Professional Documents
Culture Documents
2 Kilometer Driven
Km driven this Week ###
###0 0 5 7 9 7 2 Total Km Driven YTD 0 0 0 0 0 0 0 0
3 Reportable incident
This Week Total Y T D This Week Total Y T D
Near Miss ###0 0 0 0 0 Fatalities 0 0 0 0 0
First Aid Cases ###0 0 0 0 0 Fire / Explosions 0 0 0 0 0
Medical Treatment Cases ###0 0 0 0 0 Property Damage 0 0 0 0 0
Restricted Workdays Cases ###0 0 0 0 0 Vehicle Accident 0 0 0 0 0
Lost Time Injurie without disability ###0 0 0 0 0 Environment Accident 0 0 0 0 0
Lost Time Injurie (permanent disability)
###0 0 0 0 0
4 OBSERVASI / PENGAMATAN
Minggu ini Total Y T D
Safe Condition Kondisi Aman ###0 7 0 0 0
Unsafe Con / Kondisi Tidak aman ###0 0 0 0 0
5 Inspection / Inspeksi
This Week Total Y T D
a. Internal Inspeksi ###0 4 0 1 5
b. Joint Inspeksi ###1 0 0 0 0
c. JSA & SIKA ###0 2 0 0 2
d. HSE Meeting ###0 0 0 0 0
e. Environmental Monitoring ###0 7 0 0 7
Finding safety patrol of this Week / Temuan Safety dalam minggu ini.
3 APD , Werrpak personil dilapanagan belum diganti. A.Rivai/Ade Rizki F6/20/2022 Open
Page 1 604135903.xlsx
10
Page 2 604135903.xlsx
Main activities of this Week / Aktivitas utama dalam minggu ini.
1 Pelaksanaan Joint Inspeksi APD. 2 Pelaksanaan Joint Inspeksi kendaraan. 3 Pelaksanaan Joint Inspeksi peralatan kerja.
Foto Foto
4 Pengawasan aktivitas pengangkatan pipa. 5 Pengawasan aktivitas unloading peralatan kerja. 6 Pengawasan aktivitas unloading peralatan kerja.
7 Pengawasan aktivitas unloading pipa. 8 Pengawasan aktivitas welder test. 9 Pelaksanaan PJSM dilokasi pekerjaan.
10 Pelaksanaan PJSM dilokasi pekerjaan. 11 Pengawasan aktivitas pengelasan di lokasi . 12 Pengawasan aktivitas pengelasan di lokasi .
13 Pelaksanaan PJSM dilokasi pekerjaan. 14 Pengawasan aktivitas Pengelasan . 15 Pengawasan aktivitas Pengelasan .
16 Pelaksanaan PJSM dilokasi pekerjaan. 17 Pengawasan aktivitas Penggalian . 18 Pengawasan aktivitas Penggalian .
Page 3 604135903.xlsx
Main activities for next Week / Aktivitas utama satu minggu kedepan
√ Berkelanjutan Melakukan Toolbox Meeting dan PJSM di Lokasi kerja
√ Berkelanjutan Secara Internal melakukan Re-Inspeksi harian Peralatan Kerja dan mesin sebelum di gunakan.
√ Pengawasan aktivitas kritikal , Pengelasan,Pengangkatan material.
√ Berkelanjutan Melakukan Pengurusan Perpanjangan Sika.
Main problem and proposed solution / Masalah utama dan solusi yang di usulkan.
√ Berhati hati selalu untuk kesemua pekerja yang terlibat dan melakukan tahapan pekerjaan secara benar.
√ Pemakaian APD memerlukan perbaikan , tetap secara berkelanjutan memberikan materi pemakaian APD dilokasi kerja.
