Jeff Vosahlo, Supervisor of Distribution Design-509-585-5390
Bob Roe, Distribution Designer-509-582-1242
Rick Sunford, Distribution Design Technician II -509-582-1271
Ken Klander, Distribution Design Technician I - 509-582-1241
Dave Smith, Distribution Design Technician I- 509-582-1231

CUSTOMER SERVICE REQUIREMENTS INDEX

General Information
Q-1A Meter Socket Terminal Clip Configuration

Q-1B Residential & Commercial Services Maximum Wire Lengths and Required Conduit Sizes

Q-1C Multiple Meter Base Identification Numbering Requirements for Multi-Unit Mobile
Home Parks & Multi-Unit Buildings

Q-1D Group Meter Base Installation for Apartments, Strip Malls etc.

Q-1E 2-1/2” x 3” Conduit Adapter for 200Amp Meter Base

Temporary Services
Q-2A Metered or Un-Metered Temporary Service Requirements Overhead Feed

Q-2B Metered or Un-Metered Temporary Service Requirements Underground Area

Q-2C Alternate Temporary Service Installation Guidelines

Overhead Services
Q-3A New and/or Altered Through Roof Mast Installation 200Amp or Less

Q-3B New and/or Altered Below Roof Mast Installation 200Amp or Less

Q-3C Overhead Feed Single Phase Meter Base 200Amp, 240/480 Volt 3-Wire

Q-3D Overhead Feed 200Amp or Less Meter Base, Single Phase, 120/240 Volt, Residential

Q-3E Overhead Feed 200Amp or Less Meter Base, Network, 120/208 Volt, Residential

Q-3F Overhead Feed 200Amp Meter Base, Single Phase, 120/240 Volt, Non-Residential

Q-3G Overhead Feed 200Amp Meter Base, Network, 120/208 Volt, Non-Residential

Q-3H Overhead Feed 320Amp Meter Base, Single Phase, 120/240 Volt

Q-3J Overhead Feed 200Amp Meter Base, Three Phase, 600 Volt, Non-Residential

Q-3K 200 Amp Service, Overhead Source for either Underground to Overhead Feed to Manufactured
Home

Q-3L Meter Pole Service Overhead Source with Receptacle

Q-3M Overhead Feed, Underground Load, Pole Mounted 200Amp Socket, Three Phase, 4-wire
GEN14.11498 Rev 03/2014
Underground Services

Q-4A Service Entrance Surface Mounted -Underground 400Amp or Less

Q-4B Service Entrance Flush Mounted -Underground 400Amp or Less

Q-4C Underground Feed 200Amp Meter Base Single Phase 120/240 Volt, Residential

Q-4D Underground Feed 200Amp Meter Base, Network, 120/208 Volt, Residential

Q-4E Underground Feed 200Amp Meter Base, Single Phase, 120/240 Volt, Non-Residential

Q-4F Underground Feed 200Amp Meter Base, Network, 120/208 Volt, Non-Residential

Q-4G Underground Feed 320Amp Meter Base, Single Phase, 120/240 Volt, Residential or Commercial

Q-4H Underground Feed 200Amp Meter Base, Three Phase, 600 Volt, Non-Residential

Q-4J Underground Service 200Amp for Metered Pedestal

Q-4K 200Amp Component Meter Pedestal (Mounted on Uni-Strut)

Q-4L 320Amp Component Meter Pedestal (Mounted on Uni-Strut)

Q-4M Pre-Approved Meter Bases

Current Transformers
Q-5B Current Transformer (CT) Compartment Requirements for Residential Services 201-800 Amps,
(2 Pages)

Q-5E Current Transformer (CT) Compartment Requirements for Commercial Three Phase Services
201-800 Amps (2 Pages)

Q-5F Current Transformer (CT) Compartment Requirements for Commercial Three Phase Services
1200-2500 Amps (2 Pages)

Q-5G Self Supported CT Meter Pedestal with CT’s installed in Secondary Side of District Transformer

Q-5H Current Transformer Compartment for Switch gear 1000-3000 Amp

Transformer Pads and Clearances


Q-6C Installation Clearances for Commercial and Residential Transformers

UG6-C Transformer Pad Details 500 kVA and Below Three Phase (2 Pages)

UG6-C2 Transformer Pad Details 750 kVA and Above Three Phase Pad (2 Pages)

Q-6G 600V Termination Cabinet Guideline

Trenching

Q-7A Trenching and Conduit Details for Typical Underground Service Installation, from Pad Mount
Transformer

Q-7B Trenching and Conduit Details for Typical Underground Service Installation, from Overhead
Transformer
GEN14.11498 Rev 03/2014
Net Metering Services
Q-8A Net Metering Typical One Line Schematic

Fiber Services
Q-9A Installation Practices for Customer Fiber Services

Work Area Clearances


Q-10A Work Area Clearance

GEN14.11498 Rev 03/2014


GENE. L
INFORMATION

BENTON TITLE

1/UD
DRAWN BY; JAD
GENERAL INFORMATION
Q-1 Series
Q-1
DRAW DATE· 03/05/04
Self Contained Meter Base Current Transformer Meter Base
(Furnished and provided by customer) (Provided by District)

Voltage Wires Max Amp. No. Clips Socket No. CT. No. Clips Socket

Single Phase
1201240 3 200 Res I Comm'l 4 A 2 6 C/Test SW
1201240 3 320 Res I Comm'l 4 A
2401480 3 200 4 A

Network
1201208 3 200 5 8

Three Phase
2081120 4 200 7 D 3 13 E/Test SW
2401120 4 200 7 D 3 13 E/Test SW
2401480 4 200 7 D 3 13 EITest SW
4801277 4 200 7 D 3 13 E/Test SW
-

rn rn rn rn CD rn
I
~
8 B B
! rn rn rn rn rn rn
J
0 -
-A -8 c
rnrn rn rnrn rn -
lrnrnrnrnrnrnrn
OJOJOJ[I] OJOJ OJ

-D -E
Purchased From Vendor Provided b~ District
Notes:
1. Manual block by pass required on all 200 Amp non-residential installations, and all 320 Amp installations.
2. No automatic, plunger, or lever type by pass devices allowed.
3. Meters are required to be mounted external to the building. Exceptions will need to be approved by District
Engineering and Metering Departments prior to construction.
4. Sockets A,8,D, will be provided by the customer.
l
c
5.
6.
Sockets C & E will be provided by the District for the customer to install.
The meter base for single phase, two wire service, shall be the same as a single phase, three wire service, with the
!
~ upper right terminal tied to the neutral. Three phase, three wire service shall be metered as a three phase four wire
service.
7. Socket 8 will have the 9 o'clock terminal position tied 'to the neutral.
8. For pedestal details see Q-4K and Q-4L.
9. Ringless meter base not allowed.

"' TITLE
j BENTON
j;JIUD
'!< DRAWN BY· JAO
Meter Socket
Terminal Clip Configuration
Q·1A
s DRAW DATE. 02/ 16/0 1
~0~-----------L----------------------------------------------~--------------------~
Service Conduit & Requirements

Minimum Conduit Maximum Service


Resident ial UG Services Meter Base Type
Size, Type Length

200A Self Contained 3" SCH 40 200FT*


400A, Over Self Contained 3" SCH 40 250FT*
400A CT Contained 4" SCH 40 250FT •

Service Conduit & Requirements

Commercial Minimum Conduit Maximum Service


Meter Base Type
UG Services Size, Type Length

200A, 10 Self Contained 3", SCH 40 200FT*


400A, 10 Self Contained 3", SCH 40 250FT*
400A, 10 CT Meter See Note 3 See Note 3
Over 400A, 10 CT Meter See Note 3 See Note 3
200A, 30 Self Contained 3", SCH 40 3", SCH 40
Over 200A, 30 CT Meter See Note 4 See Note 4

f
3
~
ell
'!! [ * Distances are based on measurements from the padmount transformer,~
z0 subtract 50 feet from pole mount transformer installations.
i
0
?;
s
.v
~
Q_

iii
0

..."'
~
8

Notes:

1. Locate meter base so the conduit run does not exceed maximum allowable length per this standard where it
applies, or have more than 3 bends totaling 270 degrees. (This 270 degrees shall include 1-90 degree sweep at the
meter base and one at the transformer or pole).
j
.
"'"
2. Details shown are minimum District requirements and are not intended to depict the Washington State Labor and
Industries requirements.

I
..e
c.
~
.2
3.

4.
Customer owned and installed service wires - not to exceed 500 kcm copper or aluminum and not to exceed 4 sets
of conductors.
Customer owned and installed service wires on large 3 phase commercial projects. Not to exceed 750 kcm copper
or aluminum and not to exceed 6 sets of conductors.
i
l REVBY· JWV lsHT
~ TITLE·
§ BENTON Residential & Commercial Services REV DATE' 10/01/13 I 1 of 1

l~UD
Maximum Lengths
REV No
1 ~~~~~ DATE / / / 1 -
OWG. NO
& Required Conduit Sizes
~DRAWN BY: SWT Q-18
..
!! DRAW DATE: 02/26/01
Address Number

<\\
8 3/4"
Approx.
\' 4
.' '~
'\\
,\\
\ '.'\~
.~ '
"'
_);,· 6J
Manufactured Home Type

!
j
0

--
Apartment I Multi-Family
.i'J Buildings
~ I
£ I
I
c
Notes: ,/
1.) Before permanent service is connected raised letters and numbers (1" min. height) or engraved placard as
approved by the District must be permanently attached to the meter base, apartment door and apartment panel. No
adhesive non-raised letters or numbers allowed.

