Introduction
1.1. Malaysian Standard Method of Measurement (‘MySMM’, its acronym) of Building Works
(First Edition) for use in Malaysia has been written to provide a standard set of
measurement rules for the preparation of bill of quantities (BQ) and schedules of works
(quantified) for building works, and a framework that can be used to develop bespoke and
standard schedules of rates.
1.2. In keeping with the advancement in construction technologies in Malaysia, MySMM has
incorporated rules governing the measurement of such technologies, e.g. Industrialized
Building System (IBS), diaphragm walls, reinforced earth, etc.
1.3. In sync with the use of Building Information Modeling (BIM) technology in the construction
industry in Malaysia, MySMM has incorporated BIM-friendly features i.e. simplification of
measurements, reduction in measurable building components/items, simplification of
building components/items description and provision of guidelines as to the specific
information to be shown in 3D models by the respective consultants for ‘quantities’
extraction purposes from the 3D models.
1.4. MySMM also includes guidelines to the drafting of ‘Preliminaries’, ‘Specification’ and
‘Preambles’, all of which form parts of the procurement document for building works.
1.5. The main part of MySMM is in a tabulated form (‘the Tabulation’) divided into levels. The
main intention is that any building component/item description can easily be formed by
extracting the relevant parts of the description from each level in the Tabulation and filling
in any missing information and/or dimension as advised therein. Truly, the parts of the
description and the unit of measurement for each of the building components/items shown
in the Tabulation are the actual rules of measurement, which have to be read in
conjunction with ‘Specification’ and ‘Preambles’ as stated in Item 1.1.4 above. It also
serves as a template for the description of any components/items not found in MySMM.
1.6. There are specific rules of measurement that cannot be inferred or covered by the
component/item descriptions and ‘Preambles’. Such rules are dealt with in ‘Specific Rules
of Measurement’ section of MySMM
Items 1.1-1.6 above set-out the main objectives of MySMM, which, in essence, shall
propel the QS profession towards standardization of component/item descriptions,
Preliminaries items, Specification and Preambles in the production of procurement
document of building works as well as to be a member of the BIM team specializing in
extraction of ‘quantities’ from the 3D model.
1.7. MySMM embodies the essentials of good practice and is understandable by all the
stakeholders involved in a construction project e.g. the employer, the contractor, the
project/design team, etc. and is equally applicable to both proposed and executed works.
1.8. Rules of measurement adopted for work not covered by these rules shall be stated and
such rules shall as far as possible conform with those given in this MySMM for similar
work.
1
2.0. Tabulated rules of measurement for building works
2.1. Introduction
2.1.1. The rules comprise:
(1) the information and requirements for the main contractor’s preliminaries; and
(2) the rules of measurement for building components/items which are grouped
under 28 Work Sections.
2.2. Interpretation
2.2.1. The rules of measurement for building works are set out in tables. The tables are divided
into two categories, namely those dealing with:
• preliminaries; and
• measurement of building components/items
2.2.3. The symbol ‘/’ used between two or more units of measurement or within the text, means
‘or’.
2.2.4. Horizontal lines divide the tables and rules into zones to which different rules apply.
2.2.5. The use of broken lines (-------) between two different supporting information in these
tables means with different units of measurement but under the same level for the building
components/items.
2.2.6. The use of a hyphen (-) or the phrase ‘to’ between two dimensions in these tables or a bill
of quantities means a range of dimensions exceeding the first dimension stated but not
exceeding the second.
2.2.7. This bracket, ( ) contains an instruction as to the insertion of drawing nr., dimension,
width, length, diameter, etc. and shall be deleted upon such insertion while this bracket
{ } contains the additional supporting information e.g. ‘measured separately’.
‘consolidated thickness’, etc. and NOT to be deleted.
2.2.8. The ‘S.O.’ an acronym that stands for Superintendent Officer which can also mean the
Architect or the Engineer or Specialist Consultant as the case may be.