Prepared By : Acknowledge by :
Page 4 604135903.xlsx
WEEKLY HSE PERFORMANCE REPORT
2 Kilometer Driven
Km driven this Week ###
###0 0 4 5 7 0 8 Total Km Driven YTD 0 0 0 0 0 0 0 0
3 Reportable incident
This Week Total Y T D This Week Total Y T D
Near Miss ###0 0 0 0 0 Fatalities 0 0 0 0 0
First Aid Cases ###0 0 0 0 0 Fire / Explosions 0 0 0 0 0
Medical Treatment Cases ###0 0 0 0 0 Property Damage 0 0 0 0 0
Restricted Workdays Cases ###0 0 0 0 0 Vehicle Accident 0 0 0 0 0
Lost Time Injurie without disability ###0 0 0 0 0 Environment Accident 0 0 0 0 0
Lost Time Injurie (permanent disability)
###0 0 0 0 0
4 OBSERVASI / PENGAMATAN
Minggu ini Total Y T D
Safe Condition Kondisi Aman ###0 7 0 0 0
Unsafe Con / Kondisi Tidak aman ###0 0 0 0 0
5 Inspection / Inspeksi
This Week Total Y T D
a. Internal Inspeksi ###0 4 0 1 5
b. Joint Inspeksi ###1 0 0 0 0
c. JSA & SIKA ###0 5 0 0 5
d. HSE Meeting ###0 0 0 0 0
e. Environmental Monitoring ###0 7 0 0 7
Finding safety patrol of this Week / Temuan Safety dalam minggu ini.
2 Sertifikat Operator TMC belum ada. A.Rivai/Ade Rizki F6/20/2022 X 6/26/2022 Close
3 APD , Werrpak personil dilapanagan belum diganti. A.Rivai/Ade Rizki F6/20/2022 Open
Page 5 604135903.xlsx
10
Page 6 604135903.xlsx
Main activities of this Week / Aktivitas utama dalam minggu ini.
1 Pelaksanaan PJSM dilokasi pekerjaan. 2 Pelaksanaan pengawasan aktivitas pengelasan. 3 Pelaksanaan pengawasan aktivitas pengelasan.
Foto Foto
4 Pelaksanaan pengawasan aktivitas pengelasan. 5 Pelaksanaan pengawasan aktivitas pengelasan. 6 Pelaksanaan pengawasan aktivitas pengelasan.
7 Pengawasan penggalian crossing jalan. 8 Pengawasan aktivitas Holiday test. 9 Pelaksanaan pengawasan aktivitas pengelasan.
10 Pelaksanaan PJSM dilokasi pekerjaan. 11 Pelaksanaan pengawasan aktivitas pengelasan. 12 Pelaksanaan pengawasan aktivitas pengelasan.
13 Pelaksanaan pengawasan aktivitas pengelasan. 14 Pengawasan aktivitas penggalian jalur pipa. 15 Pelaksanaan pengawasan aktivitas pengelasan.
16 Pelaksanaan PJSM dilokasi pekerjaan. 17 Pelaksanaan pengawasan aktivitas pengelasan. 18 Pengawasan aktivitas Radiography.
Page 7 604135903.xlsx
Main activities for next Week / Aktivitas utama satu minggu kedepan
√ Berkelanjutan Melakukan Toolbox Meeting dan PJSM di Lokasi kerja
√ Berkelanjutan Secara Internal melakukan Re-Inspeksi harian Peralatan Kerja dan mesin sebelum di gunakan.
√ Pengawasan aktivitas kritikal , Pengelasan,Pengangkatan material,Penggalian Jalur pipa.
√ Berkelanjutan Melakukan Pengurusan Perpanjangan Sika.
Main problem and proposed solution / Masalah utama dan solusi yang di usulkan.
√ Berhati hati selalu untuk kesemua pekerja yang terlibat dan melakukan tahapan pekerjaan secara benar.
√ Pemakaian APD memerlukan perbaikan , tetap secara berkelanjutan memberikan materi pemakaian APD dilokasi kerja.