REV BY: JWV


TITLE:
Multiple Meter Base Identification REV DATE:

REV No·
Numbering Requirements for
..
c Multi- Unit Mobile Home Parks
OWG. NO
0

~~==~~------~ Q-1C
~ DRAWN BY: SVI/T
& Multi Unit Buildings
:s DRAW DATE: 03/27/01
~~----------~------------------------------------------~--------------------_J
--
·-

- S e e No t e s -

Side Of Building

Acceptable
Installation

Notes:

1. Permanent service will not be connected without proper meter base identification, refer to Q-1C for meter base
identification requirements.
2. Access to supply conductors must be capable of being sealed by the utility.
3. District approval must be obtained in writing for any of the following:
A. If any disconnect is installed on the delivery side of meters.
B. If meter installation is over 4' from the front, on the side of the building.
C . If other than outside installation.
" 4. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
I Industries Requirements.
~Ji~------------r-----------------------------------------------~RE~V~B~Y.--JWV
--------~,-
!SH-
T------1

~ BENTON TITlE: REVDATE: 10/01/13 I 1 of 1

1!~ ~'1}J1J Group Meter Base Installation Rev No 1 ~~~~~::>DATe 1//~


DWG. NO.
For Apartments, Strip Malls, etc.
!!I DRAWN BY: SWT Q-1D
'DRAW DATE; 02/25/01
~L-----------~------------------------------------------------~--------------------~
r

District conductor
to bottom of meter~
base on left side

I (
-)
L I I Bushing
~ Locking nut

Carlon 2-1 /2"


M.A.
E943 PVC

'
I
or equal
I I
I I
I I
I \ Carlon
I l 3" X 2 -1 /2" X 8"
reducer
' I I E952LK,
I I or equal
I I

Carlon 3" CPLG


E040L
or equal

Notes:

1. Reducer (supplied by customer) 3" x 2-1/2" x 8" shall not have sharp internal edges.
2. Carlon adapters are supplied by customer and must be pre-approved to meet District requirements.

REV BY· JWV


TITLE. REV DATE·
REV No
2 1/2" x 3" Conduit Adapter 1 14-
DWG NO.
for 200 Amp Meter Base
Q·1E
:1 DRAW DATE: 12/20/00
~~----------~------------------------------------------~--------------------~
TITLE
BENTON
;JPUD
REV NO:
TEMPORARY SERVICE 1
DWG. NO.
Q-2 Series
DRAWN BV: JAD Q-2
DRAW DATE 03/05/04
~l~-~1----------------~
'I- $ Top View /
~------------------50' Max------------------~
Note 3

Service Attachment
Must Be Below
Weatherhead

vDistrict Pole

17' Min.

I
0
~

l
i5.
~
@
Finished Grade
.... ..__._
--------
Elevation
-----
t8 ~----------------------------------------------------------~----------------------~
II
II 3'
u __

Notes:
1. Application for temporary service is required by the District before service will be connected .
2. Metered temporary power installations 1 Year Maximum.
3. Any service that exceeds the 50' maximum length must be reviewed by a District engineer on a case by case basis.
4. Customer's temporary service pole may be of 4" x 4" solid lumber or two 2" x 4".
5. Laminated together 4" x 4" overall will be the minimum acceptable.
6. Braces will consist of 2" x 4" lumber with stakes solidly driven into the ground and firmly attached to braces.
7. Temporary service arrangement and equipment to be "Approved For Service" by the state electrical inspector before
the District will connect service.
8. The customer shall notify the District as to when service is requested.
9. Meter base may be required for 120 day temporary installations.
10. Meter base will be required for RV's, pumps, job shacks, and all commercial projects or similar applications.
11 . Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
12. Prior to any digging call UDIG or 811 for free cable locate prior to digging.
13. All clearances must meet or exceed the National Electrical Safety Code.

"'
I BENTON
TITLE.
Metered or Un-Metered

11/UD
REV No:
Temporary Service Requirements 1 14--
OWG NO
Overhead Services
!!: DRAWN BY· JAD Q-2A
,: DRAWOATE: 3/28/01
~.L-------------~-----------------------------------------------~-----------------------J
Meter Base

Service equipment to be installed by customer.


Location must avoid conflict with District
equipment.

2" x 4" Stakes

3'-6" Min
5'Max
3' Min.

Notes:
1. Application for temporary service is required by the District before service will be connected.
2. Metered temporary power installations 1 year maximum.
3. Prior to any digging, call UDIG or 811 for free cable locate prior to digging.
4. The customer shall provide all trench and backfill to the transformer, pedestal or hand hole. Contact District
representative prior to trenching, for coordination.
5. The customer shall provide sufficient conductor to reach transformer plus 6 feet.
6. Temporary service arrangement and equipment to be "Approved For Service" by the State Electrical Inspector
before the District will connect service.
7. The customer shall notify the District a minimum of 2 weeks prior to when service is required.
8. The District will install customer owned wire in transformer box and make connection.
9. Temporary power connections shall not be made through permanent service stub-outs.
10. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
11. One year renewal limit without re-inspection and approval by State Labor and Industries.
. REV BY
JWV
i BENTON Meterd or Un-Metered REV DATE

REV No:

j1 /UD
~ DRAWN BY· JAO
Temporary Service Requirements
Underground Area
OWG. NO.

Q-28
!! DRAW DATE 4/ 10/12
~L-------------~------------------------------------------------~----------------------~
Service transformer

~0;­
c
Example of a stub -up.

The District installs


go• sewer elbow
for stub-up

Cove(F~Jp
A A
Metered or un-metered
temporary service.
l ru:ena; -

Earth surface
Plan
See hand
! hole details
J
0
Customer to purchase and
(this sheet)

install 3" Sch. 40, 36" radius sweeps


to replace BPUD go• sewer elbow.

Lid to be 2"
maximum above grade
G) Replace go• sewer elbow with 3 inch,
Hand hole box 36"R, Sch. 40 PVC go• sweep.

f
.. & all conduit
._...
from box to meter @ Install conduit run from hand hole
to be installed by Example of a temporary service box area to future meter at a
customer install. home/building
Hand hole and connecting
conduit are required . @ Install hand hole box and connect
..:::::::r:r:~ 1'0 Temporary panel must be both conduit runs.
permanent
meter
within 5 Ft. from hand hole.
0 Direct bury temp wires to hand hole
box entry way and prepare wire for
Hand Hole Details After
temp service.

Hand hole may be picked up at the District's warehouse located at 1500 S. Ely St. or a purchased approved equivalent
and installed, after permanent service application is received by engineering.
Hand hole and all sweeps to be installed by customer prior to energizing a temporary service.

REVBY JWV
TITLE.
REV DATE:

REV No:
Alternate Temporary Services 0
OWG. NO.
Installation Guidelines
Q-2C
OVERHEAD
SERVICE

REVBY· JWV lsHT


TITLE
BENTON REV DATE· 10/01/13
REV NO
I 1 of 1

~~~RG.?\1~ DATE. J//4-


1/UD
DRAWN BY· JAD
OVERHEAD SERVICES
Q-3 Series
1
DWG. NO.

Q-3
DRAW DATE: 03/05/04
No. 6 copper weld guys, Cyclone fence collars 3/8" min. bolt size or ~
or 3/4" rigid conduit brace equal. 3/4" rigid galvanized conduit brace
per detail weld guys, or 3/4" with ends flattened and drilled

Brace/roof connection will \


have sharp bend with no radius

Service conductor 1/4" x 4" x 4" Galvanized washer


Mast
\
Plan
Optional Bracing Secure conduit/.
to rafter with u-bolt Detail
Optional Bracing
Galvanized thimble and guy clamp

4' Max
Per SPUD

1-6" M1n.
2 '-2" Max.

Dead End insulator


supplied by customer

Minimum "2 x 6" solid blocking


between rafters (at service lead-in)
and wallplates drilled for steel conduit 2" rigid steel conduit

2" Dia., 5/16" u-bolts


N 2" x 4" Installed solid for all conduit fasteners
2 between studs and
u length as required
rough siding
}
Interior finish -0'-
Stud_/

S' Min.

J 6' Max.

Notes:
Finished Grad.e J1
Elevation
j

1. See Washington State Department of Labor and Industries WAC 296-468-23028.


2. Service drop must maintain 12 feet minimum clearance above grade at lowest point. See National Electrical Safety
Code rule 232.
3. See WAC code regarding recessed Meter Base Installations.
REVBY· JWV
TITlE:
New and/or Altered Service REV DATE.
REV No;
Through Roof
OWG. NO
200 Amp or Less
Q-3A
6" Min. 6" Min.
1 ' Max

~~~ead
-- [
'r-<-----..._[ 1' Max. 000

_ End Insulator
Eyebolt ~ 5/ 16" U-bolt

Strap

View A-A View B-B

3/4" Dia. eyebolt flat '~I


washer & lock washer 2" x 4" Installed t supplied By customer
between studs ~ 1 2" Rigid steel conduit
~I
Interior fln;sh ~
and rough siding

Interior finish_/,

Stud/.
l 5' Min. Stud~~ SM•~
6' Max
-LI 6' ~ax.
Fini!?he_q Gr.;~de Jjf_____ ...._l ~ Finished Grade _ fTr______.~. .l ~
Elevation Elevation
Guy Attached To Eye bolt Guy Attached To Rigid Conduit

Notes:

1. Service drop must maintain 12 feet minimum clearance above grade at lowest point. See current National Electrical
Safety Code Rule 232.
2. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
REVBY JWV
"'
I BENTON TITLE:
New and/or Altered Service REV DATE

i1/'UD
REV No·
Below Roof Mast Installation
DWG . NO .
200 Amp or Less
\!1 DRAWN BY: JAD Q-38
:s DRAW DATE 03/27/11
~L------~------------------------~-----------~
Service entrance
conductors, furnished
and installed by
customer per the NEC
Code

Customer to furnish
& install conduit per
the NEC code

Notes:
i-g
.. 1. Customer shall contact Customer Engineering before installation.
"'c 2. Customer shall supply and install meter base, mast, and conductors as shown above.
18 3. The meter base must be installed (plumb and solid) and bonded to customer neutral per the National Electric Code
4. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements .
5. Ringless meter base not allowed .
6. For pre-approval or equipment meter base, see document Standard Q-4M .
REV BY: JWV
"'
1 BENTON TITLE:
Overhead Feed REV DATE:

11/UD 11-
REV No:
Single Phase Meter Base
DWG . NO.
200 Amp, 240/480 Volt 3 Wire
~ DRAWN BY : JAD Q-3C
Non-Typical
s DRAW DATE : 02/26/01
~L-----------~--------------------------------------------L-------------------~
Service entrance
conductors furnished
and installed by customer
Conduit to be furnished and per the NEC code
installed by customer
per the NEC code

Front View

2 1/2" Knockouts

Bottom View
Notes:
'il
~ 1. Customer shall supply and install meter base.
£ 2. Lever by-pass not allowed , manual block by-pass allowed under Q-3F,G ,H,J .
3. The meter base must be installed (plumb and solid) and bonded to customer neutral per the National Electric Code
4. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
5. Ringless meter base not allowed .
6. For pre-approval or equipment meter bases , see document Standard Q-4M .