2
2.3. Work Sections
2.3.1. Work Section 01 tabulates the common preliminaries items encountered in a main
contract together with the rules for describing the information and requirements related to
each of such items therewith in the form of tables structured as follows:
(1) There are nine group headings under which these preliminaries items are
grouped, namely,
(i) Generally;
(ii) Bills and Pricing/Pricing;
(iii) Materials and Samples;
(iv) Form of Contract;
(v) Statutory Obligations;
(vi) Contract Administration;
(vii) Site Control;
(viii) Temporary Works; and
(ix) On Completion
(2) Each of the above group headings has a table whereby the information and
requirements related thereto are specified ( ‘the Table’)
(3) The left-hand column (sub-heading) of the Table lists the common preliminaries
items to be provided under the heading;
(4) The second column (information and requirements) lists the information and
requirements which shall be included within the preliminaries descriptions.
(5) ‘Preliminaries’ prices are to cover the cost of administering a project and
providing plant, site staff, facilities, site-based services, and other items not
included for in the rates for measured work. Therefore, the ‘information and
requirements’ given therein ONLY serve as a guide as to the drafting of Work
Section 01: ‘Preliminaries’ commonly encountered and are by no means
exhaustive.
3
2.3.2. Work Sections 02-29 are as follows:
02 IBS
03 Demolitions, alterations, repairs, and conservation
04 Excavating and filling
05 Ground remediation and soil stabilisation
06 Piling
07 Diaphragm walls and underpinning
08 Crib walls, gabions, and reinforced earth
09 Insitu concrete works
10 Prestress/precast/composite concrete
11 Masonry
12 Waterproofing
13 Roofing
14 Carpentry
15 General joinery
16 Structural metalwork
17 Metalwork
18 Cladding and covering
19 Floor, wall and ceiling finishes
20 Glazing
21 Decoration
22 Drainage and piping works below ground
23 Site works
24 Fencing, turfing and planting
25 Plumbing services
26 Mechanical services
27 Electrical services
28 Transportation
29 Builder's work in connection with mechanical, electrical and transportation
installations
4
2.3.3. A table is created for each Work Sections 02-29 and is structured as follows:
(1) At the beginning of each Work Section there is a list of group headings under
which the building components/items are categorized.
(2) The first four rows of the tables set out in the following order:
(d) ‘Works and materials deemed included’ which are collectively referred to
as the ‘Preambles’
• This row gives the Preambles related to each of the Work Sections.
• If any building component/item under any Work Section appears in
other Work Section/s, then the relevant ‘Preambles’ related to that
building component/item shall similarly be applied to the same.
5
• Its main intention is that in the preparation of BQ, it can be stated that
the BQ shall be read in conjunction with the Preambles in MySMM
instead of repeating them in the BQ document. As such, it serves as
a universal standard for ‘Preambles’ in Malaysia. However, if
additional Preambles are required, it can be added to the BQ
document accordingly.
(3) The first column from the left (‘Item or work to be measured’) , lists the headings
of the building components/items descriptions numerically (‘the Heading’) ;
(4) The second column (‘Unit’) lists the unit of measurement for building
components/items;
(5) The third column (Level One) lists the information numerically, including any
dimension requirements, that shall be included in the description of the building
components/items;
(6) The fourth column (level Two) lists the supporting information numerically,
including any additional dimension requirements, which shall be included in the
description of the building components/items.
(7) The fifth column (level Three) lists the further supporting information
numerically, including any additional dimension requirements, which shall be
included in the description of the building components/items;
(8) The sixth column (notes, comments, and glossary) deals with the following:
(a) definitions of some generic terms and phrases used in connection with
the building components/items;
(b) additional information to be added into the Heading or the specific level
to complete the descriptions of some of the building components/items;
(9) It is to be noted:
(a) that any descriptions of building components/items with the same ‘Heading’
should have the same number of ‘Level’ of information and/or supporting
information. In the event that any one of them is short of one such Level,
then ‘generally’ will be used in its place;
(b) that the first letter of the word for all levels except the last level is to be
‘capital-letter’;
(c) that the number of Headings, the different situations and the supporting
information appear in the respective columns are NOT exhaustive, but they
represent the ones commonly encountered in building works; and
(d) that in principle, the table give a standard template for the descriptions of
any building components/items.
6
2.4. Coding
2.4.1. For codification, each level of the table is numbered. An example as to how an building
component/item can be created and coded is given below:
(2) The parts of the components/item description in ‘italics’ as shown above are
extracted from the table created in accordance with Item 2.3.3 (3)-(9) above to
form a full description for a component/item which will have the following code
number :
09 04 014 03 03 00
(3) Coding for any component/item description shall have six (6) facets. The above
shows how the first five facets are obtained from the respective numberings from
the table while the six facet is ‘00’ because this component/item description has
no Level Three.
