 1, Junior Colleges: 10) were
functioning in own buildings. The remaining two 12 colleges were running in rented
buildings. Audit scrutiny of data/ details furnished by APREIS and physical verification
of five out of 11 colleges showed that adequate infrastructure facilities were not provided
in the colleges. There was shortage of classrooms (91 against 203 required), dormitories
(39 against 58 required), toilets & bathrooms (224 against 360 required).
Superintending Engineer
APREI Society
10
ENGINEERING ITEMS
LATEST STAGE AS ON 22-07-2021
2.1.6 Infrastructure:
It is submitted that the APREI society has submitted the following proposals
from time to time to the Government to release funds for construction of balance
building for individual schools and also total APR Institutions. The details of works
requested to Government are as follows.
Sl.
Proposal File
N Item of works Amount Scheme
Number
o
construction of additional
Rc.No.Engg/A4/160/1 buildings and also for
Rs 679.25 Additional Funds
1 3-14, dt 10-10- maintenance for existing
lakhs under Capital Grants
2014, dt 30.03.2015 buildings at Mukkavaripalli,
Kadapa District
To improve the infrastructure
Rc.No.Engg/A4/160/8
facilities in APR Schools & Junior Rs.631.73 Additional Funds
2 3-15, dated 06-
Colleges over a period of six crores under Capital Grants
10-2015
years under Capital Grants
Towards improvement of
Lr.Rc.No.Engg/A4/16
minimum requirement of
0/83-16, dt: Rs.314.37 Additional Funds
3 infrastructure faculties in APR
09.02.2016, dt: crores under Capital Grants
Schools & Junior Colleges under
17.03.2016
Capital Grants head.
crores towards providing
additional toilet block,
Rc.No.Engg/A4/160/8 maintenance/ repairs to the Rs 25.04 Additional Funds
4
3-15, dt: 22.08.2015 existing toilet block and Crores under Capital Grants
improving the water supply
facilities in APRE Institutions
Rc.No.Engg/A4/760/1 For completion of ongoing works Rs.1177.00 Additional Funds
5
5-16, dt: 01.07.2016 in 13 institutions. lakhs under Capital Grants
Lr.No.Engg/A4/785/1
Construction of additional Rs.114.05 RIDF NAABARD
6 7-18, dt: 21.09.2016
buildings in 30 APR Institutions Crores
& 03.08.2017
Lr.No.Engg/A4/786/1 Construction of additional Rs 196.00
7 ANNUITY BASIS
7-18, dt: 05.08.2017 buildings in 32 APR Institutions. Crores
The Government have sanctioned the following funds under varies schemes
for construction of additional buildings in APR Institutions
SL Amount
Sanction GOs Name the works Expr Stage of work
No sanctioned
Construction of full-fledged
G.O.Rt.No.173, School
works including compound Completed and handed
1 Education (TRG) Dept, 1493.00 1058.51
wall at S,N.Padu Prakasham over to the Principal
dt.4.09.2015
District
G.O.Rt.No.1433, Construction of full-fledged
School Education works Excluding compound Completed and handed
2 1300.00 889.51
(SE Genl II) Dept, wall at Atmakur, Nellore over to the Principal
Dt.16.11.2013 District.
Dormitory completed and
G.O.Rt.No.290. Construction of dormitory, handed over, for Staff
,School Education SE Principal Quarters and 4 quarters flooring, painting
3 198.00 124.99
Genl II)Dept, TSQs at Vayalpadu, Chittoor works are to be completed.
Dt.08.02.2013 District. Work stopped for want of
funds
11
• Although land was available in respect of five schools, they were running in
private buildings due to non-release of funds for construction of buildings.
12
EXPLANATORY NOTES:
The Government has sanctioned each Rs. 600.00 lakhs to APR School
Nutimadugu & APR School Chilakaluripeta under NABARD RIDF XXIII towards
Construction of full-fledged buildings. The stages of works are as follows:
As per the data furnished by the Engineering wing of APREIS, each residential
school is required to be provided with 10 dormitories to accommodate the children.
Audit scrutiny/ physical verification showed the following:
i) Shortage of dormitories was noticed in all the 34 residential schools.
There was shortage of 257 dormitories (76 per cent) against the
14
Sl.
Types of Buildings Sanctioned Completed Progress
No
1 Non-Teaching Quarters 20 16 4
2.1.6.7 Compound Wall
As per Government's stipulation, all residential schools should have a
compound wall all around the school.
Audit scrutiny/physical verification by Audit team showed that compound wall
was not provided in 10 out of 34 residential schools including four 1° girls' schools.
In another 15 schools including six girls' schools, compound wall was only
partially available.
EXPLANATORY NOTES: -
Out of total required 28 Schools (78427 Mts) 04 Institutions (3100 Mts) are
proposed to construct compound wall for the year 2017-18 from the sanctioned
funds by the Government under various schemes.
APR SCHOOLS:
The Government have included 43 APR Schools under NAADU NEDU
Phase-I project towards maintenance of existing buildings & providing
additional infrastructure facilities. In this project the works are taken up like
repairs to main school block, electrification, paintings, providing of green
chalk boards and construction of new toilet block works are taken up and
completed.
Superintending Engineer