You are on page 1of 44

Risk=Probabilit

y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

Wet Floor signage’s are used.

Floors are immediately dried after water spills or cleaning


If water spills are unnoticed, it may cause trip and
1 Slips & Trips 1 3 3 Housekeeping Supervisor
staff may fall and injure themself.
Staff are trained on Slips and trips

Floor cleaning are done early morning and late night.

Soldering Gun are used at Workstation only

Soldering Gun are used only by Experienced technincian.


2 Fire Due to Short Circuit, or Soldering gun 2 2 4 Bio Medical
Solder Gun Cables are frequently inspected for any
damage.
Workstation must be fitted with RCCB for better
prevention of short circuit.
Heavy Materials should not be stacked above cupboard
top.

proper ladder to use while stacking or removing materials


3 Work Tool Injury from moving or falling heavy materials 2 3 6 Bio Medical
Boxes to be labelled to identify materials inside

Wwhile removing or stacking no one should sit or stand


beside cupboard

Wet Floor signage’s are used.

Floors are immediately dried after water spills or cleaning


If water spills are unnoticed, it may cause trip and
4 Slips & Trips 2 4 8 Kitchen Manager
staff may fall and injure themself.
Staff are trained on Slips and trips

Floor cleaning are done early morning and late night.


Risk=Probabilit
y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

LPG gas leak detector is installed.

Staff Trained in Immediate action to take if found LPG


leakage
In Kitchen LPG gas leak due to hose damage or
5 Fire leakage due to negligence of staff 2 5 10 LPG Hoses are replaced as per OEM guidelines. Kitchen Manager

LPG gas bank is secured by padlock

Rodent Stick Pad is installed inside kitchen

Sharpened knives are used for chopping to avoid


accidental slips.

Staff are trained on Proper Handling of Knifes


6 Work Tool Cut from Knife While chopping vegetables or Fruits 3 2 6 Kitchen Manager
Staff are trained not to put knifes soaking in basin

Grips are checked before using knifes to avoid accidental


slips.

Scrapyard is cleaned quarterly.

Fire Extinguishers Installed in Scrapyard.

Welding work near scrapyard, If Fire in the Exits/fire exits signage’s pasted.
7 Fire scrapyard. Housekeeping staff, welder & helper 2 5 10 Scrap Co-Ordinator
could suffer from smoke inhalation or burns which
could potentially kill. Conducted a fire risk assessment at scrapyard.

Provided training in the proper use of fire extinguishers.

Provided Sprinkler System at scrapyard


Risk=Probabilit
y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

Caution Signage Board is placed during the cleaning work.

The step ladder with damaged rungs is used daily Gloves &apron are provided for cleaning.
in the hospital. The daily activity involves cleaning
the false ceiling AHU grills and repair work .The Daily tool box talk is conducted prior to the start of each
8 Working at Height staff carries out the task numerous times a day. 3 4 12 shift. Housekeeping Executives
This can lead to a risk of falling from a height and
can cause serious neck injury, spinal cord injury, Providing effective supervision.
bone fracture, and even fatal.

Provided PPE’s such as hard helmet.

Experienced drivers appointed for ambulance services.

Due to sharp turns at the entrance ramp, this will Avoiding over speeding and driving under speed limit
Movement of people and lead to the risk of collision of ambulance and
9 vehicles in the workplace pedestrian and cause serious injuries bone 3 4 12 Security Officer
Ensure ambulance are well maintained and are fit for
fracture, head injury, and fatality in severe cases. purpose and comply with safety standards
Provide extra mirror to improve driver visibility and
proximity detector in place to be aware of approaching
object.
Scrapyard is cleaned quarterly.

Fire Extinguishers Installed in Scrapyard.

Welding work at scrapyard. If Fire in the Exits/fire exits signage’s pasted.


10 Fire scrapyard, Housekeeping staff, welder & helper Maintenance
could suffer from smoke inhalation or burns which
could potentially kill. Conducted a fire risk assessment at scrapyard.

Provided training in the proper use of fire extinguishers.

Provided Sprinkler System at scrapyard


Risk=Probabilit
y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

2 Security Guards are deployed for patrolling the parking


area continuously
Bikes are overparked at basement leaving almost 2 Fire Hydrant Outlet is regularly Tested & ready to use at
no space for shifting or removing center bikes Basement
11 Fire which can be a hurdle in emergency situation such 1 4 4 Safety & Security
as fire. It poses a immediate risk of smoke and fire 2 ABC 1 Co2 & 1 Foam Extinguisher are located near by
spread in the basement area if ignited Basement Area
Alternate area for parking bikes is under process which
can help in clearing congestion.