√ Segera mungkin melengkapi kebutuhan APD Pekerja di lapangan
Prepared By : Acknowledge by :
Page 8 604135903.xlsx
WEEKLY HSE PERFORMANCE REPORT
2 Kilometer Driven
Km driven this Week ###
###0 0 4 5 7 0 8 Total Km Driven YTD 0 0 0 0 0 0 0 0
3 Reportable incident
This Week Total Y T D This Week Total Y T D
Near Miss ###0 0 0 0 0 Fatalities 0 0 0 0 0
First Aid Cases ###0 0 0 0 0 Fire / Explosions 0 0 0 0 0
Medical Treatment Cases ###0 0 0 0 0 Property Damage 0 0 0 0 0
Restricted Workdays Cases ###0 0 0 0 0 Vehicle Accident 0 0 0 0 0
Lost Time Injurie without disability ###0 0 0 0 0 Environment Accident 0 0 0 0 0
Lost Time Injurie (permanent disability)
###0 0 0 0 0
4 OBSERVASI / PENGAMATAN
Minggu ini Total Y T D
Safe Condition Kondisi Aman ###0 7 0 0 0
Unsafe Con / Kondisi Tidak aman ###0 0 0 0 0
5 Inspection / Inspeksi
This Week Total Y T D
a. Internal Inspeksi ###0 4 0 1 5
b. Joint Inspeksi ###1 0 0 0 0
c. JSA & SIKA ###0 5 0 0 5
d. HSE Meeting ###0 0 0 0 0
e. Environmental Monitoring ###0 7 0 0 7
Finding safety patrol of this Week / Temuan Safety dalam minggu ini.
2 Sertifikat Operator TMC belum ada. A.Rivai/Ade Rizki F6/20/2022 X 6/26/2022 Close
3 APD , Werrpak personil dilapanagan belum diganti. A.Rivai/Ade Rizki F6/20/2022 Open
Page 9 604135903.xlsx
10
Page 10 604135903.xlsx
Main activities of this Week / Aktivitas utama dalam minggu ini.
1 Pelaksanaan PJSM dilokasi pekerjaan. 2 Pelaksanaan pengawasan aktivitas pengelasan. 3 Pelaksanaan pengawasan aktivitas pengelasan.
Foto Foto
4 Pelaksanaan pengawasan aktivitas pengelasan. 5 Pelaksanaan pengawasan aktivitas pengelasan. 6 Pelaksanaan pengawasan aktivitas pengelasan.
7 Pengawasan penggalian crossing jalan. 8 Pengawasan aktivitas Holiday test. 9 Pelaksanaan pengawasan aktivitas pengelasan.
10 Pelaksanaan PJSM dilokasi pekerjaan. 11 Pelaksanaan pengawasan aktivitas pengelasan. 12 Pelaksanaan pengawasan aktivitas pengelasan.
13 Pelaksanaan pengawasan aktivitas pengelasan. 14 Pengawasan aktivitas penggalian jalur pipa. 15 Pelaksanaan pengawasan aktivitas pengelasan.
16 Pelaksanaan PJSM dilokasi pekerjaan. 17 Pelaksanaan pengawasan aktivitas pengelasan. 18 Pengawasan aktivitas Radiography.
Page 11 604135903.xlsx
Main activities for next Week / Aktivitas utama satu minggu kedepan
√ Berkelanjutan Melakukan Toolbox Meeting dan PJSM di Lokasi kerja
√ Berkelanjutan Secara Internal melakukan Re-Inspeksi harian Peralatan Kerja dan mesin sebelum di gunakan.
√ Pengawasan aktivitas kritikal , Pengelasan,Pengangkatan material,Penggalian Jalur pipa.
√ Berkelanjutan Melakukan Pengurusan Perpanjangan Sika.
Main problem and proposed solution / Masalah utama dan solusi yang di usulkan.
√ Berhati hati selalu untuk kesemua pekerja yang terlibat dan melakukan tahapan pekerjaan secara benar.
√ Pemakaian APD memerlukan perbaikan , tetap secara berkelanjutan memberikan materi pemakaian APD dilokasi kerja.
