CONTRACTOR WEEKLY SAFETY REPORT REVISION

Construction of HV/MV lines associated with the No. Date Page


hydroelectric developments of JIJI and MULEMBWE

0 16/02/2020+ 1/4

Originator: SAJILAL.AS
1. Name of the Project: Construction of HV/MV lines associated with the hydroelectric developments of JIJI and MULEMBWE
2. Project Activities Taking Place
The main Project activities during the 3rd week of April 2022
 Site S&H visits
- PPE Inspection
- Housekeeping Inspections
- Vehicle inspection

2.Review of HSE activities that were planned this week activities/ Success rate/ Challenges encountered/ Cost
 General EHS training for the staff and workers at Project , Training includes
1 Environmental Awareness Training
2 General EHS Training
SL.N Training No of Cost for Type Of Duration Percentage Of Total Challenges Encounter
o People The Training of Compilation Expenditure
Attended Training Training for Last Week
1 Equipment Equipment 0BIF External NA 0% 0
Tools Inspection &Tools
2 First Aide 0 NA External 0hrs 0% NA Training agency
Training identification in
progress
3 Environmental 3 NA Internal 8hrs 5% NA Under Progress
Training
4 Fire Fighting 0 NA Internal 0hrs 2% NA Under Progress
Training
5 General EHS 11 NA Internal 11hrs 6% NA Under Progress
Training
5 ERT 0 NA External 0hrs 0% NA Training agency
identification in
CONTRACTOR WEEKLY SAFETY REPORT REVISION

Construction of HV/MV lines associated with the No. Date Page


hydroelectric developments of JIJI and MULEMBWE

0 16/02/2020+ 2/4

progress

5.Sanctions and performance of workers on the site for this week / Sanctions (penalties) and performance of workers on the site for this
week

Sl.No Sanctions Suspension Penalty EHS Violation Memo Sub Contractor Date Remarks
/Penalty /warning
1 Work stoppage NA NA NA NA 11/04/2022 TO
16/04/2022
2 Suspension NA NA NA NA 11/04/2022 TO
16/04/2022
3 EHS Violation NA NA NA NA 11/04/2022 TO
Memo 16/04/2022

6.New HSE measures or strategies planned (planned) for improvement / New HSE measures and strategies projected (planned) for
improvement

Sl.No Activity Existing HSE Measures Improvement Projection Date Of Compliance


Improvement
1 Foundation Toolbox Talk /Risk Assessment Pre-Start Checklist Before NA 0%
/Continues Supervision/Covid 19 commencing Activity
Prevention Protocol
2 Tower Erection Toolbox Talk /Risk Assessment Pre-Start Checklist /permit NA 0%
/Continues Supervision/Covid 19 System
Prevention Protocol
3 Stringing Tool Box Talk /Risk Assessment Pre-Start Checklist /permit
/Continues Supervision/Covid 19 System NA 0%
Prevention Protocol
CONTRACTOR WEEKLY SAFETY REPORT REVISION

Construction of HV/MV lines associated with the No. Date Page


hydroelectric developments of JIJI and MULEMBWE

0 16/02/2020+ 3/4

4 General EHS Stringing /Erection/Foundation EHS Checklist 5/06/2022 5%


Checklist
8.HS WEEKLY DATA
Frequency Rate (FR) = 0.00 (preliminary formula - for discussion)
Cumulative HSE Weekly Data

Description Near First Aid Medical Restricted Lost Time Fatality Environmental Road Property damage
Misses Cases Treatment Work Incidents Incidents Traffic
cases Cases (LTI) Accident
This Week 0 0 0 0 0 0 0 0 0

Cumulative 0 0 0 0 0 0 0 0 0

Frequency Rate (FR) = 0.00 (preliminary formula - for discussion)

Severity Rate (SR) = 0.00

Severity Rate (SR) = 0.00


Reporting Week
Description Manpower 11/04/2022 TO16/04/2022 Cumulative

Indirect Staff Hours 0 0 0


Total Indirect Hours 0 0 0
Direct Construction Hours 37 1710 5150
Total Direct Hours 37 1710 5150
CONTRACTOR WEEKLY SAFETY REPORT REVISION

Construction of HV/MV lines associated with the No. Date Page


hydroelectric developments of JIJI and MULEMBWE

0 16/02/2020+ 4/4

Grand Total 37 1710 5150