(4) It shall also be noted that it is a good practice in the preparation of BQ that the
component/item description is created with an indent for each part of the
description as shown above.
3.1. Quantities
3.1.1. The general rules for quantifying building components/items are as follows:
(a) Measure the work net as fixed in position unless otherwise stated.
(b) Net quantity measured shall be deemed to include all additional material
required for laps, joints, seams and the like, as well as any waste material.
(c) Curved profile shall be of any radius that is shown on the relevant drawing.
7
(d) Dimensions shall be measured to the nearest 10mm. 5mm and over shall
be regarded as 10mm and dimensions less than 5mm shall be disregarded.
(e) Except for quantities measured in tonnes (t), quantities shall be given to
the nearest whole number. Quantities of less than one unit shall be given
as one unit. Quantities measured in tonnes (t) shall be given to two decimal
places.
(2) Voids:
3.2. Descriptions
3.2.1. Each Work Section of a BQ shall begin with the name of the Work Section as a top
heading.
3.2.2. The building components/items under each of Work Sections 02-29 shall be
grouped,listed and coded as described in Item 2.3.3 above.
3.2.3. Unless specifically stated otherwise in the BQ or any part of the MySMM, descriptions for
building components/items shall generally include the:
(1) stated in the sequence: length, width, and height. Where ambiguity could arise,
the dimensions shall be identified in the description; and
(2) the finished lengths, widths, and heights specified or shown on the drawings
with no allowance made for overlaps, scarcements and the like.
3.2.5. Any thickness given as part of the description shall be the finished thickness of the
material after compaction and shall exclude the thicknesses of adhesives and or bedding
materials unless otherwise stated.
8
3.2.6. The use of a hyphen (-) or the phrase ‘to’ between two dimensions in a description shall
mean a range of dimensions exceeding the first dimension stated but not exceeding the
second.
3.2.7. Work with a curve, concave, convex, conical, spherical and the like shape shall be so
stated without the necessity of stating the radius/radii, but such information may be given
by a precise and unique cross-reference to another document e.g. to a specification, a
catalogue or a drawing.
3.2.8. The standard template for the descriptions of building components/items as described in
Item 2.3.3 above is to facilitate both the traditional ways of measurements and for
renovation works though in a simplified manner but its main aim is to reduce the number
of measureable BQ items and the simplification of the measurement of the same to
facilitate the ease of auto-production of ‘usable raw quantities’ from a 3D model in BIM
application. Therefore, to achieve this aim of making MySMM BIM-friendly , the following
methods are adopted in so far that they are possible in drafting the standard template:
(2) the use of generic terms to group several related building components/items
for measurement as one item e.g. portal frames comprising stanchions, rafters,
struts, chords, etc., narrow width comprising skirting, risers, treads, edges of
slabs, kerbs, etc.,
(3) the use of total depth in stages for excavation work e.g. for foundation
excavation, as ‘not exceeding 2.00m total depth’, ‘not exceeding 4.00m total
depth’ and thereafter in 2.00m stages;
(4) the use of only two stages of strutting based on total height e.g. for formwork to
soffits of slabs and beams, as ‘strutting not exceeding 3.5m total height’,and
‘strutting exceeding strutting 3.5 total height’;
(5) the measurement in ‘m3’ without stating the thickness e.g. concrete to walls,
blinding, slabs, etc, measured in ‘m3’ without stating the thickness, formwork
to sides of foundations, edges of slabs, etc. measured in ‘m2’ without stating
the height, etc.
(6) voids within or the boundaries of the measured work irrespective of size to be
deducted
(7) any curved profile to be stated without the need to state the radius
9
3.2.9. Unless specifically stated otherwise in the BQ or any part of the MySMM, each building
component/item shall be deemed to include the following:
3.3.1. Work of each of the following special types shall be separately identified:
(1) Work to existing buildings: such work is defined as work on, in or immediately
under buildings or structures existing before the current building project.
(2) Work carried out and subsequently removed;
(3) Work outside the curtilage of the site;
(4) Work carried out in extraordinary conditions, including:
(a) in, on or under water, stating whether river, canal, lake or sea and,
where applicable, stating the mean spring levels of high and low water;
(b) in tidal conditions;
(c) underground, stating mean depth;
(d) in compressed air, stating the pressure and means of entry and exit;
and
(e) in other types of extraordinary conditions.
