You are on page 1of 115

Cairo University - Faculty of Engineering

Irrigation and Hydraulics Department

Design of
Shallow Production Groundwater Wells

1- Well Construction
in Phreatic
(Unconfined) Aquifer
Lecture # 2
Prepared by
Prof. Dr. Reda M El-Damak
2022
Design of
Shallow Production Groundwater Wells
Lecture # 2
Design of
Shallow Production Groundwater Wells
Lecture # 2
1- Well Construction in Phreatic
(Unconfined) Aquifer
Design of
Shallow Production Groundwater Wells
Lecture # 2

1- Casing (Well) Diameter , D-casing 1- Well Construction in Phreatic


2- Drilling Diameter , D-drilling (Unconfined) Aquifer
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well
Design of
Shallow Production Groundwater Wells
Lecture # 2

1- Casing (Well) Diameter , D-casing 1- Well Construction in Phreatic


2- Drilling Diameter , D-drilling (Unconfined) Aquifer
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well

7- Gravel Pack & Surface Cementing


8- Plain Concrete Cap
Design of
Shallow Production Groundwater Wells
Lecture # 2

1- Casing (Well) Diameter , D-casing 1- Well Construction in Phreatic


2- Drilling Diameter , D-drilling (Unconfined) Aquifer
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well

7- Gravel Pack & Surface Cementing


8- Plain Concrete Cap

9- Well Pump & Riser Pipe


10- Pump Setting
Design of
Shallow Production Groundwater Wells
Lecture # 2

1- Casing (Well) Diameter , D-casing 1- Well Construction in Phreatic


2- Drilling Diameter , D-drilling (Unconfined) Aquifer
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well

7- Gravel Pack & Surface Cementing


8- Plain Concrete Cap

9- Well Pump & Riser Pipe


10- Pump Setting

11- Well Cover


Design of
Shallow Production Groundwater Wells
Lecture # 2

1- Casing (Well) Diameter , D-casing 1- Well Construction in Phreatic


2- Drilling Diameter , D-drilling (Unconfined) Aquifer
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well

7- Gravel Pack & Surface Cementing


8- Plain Concrete Cap

9- Well Pump & Riser Pipe


10- Pump Setting

11- Well Cover


12- Well Head Design
Design of Shallow Production Groundwater Well
1- Casing (Well) Diameter , D-casing
2- Drilling Diameter , D-drilling
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well
7- Gravel Pack & Surface Cementing
8- Plain Concrete Cap
9- Well Pump & Riser Pipe
10- Pump Setting
11- Well Cover

12- Well Head Design


Design of Shallow Production Groundwater Well
1- Casing (Well) Diameter , D-casing
2- Drilling Diameter , D-drilling
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well
Example 1 :
Q w = 95 M3/hr

static water level

Phreatic
Aquifer
Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr

static water level

Phreatic
Aquifer
Example 1 :
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m Q = 95 M3/hr

Depth to SWL = 30 m

Phreatic
Aquifer
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing

2- Drilling Diameter , D-drilling

3- Length of Casing , L -casing

4- Length of Screen, L-screen

5- Length of Sand Trap, L-sand trap


Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing

2- Drilling Diameter , D-drilling

3- Length of Casing , L -casing

4- Length of Screen, L-screen


1- Casing
5- Length of Sand Trap, L-sand trap (Well) Diameter
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

2- Drilling
1- Casing ( Well) Diameter , D- casing Diameter

2- Drilling Diameter , D-drilling

3- Length of Casing , L -casing

4- Length of Screen, L-screen


1- Casing
5- Length of Sand Trap, L-sand trap (Well) Diameter
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

2- Drilling
1- Casing ( Well) Diameter , D- casing Diameter

2- Drilling Diameter , D-drilling 3- L-Casing

3- Length of Casing , L -casing

4- Length of Screen, L-screen


1- Casing
5- Length of Sand Trap, L-sand trap (Well) Diameter
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