√ Segera mungkin melengkapi kebutuhan APD Pekerja di lapangan
Prepared By : Acknowledge by :
Page 12 604135903.xlsx
WEEKLY HSE PERFORMANCE REPORT
2 Kilometer Driven
Km driven this Week ###
###0 0 4 5 7 0 8 Total Km Driven YTD 0 0 0 0 0 0 0 0
3 Reportable incident
This Week Total Y T D This Week Total Y T D
Near Miss ###0 0 0 0 0 Fatalities 0 0 0 0 0
First Aid Cases ###0 0 0 0 0 Fire / Explosions 0 0 0 0 0
Medical Treatment Cases ###0 0 0 0 0 Property Damage 0 0 0 0 0
Restricted Workdays Cases ###0 0 0 0 0 Vehicle Accident 0 0 0 0 0
Lost Time Injurie without disability ###0 0 0 0 0 Environment Accident 0 0 0 0 0
Lost Time Injurie (permanent disability)
###0 0 0 0 0
4 OBSERVASI / PENGAMATAN
Minggu ini Total Y T D
Safe Condition Kondisi Aman ###0 7 0 0 0
Unsafe Con / Kondisi Tidak aman ###0 0 0 0 0
5 Inspection / Inspeksi
This Week Total Y T D
a. Internal Inspeksi ###0 4 0 1 5
b. Joint Inspeksi ###1 0 0 0 0
c. JSA & SIKA ###0 5 0 0 5
d. HSE Meeting ###0 0 0 0 0
e. Environmental Monitoring ###0 7 0 0 7
Finding safety patrol of this Week / Temuan Safety dalam minggu ini.
2 Sertifikat Operator TMC belum ada. A.Rivai/Ade Rizki F6/20/2022 X 6/26/2022 Close
3 APD , Werrpak personil dilapanagan belum diganti. A.Rivai/Ade Rizki F6/20/2022 Open
Page 13 604135903.xlsx
10
Page 14 604135903.xlsx
Main activities of this Week / Aktivitas utama dalam minggu ini.
1 Pelaksanaan PJSM dilokasi pekerjaan. 2 Pelaksanaan pengawasan aktivitas pengelasan. 3 Pelaksanaan pengawasan aktivitas pengelasan.
Foto Foto
4 Pelaksanaan pengawasan aktivitas pengelasan. 5 Pelaksanaan pengawasan aktivitas pengelasan. 6 Pelaksanaan pengawasan aktivitas pengelasan.
7 Pengawasan penggalian crossing jalan. 8 Pengawasan aktivitas Holiday test. 9 Pelaksanaan pengawasan aktivitas pengelasan.
10 Pelaksanaan PJSM dilokasi pekerjaan. 11 Pelaksanaan pengawasan aktivitas pengelasan. 12 Pelaksanaan pengawasan aktivitas pengelasan.
13 Pelaksanaan pengawasan aktivitas pengelasan. 14 Pengawasan aktivitas penggalian jalur pipa. 15 Pelaksanaan pengawasan aktivitas pengelasan.
16 Pelaksanaan PJSM dilokasi pekerjaan. 17 Pelaksanaan pengawasan aktivitas pengelasan. 18 Pengawasan aktivitas Radiography.
Page 15 604135903.xlsx
Main activities for next Week / Aktivitas utama satu minggu kedepan
√ Berkelanjutan Melakukan Toolbox Meeting dan PJSM di Lokasi kerja
√ Berkelanjutan Secara Internal melakukan Re-Inspeksi harian Peralatan Kerja dan mesin sebelum di gunakan.
√ Pengawasan aktivitas kritikal , Pengelasan,Pengangkatan material,Penggalian Jalur pipa.
√ Berkelanjutan Melakukan Pengurusan Perpanjangan Sika.
Main problem and proposed solution / Masalah utama dan solusi yang di usulkan.
√ Berhati hati selalu untuk kesemua pekerja yang terlibat dan melakukan tahapan pekerjaan secara benar.
√ Pemakaian APD memerlukan perbaikan , tetap secara berkelanjutan memberikan materi pemakaian APD dilokasi kerja.