Specific details pertaining to work carried out in each condition shall be given
at the start of each applicable work section.
3.3.2. The additional rules for special types of work shall be read in conjunction with the rules in
the appropriate Work Sections.
3.3.3. Details of the additional preliminaries that are pertinent to the special types of work shall
be given in the description, drawing attention to any specific requirements due to the
nature of the work.
10
3.4. Measurable work not covered by the tabulated rules:
3.4.1. Building components/items not covered by the tabulated rules shall, if possible, be
measured by rules for similar types of work. Rules of measurement adopted for such
building components/items shall be clearly stated and fully defined in either the
preliminaries or in the BQ (against the building components/items or items to which the
rule relates). Such rules shall, as far as possible, conform to those given in the tabulated
rules of measurement for similar building components/items.
3.4.2. Where it is not possible to derive the method of measurement from the tabulated rules,
the rules chosen may be bespoke. In such cases, the rule or rules derived shall be
reiterated in full in either the preliminaries or in the BQ (above the building
components/items or items to which the rule relates i.e. under “Notes’ preceding the
Heading of the building components/items concerned).
3.5.1. For the rules relating to work that cannot be quantified and described in accordance with
the tabulated rules of measurement as they cannot entirely be foreseen, defined, or
detailed at the time the tender documents are issued, they shall be given a sum called
‘provisional sum’.
3.6.1. Where the exact type of product or component cannot be specified, an estimated price
for the product or component shall be given in the description as a prime cost unit rate
(P.C. unit rates). State, for example, ‘* at P.C. unit rate of RM * per m for the supply only
by a firm to be selected by the Architect; ……….’,
3.6.2. Unless specifically stated otherwise in the bill of quantities or these rules, the contractor
shall be deemed to have allowed for all items listed in paragraph 1.4.2.11 plus, his
overheads and profit in his period rate for each building component/item incorporating a
PC price with the breakdown of such items given therein.
11
3.7. Procedure where the quantity of work cannot be accurately
determined:
3.7.1. Where work can be described and given in items in accordance with the tabulated rules
of measurement, but the quantity of work cannot be accurately determined, an estimate
of the quantity shall be given and identified as a ‘provisional quantity’
3.7.2. Work items identified as a ‘provisional quantity’ shall be subject to remeasurement when
they have been completed. The ‘approximate quantity’ shall be substituted by the ‘firm
quantity’ measured, and the total price for that item adjusted to reflect the change in
quantity. Where the variance between the ‘provisional quantity’ and the ‘firm quantity’
measured is less than 20 per cent, the rate tendered by the contractor shall not be subject
to review. Where the variance is significant (i.e. 20 per cent or more), the rate can be
reviewed to ensure that the rate is fair and reasonable to both the employer and
contractor.
3.8.1. A ‘prime cost sum’ shall be provided for such work or services or materials or goods. Such
sum shall be deemed to be exclusive of any profit required and/or attendance to be
provided by the main contractor and provision shall be made for the addition thereof where
applicable.
12
01 PRELIMINARIES
01 PRELIMINARIES
01 Generally
02 Bills and Pricing/Pricing
03 Materials & Samples
04 Form of Contract
05 Statutory Obligations
06 Contract Administration
07 Site Control
08 Temporary Works
09 Completion
01 Generally
01 Definition and Interpretation 01 Function (e.g. architect), name of organisation, address, telephone number and email address to be stated.
To include (where applicable)
(1) Employer
(2) Project Manager
(3) Architect/S.O.
(4) Civil & Structural Engineer
(5) Mechanical & Electrical Engineer
(6) Landscape Architect
(7) Quantity Surveyor
(8) Employer’s Representatives (ER)
(9) Specialists
02 Definition and interpretation of keywords, terms, phrases, and synonyms used in the preliminaries and
specifications.
02 Weight and Measurement 01 Units of weight and measurement to be of imperial or metric format.
03 Singular and Plural 01 Statement of words importing the singular only also include the plural and vice versa where the context requires.
13
01 PRELIMINARIES
07 Contract Documentation 01 The cost of preparation of contract documents, who to bear and mode of payment.
Charges
10 Preambles, Specification, and 01 Statement that description of work and materials in the Bill of Quantities and their pricing are to be read in
Drawings conjunction with the preambles, specification, and drawings.