2- Drilling
1- Casing ( Well) Diameter , D- casing Diameter

2- Drilling Diameter , D-drilling 3- L-Casing

3- Length of Casing , L -casing

4- Length of Screen, L-screen


1- Casing
5- Length of Sand Trap, L-sand trap (Well) Diameter

4- L-Screen
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

2- Drilling
1- Casing ( Well) Diameter , D- casing Diameter

2- Drilling Diameter , D-drilling 3- L-Casing

3- Length of Casing , L -casing

4- Length of Screen, L-screen


1- Casing
5- Length of Sand Trap, L-sand trap (Well) Diameter

4- L-Screen

5- L-Sand Trap
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

2- Drilling
1- Casing ( Well) Diameter , D- casing Diameter

2- Drilling Diameter , D-drilling 3- L-Casing

3- Length of Casing , L -casing Total


Well
4- Length of Screen, L-screen Length

1- Casing
5- Length of Sand Trap, L-sand trap (Well) Diameter

4- L-Screen
Total Well Length =
L- Casing +
L- Screen +
L- Sand Trap 5- L-Sand Trap
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing


2- Drilling Diameter , D-drilling
2- Drilling
Diameter

1- Casing
(Well) Diameter
1- Casing ( Well) Diameter , D- casing Q
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter

D1- Well Pump


Diameter
1- Casing ( Well) Diameter , D- casing Q
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter

D1- Well Pump


Diameter

Submersible Well Pump


1- Casing ( Well) Diameter , D- casing Q
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter

D1- Well Pump


D1- Well Pump Diameter Diameter

Submersible Well Pump


1- Casing ( Well) Diameter , D- casing
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter

D1- Well Pump


Diameter
1- Casing ( Well) Diameter , D- casing
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter

D2- Casing or Well Diameter

D1- Well Pump


Diameter

D2- Casing or
Well Diameter
1- Casing ( Well) Diameter , D- casing
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter D3- Drilling


Diameter
D2- Casing or Well Diameter

D1- Well Pump


Diameter
D3- Drilling Diameter
D2- Casing or
Well Diameter
1- Casing ( Well) Diameter , D- casing
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter D3- Drilling


Diameter

D1- Well Pump


Diameter

D2- Casing or
Well Diameter
1- Casing ( Well) Diameter , D- casing Q
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter D3- Drilling


Diameter
D2- Casing or Well Diameter > D1- pump

D1- Well Pump


Diameter

D2- Casing or
Well Diameter
1- Casing ( Well) Diameter , D- casing Q
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter D3- Drilling


Diameter
D2- Casing or Well Diameter > D1- pump

D2- Casing or Well Diameter > D1- pump + 2 inches

D1- Well Pump


Diameter

D2- Casing or
Well Diameter
1- Casing ( Well) Diameter , D- casing Q
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter D3- Drilling


Diameter
D2- Casing or Well Diameter > D1- pump

D2- Casing or Well Diameter > D1- pump + 2 inches

D1- Well Pump


Diameter
D3- Drilling Diameter > D2- casing
D2- Casing or
Well Diameter
1- Casing ( Well) Diameter , D- casing Q
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter D3- Drilling


Diameter
D2- Casing or Well Diameter > D1- pump

D2- Casing or Well Diameter > D1- pump + 2 inches

D1- Well Pump


Diameter
D3- Drilling Diameter > D2- casing
D2- Casing or
Well Diameter
D3- Drilling Diameter > D2- casing + 6 inches
1- Casing ( Well) Diameter , D- casing Q
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter D3- Drilling


Diameter
D2- Casing or Well Diameter > D1- pump

D2- Casing or Well Diameter > D1- pump + 2 inches

D1- Well Pump


Diameter
D3- Drilling Diameter > D2- casing
D2- Casing or
Well Diameter
D3- Drilling Diameter > D2- casing + 6 inches

D1 (Well Pump Diameter)

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


Q
1- Casing ( Well) Diameter , D- casing
2- Drilling Diameter , D-drilling

D1- Well Pump Diameter D3- Drilling


Diameter
D2- Casing or Well Diameter > D1- pump

D2- Casing or Well Diameter > D1- pump + 2 inches

D1- Well Pump


Diameter
D3- Drilling Diameter > D2- casing
D2- Casing or
Well Diameter
D3- Drilling Diameter > D2- casing + 6 inches

D1 (Well Pump Diameter)

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


Example 1 :
Q
Q w = 90 M3/hr
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing


2- Drilling Diameter , D-drilling
D3- Drilling
D1 (Well Pump Diameter) Diameter

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


D1- Well Pump
Diameter

D2- Casing or
Well Diameter
D1- Well Pump Diameter

D1- Well Pump Diameter

Submersible Well Pump


Example 1 :
Q
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing


2- Drilling Diameter , D-drilling
D3- Drilling
D1 (Well Pump Diameter) Diameter

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


D1- Well Pump
Diameter

D2- Casing or
Well Diameter
Example 1 :
Q
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing


2- Drilling Diameter , D-drilling
D3- Drilling
D1 (Well Pump Diameter) Diameter

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


D1- Well Pump
Diameter

D2- Casing or
Well Diameter
Example 1 :
Q
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing


2- Drilling Diameter , D-drilling
D3- Drilling
D1 (Well Pump Diameter) Diameter

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


D1- Well Pump
Diameter

D2- Casing or
Well Diameter
Example 1 :
Q
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing


2- Drilling Diameter , D-drilling
D3- Drilling
D1 (Well Pump Diameter) Diameter

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


D1- Well Pump
Diameter

D2- Casing or
Well Diameter

Pump Diameter (D1) ~ 8 inches


Example 1 :
Q
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing


2- Drilling Diameter , D-drilling
D3- Drilling
D1 (Well Pump Diameter) Diameter

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


D1- Well Pump
Diameter

D2- Casing or
Well Diameter

Pump Diameter (D1) ~ 8 inches


Casing Diameter (D2) > 8 + 2 > 10 inches
Example 1 :
Q
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m

1- Casing ( Well) Diameter , D- casing


2- Drilling Diameter , D-drilling
D3- Drilling
D1 (Well Pump Diameter) Diameter

1- Casing Diameter (D2) ≥ D1 + 2 inches

2- Drilling Diameter (D3) ≥ D2 + 6 inches


D1- Well Pump
Diameter

D2- Casing or
Well Diameter

Pump Diameter (D1) ~ 8 inches


Casing Diameter (D2) > 8 + 2 > 10 inches
Drilling Diameter (D3) > 10 + 6 > 16 = 17.5 inches
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing

3- L-Casing
Example 1 :
Q w = 95 M3/hr
Q = 90 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing

L-casing ≥ 1.0 m + h + Max Sw


+ 5.0 m + length of pump
+ L (as a factor of safety)

3- L-Casing
Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

L-casing ≥ 1.0 m + h + Max Sw


+ 5.0 m + length of pump
+ L (as a factor of safety)

❶ 1.0 m : height above Ground Surface


3- L-Casing
❷ h : Depth to static water level

❸ Sw : Max permissible Drawdown

❹ 5.0m : Min water height above pump

❺ Length of pump

❻ L : distance as a factor of safety


Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

h = 30.0 m
L-casing ≥ 1.0 m + h + Max Sw
+ 5.0 m + length of pump
+ L (as a factor of safety)

❶ 1.0 m : height above Ground Surface


3- L-Casing
❷ h : Depth to static water level

❸ Sw : Max permissible Drawdown

❹ 5.0m : Min water height above pump

❺ Length of pump

❻ L : distance as a factor of safety


Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

h = 30.0 m
L-casing ≥ 1.0 m + h + Max Sw
+ 5.0 m + length of pump
+ L (as a factor of safety) Max Sw

❶ 1.0 m : height above Ground Surface


3- L-Casing
❷ h : Depth to static water level

❸ Sw : Max permissible Drawdown

❹ 5.0m : Min water height above pump

❺ Length of pump

❻ L : distance as a factor of safety


Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

h = 30.0 m
L-casing ≥ 1.0 m + h + Max Sw
+ 5.0 m + length of pump
+ L (as a factor of safety) Max Sw

5.0 m
❶ 1.0 m : height above Ground Surface
3- L-Casing
❷ h : Depth to static water level

❸ Sw : Max permissible Drawdown

❹ 5.0m : Min water height above pump

❺ Length of pump

❻ L : distance as a factor of safety


Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

h = 30.0 m
L-casing ≥ 1.0 m + h + Max Sw
+ 5.0 m + length of pump
+ L (as a factor of safety) Max Sw

5.0 m
❶ 1.0 m : height above Ground Surface
3- L-Casing Length of pump
❷ h : Depth to static water level

❸ Sw : Max permissible Drawdown

❹ 5.0m : Min water height above pump

❺ Length of pump

❻ L : distance as a factor of safety


Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

h = 30.0 m
L-casing ≥ 1.0 m + h + Max Sw
+ 5.0 m + length of pump
+ L (as a factor of safety) Max Sw