√ Segera mungkin melengkapi kebutuhan APD Pekerja di lapangan
Prepared By : Acknowledge by :
Page 16 604135903.xlsx
WEEKLY HSE PERFORMANCE REPORT
2 Kilometer Driven
Km driven this Week ###
###0 0 4 5 7 0 8 Total Km Driven YTD 0 0 0 0 0 0 0 0
3 Reportable incident
This Week Total Y T D This Week Total Y T D
Near Miss ###0 0 0 0 0 Fatalities 0 0 0 0 0
First Aid Cases ###0 0 0 0 0 Fire / Explosions 0 0 0 0 0
Medical Treatment Cases ###0 0 0 0 0 Property Damage 0 0 0 0 0
Restricted Workdays Cases ###0 0 0 0 0 Vehicle Accident 0 0 0 0 0
Lost Time Injurie without disability ###0 0 0 0 0 Environment Accident 0 0 0 0 0
Lost Time Injurie (permanent disability)
###0 0 0 0 0
4 OBSERVASI / PENGAMATAN
Minggu ini Total Y T D
Safe Condition Kondisi Aman ###0 7 0 0 0
Unsafe Con / Kondisi Tidak aman ###0 0 0 0 0
5 Inspection / Inspeksi
This Week Total Y T D
a. Internal Inspeksi ###0 4 0 1 5
b. Joint Inspeksi ###1 0 0 0 0
c. JSA & SIKA ###0 5 0 0 5
d. HSE Meeting ###0 0 0 0 0
e. Environmental Monitoring ###0 7 0 0 7
Finding safety patrol of this Week / Temuan Safety dalam minggu ini.
2 Sertifikat Operator TMC belum ada. A.Rivai/Ade Rizki F6/20/2022 X 6/26/2022 Close
3 APD , Werrpak personil dilapanagan belum diganti. A.Rivai/Ade Rizki F6/20/2022 Open
Page 17 604135903.xlsx
10
Page 18 604135903.xlsx
Main activities of this Week / Aktivitas utama dalam minggu ini.
1 Pelaksanaan PJSM dilokasi pekerjaan. 2 Pelaksanaan pengawasan aktivitas pengelasan. 3 Pelaksanaan pengawasan aktivitas pengelasan.
Foto Foto
4 Pelaksanaan pengawasan aktivitas pengelasan. 5 Pelaksanaan pengawasan aktivitas pengelasan. 6 Pelaksanaan pengawasan aktivitas pengelasan.
7 Pengawasan penggalian crossing jalan. 8 Pengawasan aktivitas Holiday test. 9 Pelaksanaan pengawasan aktivitas pengelasan.
10 Pelaksanaan PJSM dilokasi pekerjaan. 11 Pelaksanaan pengawasan aktivitas pengelasan. 12 Pelaksanaan pengawasan aktivitas pengelasan.
13 Pelaksanaan pengawasan aktivitas pengelasan. 14 Pengawasan aktivitas penggalian jalur pipa. 15 Pelaksanaan pengawasan aktivitas pengelasan.
16 Pelaksanaan PJSM dilokasi pekerjaan. 17 Pelaksanaan pengawasan aktivitas pengelasan. 18 Pengawasan aktivitas Radiography.
Page 19 604135903.xlsx
Main activities for next Week / Aktivitas utama satu minggu kedepan
√ Berkelanjutan Melakukan Toolbox Meeting dan PJSM di Lokasi kerja
√ Berkelanjutan Secara Internal melakukan Re-Inspeksi harian Peralatan Kerja dan mesin sebelum di gunakan.
√ Pengawasan aktivitas kritikal , Pengelasan,Pengangkatan material,Penggalian Jalur pipa.
√ Berkelanjutan Melakukan Pengurusan Perpanjangan Sika.
Main problem and proposed solution / Masalah utama dan solusi yang di usulkan.
√ Berhati hati selalu untuk kesemua pekerja yang terlibat dan melakukan tahapan pekerjaan secara benar.
√ Pemakaian APD memerlukan perbaikan , tetap secara berkelanjutan memberikan materi pemakaian APD dilokasi kerja.