<f) REVBY: JWV

t BENTON
TITLE:
Overhead Feed REV DATE :

11/UD r?--
REV No:
200 Amp or Less Meter Base
DWG. NO.
Single Phase, 120/240 Volt
~ DRAWN BY: JAD Q-3D
Residential
~ DRAW
u:.____DATE
__ _ _ _.L___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _--L.__ _ _ _ _ _ _ _ _ _ __ ,
: 02/26/01
Service entrance
conductors furnished
and installed by customer
Conduit to be furnished per the NEC code
and installed by customer
per the NEC code

This lug is to be in 9 o'clock


position only, and tied to neutral.

ci
z
Front View
i
0
2 1/2" Knockouts

Bottom View

Notes:
"!:
"..
U)
1.
2.
Customer shall supply and install meter base.
Lever by-pass not allowed, manual block by-pass allowed on District Standards Q-3F, G, H & J.
3. The meter base must be installed plumb and solid , and bonded to customer neutral per the National Electric Code.
4. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
5. Ringless meter base not allowed .
6. For pre-approval or equivalent meter bases, see document Standard Q-4M.
U) REV BY: JWV

I BENTON
TITLE:
Overhead Feed REV DATE:

11/UD
REV NO:
200 Amp or Less Meter Base
DWG. NO.
Network 120/208 Volt
~ DRAWN BY JAD Q-3E
Residential
02/16/01
:;; DRAW DATE:
~~------------L--------------------------------------------------L----------------------~
Conduit to be furnished
and installed by customer
Service entrance
per the NEC code
conductors furnished
and installed by customer
per the NEC code

Block type by-pass


stud for by-pass clip
(TYP.)

Front View
2 1/2" Knockouts
N
0

1
8

Notes: Bottom View


1. Meter base shall be supplied and installed (plumb & solid) by the customer.
~ 2. Manual block type by-pass required for 200 Amp non-residential services. Lever by pass or safety socket style not
"
il allowed.
The meter base must be bonded to the customer neutral per the National Electric Code.
3.
4. No condulet type fittings allowed in conduit containing un-metered conductors.
5. Ringless meter base not allowed.
6. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
7. For pre-approval or equipment meter bases, see document Standard Q-4M.
if>
REVBY: JWV

I BENTON
TITLE:
Overhead Feed REV DATE :

l11UD If-
REV NO:
200 Amp Meter Base
DWG.NO.
Single Phase 120/240 Volt
~ DRAWN BY:
Q-3F
JAD Non-Residential
:> DRAW DATE: 02/26/01
~L-----------~--------------------------------------------L-----~------------~
Service entrance
conductors furnished
Conduit to be furnished and installed by customer
and installed by customer per the NEC code
per the NEC code

The fifth jaw is required


in the 9 o'clock position
and tied to the neutral

Block type by-pass


stud for by-pass clip
(TYP.)

Front View
2 1/2" Knockouts
N
0

@
:E

i
u

Bottom View
Notes:

1. Meter base shall be supplied and installed (plumb & solid) by the customer.
2. Manual block type by-pass required for 200 Amp non-residential services. Lever by pass or safety socket style not
~
allowed .
"gs
if>
3. The meter base must be bonded to the customer neutral per the National Electric Code.
~ 4. No condulet type fittings allowed in conduit containing un-metered conductors.
8 5. Ringless meter base not allowed .
6. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements .
7. For pre-approval or equipment meter bases , see document Standard Q-4M.
if>
REV BY: JWV

1 BENTON
TITLE:
Overhead Feed REV DATE:

i11UD
REV NO :
200 Amp Meter Base '/9-
DWG. NO.
Network 120/208 Volt
~ DRAWN BY JAD Q-3G
Non-Residential
:> DRAW DATE : 02/26/01
~L-------------L--------------------------------------------------L----------------------~
Conduit to be furnished
and installed by customer
per the NEC code. Service entrance
conductors furnished
and installed by customer
per the NEC code

Service conductors furnished


and installed by customer

Block type by-pass


stud for by-pass clip

Front View
Notes:

1. Doubling of wires allowed in factory provided , UL approved connectors, only when conductor type and size are the
same.
2. Meter base shall be supplied and installed (plumb & solid) by the customer.
"ll
3. No condulet type fittings allowed in conduit containing un-metered conductors.
""'"
c
4. Lever by-pass not allowed, block by-pass only.
~
5. The meter base must be bonded to the customer neutral per the National Electric Code.
i
Sl 6. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
"
.,£ 7.
Industries requirements.
Ringless meter base not allowed .
c
Q
8. For pre-approval or equipment meter bases, see document Standard Q-4M
i"' REVBY: JWV

I BENTON
TITLE:
Overhead Feed REV DATE :

!1/'UD
REV NO:
320 Amp Meter Base
DWG . NO.
Single Phase, 120/240 Volt
~ DRAWN BY: JAD Q-3H
~ DRAW DATE : 03/27/01
~~------------~------------------------------------------------~----------------------~
Service entrance
conductors furnished and
installed by customer
per the NEC code

For delta service


power conductor
(wild leg)
Bond to neutral

Block type by-pass stud


for by-pass clip (TYP.)

2 1/2" Knockouts Front View

Notes: Bottom View

1. Meter base shall be supplied and installed (plumb & solid) by the customer.
2. Manual block type by-pass required for 200 Amp non-residential services.
~ 3. The meter base must be bonded to the customer neutral per the National Electric Code.
-g
4. No condulet type fittings allowed in conduit containing un-metered conductors.
"'"
5. Lever by-pass not allowed, block by-pass only.
6. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
7. For pre-approval or equipment meter bases , see document Standard Q-4M .
8. Power conductor (wild leg, color coded orange).
9. Ringless meter base not allowed .
REVBY: JWV
"'
1 BENTON TITLE:
Overhead Feed REV DATE :

l11UD
REV NO:
200 Amp Meter Base
DWG. NO.
Three Phase
~ DRAWN BY: JAD Q-3J
Non-Residential
~ DRAW DATE 02/26/01
~~------------L--------------------------------------------------L----------------------~
Leadedength "-..
~
~ Conduit must be even with top of pole
Leader length

Er
18" min. 18" min.

,.
I
i \ '- Conduit must be
Deadend insulator_/
supplied by customer
attachment must be
Weatherhead height per the
National Electric Code requirement
I \_even with top of pole

Deadend insulator
below weatherhead
Provided And Installed By Customer
w. supplied by customer.
Service attachment
must be below
Item No. Description weatherhead.

CD Weatherhead
® Conduit
@ Meter base
Provided And Installed By District
Item No. Description

& Meter

& Pole

200A combination meter 200A combination meter


~
~ base disconnect rain tight base disconnect rain tight
5

I 5' Min.
6' Max.
5' Min.
6' Max. !
I j

~~ I
~
I
'
I
Finished Grade I . - l.o:r'IE"'fl l I Finished Grade
T -lt=12..'ifd l t
I I
lf~""
I
-~~~~ I
II
1
'I1:!J11~ .U
I
I ~ :
L.. - - -.J
I
I
L -- -~
~ I
I

Overhead Feed To Underground Feed Overhead Feed To Overhead Feed


Notes:

1. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements. Wiring must be approved for service by state inspector.
2. The meter base must be bonded to customer neutral per the National Electric Code.
3. Refer to standard Q-1 C for numbering practice in mobile home and RV parks.
4. Ringless meter base not allowed
REVBY: JWV
"' TITLE:
j BENTON 200 Amp Service REV OATE:

1111/D
REV NO:
Overhead Source for either
DWG. NO.

y
Underground to Overhead
!!I DRAWN BY: JAO
Feed to Manufactured Home Q-3K
s DRAW DATE: 02/26/01
~L-----------~--------------------------------------------L-------------------~
Lead length
18" minimum
Provided And Installed By Customer

Deadend Insulator supplied by _ / Item No. Description


customer. Service attachment must CD Weatherhead
be below weatherhead.
® Conduit
® Meter base
Provided And Installed By District
Item No. Description

& Meter

& Pole

Conduit strap

2
@)

I 5' Min
Customer panel
6' Max.

Finished Grade
I I I 'l ) !
I
I I I'
I tal I
L __ ...J

Notes:

1. The meter base must be bonded to customer neutral per the National Electric Code.
2. Refer to District standard Q-1 C for numbering practice in mobile home and RV parks.
3. Ringless meter base not allowed.
., REV BY·

1 BENTON TITLE:
Meter Pole Service REV DATE

J11UD
REV NO.
Overhead Source
DWG. NO.
with Receptacle
!!I DRAWN BY: JAD Q-3L
:1 DRAW DATE~ 03/27/01
~.L-------------L-------------------------------------------------~-----------------------J
Conduit must
be even with
Service entrance
top of pole
conductors furnished
and installed by
customer For delta service
power conductor
(wild leg).
Lead length
18" minimum
Deadend insulator
j 9"

supplied by customer
service attachment
must be below
weatherhead
Bond to neutral

Socket Wiring Diagram


!
!
0
Provided And Installed By Customer

Item No. Description


CD Weatherhead
® Conduit
® Meter base

Provided And Installed By District 5' Min.