Fire extinguisher installed inside ICU

Fire Rid Installed at Nursing Station


Due to shortcircuit in electrical equipment at ICU
fire can spread affecting patients and staff with Staff Trained on Strategic Evacuation Planning
12 Fire Heat and smoke. Which can cause burns and 2 5 10 Fire & Safety
suffocation due to smoke inhalation
Staff Trained on How to use Fire Extinguishers

Code Red Evacuation Mock Drill Conducted For ICU Staff

ERT team trained on ICU evacuation & Fire Fighting

Fire extinguisher installed inside OT

Fire Rid Installed at Nursing Station


Due to short-circuit in electrical equipment at OT
fire can spread affecting patients and staff with Staff Trained on Strategic Evacuation Planning
13 Fire 2 5 10 Fire & Safety
Heat and smoke. Which can cause burns and
suffocation due to smoke inhalation
Staff Trained on How to use Fire Extinguishers

Code Red Evacuation Mock Drill Conducted For OT Staff

ERT team trained on OT evacuation & Fire Fighting


Risk=Probabilit
y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

Hot work permit is not given anywhere near Liquid


Medical Oxygen Bay

Hot work carried near Liquid Medical Oxygen Bay Fence are installed to keep away unauthorised movement
can cause extreme fire if comes in contact with
14 Fire 1 5 5 Bio Medical & Fire Safety
presurrized oygen. Which can casue explosions
and results into sentinel event. Danger and "No Hot work" signages are installed at Bay

Security Guards are depoyed 24X7 at the area

Every Week the sludge are removed from drainage line to


Due to Heavy rains in monsoon it has been avoid any clog
observed drainage spills out groundwater due to
Heavy Powered sump pums are used to avoid back flow of
15 Flooding clogging of sludge inside drainage. Because of that 4 4 16 ground and drain water Maintenance
basement gets flooded with dirty water resulting
in very poor hygiene and even short circuit Additional Pump are used to pump out water directly from
main chamber to outside drainage.

All compressed cylinders are transported in proper trolley


Compressed cylinders are used daily for
transporting patients in OT and Compressor room. All compressed cylinders are stored in proper storage area
While transporting or storing if accidentally the with chain lock for support
Compressed Cylinders
16 cylinders fell and valve is broken it can act as a 2 5 10 Bio- Medical, HK & Safety
Valve Burst All cylinders are equipped with valve guard for additional
missile due to propulsion from compressed gases
destroying property, equipement and harming protection
person.
Trainings are provided to all HK staff for safe
transportation of compressed cylinders

Timely PPM are done of all electrical panels

Energy audits are done yearly


Electrical Substation gives continuous supply of
17 Short Circuit in Electrical electricty via HT and LT panels, if short circuit 2 5 10 Thermography is done yearly to prevent and rectify Enginnering & Maintenance
Panels happens it can affect the power supply for critical hotspots
equipments which can cause chaos in wards.
Regular inspection and maintenance of all electrical panels
are done as per tracker
Fire Tube supression system are installed to prevent major
damage because of short circuit
Risk=Probabilit
y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

Code Violence is activated for Verbal or PhysicalAbuse

Aggressive Patient and Patient Relatives are part Bouncers are deployed in 3 Shifts
of the Day to Day operations, Often Verbal Abuse
18 Violence at Work Place 5 3 15 Security Officer
and Physical Abuse are seen mainly due to billing Security guards are deployed to be vigilante and identify
issue and during visitor control. aggressive behaviour
Trainings are provided to Security guard, Bouncers and
General Staff.

Vehicle Entry & exit register is maintained by Security

Security guards are deployed at Parking area to monitor


Staff bikes are parked at parking, In past bike theft vehicles
19 Theft 2 3 6 Security Officer
incident has occurred.
CCTV Cameras are installed at Entry, Exit & Parking Bay

Boom Barrier has been installed torestrict movements of


vehicles

We have 2 service provides for security Guards

Absconding or leave without permission guards are


Staff deployement is essential on each and every penalised
Security Staff Abscond
20 From Duty points, Such abscond cases can result in shortage 3 3 9 Security Officer
and vacant post on site. Head guard is deployed to ensure 100% attendance at
post.
Additional Security guards are hired to fill the posiition at
such instance.

Daily Fresh Vegetables are Procured and supplied to F&B


F&B team cooks food for patient as per diet
planned by dietician, Meals are preapred in large Quality checks are done by Chef to ensure taste of food is
quantity, if spoiled vegetables or cereals are better
21 Food Poison 1 5 5 Food & Beverage
accidentaly used for cooking food it can cause While chopping and cooking the quality test are done of
serious problems of food poisioning in patients at vegetables and cereals
large numbers.
Plates and Utensils are properly cleaned before cooking
and serving food to patients.
Risk=Probabilit
y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

Periodically servicing of ambulance are done by


authorised service center.