13 Languages 01 Requirements of language in which the Contract Documents shall be drawn up.
14 Documents Mutually 01 Obtaining of the S.O. clarification on the differences between the drawings and conditions on site and carrying out
Explanatory Works in accordance with instructions as may from time to time be issued by the S.O.
14
01 PRELIMINARIES
SUB-HEADING INFORMATION REQUIREMENTS
15 Soil Investigation 01 Where the soil investigation report is available.
02 Statement that soil investigation report not forming part of the Contract.
16 Works Already Executed by 01 Description of the works already executed by others and the requirements for the protection of the same and offer
Others of assistance with no extra cost.
17 Co-ordination with Other 01 Co-ordination with other contractors employed on the site.
Contractors Employed on the
Site
19 Mock-Ups 01 Completeness of the mock-up unit to be chosen by the Architect and the time frame for completion.
02 Bills and Pricing (applicable for BQ Contract) / Pricing (applicable for ‘Lump-sum’ Contract)
01 Bills of Quantities 01 Measurement of Bill of Quantities in accordance with the 'Malaysian Standard Method of Measurement (MySMM)
(applicable for BQ contract) for Building Works' for use in Malaysia, (to state Edition) published by the Royal Institution of Surveyors Malaysia.
02 Usage of the Bill and its ‘Quantities’.
02 P.C. Unit Rates for Supply of 01 Meaning of P.C. Unit Rates for the supply of goods and materials and their contractual treatment.
Goods or Materials
03 Pricing of Bills of Quantities 01 Treatment of any item left blank in the Bill of Quantities.
(applicable for BQ contract)
04 Elemental Bills of Quantities 01 Preparation of the Bill of Quantities in the ELEMENTARY FORM that is in functional order rather than trade order
(applicable for BQ contract) and within each element the items have been set out in Trade Order.
15
01 PRELIMINARIES
SUB-HEADING INFORMATION REQUIREMENTS
06 Works Included in the Contract 01 Constituent costs of all item prices for the Works included in the Contract.
07 Condition of Tender 01 Disqualification of the tender when the Contractor was to submit conditions in contravention to those contained in
the tender documents.
09 Pricing of Preliminaries 01 Payment method for additional preliminaries for approved extension of time.
10 Fix the Only Item Supplied by 01 Costs comprised under "Fix Only' items supplied by Nominated Supplier.
Nominated Supplier
11 Inspection of Site 01 Inspection of the site before submitting the tender in relation to the surrounding, nature of the ground, hydrological
and climatic conditions, the form and nature of the site, means of access to the site, the accommodation, etc. and
all necessary information i.e. risks, contingencies and other circumstances that may affect the tender.
12 Sufficiency of Tender 01 Requirements to be satisfied as to the correctness and sufficiency of the Tender.
01 Materials and Samples 01 Whole of the materials, goods, and workmanship throughout the Works in compliance with the requirements of
Malaysian Standards (MS) or relevant British Standard (BS) Code of Practice (to state other Standard if any)
current at the date of closing of tenders.
02 Sample of Materials 01 Submission of samples and/or test certificate of materials or the execution of samples of workmanship for
approval by the S.O.
03 Employer's Right to Supply 01 Situations whereby the Employer has the right to supply materials.
Materials 02 Requirements if the Employer supplies the materials.
04 Testing of Sampled and 01 Testing of sampled and completed works by the Contractor.
Completed Works
16
01 PRELIMINARIES
SUB-HEADING INFORMATION REQUIREMENTS
05 Ordering 01 Ordering specified materials by the Contractor.
06 Substitute Materials 01 Conditions for the acceptance of the substitute materials by the S.O.
04 Form of Contract
01 Form of Contract 01 Full title of the standard or bespoke form of contract, including edition, revision, and standard amendments
applicable.
02 Schedule of clause/condition headings in the standard form of contract.
03 Reference to any amendments to clauses/conditions to standard form of contract.
04 Reference to any supplementary or special clauses/conditions to standard form of contract.
05 Insertions to Appendix to Contract.
06 Where bespoke, or uncommon form of contract is used - a copy is to be appended to the bill of quantities or
included as part of the tender.
05 Statutory Obligations
01 Taxation 01 Payment of Malaysian taxes under the laws for the time being in force.
04 On-Site Training Scheme 01 Compliance with the requirements of any on-site training scheme which may be by the Authorities and/or
Government.