Item No. Description


6'Max.l ~
& Meter

ill Pole Finished Grade


~~~-- I
. l
I I
II
lil,· ~-if.-
I 1
Notes: "' I
I
II
II
I
I
l II I
l Iii I
1. Line conductors, color code black. I I
J J
2. Power conductor (wild leg), color coded orange. L __ .J
3. Neutral conductor must be color coded white.
1 4. No condulet type fittings allowed in conduit containing un-metered conductors.
':!*
c
J! 5. The meter base must be bonded to the customer neutral per the National Electric Code.
~ 6. Manual block type by-pass required for three phase 200A services.
7. Lever by-pass or safety socket style not allowed.
8. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
9. Ringless meter base not allowed.
REVBY· JWV
"' TITLE:
j BENTON Overhead Feed to Underground Load REV DATE:

i11UD
REV No:
Pole Mounted 200 Amp Socket
DWG. NO.
Three Phase 4 Wire
~ DRAWN BY: JAD Q-3M
:s DRAW DATE: 03/27/01
~L-----------~------------------------------------------~~------------------~
UNDERGROUND
SERVICES

REV BY: JIJ'N j sHT

BENTON TITLE REV DATE: 10101113 1 1 of 1


tl/4-
1/'IID
DRAWN BY: JAD
UNDERGROUND SERVICES
Q-4 Series
REV NO
DWG NO.
1 ~~~G ~DATE·

Q-4
DRAW DATE: 03/05/04
Provided And Installed By Customer

Item No. Description


® Meter Base
0 3" Rigid PVC Conduit
® Sweep 3" sch. 40 PVC 36" radius
® Conduit-3" Sch. 40 PVC
0 3" to 2-1 /2" adapter for
200A meter base only
refer to Q-1 E standard
® Conduit Straps

Provided And Installed By District


Item No. Description
5' Min.
Conductors 6' Max.

Meter

Finished Grade
,_ r

~1

Notes:

1. No condulet type fittings will be allowed in the conduit containing the District's un-metered conductors.
2. The District's service conductors will terminate at the meter socket line terminals.
I 3.
4.
The meter base must be bonded to customer neutral per the National Electric Code.
The 320 Amp meter base is for single phase installation only.
I 5.
6.
For trench details, see District standards Q-7A, Q-78.
For meter base details, see District standards. Q-4C, D, E, F, G, & H.
7. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
8. Ringless meter base not allowed.

TITLE
Service Entrance
Surface Mounted Underground
400 Amp or Less
Q·4A
s DRAW DATE: 03/22/01
~~----------~------------------------------------------------~--------------------~
Provided And Installed By Customer

Item No. Description


@ Meter Base
@ 3" Rigid PVC Conduit
® Sweep 3" sch. 40 PVC 36" radius Meter base to
® Conduit-3" Sch. 40 PVC extend 1" past
finished wall
(j) 3" to 2-1/2" adapter for
(Min.)
200A meter base only
refer to Q-1 E standard

4
Provided And Installed By District
5' Min
Item No. Description
6' Max.
& Conductors

ffi Meter

Finished Grade

..2
@

Notes:
1. No condulet type fittings will be allowed in the conduit containing the District's un-metered conductors.
2. The District's service conductors will terminate at the meter socket line terminals.
J 3.
4.
The meter base must be bonded to customer neutral per the National Electric Code.
The 320 Amp meter base is for single phase installation only.
5. For trench details, see district specification Q-7A.
6. For meter base details, see District standards Q-4C, D, E, F, G, & H.
7. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
8. Ringless meter base not allowed.
C/) REVBY JWV

t BENTON
TITLE·
Service Entrance REV DATE

i11UD
REV NO·
Flush Mounted Underground
OWG. NO.
4-
400 Amp or Less
DRAWN BY· JAD Q-48
!1 DRAW DATE: 03/22/ 01
~~----------~------------------------------------------------~--------------------~
District service connectors

Do not use knock-outs on


this side due to conflicts
with District conductors .

3" conduit may require ~


adapter see Q-1 E ~L-r__,_...._...c;...r------------'

District service conductors


#4/0 AL furnished and
Front View
~
installed by the District
il
u
c

~
"'
0

ci
z 2-1/2" Min Knock-Out
~
0

Bottom View
Notes:

1. Meter base shall be supplied and installed (plumb and solid) by the customer.
2. Lever by-pass not allowed , manual block by-pass allowed under District standard Q-4E.
3. The meter base must be bonded to the customer neutral per the National Electric Code.
"'~ 4. The District requires that all services 200 Amp and below (self-contained) use meter sockets rated for 200 Amp
.llc
continuous duty.
1
(.)
5.
6.
Meter base must have lugs which accept #4/0 aluminum conductors.
Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
7. For pre- approval or equipment meter bases , see document Standard Q-4M.
8. Ringless meter base not allowed. ·
REVBY : JWV SHT
"'
i BENTON
TITLE:
Underground Feed REV DATE:
10/01/13 1 of 1

l11UD
REV NO:
200 Amp Meter Base
DWG . NO.
Single Phase 120/240 Volt
Q-4C
..
,fj DRAWN BY: JAD
$ DRAW DATE: 07/10/03
Residential
~~------------~------------------------------------------------~----------------------~
District service connectors

The fifth lug is


required in the
9 o'clock position
and tied to the neutral

Do not use knock-outs on


this side due to conflicts
with District conductors.

3" conduit may require


adapter see Q-1 E

District service conductors Front View


#4/0 AL furnished and
installed by the District

2-1 /2" Min Knock-Out

..2
u

1
Bottom View
Notes:
1. Meter base shall be supplied and installed (plumb and solid) by the customer.
2. Lever by-pass not allowed, manual block by-pass allowed under Q-4F.
3. The meter base must be bonded to the customer neutral per the National Electric Code.
I
Ol
4. The District requires that all services 200 Amp and below (self-contained) use meter sockets rated for 200 Amp
continuous duty.
' 5. Meter base must have lugs which accept #4/0 aluminum conductors.
6. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
.... 7.
Industries requirements.
For pre-approval or equipment meter bases, see document Standard Q-4M .
•~ 8. Ringless meter base not allowed.
REVBY· JWV
TITLE·
Underground Feed REV DATE

REV NO.
200 Amp Meter Base
OWG. NO
Network, 120/208 Volt
Q-4D
Residential
$DRAW DATE: 02/ 26/01
~~----------~------------------------------------------------~--------------------_J
Block type by-pass stud
for by-pass clip
(TYP.)

Do not restrict
access to this area

3" rigid conduit furnished and , I I I '\ ---------District service conductors


installed by the customer ~ #4/0 AL furnished and
installed by the District

3" Min . Knock-Out

Notes: Bottom View


1. Meter base shall be supplied and installed (plumb and solid) by the customer.
2. Manual block type by-pass required for 200 Amp non-residential services.
3. Lever by-pass Or Safety Socket Style Not Allowed.
i 4. The District requires that all services 200 Amp and below (self-contained) use meter sockets rated for 200 Amp
"'"
0
continuous duty.
I
8
5.
6.
Meter base must have lugs which accept #4/0 aluminum conductors.
Details shown are minimum District requirements and are not intended to depict Washington State Labor and
e Industries requirements
.
.,
Q_

0
0
7. For pre-approval or equipment meter bases, s~e document Standard Q-4M .
8. Ringless meter base not allowed.
~
REV BY: JWV SHT.
"'
1 BENTON TITLE:
Underground Feed 1-::
R"" EV-:-:D:-:-
AT : ..:...:. . :.0/-01-,-3---1
=E,...:
1 1 1 of 1

0.f-
11/UD
REV NO: ATE
200 Amp Meter Base
DWG . NO .
Single Phase , 120/240 Volt
~ DRAWN BY: JAD Q-4E
Non- Residential
02/26/01
s; DRAW DATE:
~~----------L-------------------------------------------------~----------------------~
The fifth lug is
required in the
9 o'clock position
and tied to the neutral

Block type by-pass stud


for by-pass clip (TYP.)

Do not restrict
access to this area
Front View
3" rigid conduit furnished and
installed by the customer
District service conductors
#410 AL furnished and
Installed by the District
2 1/2" Min . Knock-Out

Notes: Bottom View


1. Meter base shall be supplied and installed (plumb and solid) by the customer.
2. Manual block type by-pass required for 200 Amp non-residential services.
3. Lever type by-pass or safety socket style not allowed.
The meter base must be bonded to the customer neutral per the National Electric Code.
I
ciS
4.
5. The District requires that all services 200 Amp and below (self-contained) use meter sockets rated for 200 Amp
.s continuous duty.
i 6.
7.
Meter base must have lugs which accept #4/0 aluminum conductors.
Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
8. For pre- approval or equipment meter bases, see document Standard Q-4M .
9. Ringless meter base not allowed.
REVBY· JWV
"'
I BENTON
TITLE·
Undergrounnd Feed

i11UD
~ DRAWN BY: JAD
200 Amp Meter Base
Network, 120/208 Volt
Non - Residential
Q-4F
$ DRAW DATE 02/26/01
~··~--------------------~------------------------------------------------------------------------------------------------~----------------------------------------~
Stud for by-pass clip

3" Sch. 40 PVC conduit ~ Do not restrict


furnished and installed by access to this area
customer. Customer must
use center knock-out refer to ----- District service conductors
District standard Q-1B Front View -------350 kcm AL, furnished
and installed by the District

N
3" Knock Outs
0

@
}

Bottom View
Notes:
1. Meter base shall be supplied and installed (plumb & solid) by the customer.
2. The meter base must be bonded to the customer neutral per the National Electric Code.
3. Lever by-pass not allowed, block by-pass only.
4. Details shown are minimum District requirements and are not intended to depict Washington State Department of
Labor and Industries requirements.
5. For pre-approval or equipment meter bases, see document Standard Q-4M .
6. Ringless meter bases not allowed.

VI REVBY JWV

I BENTON
TITLE
Underground Feed REVOATE

11/UD
REV NO
320 Amp Meter Base
DWG NO
Single Phase, 120/240 Volt
~ DRAWN BY· JAD Q-4G
Residential or Commercial
~ DRAW DATE· 0 4/10/01