Daily ambulance are used for transporting Timely mechanical parts are replaced by the service center
Ambulance Mechanical patients, if there's a breakdown in ambulance as per the OEM guidelines
22 1 5 5 Ambulance HOD
Breakdown whiletransporting patients, it can be a life Ambulance drivers are competent and trained and they do
threatening scenario for the patient. visual check on ambulance on daily basis
Standby ambulance are always ready if any breakdown
happens.

Periodically check are done of ceiling fans and its bolts


Ceiling fan are installed at every ward, rooms and
office space. If the ceiling fan fell due to loose Visual Inspections are done by the user and complaint are
23 Ceiling Fan fell down bolts it can seriously injured the persons below 2 5 10 lodge if any abnormaly seen Enginnering & Maintenance
the fan.
ISI approved ceiling fans are only installed in hospital.

Chemicals are appropriately stored in Hazmat Cabinets

Housekeeping teams used chemical for cleaning All chemicals are labelled properly as per GHS
purpose, accidental spill or wrong mix of requirements
24 Substance Abuse at Work 2 4 8 Housekeeping
chemicals can result in a disaster and release of
toxic fumes. Housekeeping staff are trained in handling chemicals

Hazmat spill kit are procured to tackle major spills

Trainings are provided to staff for corrrect method of


lifting heavy materials.
Staffs are encoraged to lift heavy materials with proper
Housekeeping teams does a lot of manual technique and 2 or more people if required
25 Manual Handling handling of heavy boxes daily, Over a long period 2 3 6 Housekeeping
it may cause sever pain and inury. Trolleys are provided for transporting heavy materials

Hydraulic hand pallet trolley are recommended to procure


for lifting and shifting heavy materials
Risk=Probabilit
y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

Warning signs and posters posted to raise awareness of


noise pollution.
The medical air compressor is used daily to
maintain the air pressure in line. The RPM must be
regulated while the compressor is running. The Avoiding the time an operator spends in noisy areas.
operator is responsible for calibrating the RPM
Noise. throughout the shift in accordance with the
Generation of loud noise Conducting regular maintenance of the compressor in
26 from medical air pressure requirement. 2 2 4 Bio Medical
This continuous exposure of the operator with order to check the lubrication which contributes to noise
compressor. loud noise greater than 85db will lead to health reduction.
problems The most common health problem is
Noise Induced Hearing Loss (NIHL). Exposure to
loud noise can also cause high blood pressure, Providing regular breaks In case of prolonged exposure.
heart disease, sleep disturbances, and stress.
Carry out noise risk assessment.
Provided ear muffs

Experienced gardener is appointed for gardening.

Patients, Relatives & Staffs. Provided a French drain trench at lawn for proper
Watering the plant is a daily activity at the drainage of excess water.
Health, Welfare
entrance lawn. Due to the daily watering of the
& Work plants and the poor drainage system, the stagnant
Environment Provided sump pumps to remove stagnant water.
27 Stagnant Water water is accumulated at different places of the 3 4 12 Housekeeping & Gardener
lawn. This can result in mosquito breeding and Conduct a regular inspection of lawns to avoid stagnant
accumulated at malaria/dengue outbreaks and may lead to serious
garden water.
health problems,
medical bills and civil lawsuits.
Conduct periodic spray at lawns and plants with
insecticidal solution to prevent mosquito breeding

Lighting and temperature are adjusted appropriately

In the medical records department, admission


desk the data entry clerk must enter data into the An eye test is provided if the worker requests it.
WRULD. system on a daily basis. Details of OPD patient files
Excessive use of display
are entered into the system manually. Due to the The workstation and equipmen's are configured to ensure
screen equipment for a
28 long time. constant input of data, the clerk risks posture 4 2 8 proper posture. IT & Department HOD
problems with pain in the neck, shoulders, back or
arms, as well as fatigue, headache and strained Instructed & trained staff to inform their supervisor of any
eyes. pain or discomfort they may have associated with using a
computer.

Provide regular breaks or job rotation (if needed)


Risk=Probabilit
y X Severity
Probability

Severity
Risk Summary/ Risk Statement (Nature of Risk Risk Mitigation, Management & Monitoring Plan (RMMM
Sr No Hazard Category Responsible Stake Holder Remarks
Involved PLAN)

Good lighting is provided in the passages


Staff, Patients & Visitors.
Daily routine activity is to clean the passages on all Provided floor cleaning machine with inbuilt vacuum to
floors. The housekeeping staffs’ uses floor cleaning prevent wet floors.
Slips & Trips solution and water to clean the floor surface, After
Slippery surface due to Provided training to staffs on safety measures while floor
29 wet floor. the mopping is done , due to the cleaning the floor 4 4 16 cleaning. Housekeeping
gets wet and the surface becomes slippery, which
can result in slips and trips and can cause sprains, Conducting cleaning activities early morning hours to
fractures, dislocated joints, knee injuries or prevent exposure to wet floors.
bruises.
Provided wet floor sign board while floor cleaning

Avoid using damaged ladder at workplace.