5.0 m
❶ 1.0 m : height above Ground Surface
3- L-Casing Length of pump
❷ h : Depth to static water level
L
❸ Sw : Max permissible Drawdown

❹ 5.0m : Min water height above pump

❺ Length of pump

❻ L : distance as a factor of safety


Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

h = 30.0 m
L-casing ≥ 1.0 m + h + Max Sw
+ 5.0 m + length of pump
+ L (as a factor of safety) Max Sw

Assume : 5.0 m
Max permissible Sw ~ 10.0 m
Length of pump ~ 3.0 m 3- L-Casing Length of pump
L ~ 2.0 m L
Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

h = 30.0 m
L-casing ≥ 1.0 m + h + Max Sw
+ 5.0 m + length of pump
+ L (as a factor of safety) Max Sw

Assume : 5.0 m
Max permissible Sw ~ 10.0 m
Length of pump ~ 3.0 m 3- L-Casing Length of pump
L ~ 2.0 m L

L casing ≥ 1.0 m + h + Max Sw + 5.0 m


+ length of pump + 2.0 m

L casing ≥ 1.0 + 30.0 + 10.0 + 5.0


+ 3.0 +2.0 ≥ 51.0 m
Example 1 :
Q w = 95 M3/hr
Q = 95 M3/hr
Depth to static water level (SWL) = 30 m

3- Length of Casing , L -casing 1.0 m

h = 30.0 m
L-casing ≥ 1.0 m + h + Max Sw
+ 5.0 m + length of pump
+ L (as a factor of safety) Max Sw

Assume : 5.0 m
Max permissible Sw ~ 10.0 m
Length of pump ~ 3.0 m 3- L-Casing Length of pump
L ~ 2.0 m L

L casing ≥ 1.0 m + h + Max Sw + 5.0 m


+ length of pump + 2.0 m

L casing ≥ 1.0 + 30.0 + 10.0 + 5.0


+ 3.0 +2.0 ≥ 51.0 m

L casing = 54.0 m
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Screen Diameter
(D)

4- L-Screen
Example 1 :
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m Q

4- Length of Screen, L-screen

Q = Well discharge = As x Ve
As = Opening Area

Ve = Entrance velocity

Screen Diameter
Screen
(D)Diameter
(D)
4- L-Screen
4- L-Screen
Example 1 :
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m Q

4- Length of Screen, L-screen

Q = Well discharge = As x Ve
As = Opening Area

Ve = Entrance velocity

Screen Diameter
Screen
(D)Diameter
(D)
4- L-Screen
4- L-Screen
Example 1 :
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m Q

4- Length of Screen, L-screen


D

L-screen

Screen Diameter
Screen
(D)Diameter
(D)
4- L-Screen
4- L-Screen

As = Opening Area
Example 1 :
Q
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m Q

4- Length of Screen, L-screen


D

L-screen

Screen Diameter
Screen
(D)Diameter
(D)
4- L-Screen
4- L-Screen

As = Opening Area
= (π x D) x L-screen x Opening ratio
D = Screen outer diameter
Opening ratio = ( 10 - 8.0 ) %
Example 1 :
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m Q

4- Length of Screen, L-screen

Q = Well discharge = As x Ve
As = Opening Area

Ve = Entrance velocity

Screen Diameter
Screen
(D)Diameter
(D)
4- L-Screen
4- L-Screen
Example 1 :
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m Q

4- Length of Screen, L-screen

Q = Well discharge = As x Ve
As = Opening Area
= (π x D) x L-screen x Opening ratio

Ve = Entrance velocity

Screen Diameter
Screen
(D)Diameter
(D)
4- L-Screen
4- L-Screen
Example 1 :
Q w = 95 M3/hr
Depth to static water level (SWL) = 30 m Q

4- Length of Screen, L-screen

Q = Well discharge = As x Ve
As = Opening Area
= (π x D) x L-screen x Opening ratio

Ve = Entrance velocity
= ( 0.03 – 0.01 m /sec )
Screen Diameter
Screen
(D)Diameter
(D)
4- L-Screen
4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve

Screen Diameter =
Casing Diameter =
(D)

Screen Diameter
(D)

4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve

Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
(D)
4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------
(π x D) x 0.08 x Ve

Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
(D)
4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------ x FS (1.25)
(π x D) x 0.08 x Ve

Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
(D)
4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------ x FS (1.25)
(π x D) x 0.08 x Ve

Q = 95 M3/hr = 0.0264 m3/sec

Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
(D)
4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------ x FS (1.25)
(π x D) x 0.08 x Ve

Q = 95 M3/hr = 0.0264 m3/sec


D = 10 inches = 250 mm = 0.250 m
Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
(D)
4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------ x FS (1.25)
(π x D) x 0.08 x Ve

Q = 95 M3/hr = 0.0264 m3/sec


D = 10 inches = 250 mm = 0.250 m
Ve = 0.02 m/sec Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
(D)
4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------ x FS (1.25)
(π x D) x 0.08 x Ve

Q = 95 M3/hr = 0.0264 m3/sec


D = 10 inches = 250 mm = 0.250 m
Ve = 0.02 m/sec Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
Opening ratio = 8.0 % (D)
4- L-Screen
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------ x FS (1.25)
(π x D) x 0.08 x Ve

Q = 95 M3/hr = 0.0264 m3/sec


D = 10 inches = 250 mm = 0.250 m
Ve = 0.02 m/sec Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
Opening ratio = 8.0 % (D)
4- L-Screen
0.0264
L = ----------------------------------- X 1.25
3.14 x 0.250 x 0.08 x 0.02
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------ x FS (1.25)
(π x D) x 0.08 x Ve

Q = 95 M3/hr = 0.0264 m3/sec


D = 10 inches = 250 mm = 0.250 m
Ve = 0.02 m/sec Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
Opening ratio = 8.0 % (D)
4- L-Screen
0.0264
L = ----------------------------------- X 1.25
3.14 x 0.250 x 0.08 x 0.02

L screen = 26.26 m
Example 1 :
Q
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

4- Length of Screen, L-screen

Q = As x Ve
Q = ( π x D x L-screen x 0.08 ) x Ve
Q
L-screen = ------------------------ x FS (1.25)
(π x D) x 0.08 x Ve

Q = 95 M3/hr = 0.0264 m3/sec


D = 10 inches = 250 mm = 0.250 m
Ve = 0.02 m/sec Screen
ScreenDiameter
Diameter =
Casing(D)
Diameter =
Opening ratio = 8.0 % (D)
4- L-Screen
0.0264
L = ----------------------------------- X 1.25
3.14 x 0.250 x 0.08 x 0.02

L screen = 26.26 m = 30.0 m


Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

5- Length of Sand Trap, L-sand trap

5- L-Sand Trap
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

5- Length of Sand Trap, L-sand trap

5- L-Sand Trap
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

5- Length of Sand Trap, L-sand trap

Length of Sand Trap = 6.0 m

5- L-Sand Trap
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

Total Well Length

3- L-Casing

Total
Well
Length

4- L-Screen

5- L-Sand Trap
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

Total Well Length

Total Well Length = 3- L-Casing

L- Casing + Total
Well

L- Screen + Length

L- Sand Trap
4- L-Screen

5- L-Sand Trap
Example 1 :
Q w = 95 M3/hr Q
Depth to static water level (SWL) = 30 m

Total Well Length

Total Well Length = 3-54.0


L-Casing
m

L- Casing + Total
Well

L- Screen + Length

L- Sand Trap
4-30.0
L-Screen
m

Total Well Length =


54.0 + 30.0 + 6.0 = 90.0 m

6.0 mTrap
5- L-Sand
Design of Shallow Production Groundwater Well
1- Casing (Well) Diameter , D-casing
2- Drilling Diameter , D-drilling
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well = L casing + L screen + L sand trap
Design of Shallow Production Groundwater Well
1- Casing (Well) Diameter , D-casing
2- Drilling Diameter , D-drilling
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well = L casing + L screen + L sand trap
7- Gravel Pack & Surface Cementing
8- Plain Concrete Cap
7- Gravel Pack & Surface Cementing

Cementing

Gravel Pack
7- Gravel Pack & Surface Cementing

Gravel Pack
7- Gravel Pack & Surface Cementing

Gravel Pack
7- Gravel Pack & Surface Cementing

Gravel Pack
7- Gravel Pack & Surface Cementing

Aquifer Aquifer
Gravel Pack Well Screen

A filter of gravel pack (size 3-6 mm diameter) is


placed between the borehole wall and screen
to reduce the entrance velocity.
7- Gravel Pack & Surface Cementing

Aquifer Aquifer
Gravel Pack Well Screen

A filter of gravel pack (size 3-6 mm diameter) is


placed between the borehole wall and screen
to reduce the entrance velocity.