~~----------~------------------------------------------------~--------------------~
For Delta Service
Power Conductor
(Wild Leg)

. Bond to neutral

Block type by-pass stud for


by-pass clip (TYP.)

3" conduit may require adapter


see districtstandard Q-1 E

District service conductors


#4/0 AL furnished and Front View
Installed by the District

3" knock-outs
for utility use

Notes: Bottom View


1. Meter base shall be supplied and installed (plumb & solid) by the customer.
2. Manual block type by-pass required for 200 Amp non-residential services.
3. Lever by-pass not allowed .
4. The meter base must be bonded to the customer neutral per the NEC.
"E 5. The District requires that all services 200 Amp and below (self-contained) use meter sockets rated for 200 Amp
~ continuous duty.
"
<f)
c
6. Meter base must have lugs which accept 4/0 aluminum conductors.
1
8
7. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements .
8. For pre- approval or equipment meter bases, see document Standard Q-4M.
9. Ringless meter base not allowed. .
10. Power conductor (wild leg), color coded orange.
<f) REV BY: JWV

1 BENTON TITLE:
Underground Feed REV DATE:

!1/UD
REV NO:
200 Amp Meter Base
DWG . NO.
Three Phase
~ DRAWN BY: JAD Q-4H
Non - Residential
s; DRAW DATE 02/26/01
~L-------------~-------------------------------------------------L----------------------~
Meter pedestal (200A, raintight meter
base disconnect combination)
~-See note 1-

~
Q)
E ..
o l

~~
.D \
~- II
II 3'-6" Mtn Customer
II 6' Max.
II load conduit
II as required
I I
II
II
II
II
Finished Grade II Finished Grade
a., n -~

~·:;:Undisturbed
~ 6
..

l
II
I I
.. II
II "
.o
earth
II
II " l
2'

"
II
II
II

d
. A
.. ~
l
Concrete to
firmly hold
meter pedestal
2'-6"Min
L_J_
3" Sch.
..
"

40, 36" radius


PVC sweep
for District

2
@ v---.
} 1----1'-6"----1
'-V
1-----1 '-6"
Front View Side View
Notes:

1. The disconnect distance between the manufactured (or mobile) home must meet the
National Electric Code requirements.
2. Line termination lugs must accept #4/0 aluminum conductors.
3. Set pedestal plumb to finished grade. Set in concrete prior to District installation of service conductors.
4. Multi-unit mobile home parks and multi-unit buildings must have address identification permanently attached to the
front of the meter base, per District standard Q-1 C, before service will be connected.
Ili
5. The meter base must be bonded to the customer neutral per the National Electric Code.
6. Customer must provide all trench and backfill per District standard Q-7A or Q-78.
7. Customer must provide all conduit per standard Q-18.
8. Meter socket to be rated for 200 Amp continuous.
.... 9. Details shown are minimum District requiremen ts and are not intended to depict Washington State Labor and
Industries requirements.
i 10. Ringless meter base not allowed.
REVBY JWV
"'
I BENTON TITLE.
Underground Service REV DATE

i11UD
REV NO:
200 Amp
OWG. NO.
Metered Pedestal
~ DRAWN BY: JAD Q-4J
DRAW OATE· 03/27/01
Detail A
Meter base (200A meter base
Double back disconnect combination raintight)
uni-strut

D Customer load Detail B


See Detail
8
5' Min
conduit size as Double back
6' Max.
required uni-strut

L
2'-Cover
JMm. -.,.
. ,.
• 2'

3" sch. 40 36" 1 •

Concrete to firmly
hold meter pedestal

Front View

-1'-6"

Side View
Notes:

1. The minimum distance between the pedestal and mobile home must meet the National Electric Code requirements.
2. Set pedestal plumb to fini shed grade. Set in concrete prior to the District installing service conductors.
3. Multi-unit mobile home parks and multi-unit buildings must have address identification permanently attached to the
front of the meter base, per District standard Q-1C, before service will be connected.
J
]
4.
5.
The meter base must be bonded to the customer neutral per the National Electric Code.
Customer must provide all trench and backfill per District standard Q-7A or Q-78
~ Customer must provide all conduit per standard Q-18.
~ 6.
7. The meter socket will be rated for 200A continuous duty.
8. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
9. Ringless meter base not allowed.
U1 REVBY JWV
TITLE:
j BENTON REV DATE:

11/UD
REV NO·
200 Amp Component
DWG NO
Meter Pedestal
SWT Q-4K
'$.DRAWN BY:
(Mounted on Uni-Strut)
:s
~L_ __
DRAW DATE.
____ 03/27/01
_ _ _ _ _ _L __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _J __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ J
Detail A
Double back
320A meter base
Support legs
(2) required 1-5/8"
double back uni-strut
ffi
Detail B
Double back
uni-strut or 2" steel pipe
uni-strut

See Detail
Cross members
A
(3) required min .
or 1" X 1" 1/8" Sq. See Detail
tube steel min. B
rigidly attach by
bolt or weld.

Customer 5' Min .


load conduit 6' Max.
as required

M->------<-+-6" Min. (TYP.)

Concrete
to firmly
hold meter
pedestal

Front View

Notes:
Side View
1. Line termination lugs must accept 350 kcm aluminum conductors.
2. Set pedestal plumb to finished grade set in concrete prior to District installation of service conductors.
~ 3. All vertical structural components must be adequately encased in concrete .
1'
4. The meter base must be bonded to the customer neutral per the National Electric Code.
"'"
5. Customer must provide all trench and backfill per District standard Q-7A or Q-78.
6. Customer must provide all conduit per District standard Q-1 B.
7. The meter socket will be rated for 320 Amp continuous per District standard Q-4G.
8. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.
9. Ringless meter base not allowed
REVBY : JWV
"'
1 BENTON TITLE:
REV DATE :

!1/UD
REV NO:
320 Amp Component
DWG. NO.
Meter Pedestal
~ DRAWN BY: DDB Q-4L
(Mounted on Uni-Strut)
.~
:.DRAWDATE : 06/04/10
_ __ _ _ _ _ _. . _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ . __ _ _ _ _ _ _ _ _ _ ____j
Q-30 Q-4C
Pre-Approved Meter Bases Pre-Approved Meter Bases

B-Line #U204SSMS21 B-Line U264


Milbank #U4517-DL-M4 Milbank 4015-0

Q-3E Q-4 0
Pre-Approved meter bases Pre-Approved Meter
and 5th jaw kits Bases

B-Line #U204SSMS21 B-Line U204-MSCD


5th jaw kit #50365 W/50365 (5th Jaw Kit)
Milbank #U4517 -DL-M4
Milbank # U4015-0
5th jaw kit #T8K2 - Round
W/K5T (5th Jaw Kit)
5th jaw kit #K5T - Square

Q-3F Q-4 E
Pre-Approved Meter Pre-Approved Meter
Bases Bases

~ B-Line U264 Preferred B-Line U264


&
0
Milbank U3514-XL
!
~
-
.0
z
.il
c5
Q-3G Q-4 F
~
5 Pre-Approved Meter Pre-Approved Meter
""~ Bases Bases
N

~ B-Line U264 Preferred W/ #50365 (5TH Jaw Kit) B-Line U264


0
;;; Milbank U3514-XL W/ #5T8KS (5th Jaw kit) #50365 (5TH Jaw Kit)
r
~

Q-3H Q-4G
Pre-Approved Meter Pre-Approved Meter
Bases Bases

B-Line 324N Preferred


Milbank U3548-K B-Line 324CMilbank U3548-X

Q-3J Q-4H
J
I!
Pre-Approved Meter
Bases
Pre-Approved Meter
Bases

..i. B-Line U267 Prefered B-Line U267


..i Milbank 127TB Milbank 127TB
~
j, REV BY:
JINV j sHT.

I BENTON TITLE
REV DATE:
10/01/13 I 1 of 1

j;JPUD ~~~~-~ATE: J/14--


REVNO· O
Pre-Approved
OWG NO
Meter Bases
'ji DRAWN BY: JWV Q-4M
_sDRAW DATE· 10/01/ 13
~
CURRENT
NSFORMERS

BENTON TITLE:

1/UD
DRAWN BY· JAO
CURRENT TRANSFORMERS
Q-5 Series
Q-5
DRAW DATE 03105104
Source
1 -- -
8" Min
2' Max -=l _
~

Hinges on CT
cabinet must
f-T
,-lL
. 0
0
J
0

0
c
0
0
0
0
0

0
0
0
0 ---t--T-
be on the side -{
opposite the
meter base.
X
t ro 0 0 0 0 0 0
s ~ .....,_.._ 000 0 0
..
g
.!:
(o
_g._
v~-+~~~--~~
0~
(o
~

[
0
2
;;
;
0
~
.5
]I
>
1" Conduit
6' Max.
0. 4' Min.
N

2 Mounting base for


@) current transformers
"r,:
~
(by customer, see
~ Conduit(s)
table on Sht.2)
~to transformer

Final Grade
·- -.__._~ . .,.r--.;. .__,. .,- ---r--: •
_ _.....__ _ _ _ __..__~..;;.....o'-_._::-- 0
....
0
f I ....
·~ l

i1

.
i.,

en REVBY· JWV

I BENTON
TITLE:
Current Transformer (CT) REV DATE:

11/UD
REV NO
Compartment Requirements for 0
DWG. NO
Single Phase Services
JAD Q-58
!!/DRAWN BY:
201-800 Amps
~ORAWOATE: 03/07/01
~~----------~------------------------------------------------~--------------------~
Pre -approved Single Phase Current Transformer Cabinet & Mounting Bases
CT Service Type Cabinet Dimensions CT Cabinets CT Mounting Bases

Num.ber of Cooper
Service Cooper B-Line Milbank Milbank EUSERC
Load Width Height Depth B-Line
Size Part# Part# Part# Drawing#
Conductors Part#
244811 HRTCT CT244811HC 6019HA K4797
24"
201-400A 1-2 48" 11" or or or or
min 328A
304811 HRTCT CT304811HC 6019HAL K4903
or
6019HE K4797 3288
201-800A 1-4 36" 48" 11" 364811 HRTCT CT364811HC or or
6019HEL K4729
Notes:

1. Current transformer cabinet and CT mounting base to be supplied by the customer.


2. Current transformers to be supplied and installed by District.
3. Estimated Load must be at least 25 KVA for CT metering to facilitate additional load growth and the customers
request appears reasonable, customer must install Current Transformer Enclosure for the CT metering equipment.
4. The CT mounting base shall have a 50,000 Amp minimum fault current rating.
5. The cabinet will be raintight, with a sealable, hinged, cover.
6. District provides the service conductors to transformer on residential services.
7. The maximum number of load conductors per phase will be limited to four without prior District approval.
8. Customer shall ensure the load conductors are compatible with the connectors on the EUSERC 3288 style CT
mounting base. All mechanical cable termination blocks shall be provided by the customer.
9. The customer shall make up and terminate the load side connections in the CT compartment.
10. The customer service entrance conduits must exit the enclosure on the load side of the CT mounting base. The
District will not allow customer conductors or conduit in the District's terminating and pull space.
11. The meter base shall be provided by District and installed by customer.