Housekeeping, Maintenance & Vendors.


The step ladder with damaged rungs is used for Conducting regular maintenance of the step ladder.
Working at Height maintenance work at height. The activity involves
fitting & cleaning work. This can lead to a risk of
30 Damaged rungs of step falling from a height and can cause serious neck 4 5 20 Repaired the ladder damaged rungs before starting any Maintenacne, housekeeping,
ladder. activity. Security & Safety
injury, spinal cord injury, bone fracture, and even
fatal.
Provided effective supervision during height work activity
by ladder.

Provided PPE’s such as hard helmet.


Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Warning signs and posters posted to raise


awareness of noise pollution.
Avoiding the time an operator spends in noisy
areas.
The medical air compressor is used daily to
maintain the air pressure in line. The RPM Conducting regular maintenance of the
must be regulated while the compressor is compressor in order to check the lubrication
running. The operator is responsible for which contributes to noise reduction.
Noise. calibrating the RPM throughout the shift in
Generation of loud accordance with the pressure requirement.
1 noise from medical air This continuous exposure of the operator 2 2 4 Providing regular breaks In case of prolonged Bio Medical
compressor. with loud noise greater than 85db will lead exposure.
to health problems The most common Carry out noise risk assessment.
health problem is Noise Induced Hearing
Loss (NIHL). Exposure to loud noise can
also cause high blood pressure, heart
disease, sleep disturbances, and stress.
Provided ear muffs

Experienced gardener is appointed for gardening.

Patients, Relatives & Staffs.


Watering the plant is a daily activity at the Provided a French drain trench at lawn for proper
Health, Welfare entrance lawn. Due to the daily watering drainage of excess water.
& Work of the plants and the poor drainage
2 Environment system, the stagnant water is accumulated 3 4 12 Provided sump pumps to remove stagnant water. Housekeeping & Gardener
Stagnant Water at different places of the lawn. This can
accumulated at result in mosquito breeding and
garden malaria/dengue outbreaks and may lead to Conduct a regular inspection of lawns to avoid
serious health problems, stagnant water.
medical bills and civil lawsuits.
Conduct periodic spray at lawns and plants with
insecticidal solution to prevent mosquito
breeding
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Lighting and temperature are adjusted


appropriately

In the medical records department,


WRULD. admission desk the data entry clerk must An eye test is provided if the worker requests it.
Excessive use of enter data into the system on a daily basis.
display screen Details of OPD patient files are entered The workstation and equipmen's are configured
3 equipment for a long into the system manually. Due to the 4 2 8 to ensure proper posture. IT & Department HOD
time. constant input of data, the clerk risks
posture problems with pain in the neck,
shoulders, back or arms, as well as fatigue, Instructed & trained staff to inform their
headache and strained eyes. supervisor of any pain or discomfort they may
have associated with using a computer.

Provide regular breaks or job rotation (if needed)

Good lighting is provided in the passages


Staff, Patients & Visitors. Provided floor cleaning machine with inbuilt
Daily routine activity is to clean the vacuum to prevent wet floors.
passages on all floors. The housekeeping
Slips & Trips staffs’ uses floor cleaning solution and Provided training to staffs on safety measures
4 Slippery surface due to water to clean the floor surface, After the 4 4 16 while floor cleaning. Housekeeping
wet floor. mopping is done , due to the cleaning the
floor gets wet and the surface becomes Conducting cleaning activities early morning
slippery, which can result in slips and trips hours to prevent exposure to wet floors.
and can cause sprains, fractures, dislocated
joints, knee injuries or bruises.
Provided wet floor sign board while floor cleaning
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Avoid using damaged ladder at workplace.

Conducting regular maintenance of the step


ladder.
Housekeeping, Maintenance & Vendors.
The step ladder with damaged rungs is
Working at Height used for maintenance work at height. The Maintenacne,
Damaged rungs of step activity involves fitting & cleaning work. Repaired the ladder damaged rungs before
5 ladder. This can lead to a risk of falling from a 4 5 20 starting any activity. housekeeping, Security &
height and can cause serious neck injury, Safety
spinal cord injury, bone fracture, and even
fatal. Provided effective supervision during height work
activity by ladder.

Provided PPE’s such as hard helmet.

Wet Floor signage’s are used.


