Development relating to the use of land and/or buildings are not included in this list.the list
of items also does not apply to buildings:
You should check if you need to obtain clearance/approvals from other authorities or to
comply with caveat and by-laws which may apply to your premises. These include rules
and regulations of the Management Corporation.
HOW TO READ
TABLE Street & Access Road
Works or Structures for Temporary Use
Perimeter Fence, Boundary Wall, etc.
Site Layout
Exterior of a Building
Interior of a Building
BACK TO TOP
Back To
about:blank 1/1
Street & Access Road
SN Description Remarks
1 Maintenance and/or improvement work ---
carried out to a street by a statutory
authority.
i. trade fair,
ii. trade exposition,
iii. funfair,
iv. carnival,
v. athletics or sports meet,
vi. festive bazaar, festive sale, festive
entertainment,
vii. religious entertainment, religious
ceremony,
viii. opening ceremony,
ix. funeral wake,
x. wedding reception, and
xi. wayang;
SN Description Remarks
except for the use of land for any open
cinema, for not more than a total of 90
days within a calendar year; provided
that:
21 Building works carried out for or in URA's approval is not required if:
connection with any plinth, platform or
other base with a visible height not
exceeding 1,000mm from the ground level a. it is within industrial /warehouse
and erected for the purpose of supporting development only, and
any mechanical plant, tank, equipment, b. it complies with the green buffer
machinery or other components (other and requisite setback requirement.
than a building).
Exterior of a Building
SN Description Remarks
22 Painting of the exterior of any building. ---
25 Installation of any roller shutter or grille URA's approval is not required if such
door. installation is carried out for approved or
existing door only.
40 Replacement of existing floor and wall This is not applicable to repaving of the
finishes. covered and open walkways within the
Civic District as approval is required to be
obtained from LTA’s Development and
Building Control Division and URA’s
Development Control Group. For detail,
please refer to our Circular No :
URA/PB/2009/22-CUDG (Date : 05 Oct
2009)