12. Bonding must be in accordance with the current National Electric Code requirements.
13. Meter sockets shall be installed within 24" of Non-Hinge side of CT compartment and not be located above CT cans due
to safety of working in front of the energized equipment.
14. Maximum conductor size allowed is 500 kcm copper or aluminum.
15. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries requirements.

j REV BY: JWV SHT.

1 BENTON TITLE :
Current Transformer {CT) REV DATE :
10/01/13 2 of 2

11/UD
REV NO:
Compartment Requirement for 1
DWG . NO.
Single Phase Services
~ DRAWN BY: JAD Q-58 (Cont.)
201-800 Amps (Cont.)
03/07/01
:> DRAW DATE:
~L-------------L--------------------------------------------------L----------------------~
,__S"Min.l
2' Max
Source
¥-
-T
- -
c
t
Q)
E
Hinges on CT
cabinet must
.
....2... 0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0 0 ID
8

ro
a.
E
0
be on the side --{
opposite the
meter base.
.
u
(.)

.
- 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 '-o 0 0 0
a. c J
B
B
xro [ Load
.
~
<0
1" Conduit
io
6'Ma X.
N Mounting base for 4'Mi n.
2 current transformers
0

(by customer, see


f table on Sht. 2)
V Conduit(s) to
transformer
2' Min.

Final Grade

L •.a.
- .· -- .
... r • • I • - '--

J
J

TITlE:
Current Transformer {CT)
Compartment Requierments for
Three Phase Services
201-800 Amps Q-SE
03/26/10
:1 DRAW DATE:
~~----------~------------------------------------------------L---------------------~
Pre -approved Three Phase Current Transformer Cabinet & Mounting Bases
CT Service Type Cabinet Dimensions CT Cabinets CT Mounting Bases

Number of Cooper
Service Cooper 8-Une Milbank Milbank EUSERC
Load Width Height Depth 8-Une
Size Part# Part# Part# Drawing#
Conductors Part#
6067HA K4798
201-400A 1-2 30" 48" 11" 304811 HRTCT CT304811-HC or or
6067HAL K4904 329A
or
6067HE K4798 3298
201-800A 1-4 36" 48" 11" 364811 HRTCT CT364811-HC or or
6067HEL K4722
Notes:

1. Current transformer cabinet and CT mounting base to be supplied and installed by the customer
2. Current transformers to be supplied and installed by District.
3. Estimated Load must be at least 25 KVA for CT metering to facilitate additional load growth and the customers
request appears reasonable, customer must install Current Transformer Enclosure for the CT metering equipment.
4. Estimated load must be at least 50 KVA for secondary compartment CT metering, specifically services which are fed
by a District 45 KVA transformer must be metered within a Current Transformer Enclosure.
5. Estimated load must be at least 100 KVA for can be metered in the secondary compartment the transformer. CT
metering , specifically for services which are fed by a District 75 KVA or smaller transformer shall be metered within a
Current Transformer Enclosure.
6. The CT mounting base shall have a minimum 50,000A fault current rating.
7. The cabinet will be raintight, with a sealable, hinged, cover.
8. The customer shall provide and install the service conductors to the District transformer.
9. The maximum number of conductors per phase will be limited to four without prior District approval.
10. Customer shall ensure all the conductors are compatible with the connectors on the EUSERC 3298 style
CT mounting base. All mechanical cable termination blocks shall be provided by the customer.
11. The customer shall make up and terminate all connections in the CT compartment.
12. The customer service entrance conduits must exit the enclosure on the load side of the CT mounting base.
The District will not allow customer conductors or conduit in the District's terminating and pull space.
13. The meter base shall be provided by the District and installed by the customer.
14. Bonding must be in accordance with latest Issue of National Electric Code (Article 250 grounding).
15. Meter sockets shall be installed within 24" of Non-Hinged side of CT compartment and not be located above CT cans
due to safety of working in front of the energized equipment.
16. Maximum conductor size allowed is 750 kern copper or aluminum.
17. Details shown are minimum district requirements and are not intended to depict Washington State Labor and
Industries requirements.

Ii

....
I
!li
~ REVBY· JWV SHT

I BENTON
TITLE:
Current Transformer (CT) REV DATE: 10/01/13 2 of2

l11UD Compartment Requirement fror REVNO. O ~~~RG.~DATE l/f4-


DWG NO.
Three Phase Services
~ DRAWN BY: JAD Q-SE (Cont.)
201- 800 Amps
, DRAW DATE: 03/26/10
~~------------L-------------------------------------------------~----------------------_j
Three Phase
Bus 8 ar Kit
to be ins tal l e~~ Source 8" Min.
by cus tomer

~
rt n rt 2' Max
,.~ ,. ~ ~~ • 0 c
Q)

0
...__ r-- r-- I- E
"C

~
II)
a.
E
0
Vi I
I'--
()

1-
0
"':J "' u:J "'tl 0

v
0 0

~1"Conduil
u JU a.
.8
4' M1n .8
Load 6' Max. x
II)
~
Co

District suppliedCt's_/

vconduit(s) 1' Min


I
to transformer
.. j_ Final Grade
oCl ...

REVBY. JWV
"'
1 BENTON TITLE:
Current Transformer (CT) REV DATE
REV NO·

)1 /IJD
!!! DRAWN BY: SWT
Compartment Requirements for
Commercial Three Phase Services
1200-2500 Amps
DWG NO.

Q-SF
:S DRAW DATE 05/ 12/10
~·L-----------~--------------------------------------------~------------------~
Pre -approved Three Phase Commercial Current Transformer Cabinet & Mounting Bases
CT Service Type Cabinet Dimensions CT Cabinets with Mounting Bases

Number of Erickson
Service Height Depth
Load Width Bulletin Erickson Catalog Numbers
Size
Conductors Numbers

1200A 3 55"* 64" 15" BPCT-07A CT-124-BP-SG

1600A 4 61"* 64" 15" BPCT-07A CT-164-BP-SG

2000A 5 65"* 64" 15" BPCT-07A CT-204-BP-SG**

2500A 7 65"* 64" 15" BPCT-07A CT-254-BP-SG**

* INCLUDES SIDE GUTIER


**MUST CONTACT BENTON PUD PRIOR TO PURCHASE(NON-STANDARD)

Notes:

1. Current transformer cabinet and CT mounting base to be supplied and installed by the customer
2. Current transformers to be supplied and installed by the District.
3. The CT mounting base shall have a 85,000A minimum fault current rating.
4. The cabinet will be raintight, with a sealable, hinged, cover.
5. The customer shall provide and install the service conductors to the District transformer.
6. The maximum number of source conductors per phase will be limited to six without prior District approval.
7. Customer shall ensure all load conductors are compatible with the connectors on the EUSERC 328B Style
CT mounting base. All mechanical cable termination blocks shall be provided by the customer.
8. The customer shall make up and terminate all connections in the CT compartment
9. The customer service entrance conduits must exit the enclosure on the load side of the CT mounting base,
unless written permission is obtained from Engineering and the Meter Shop.
The District will not allow customer conductors or conduit in terminating and pull space.
10. The meter base shall be provided by the District and installed by the customer.
11 . Bonding must be in accordance with latest issue of the National Electric Code (Article 250 grounding).
The code enforcing agency requires bonding connection to be visible when electrical inspection is made.
12. Meter sockets shall be installed within 2' of CT compartment and not be located above CT cans due to safety
of working in front of the energized equipment.
13. Maximum conductor size allowed is 750 kern copper or aluminum.
14. Details shown are minimum District requirements and are not intended to depict Washington State
Labor and Industries requirements.
15. Customer will install bus bar and CT perch for window style CT.

REV BY· JWV ISHT


TITLE:
I BENTON Current Transformer (CT) REV DATE 10101113 1 2 of 2
1/11--
j;JIUD
REV NO· 1 I~~~./ DATE·
Compartment Requirements for
DWG NO
Commercial Three Phase Services
\II DRAWN BY; SWT 1200-2500 Amps
Q-SF
s DRAW DATE: 05/1 2/ 10
~~----------~------------------------------------------------~--------------------~
'
Center pedestal
Alternate Preferred in concrete

,-----
1
Placement Transformer Pad Placement

i ~!=J~==r--==r:_=- ->-JTISI I
1'-6"

L____ L
ITransformer door location (TY~ .) ---.._
I -
1"
~6" Min.(TYP.)
_ j

NOTE:
Meter Pedestal Placement
Plan View
e ·Cl
Install pedestal to
avoid interference
when transformer
door is opened 4'

5'

Note. 5 ~ Dl:: ~ 01- ----+-

. . o;.~u;ct ; stalled CT w;res~ . • -,; ~ )


r 4" 1'
I
,, •:... ~· •·:1 ~...., ·

#'' '[.,~
I .
F1mshed Grade
. 1:'·
-t
- Customer ! ~ stalled I I 'i c ·•; I; . :. 2'-2"
1" Rigid Conduit_/
With Sweeps 0--..
,,
.'~ •• ' .;
•.
,:

H . I
Meter Pedestal Placement
Elevation View 6"J

Notes:

1. The District will provide the pre-fabricated meter base and frame. Contractor install pedestal in concrete, plumb and
sound, and to finished grade as shown.
2. Refer to transformer pad detail , Q-6A, or Q-68.
3. Customer will supply and install the 1" conduit for the meter..
I. 4. The meter must be located so the metering circuit conduit run does not exceed 25' in length or contain more than 4
bends totaling 360 degrees.
5. No condulets or junctions are allowed in metering circuit conduit.
6. Secondary circuit conductors: maximum number of wire-6 sets of 750 kern copper or aluminum. Contact the District
if in need of additional sets.
.. 7. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
.i Industries requirements.
~
REV BY· JWV SHT

j BENTON TrrLE:
Self Supported CT I:R=
EV-:-:D:-:-
AT:::E~1-0/-
01-/1-3----j 1 of 1

j;JPUD
REVNO DIR. ~ -:; DATE ///"?-
Meter Pedestal 1 ENG.~ '1-r-
DWG. NO
with CT's Installed in Secondary
':l( DRAWN BY: JAO Q-5G
Side of District Transformer
:1 DRAW DATE: 03/27/0 1
~·~----------~------------------------------------------------L---------------------~
Neutral bus Alternate location
of neutral bus

c=::::~ c=::::~
=:::::~ c =
c=::::J c::=::::~
c;;::::~ T _t_c::;;::::~

5" 5'' Min 5" 5"


j- -1 Min.
j_~~~~l
Min.