Floors are immediately dried after water spills or
If water spills are unnoticed, it may cause cleaning
6 Slips & Trips trip and staff may fall and injure themself. 1 3 3 Staff are trained on Slips and trips Housekeeping Supervisor

Floor cleaning are done early morning and late


night.
Soldering Gun are used at Workstation only
Soldering Gun are used only by Experienced
technincian.
7 Fire Due to Short Circuit, or Soldering gun 2 2 4 Solder Gun Cables are frequently inspected for Bio Medical
any damage.
Workstation must be fitted with RCCB for better
prevention of short circuit.
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Heavy Materials should not be stacked above


cupboard top.
proper ladder to use while stacking or removing
Injury from moving or falling heavy materials
8 Work Tool 2 3 6 Bio Medical
materials
Boxes to be labelled to identify materials inside

Wwhile removing or stacking no one should sit or


stand beside cupboard
Wet Floor signage’s are used.
Floors are immediately dried after water spills or
If water spills are unnoticed, it may cause cleaning
9 Slips & Trips trip and staff may fall and injure themself. 2 4 8 Kitchen Manager
Staff are trained on Slips and trips
Floor cleaning are done early morning and late
night.
LPG gas leak detector is installed.
Staff Trained in Immediate action to take if found
LPG leakage
In Kitchen LPG gas leak due to hose
10 Fire damage or leakage due to negligence of 2 5 10 Kitchen Manager
staff LPG Hoses are replaced as per OEM guidelines.

LPG gas bank is secured by padlock


Rodent Stick Pad is installed inside kitchen
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Sharpened knives are used for chopping to avoid


accidental slips.

Staff are trained on Proper Handling of Knifes


11 Work Tool Cut from Knife While chopping vegetables 3 2 6 Kitchen Manager
or Fruits
Staff are trained not to put knifes soaking in basin

Grips are checked before using knifes to avoid


accidental slips.
Scrapyard is cleaned quarterly.
Fire Extinguishers Installed in Scrapyard.
Exits/fire exits signage’s pasted.
Welding work near scrapyard, If Fire in the
scrapyard. Housekeeping staff, welder & Conducted a fire risk assessment at scrapyard.
12 Fire helper could suffer from smoke inhalation 2 5 10 Scrap Co-Ordinator
or burns which could potentially kill.
Provided training in the proper use of fire
extinguishers.
Provided Sprinkler System at scrapyard
Caution Signage Board is placed during the
The step ladder with damaged rungs is cleaning work.
used daily in the hospital. The daily activity
involves cleaning the false ceiling AHU grills Gloves &apron are provided for cleaning.
13 Working at Height and repair work .The staff carries out the 3 4 12 Daily tool box talk is conducted prior to the start Housekeeping Executives
task numerous times a day. This can lead of each shift.
to a risk of falling from a height and can
cause serious neck injury, spinal cord Providing effective supervision.
injury, bone fracture, and even fatal. Provided PPE’s such as hard helmet.
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Experienced drivers appointed for ambulance


services.
Avoiding over speeding and driving under speed
Due to sharp turns at the entrance ramp, limit
Movement of people this will lead to the risk of collision of
14 and vehicles in the ambulance and pedestrian and cause 3 4 12 Ensure ambulance are well maintained and are fit Security Officer
workplace serious injuries bone fracture, head injury, for purpose and comply with safety standards
and fatality in severe cases.
Provide extra mirror to improve driver visibility
and proximity detector in place to be aware of
approaching object.
Scrapyard is cleaned quarterly.
Fire Extinguishers Installed in Scrapyard.
Exits/fire exits signage’s pasted.
Welding work at scrapyard. If Fire in the
scrapyard, Housekeeping staff, welder & Conducted a fire risk assessment at scrapyard.
15 Fire helper could suffer from smoke inhalation Maintenance
or burns which could potentially kill.
Provided training in the proper use of fire
extinguishers.
Provided Sprinkler System at scrapyard
2 Security Guards are deployed for patrolling the
parking area continuously
Bikes are overparked at basement leaving 2 Fire Hydrant Outlet is regularly Tested & ready
almost no space for shifting or removing to use at Basement
16 Fire center bikes which can be a hurdle in 1 4 4 Safety & Security
emergency situation such as fire. It poses a 2 ABC 1 Co2 & 1 Foam Extinguisher are located
immediate risk of smoke and fire spread in near by Basement Area
the basement area if ignited
Alternate area for parking bikes is under process
which can help in clearing congestion.
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Fire extinguisher installed inside ICU


Fire Rid Installed at Nursing Station

Due to shortcircuit in electrical equipment Staff Trained on Strategic Evacuation Planning


at ICU fire can spread affecting patients
17 Fire and staff with Heat and smoke. Which can 2 5 10 Fire & Safety
cause burns and suffocation due to smoke Staff Trained on How to use Fire Extinguishers
inhalation Code Red Evacuation Mock Drill Conducted For
ICU Staff
ERT team trained on ICU evacuation & Fire
Fighting
Fire extinguisher installed inside OT
Fire Rid Installed at Nursing Station

