Professional Documents
Culture Documents
DETAILS
DIRECT VERIFICATION
Force calibration
Load cells
Data
Page 1/4
Data
Test cycle
Timing device
Data
Timing
Time to mainforce (tTA) Dwell time total force (tTF)
Measured (s) 4,77 11,29
Allowed (s) 2 to 8 10 to 15
Page 2/4
Optics
Stage Micrometers
Data
Page 3/4
Indirect verification
Test Blocks
Indenters used
Data
Signature
Randy Simons
*The proving devices and testblocks that are used are all traceable to ASTM / ISO: certificates on file.
Page 4/4