~~~~ t
~~~~
7" Min
11" Max

2'-11" Min.

I ~------- 2'-9" Min . -------1~


......_ / B u s link "B"
-
K
l
11 A
( >

A
(
vV A
District to furnish
theCT's

!lloo II iii
2'-6"
~ r
~ ( > ~ Insulated CT
I ~bracket supplied
._-Wffl---,r----r-~~f-+---+-~~1---1 by switchgear
~ ~ ~ manufacturer

~ ~ ~
- -
l
Notes :

1. Contact Engineering regarding all switchgear installation.


2. Busways must remain in position when the removable bus link "B" is removed.
3. Set the direction of feed from the top. No other conductors shall pass through this compartment.
4. Bus clearance dimension measured to inside edge of the compartment access opening.
5. CT's to be provided by District.
6. Reference EUSERC 322.
7. Customer to install and terminate all conductors.
8. Current transformers to be supplied and installed by the District.
REVBY· JWV
TITLE
Current Transformer REV DATE·
REV NO:
Compartment for Switch gear
DWG. NO
1000-3000 Amps
Q-SH
$ DRAW DATE: 06/04/1 0
~~----------~------------------------------------------------~--------------------~
~ NSFORMER
PADS AND
CLEA NCES

REV BY· JWV SHT.

BENTON TITLE TRANSFORMER PADS REV DATE.


1010112013 1 of 1

1/UD
DRAWN BY: JAD
& CLEARANCES
Q-6 Series
Q-6
DRAW DATE· 03/05/04
8'
(10')
3'
(5')

8'
5'---+~
{10')
Non combustible Pad Combustible
building, fence, " Building
retaining wall,
pole, or maibox.
Front

0280e-2001 •

Clear Zone
To Be Unobstructed

®
1 1-RES IDENTIAL -J
I DIMENSIONS I
f- (COMMERCIAL} - j
I (DIMENSIONS) I

J Notes:
1. All dimensions are minimum
2. No obstructions are allowed over transformer.
3. Refer to District planting guide for landscaping.
4. Installation must not violate WAC-296-468-450 transformers.

REVBY JWV
TlTlE
Installation Clearances REV DATE:
REV NO:
for
OWG. NO.
Commercial & Residential
Transformers
Q-6C
03/27/01
$ DRAW DATE:
~~-----~-----------------------L------------~
(2) Required
District supplied
~~
T-
e Ground loop
See Note 5
- - - - - - - - - - - - - - -
(Secondary cable area) Conduit
and wire customer supplied and
installed by District when required
by District, set CT's in secondary
customer installed I1 compartment of transformer.
(See Note 5)
Primary Secondary
#3 Rebar @ 6"on Compartment Compartment
center Both ways

I
(2) Required I
District supplied I 5'-10"
customer installed I
(See Note 5) I
~I 1'-4"
I
I
*Primary cable area.
I
'
Conduit and ground
wire District supplied, - - - - l~ _ _ 1_
.J_J-I-
customer installed 1'j
(see note 5).

f----- -- - 6'-2 " - - - - - - - l

Plan View
Concrete Transformer
Pad by Customer

Refer to Q-5G for 1" conduit


1/2" Radius on all installed by customer
Exposed pad edges

Finished Grade
Top of ground rod

4" 36" Radius PVC sweep


District supplied ,customer
installed. (See Note. 5) Section A·A

., REVBV: JWV

I BENTON TITLE:

i~UD
Transformer Pad Details
500 kVA & Below
!!I DRAWN BY· JAD
Three Phase Pad
UG6-C
!S DRAW DATE: 11/01/01
~~-----~------------------------~----------~
Item Qty. Description Item Code
1 2 5/8" x8" Ground Rod 337381
2 1 4 " Diameter PVC Sch. 40 36" Radius Sweep 633651
3 50' Wire #4 MHDB 7 Str. 400300
4 2 5/8" Ground Rod Clamp 327100

Notes:

1. Ground under pad must be 95% minimum compaction.


2. Concrete shall be Portland Cement concrete, 5 sack mix, attaining 3000 P.S.I. at 28 days.
3. Top of pad shall be level and finished smooth. Surface shall not contain honeycomb or segregation.
4. Barricade traffic bollards provided and installed by customer - contact District engineering to determine location of
posts. When required , bollards must not interfere with swing of transformer doors.
5. Customer to pick up 4" primary conduit sweep, 2 ground rods, and #4 Str. bare CU. ground wire from the
District warehouse located at 1500 S. Ely street, Kennewick.
6. Maximum number of wire-6 sets of 750 kcm copper or aluminum . Contact the District if in need of additional sets.
7. For pad location,reference District standard Q-6C for clearance to existing structures.

J, REV BY· JWV SHT.

I BENTON
TITLE:
REV DATE: 10/0112013 2 o; 2

I~UD
Transformer Pad Details REYNO 1 ~~~~. ~ DATE /ff4--
DWG. NO '
500 kVA & Below
~DRAWN BY:
UG6-C
JAD Three Phase Pad
s DRAW DATE: 11/01/01
~~------------L-------------------------------------------------~----------------------~
(2) Required
~~ /P_ Ground loop
See Note 6
(Secondary cable area) Conduit
and wire customer supplied.
District supplied - - - - - - - - - - - - - - - -
customer installed
(See Note 6)
Primary Secondary
#3 Rebar @ 6"on H-+-=~c,ompartment : Compartment
center Both ways
I
I
I 10'
Transformer I
1'-4"
Pad I

:~
Primary cable area .
Conduit and ground
wire District supplied,
customer installed
(see note 6).

1 - - - - - - - 1 0' - - - -- -l

Plan View
Concrete Transformer
Pad by Customer

Refer to Q-5G for 1" conduit


1/2" Radius on all installed by customer
4
Exposed pad edges

Finished Grade
Top of ground rod 6"

4" 36" Radius PVC sweep


District supplied,customer
installed. (See Note. 6) Section A-A

REV BY: JWV

i BENTON TITLE:
REV DATE:

!1/UD
REV NO:
Transformer Pad Details
DWG . NO.
750 kVA & Above
.fi-;;; DRAWN BY: JAD UG6-C2
Three Phase Pad
:> DRAW
u:L __ DATE
_ : 11/01/01
~~__J_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __L__ _ _ _ _ _ _ _____J
UG6-C2
Item Qty. Description Item Code
1 2 5/8" x8" Ground Rod 337381
~--r---r----------------------------- ---------------------------------4·--------~
2 1 4 " Diameter PVC Sch. 40 36" Radius Sweep 63365 1
3 50' Wire #4 MHDB 7 Str. 400300
4 2 5/8" Ground Rod Clamp 327100

Notes:

1. Ground under pad must be 95% minimum compaction.


2. Concrete shall be Portland cement concrete, 5 sack mix, attaining 3000 P.S.I. at 28 days.
3. Top of pad shall be level and finished smooth. Surface shall not contain honeycomb or segregation.
4. Barricade traffic bollards provided and installed by customer - contact District engineering to determine
location of posts.
5. When required, bollards must not interfere with swing of transformer doors.
6. Customer to pick up 4" primary conduit sweep, 2 ground rods, and #4 Str. bare CU. ground wire from the
District warehouse located at 1500 S. Ely street, Kennewick.
7. Maximum number of wire-6 sets of 750 kcm copper or aluminum. Contact the District if in need of additional sets.
8. For pad location, reference District standard Q-6C for clearance to existing structures.

~
@

I
I
~ REV BY: JWV SHT
TITLE: 1=-::-=:=-'--- - - - 1
j BENTON REV DATE. 10/01 /2013 2 of2

J11UD
~ DRAWN BY: JAD
Transformer Pad Details
750 kVA & Below
Three Phase Pad
REV NO·
DWG. NO.
1 ~~~~)DATE

UG6-C2
J/;4-

:1 DRAW DATE: 11/01/01


~~------------~-------------------------------------------------L----------------------~
Ground wire

i __ ___ ____________ _______


/ T_-..- --_-_-_-\;.,....;,_r_-_-_·- -....- _y Ground wire

I I I
: Transformer : :
I Pad 1 1
I I I
I I I
I t I
I I
Primary Secondary I I
compartment compartment I I
I I
I I
L---~ ----- -
1
I
I
I Ground rods
I
I
I
IL _________ _ _ ___ Jl CT meter base Ref.
District standard Q-5C
Ensure the XFMR door
can open with no interferance
Customer to install 6 - 6" Plan
Sch 40 PVC conduits. Concrete pads by customer
u
and 6 - 6" Sch 40 PVC

1 sweeps.District to install
wire between transformer
and secondary cabinet.

Notes:

1. Terminations of customer owned wire in secondary cabinet by customer.


2. Reference transformer pad details, District standard UG6-C or UG6-C2.
3. Reference CT meter base construction, District standard Q-5G.
4. Primary cable area conduit and ground wire District supplied , customer installed.
5. When required by District set CT's in secondary compartment of transformer.
6. Termination cabinet grounds shall be bonded w ith transformer pad grounds.
7. See UG6-C or UG6-C2 fro XFMR pad details.

"' TITLE:
j BENTON
)1/'UD
!!( DRAWN BY· SWT
600V Termination Cabinet
Guideline
Q-&G
:$ DRAW DATE: 06/21/ 10
~~------------L-------------------------------------------------~----------------------_J