Due to short-circuit in electrical equipment Staff Trained on Strategic Evacuation Planning


at OT fire can spread affecting patients and
18 Fire staff with Heat and smoke. Which can 2 5 10 Fire & Safety
cause burns and suffocation due to smoke Staff Trained on How to use Fire Extinguishers
inhalation Code Red Evacuation Mock Drill Conducted For
OT Staff
ERT team trained on OT evacuation & Fire
Fighting
Hot work permit is not given anywhere near
Liquid Medical Oxygen Bay
Hot work carried near Liquid Medical Fence are installed to keep away unauthorised
Oxygen Bay can cause extreme fire if movement
19 Fire comes in contact with presurrized oygen. 1 5 5 Bio Medical & Fire Safety
Which can casue explosions and results Danger and "No Hot work" signages are installed
into sentinel event. at Bay

Security Guards are depoyed 24X7 at the area


Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Every Week the sludge are removed from


Due to Heavy rains in monsoon it has been drainage line to avoid any clog
observed drainage spills out groundwater Heavy Powered sump pums are used to avoid
20 Flooding due to clogging of sludge inside drainage. 4 4 16 back flow of ground and drain water Maintenance
Because of that basement gets flooded
with dirty water resulting in very poor
hygiene and even short circuit Additional Pump are used to pump out water
directly from main chamber to outside drainage.

All compressed cylinders are transported in


proper trolley
Compressed cylinders are used daily for
transporting patients in OT and
Compressor room. While transporting or All compressed cylinders are stored in proper
Compressed Cylinders storing if accidentally the cylinders fell and 2 storage area with chain lock for support
21 Valve Burst valve is broken it can act as a missile due to 5 10 Bio- Medical, HK & Safety
propulsion from compressed gases All cylinders are equipped with valve guard for
destroying property, equipement and additional protection
harming person.
Trainings are provided to all HK staff for safe
transportation of compressed cylinders
Timely PPM are done of all electrical panels
Energy audits are done yearly
Thermography is done yearly to prevent and
Electrical Substation gives continuous rectify hotspots
Short Circuit in supply of electricty via HT and LT panels, if
22 short circuit happens it can affect the 2 5 10 Regular inspection and maintenance of all Enginnering & Maintenance
Electrical Panels power supply for critical equipments which electrical panels are done as per tracker
can cause chaos in wards.
Fire Tube supression system are installed to
prevent major damage because of short circuit
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Code Violence is activated for Verbal or


PhysicalAbuse
Aggressive Patient and Patient Relatives
are part of the Day to Day operations, Bouncers are deployed in 3 Shifts
23 Violence at Work Place Often Verbal Abuse and Physical Abuse are 5 3 15 Security guards are deployed to be vigilante and Security Officer
seen mainly due to billing issue and during identify aggressive behaviour
visitor control.
Trainings are provided to Security guard,
Bouncers and General Staff.
Vehicle Entry & exit register is maintained by
Security
Security guards are deployed at Parking area to
Staff bikes are parked at parking, In past monitor vehicles
24 Theft bike theft incident has occurred. 2 3 6 Security Officer
CCTV Cameras are installed at Entry, Exit &
Parking Bay
Boom Barrier has been installed torestrict
movements of vehicles

We have 2 service provides for security Guards

Absconding or leave without permission guards


Security Staff Abscond Staff deployement is essential on each and are penalised
25 From Duty every points, Such abscond cases can result 3 3 9 Security Officer
in shortage and vacant post on site. Head guard is deployed to ensure 100%
attendance at post.
Additional Security guards are hired to fill the
posiition at such instance.
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Daily Fresh Vegetables are Procured and supplied


to F&B
F&B team cooks food for patient as per
diet planned by dietician, Meals are Quality checks are done by Chef to ensure taste
preapred in large quantity, if spoiled of food is better
26 Food Poison vegetables or cereals are accidentaly used 1 5 5 Food & Beverage
for cooking food it can cause serious While chopping and cooking the quality test are
problems of food poisioning in patients at done of vegetables and cereals
large numbers.
Plates and Utensils are properly cleaned before
cooking and serving food to patients.
Periodically servicing of ambulance are done by
authorised service center.
Timely mechanical parts are replaced by the
Daily ambulance are used for transporting service center as per the OEM guidelines
Ambulance Mechanical patients, if there's a breakdown in
27 Breakdown ambulance whiletransporting patients, it 1 5 5 Ambulance drivers are competent and trained Ambulance HOD
can be a life threatening scenario for the and they do visual check on ambulance on daily
patient. basis
Standby ambulance are always ready if any
breakdown happens.
Periodically check are done of ceiling fans and its
bolts
Ceiling fan are installed at every ward,
Visual Inspections are done by the user and
28 Ceiling Fan fell down rooms and office space. If the ceiling fan 2 5 10 complaint are lodge if any abnormaly seen Enginnering & Maintenance
fell due to loose bolts it can seriously
injured the persons below the fan.
ISI approved ceiling fans are only installed in
hospital.
Risk=Probability X
Probability