√ Segera mungkin melengkapi kebutuhan APD Pekerja di lapangan
Prepared By : Acknowledge by :
Page 20 604135903.xlsx
WEEKLY HSE PERFORMANCE REPORT
2 Kilometer Driven
Km driven this Week ###
###0 0 4 7 1 2 9 Total Km Driven YTD 0 0 0 4 5 7 0 8
3 Reportable incident
This Week Total Y T D This Week Total Y T D
Near Miss ###0 0 0 0 0 Fatalities 0 0 0 0 0
First Aid Cases ###0 0 0 0 0 Fire / Explosions 0 0 0 0 0
Medical Treatment Cases ###0 0 0 0 0 Property Damage 0 0 0 0 0
Restricted Workdays Cases ###0 0 0 0 0 Vehicle Accident 0 0 0 0 0
Lost Time Injurie without disability ###0 0 0 0 0 Environment Accident 0 0 0 0 0
Lost Time Injurie (permanent disability)
###0 0 0 0 0
4 OBSERVASI / PENGAMATAN
Minggu ini Total Y T D
Safe Condition Kondisi Aman ###0 7 0 4 9
Unsafe Con / Kondisi Tidak aman ###0 0 0 0 0
5 Inspection / Inspeksi
This Week Total Y T D
a. Internal Inspeksi ###0 5 0 3 5
b. Joint Inspeksi ###1 0 0 0 0
c. JSA & SIKA ###0 2 0 2 5
d. HSE Meeting ###0 0 0 0 0
e. Environmental Monitoring ###0 7 0 0 7
Finding safety patrol of this Week / Temuan Safety dalam minggu ini.
2 Sertifikat Operator TMC belum ada. A.Rivai/Ade Rizki F6/20/2022 X 6/26/2022 Close
3 APD , Werrpak personil dilapangan belum diganti. A.Rivai/Ade Rizki F6/20/2022 X 6/26/2022 Close
Page 21 604135903.xlsx
10
Page 22 604135903.xlsx
Main activities of this Week / Aktivitas utama dalam minggu ini.
1 Joint Inspeksi Peralatan Hydrotest. 2 Joint Inspeksi Peralatan Hydrotest. 3 Joint Inspeksi Peralatan Hydrotest.
Foto Foto
4 Pelaksanaan PJSM dilokasi pekerjaan. 5 Pengawasan aktivitas pemasangan Valve. 6 Pelaksanaan pengawalan internal Hydrotest.
7 Pelaksanaan PJSM dilokasi pekerjaan. 8 Pengawasan aktivitas Hydrotest. 9 Pengawasan aktivitas Hydrotest.
10 Pelaksanaan PJSM dilokasi pekerjaan. 11 Pengawasan aktivitas Hydrotest. 12 Pengawasan aktivitas Hydrotest.
13 Pelaksanaan PJSM dilokasi pekerjaan. 14 Pengawasan aktivitas Hydrotest. 15 Pengawasan aktivitas Hydrotest.
16 Pelaksanaan Genenral TBM Bersama Pertamina. 17 Pengawasan aktivitas Hydrotest. 18 Pengawasan aktivitas Hydrotest.
Page 23 604135903.xlsx
Main activities for next Week / Aktivitas utama satu minggu kedepan
√ Berkelanjutan Melakukan Toolbox Meeting dan PJSM di Lokasi kerja
√ Berkelanjutan Secara Internal melakukan Re-Inspeksi harian Peralatan Kerja dan mesin sebelum di gunakan.
√ Pengawasan aktivitas kritikal , Hydrotest Pipa.
√ Berkelanjutan Melakukan Pengurusan Perpanjangan Sika.
Main problem and proposed solution / Masalah utama dan solusi yang di usulkan.
√ Berhati hati selalu untuk kesemua pekerja yang terlibat dan melakukan tahapan pekerjaan secara benar.
√ Pemakaian APD secara berkelanjutan memerlukan perbaikan , tetap secara berkelanjutan memberikan materi pemakaian APD dilo
√
Prepared By : Acknowledge by :
Page 24 604135903.xlsx