TRENCHING

REVBY. JWV ISHT.


TinE
BENTON REV DATE
REV NO:
10/0 1/2013
I 1 of 1

~~ifG~ DATE:I/!4-

1/'UD
DRAWN BY: JAD
TRENCHING
Q-7 Series
1
DWG. NO.

Q-7
DRAW DATE: 03/05/04
When no stub-out exists, customer to
dig a 3'W x 3'L x 3'D work pit for District
use and supply a 36" radius sweep to be
installed by the District.

[ Plan
r- Gas, Water
Phone, TV- By District By customer
Power Cable
In Conduit-
- 2' r-; -~
1. / ' Spoil Pile
F:-- - -•
I
-j
b
Self contained meter
3' Secondary I
I base furnished and \
!
in:~::~:.~::~:~:~er :U~
t. ·

6"Min.J ' '"


1 - 1 ' Min. Separation
Selective District supplied
Varies 0-~
! Backfill transformer or
and installed meter
./
J

c)
Section A·A pedestal '(.
0
1 Customer provided
trenching,backfill, ~

_ _ Finish_ed Grad_e _r J --n__ Al


__n) _
- ,
A
and conduit
__ .- _ _ _ __ _ __
Conduit per District
District supplied__/'~ II standard Q-1B
and installed sweep ~ ~J:::==========================/f"
Customer Supplied
When a stub-out exists, customer will
36" radius PVC sweep
remove temporary sewer 90° and
connect to existing District stub-out. If
no stub-out exists see plan view above. Elevation

Notes:

1. Cover open conduit with conduit cap or cloth to seal out dirt.
2. The District will inspect and approve all trenches prior to backfill.
3. Always call U-DIG before digging UDIG or 811 .
4. Locate meter base so the conduit run does not exceed maximum allowed length per District standard Q-1 B,
or have more than 3 bends totaling 270 degrees including sweep at transformer.
5. Details shown are minimum District requirements and are not intended to depict Washington State Labor and
Industries Requirements.
REVBY· JWV
"'
i BENTON TITLE:
REVOATE:

tHUD
REVND:
Trenching & Conduit Details
OWG. NO
for Typical Underground Service Installation
!Ji DRAWN BY: JAD Q-7A
from Pad Mount Transformer
3/27/01
:S DRAW DATE·
~.L-------------L-------------------------------------------------~----------------------_J
When no stub-out exists, customer to dig
a 3'W x 3'L x 3'D work pit for District use.
District will dig final 36" of trench and
install District supplied sweep.

By District By Customer
Plan

Phone,TV
Power cable Self contained meter base
in conduit furnished and installed
by customer.
! -~ - --.m,
j 3' Secondary
District furnished and
i

l
f Customer provided
..~
N Selective
1-----1+-1' Min .
trenching and backfill
2 1--- --1- Varies
0 Backfill

I Section A-A
Finished
Grade
Conduit Per Standard Q-1B

District supplied and


installed sweep
Customer Supplied
Customer to remove temporary 36" Radius PVC Sweep
sewer goo and connect to existing
District stub-out. If no stub-out exists,
Notes: see plan view above. Elevation

1. The District will inspect and approve all trenches prior to backfill.
2. Cover open conduit with conduit cap or cloth to seal out dirt.
3. Always call U-DIG before digging UDIG or 811 .
4. Locate meter base so the conduit run does not exceed maximum allowed length per District Standard Q-1 B,
or have more than 3 bends totaling 270 degrees.
5. Details shown are minimum District requirements and are not intended to depict Washington State Labor
and Industries requirements.

Till.£:

Trenching & Conduit Details


for Typical Underground, Service Installation
from Overhead Transformer
Q-78
03/27/01
$ DRAW DATE:
~~------~------------------------~-----------_J
NET
METERING
SERVICES

REV BY· JWV lsHT.


BENTON TITLE: REV DATE: 1010112013 1 1 of 1

~ ~~G~

11UD
REVNO 1 DATE/ / / 4 -
NET METERING SERVICES
DWG. NO.
Q-8 Series
DRAWN BY. DDB
Q-8
DRAW DATE 03/22/12
Meter socket source terminals

D
{line side) must be connected Customer
to the branch circuit conductors main electric
See note #6 below LABELING !See note #7 below) service panel
"CU STOMER GENERATOR"
"PRODUCTION METER"

~-------T--
LABELING {See note #7 below)
"NET METER"
1 I "CUSTOMER GENERATOR CONNECTED
TO THIS SERVICE"

I I
1--t-1- - - - - i l r - - - i 0 0
Inverter
Il L~
----y-- : AC production Service meter with
I I meter base installed bi-directional
1 See note #4 below 1 by customer. Meter energy registers
Solar Panel(s)
Or I I furnished and
Other Generation I I installed by Benton
I I PUD.
..l Jr--'--Production meter shall be
L------- ------- installed within line of sight of
main electric service meter
base.Other locations are subject
to Benton PUD approval.
Notes:

1. Connecting customer generation equipment to the Benton PUD (SPUD) distribution system requires completion of a Net
Metering Application and signing of a Net Metering Interconnection Agreement.

2. This standard represents a typical arrangement for a net metering installation. The details shown are not intended to
depict Washington State Department of Labor and Industries (L&I) requirements. L&l approval of installation is required
prior to customer receiving approval from SPUD for final interconnection of generator to the SPUD distribution system .
Customer shall provide SPUD with a copy of the documentation of L&l approval.
~

@ 3. Customer's must provide a one-line electrical schematic drawing to SPUD which is specific to the proposed installation.

J"' 4. SPUD does not require a utility disconnect switch for customer generation equipment utilizing Underwriter's Laboratory
(UL) 1741 listed inverter equipment. Contact the SPUD engineering department for review and approval of other
interconnection methods.

5. Upon receiving L&l approval, SPUD will complete a field inspection of the customer's net metering installation. Approved
installations will be documented by SPUD's completion of a Generating Facility Certificate of Completion . This certificate
represents the customer's authorization to energize their generation equipment and interconnect their net metering
installation to the SPUD distribution system.

6. All SPUD meters are remotely read and controllable via radio signals. In addition, 200 amp meters are equipped with
remote disconnect and re-connect capabilities. To enable this feature , the meter socket for the AC Production meter
must be oriented as described above. SPUD meters will generate an alarm when a power outage occurs or power is
disconnected from the AC Production meter or Main Service Net meter. Customers should plan their generator
maintenance activities to avoid unnecessary power outage reports from the AC Production meter.

7. Main electric service (Net Meter) and AC Production meter bases shall be labeled with engraved phenolic placards; 3/8"
white capitalized lettering on a red background as described above.

REVBY: ECE
TITLE:
BENTON REV DATE:

REV NO :

1/UD
DRAWN BY: SWf
Customer Generator
Net Metering
Installation
DWG. NO .
2

Q-SA
DRAW DATE: 06/02/10
FIBER
SERVICES

REVBY: JWV lsHT.

BENTON TITLE:
REV DATE: 10/01/2013 I 1 of 1
REV NO:
~ ~~R~:) ///4-
11UD FIBER SERVICES 1 DATE:
_.-
DWG. NO.
Q-9 Series
DRAWN BY: 008 Q-9
DRAW DATE: 03/22/12
......

Transformer
District grid numbers

/ / 10' Min
Customer to install 2" sch 40 PVC
from communications room and
connect to 2" stub-out or hand
hole as provided by the District.

Clear Zone

l
District to install
2" Sch 40 PVC
~1
and stub-up II
u

i
~

J Notes:
1. All dimensions are minimum.
2. No obstructions are allowed over transformer or fiber hand hole.
3. Refer to District planting guide for landscaping.
REVBY: JWV
"'
i BENTON TITLE
REV DATE·

i11UD
REV NO
Installation Practices for
DWG. NO
Customer Fiber Services
\'J DRAWN BY: RPR Q-9A
_sDRAW OATE 07/02/07
~L-----------~------------------------------------------------~--------------------~
WORK AREA
CLEA NCES

BENTON TITLE:

1/UD
DRAWN BY: DDS
WORK AREA CLEARANCES
Q-10 Series
Q-10
DRAWOATE 03/22/1 2
-~6'

~
A Typical Overhead
!1------------------~====~----------------J
~
N

2
@)
l!

10'
Typical Underground
REVBY JWV

j BENTON TITLE· REV DATE·

11/'UD
REV NO·
Work Area Clearance
DWG. NO.

~i~fDRAWN
::-==,..-----J
BY: 008 Q-10A
~ DRAW DATE: 11/03/ 10

You might also like