Severity

Severity
Sr No Hazard Category Risk Summary/ Risk Statement (Nature of Risk Mitigation, Management & Monitoring Plan Responsible Stake Holder Remarks
Risk Involved (RMMM PLAN)

Chemicals are appropriately stored in Hazmat


Cabinets

Housekeeping teams used chemical for All chemicals are labelled properly as per GHS
Substance Abuse at cleaning purpose, accidental spill or wrong requirements
29 2 4 8 Housekeeping
Work mix of chemicals can result in a disaster Housekeeping staff are trained in handling
and release of toxic fumes. chemicals

Hazmat spill kit are procured to tackle major spills

Trainings are provided to staff for corrrect


method of lifting heavy materials.
Staffs are encoraged to lift heavy materials with
proper technique and 2 or more people if
Housekeeping teams does a lot of manual required
30 Manual Handling handling of heavy boxes daily, Over a long 2 3 6 Housekeeping
period it may cause sever pain and inury. Trolleys are provided for transporting heavy
materials

Hydraulic hand pallet trolley are recommended to


procure for lifting and shifting heavy materials
Risk=Probability
Probability

X Severity
Severity
Risk Summary/ Risk Statement (Nature
Sr No Risk/Hazard Category
of Risk Involved

If water spills are unnoticed, it may


1 Slips & Trips cause trip and staff may fall and injure 1 3 3
themself.

2 Fire Due to Short Circuit, or Soldering gun 2 2 4

Injury from moving or falling heavy


3 Work Tool 2 3 6
materials
Risk Mitigation, Management & Monitoring Plan (RMMM PLAN) Responsible Stake Holder

1.Wet Floor signage’s are used.

2.Floors are immediately dried after water spills or cleaning


3.Staff are trained on Slips and trips
4.Floor cleaning are done early morning and late night.
1. Soldering Gun are used at Workstation only

2. Soldering Gun are used only by Experienced technincian.

3. Solder Gun Cables are frequently inspected for any


damage.
4. Workstation must be fitted with RCCB for better
prevention of short circuit.
1.Heavy Materials should not be stacked above cupboard
top.
2.proper ladder to use while stacking or removing
materials
3. Boxes to be labelled to identify materials inside
4. while removing or stacking no one should sit or stand
beside cupboard
Remarks
Risk=Prob
Probabilit

Severity

Severity
ability X
Risk Summary/ Risk Statement (Nature
Sr No Risk Category

y
of Risk Involved

If water spills are unnoticed, it may


1 Slips & Trips cause trip and staff may fall and injure 2 4 8
themself.

In Kitchen LPG gas leak due to hose


2 Fire damage or leakage due to negligence of 2 5 10
staff

Cut from Knife While chopping


3 Work Tool 3 2 6
vegetables or Fruits
Risk Mitigation, Management & Monitoring Plan (RMMM PLAN) Responsible Stake Holder

1.Wet Floor signage’s are used.

2.Floors are immediately dried after water spills or cleaning


Kitchen Manager
3.Staff are trained on Slips and trips

4.Floor cleaning are done early morning and late night.


1.LPG gas leak detector is installed.
2.Staff Trained in Immediate action to take if found LPG
leakage
Kitchen Manager
3.LPG Hoses are replaced as per OEM guidelines.
4.LPG gas bank is secured by padlock
5.Rodent Stick Pad is installed inside kitchen
1.Sharpened knives are used for chopping to avoid
accidental slips.
2.Staff are trained on Proper Handling of Knifes
Kitchen Manager
3.Staff are trained not to put knifes soaking in basin
4.Grips are checked before using knifes to avoid accidental
slips.
Remarks
Risk=Prob
Probabilit

Severity

Severity
ability X
Risk Summary/ Risk Statement (Nature
Sr No Risk Category

y
of Risk Involved

Welding work near scrapyard If Fire in


the scrapyard, Housekeeping staff,
1 Fire welder & helper could suffer from smoke 2 5 10
inhalation or burns which could
potentially kill.

The step ladder with damaged rungs is


used daily in the hospital. The daily
activity involves cleaning the false ceiling
AHU grills and repair work .The staff
2 Working at Height 3 4 12
carries out the task numerous times a
day. This can lead to a risk of falling from
a height and can cause serious neck
injury, spinal cord injury, bone fracture,
and even fatal.
Risk Mitigation, Management & Monitoring Plan (RMMM PLAN) Responsible Stake Holder

1.Scrapyard is cleaned quarterly.