05 Custom Restriction, Quotas, 01 Compliance to all custom restrictions, quotas and duties and bearing costs arising therefrom.
and Duties, etc. 02 Liability for all increases in import duty, tariffs and taxes, etc. that may arise during the duration of the Contract.
17
01 PRELIMINARIES
SUB-HEADING INFORMATION REQUIREMENTS
06 Employment of Labour 01 Payment of all emoluments and expenses in compliance with the Employees Provident Fund Ordinance Act 1991
Generally or any other provision by Statute, Tort or Common Law or legislation concerning the employment of labour.
02 Employment of skilled and experienced persons in their respective trades.
03 Employment of sub-contractors and ensuring only skilled and experienced persons in their respective trades are
employed in connection with the Works under the Contract.
07 Employment of Foreign 01 Compliance with rules and requirements of the immigration laws of the country.
Workers and Specialists 02 Any other special requirements.
08 Environmental Policy 01 Compliance with the Environment Quality Act 1974 and development and implementation of an Environmental
Quality Management (EQM) programme for the Works.
09 Construction Industry 01 Compliance with Part VIII of the Lembaga Pembangunan Industri Pembinaan Malaysia Act 1994 and the
Development Board (CIDB) Construction Industry (Levy Collection) Regulations 1996.
10 Occupational Safety and 01 Compliance with the Occupational Safety and Health Act 1994 and provision of all necessary safety precautions.
Health Act
11 Permits and Licences 01 Obtaining all necessary permits and licence etc. required from the relevant authorities in connection with the
carrying out of the Works and pay all fees and royalties in connection therewith.
12 Tax Incentives Obtained by the 01 Obligations of the Employer to apply for tax incentives from the Government of Malaysia in respect of the Works
Employer (or the project for which the Works form a part) in the form of tax exemption, tax credit, tax benefits or any other
form.
13 Withholding Tax Legislation 01 Payment of all withholding tax in accordance with the Withholding Tax Legislation (under Section 107A to the
Income Tax Act 1967) in the case of non-resident contractors.
18
01 PRELIMINARIES
SUB-HEADING INFORMATION REQUIREMENTS
06 Contract Administration
01 Time Essence of the Contract 01 Whether time is of the essence of the Contract.
02 Drawings 01 Carrying out of the whole of the works in accordance with the dimension and sizes shown on the Architect and
Engineer drawings.
02 Checking for missing drawings, discrepancies between drawings, and between drawings and conditions on site,
and seeking clarifications from the S.O. in due time.
03 Co-ordinated Working 01 Preparation of fully co-ordinated working drawings, specifications and all requirements of all the sub-contractors
Drawings prior to commencement of the relevant work at the site.
Preparation of working drawings (Architectural, Mechanical & Electrical, and Consultants' drawings) including all
the requirements.
Clarifications of work to be accomplished by means of the following:
a. Large scale details
b. Detailed dimension computed from overall dimensions shown upon drawings
c. Combining details shown on several drawings
d. Transforming tables, schedules, and written information into a visual form of sketches and diagrams
e. Providing the field personnel with relevant drawings and all the information for them to accomplish their
portion of the work
04 Records Drawings 01 Keeping of accurate records of the Works, or as may be directed by the S.O.
05 Weekly Reports 01 Submission of weekly reports on the progress of the works to the S.O. including the elaboration of daily activities
of the site.
06 Neglect to obtain Reliable 01 Obtaining on the spot or elsewhere of reliable information about the various respects of the Works which may
Information affect the tender and no claim for any negligence or failure to do so.
07 Logistic Plan 01 Establishment of and implementation of a Logistic Plan and the operational strategy describing the overall site
facilities and services that will be provided to ensure that the construction works proceed smoothly and safely, with
minimum impact on surrounding areas; all to the S.O.’s approval.
08 Site Meetings 01 Attendance of site meetings arranged by the S.O. whenever appropriates.
19
01 PRELIMINARIES
10 Advertising 01 Reservation of the sole right of advertising upon or adjacent to the Works to the Employer.
11 Progress Photographs 01 Submission of progress colour photographs before the commencement of the works and thereafter at monthly
intervals.
