PETROCHINA

CONTRACTOR DAILY REPORT Document NO

Project Name: DQ013 Well HF0397 M0397 D1

Safety Rep: Abdul Hafeez Date: 05-April-2018


To be completed every day before 18:00
Sr.
Description Today Cumulative Remarks
No.
1. Near Misses 0 0

2. H.S.E Induction Training 0/0 1/6

No of In-house H.S.E Training carried


3. 0/0 1/20
out /No of personnel attended

No of Tool Box Meeting carried out/No


4. 3/45 6/87
of personnel attended

5. H.S.E Meeting 1 2

6. H.S.E Inspections 0 0

7. H.S.E Audits 0 0

8. Emergency Evacuation Drills 0 0

9. Safety Awards Distributed 0 0

10. Safety Violations Reported 0 0

11. STOP CARDS Received 2 10

12. Vehicles Check Performed 0 2

13. Self Inspection 0 0


Training Topic: “Day was not schedule for training”
HSE Meeting Topic: “Cement job”
Current Operation: “RIH 7” Casing, Cement Job & Forklift Operation”

Other safety activities:

 Weekly Hand Tools, Draw Works, Slings and Shackles inspections.


 Monthly ELCB & Fire pump Inspection.

Garbage(kg) Sewage(m3) Oil Filters(ea) Location


40 01 0 HF0397 M0397 D1

Completed By: Abdul Hafeez Date:05/April/2018

Drilling Supervisor: Yao Xiaoli Date:05/April/2018