2.Fire Extinguishers Installed in Scrapyard.
3.Exits/fire exits signage’s pasted.
4.Conducted a fire risk assessment at scrapyard. Scrap Co-Ordinator

5.Provided training in the proper use of fire extinguishers.

6.Provided Sprinkler System at scrapyard


1.Caution Signage Board is placed during the cleaning
work.
2.Gloves &apron are provided for cleaning.
3.Daily tool box talk is conducted prior to the start of each Housekeeping Executives
shift.
4.Providing effective supervision.
5.Provided PPE’s such as hard helmet.
Remarks
Risk=Prob
Probabilit

Severity

Severity
ability X
Risk Summary/ Risk Statement (Nature
Sr No Risk Category

y
of Risk Involved

Due to sharp turns at the entrance


ramp, this will lead to the risk of
Movement of people collision of ambulance and pedestrian
6 and vehicles in the 3 4 12
workplace and cause serious injuries bone
fracture, head injury, and fatality in
severe cases.
Risk Mitigation, Management & Monitoring Plan (RMMM PLAN) Responsible Stake Holder

Experienced drivers appointed for ambulance services.


Avoiding over speeding and driving under speed limit
Ensure ambulance are well maintained and are fit for
purpose and comply with safety standards Security Officer
Provide extra mirror to improve driver visibility and
proximity detector in place to be aware of approaching
object.
Remarks
Risk=Probability
Probability

X Severity
Severity
Risk Summary/ Risk Statement (Nature
Sr No Hazard Category of Risk Involved

Due to shortcircuit in electrical


equipment at ICU fire can spread
1 Fire affecting patients and staff with Heat 2 5 10
and smoke. Which can cause burns and
suffocation due to smoke inhalation
Risk Mitigation, Management & Monitoring Plan (RMMM PLAN) Responsible Stake Holder

Fire extinguisher installed inside ICU


Fire Rid Installed at Nursing Station
Staff Trained on Strategic Evacuation Planning
Fire & Safety
Staff Trained on How to use Fire Extinguishers
Code Red Evacuation Mock Drill Conducted For ICU Staff
ERT team trained on ICU evacuation & Fire Fighting
Remarks
Risk=Prob
Probabilit

Severity

Severity
ability X
Risk Summary/ Risk Statement (Nature
Sr No Risk Category

y
of Risk Involved

Due to shortcircuit in electrical


equipment at OT fire can spread
1 Fire affecting patients and staff with Heat 2 5 10
and smoke. Which can cause burns and
suffocation due to smoke inhalation
Risk Mitigation, Management & Monitoring Plan (RMMM PLAN) Responsible Stake Holder

Fire extinguisher installed inside OT


Fire Rid Installed at Nursing Station
Staff Trained on Strategic Evacuation Planning
Fire & Safety
Staff Trained on How to use Fire Extinguishers
Code Red Evacuation Mock Drill Conducted For OT Staff
ERT team trained on OT evacuation & Fire Fighting
Remarks
Risk=Probability X
Probability

Severity

Severity
Risk Summary/ Risk Statement (Nature
Sr No Risk/Hazard Category
of Risk Involved

Welding work at scrapyard. If Fire in the


scrapyard, Housekeeping staff, welder &
1 Fire helper could suffer from smoke
inhalation or burns which could
potentially kill.
Risk Mitigation, Management & Monitoring Plan (RMMM PLAN) Responsible Stake Holder

1.Scrapyard is cleaned quarterly.


2.Fire Extinguishers Installed in Scrapyard.
3.Exits/fire exits signage’s pasted.
4.Conducted a fire risk assessment at scrapyard.

5.Provided training in the proper use of fire extinguishers.

6.Provided Sprinkler System at scrapyard


Remarks
Risk=Probability
Probability

X Severity
Severity
Risk Summary/ Risk Statement (Nature
Sr No Hazard Category
of Risk Involved

Bikes are overparked at basement


leaving almost no space for shifting or
removing center bikes which can be a
1 Fire hurdle in emergency situation such as 1 4 4
fire. It poses a immediate risk of
smoke and fire spread in the
basement area if ignited
Risk Mitigation, Management & Monitoring Plan (RMMM PLAN) Responsible Stake Holder

2 Security Guards are deployed for patrolling the parking


area continuously
2 Fire Hydrant Outlet is regularly Tested & ready to use at
Basement
Safety & Security
2 ABC 1 Co2 & 1 Foam Extinguisher are located near by
Basement Area
Alternate area for parking bikes is under process which can
help in clearing congestion.