Filter is used to settle-out fine grained particles


that may enter the well and may reduce the
opening area of screen.
7- Gravel Pack & Surface Cementing

Aquifer Gravel Pack Well Screen Aquifer

Design of
Gravel Pack
Depend on
Aquifer
Material
Sieve Analysis
7- Gravel Pack & Surface Cementing

Aquifer Gravel Pack Well Screen Aquifer

Design of
Gravel Pack
Depend on
Aquifer
Material
Sieve Analysis
7- Gravel Pack & Surface Cementing

Surface Cementing
7- Gravel Pack & Surface Cementing

Surface Cementing

A top cementing is placed from the top of gravel pack to the


ground surface
to prevent and reduce contaminated surface & subsurface
water entering the well
8- Plain Concrete Cap

Plain Concrete Cap


8- Plain Concrete Cap

Plain Concrete Cap

Plain Concrete Cap ( 1.50 x × 1.50 × 0.5 m )


is placed around surface well casing to keep
contaminated surface water away from the well
Design of Shallow Production Groundwater Well
1- Casing (Well) Diameter , D-casing
2- Drilling Diameter , D-drilling
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well = L casing + L screen + L sand trap
7- Gravel Pack & Surface Cementing
8- Plain Concrete Cap
9- Well Pump & Riser Pipe
10- Pump Setting
9- Well Pump & Riser Pipe Q

10- Pump Setting

Pump Setting
Riser Pipe

Well Pump
9- Well Pump & Riser Pipe Q

10- Pump Setting

Lecture # 4
Pump Setting
Riser Pipe
4- Step Pumping Test &
Selection of Well Pump
Well Pump
Design of Shallow Production Groundwater Well
1- Casing (Well) Diameter , D-casing
2- Drilling Diameter , D-drilling
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well = L casing + L screen + L sand trap
7- Gravel Pack & Surface Cementing
8- Plain Concrete Cap
9- Well Pump & Riser Pipe
10- Pump Setting
11- Well Cover
11- Well Cover

Well Cover
11- Well Cover

Well Cover

Well Cover is placed to protect well


Electric Cable

Riser Pipe

Well Pump
A- Electric National Grid
A- Electric National Grid

AC (Alternating Current)

1- AC Well Pump
2- Rising Pipe
3- Discharge Pipe
4- Transformer
5- Control Unit
6 - Cables
A- Electric National Grid
B- Generator & Fuel Tank
1- AC Well Pump
2- Rising Pipe
3- Discharge Pipe
4- Fuel Tank
5- Generator
B- Generator & Fuel Tank
6- Control Unit
7- Cables
C- Electricity from the sun
C- Electricity from the sun

Photovoltaic (PV) Array


C- Electricity from the sun

1- Solar DC Well Pump


2- Rising Pipe
3- Discharge Pipe
4- PV Array
5- Stand
Photovoltaic (PV) Array 6- Controller DC (Direct Current)
7- Cables
C- Electricity from the sun

Inverter
DC/AC

1- AC Well Pump

1- AC Well Pump
2- Rising Pipe
3- Discharge Pipe
4- PV Array
5- Stand
Photovoltaic (PV) Array 6- Controller & Inverter
7- Cables
Design of Shallow Production Groundwater Well
1- Casing (Well) Diameter , D-casing
2- Drilling Diameter , D-drilling
3- Length of Casing , L -casing
4- Length of Screen, L -screen
5- Length of Sand Trap, L -sand trap
6- Length of Well
7- Gravel Pack & Surface Cementing
8- Plain Concrete Cap
9- Well Pump & Riser Pipe
10- Pump Setting
11- Well Cover

12- Well Head Design


12- Well Head
12- Well Head

1- Bend 90o
2- Air Valve
3- Pressure Gauge
4- Check Valve

5- Gate Valve
6- Flow Meter
7- Discharge Pipe
8- Concrete Support
12- Well Head

1- Bend 90o
2- Air Valve
3- Pressure Gauge
4- Check Valve

5- Gate Valve
6- Flow Meter
7- Discharge Pipe
8- Concrete Support

Lecture # 4
Thanks
Thanks

You might also like