12 Programme and Manpower 01 Submission of a construction programme and manpower chart related to the construction period showing the
Chart order or sequence to carry out the various parts of the Works and any proposed temporary works or methods of
working which may be relevant to progress before commencement of the Works.
13 Quality Assurance and Quality 01 Implementation of quality assurance systems in accordance with the details set out in the Specification and/or as
Control approved by the S.O.
14 Financial Report 01 Submission of a Progress payment `S’ curve which shall have a horizontal time-scale showing the Contract
Completion Period in months and a vertical monies-scale showing the Contract Sum before commencement of the
Works and thereafter at monthly intervals
16 Safety, Health, and Welfare of 01 Establishment of a Safety and Health Plan to ensure that all construction activities required to facilitate the
Work People execution of the Works are carried out in a safe manner, consistent with proven good practice, and comply with
the Acts.
17 Delays 01 Allowance for all possible delays caused by difficulties in obtaining labour and materials or by suspension of part
or whole of the Works due to adverse weather conditions other than exceptionally inclement weather.
18 Failure to Achieve 01 Modification to or replacement of the whole or any part of an installation forming part of the Works which fails to
Performance produce on test the performance offered without any extension of time and at own cost.
19 Dismissal by Request 01 Dismissal immediately from the Works of any person employed on site who may in the opinion of the S.O. be
incompetent or misconduct himself.
20
01 PRELIMINARIES
SUB-HEADING INFORMATION REQUIREMENTS
20 Attendance Provided By 01 Provision of the Attendance as defined in the tender document by the Contractor to the Nominated Sub-
Contractor to Nominated Sub- contractors with which the Contractor shall enter a binding sub-contract with the respective Nominated Sub-
Contractors contractors appointed under the P.C. Sum provisions of the Main Contract.
21 Confidentiality 01 Keeping of all information, documents and all other matters arising or coming to their attention in connection with
the Contract secret and confidential.
07 Site Control
02 Loading in Excess of Design 01 Measures against excess loading on structural members and to bear costs arising therefrom including making
Load good any damage caused.
03 Noise and Nuisance 01 Measures to ensure that all noises, vibrations, etc. emitting from the Works shall be kept to an absolute minimum.
02 Compliance with all reasonable requests to reduce noise and dust pollution, and all authority notices.
04 Damage to and maintenance 01 Liability to damage caused to any existing roads, culverts, roadways and footpaths, drains and watercourses and
of Existing/public Road(s) public utility and other services on or adjacent to the site from whatsoever cause arising liability for all cost of
making good any damage, maintenance, repair and reinstate same to their original condition to the satisfaction of
the S.O. or the relevant authorities.
Compliance with all police regulations; keeping all public highways and footpaths, clean and free from sand,
builder's rubbish, debris, etc. occasioned by the Works throughout the period of the Contract and liability for all
charges and imposition of fine.
Keeping of the public roads from building debris and spoil due to the movement of transportation to and from the
site and be responsible to pay any fine imposed by the Authority resulting from negligence.
05 Protection of Public and Protection, upholding and maintaining all public and private services within the site; in accordance with the
Private Services authorities’ requirements and obtain any necessary approval; bearing all costs of making good any damage
arises.
21
01 PRELIMINARIES
07 Restriction of Persons to Site 01 Responsibility of restricting all unauthorized persons to the site and establishing a proper recording system and
safety gear for authorized visitors.
08 Trespass 01 Liability for any claim resulting from a civil court action due to infringement of air space or land of adjoining
owners.
09 Working Hours 01 Compliance with all Rules and Regulations affecting work and labour and the National/Public Holidays of the
State.
10 Overtime for Supervisory Staff 01 Organizing and programming of any work to be carried out within the stipulated working hours for site Supervisory
Staff as well as obtaining the written permission of the S.O. for necessary cases such works are required to be
carried out beyond the stipulated hours.
11 Mosquito Prevention and Post 01 Keeping dry of all excavations and parts of the site where water stagnates or accumulates by means acceptable to
Control the S.O.
02 Taking relevant precautions as may be deemed necessary or desirable by the S.O. for the prevention of breeding
of mosquitoes and pest control
12 Keeping Site Dry 01 Keeping the whole of the works well-drained and free from all water (including rain, storm, spring and running
water and water below the Water Table Levels) at all times to ensure that all work is carried out in the `dry'.
13 Silting 01 Keeping all drains, stream, and waterways free from mud, silt and other obstructions and making good where
necessary to the satisfaction of the S.O. during the currency of the Contract.
14 Prevention of Earth Slope 01 Taking all necessary precautions to preserve all earth slopes, both existing i.e. slopes already existing on the site
at the time of the site being handed over to the Contractor and new i.e. slopes formed and constructed under the
Contract.
15 Site Security 01 Provision of all necessary and adequate watching by day and night for the throughout the course of the Works..
22
01 PRELIMINARIES
17 Safety Measures 01 Ensure for the complete adequacy of all protective systems to workmen and the public and comply in full to the
requirements laid down in the Local By-Laws and any future regulations or by-laws regarding safety measures
applicable in Malaysia.
18 Quality Assurance, Quality 01 Development of and implementation of a Quality Assurance Plan in compliance with the latest International
Control, and Testing Organization for Standardization's Standard ISO 9001 and MS ISO 9001.
19 Protection of Environment 01 Taking all steps to protect the environment on and off site ; avoiding damage or nuisance to persons or to
property of the public or others resulting from pollution, noise or other causes arising from the Works.
02 Compliance with the Environmental Management Practice as specified in the Specification for the protection of the
environment.
20 Fire Protection during 01 Taking of proper precautions to minimise the risks of fire whilst the Works are under construction including
Construction providing a wet or dry riser in working order ; all in compliance with all UBBL requirements.
21 Adequate Ventilation during 01 Provision of all necessary equipment and power for ventilation purposes during construction, and clearing away all
Construction apparatus when no longer required..
22 Protection of Materials and 01 Provision of all things necessary for the proper protection of materials and completed work and reinstating at own
Completed Work cost any damage or loss.
23 Overtime and Completion 01 Completion of the whole of the Works by the time stated in the Contract and no extra will be allowed in respect of
overtime paid to achieve this.
24 Covering Up 01 Covering up of any part or parts of the Works or making openings in or through the same subject to prior
inspection and approval by the S.O.
25 Antiquities 01 Discovery of any old curiosities, relics, coins, etc. found in excavation or other execution of work to be handed
over to the S.O.
02 Notification of discovery of ancient masonry, pavements or other old work of interest to be made to the S.O. before
their demolition or removal.
23
01 PRELIMINARIES
27 Work done by Statutory Bodies 01 Clearing away of all rubbish and debris left and making good acts of his works disturbed by these bodies to the
complete satisfaction of the S.O.
28 Use of Services Lifts for 01 Observance of the carrying capacity of the lifts as set down by the Lift Manufacturer and obtaining of consent from
Construction Purposes the S.O. to use the lift cars either as passenger hoists or good hoists..
29 IBS - Industrialised Building 01 Adherence to the IBS Content Scoring system based on CIDB's CIS 18:2010 Manual for IBS Content Scoring
System for Building System (IBS Score) as a standard method of assessment to achieve a score of at least 50% for components of
Construction Work (GBI-FR; work under the Contract.
SM7)
30 Dilapidation 01 Conducting of a dilapidation survey of surrounding buildings, structures and properties by a Registered Building
Surveyor.
02 Making good all consequential damages to the surrounding arising from ground movements and vibration caused
by the works.
31 Settlement and Ground 01 Assessment of the settlements and ground movements due to execution of the works.
Movements 02 Installation and maintenance of piezometers and inclinometers for checking of the water table and ground
movement during construction.
32 Monitoring/Protecting Slope 01 Method adopted to monitor the soil movement, and the temporary work to protect/support the slope, excavation
Stability and the like.
02 Liability in the event of any failure of slopes, sides of excavation and the like.
33 Monitoring Ground Water 01 Method adopted to monitor the groundwater table until it would not affect the integrity of the adjoining buildings.
Table
08 Temporary Works
01 Temporary Crossing 01 Construction of temporary crossing over drains, and/or channels, footways, kerbs, etc. and removal upon
completion and making good to the satisfaction of Local Authority or paying charges.
24
01 PRELIMINARIES
03 Temporary Drains 01 Construction temporary drains to keep the site free from water in accordance with the relevant drawings and in
compliance with the Local Authority's requirements.
04 Existing Services 01 Notification to Service Providers, Local Authorities and/or adjoining adjacent owners and for actions to be taken
when the works encountered existing services.
02 Liability for damage occurred to existing services.
03 Scope of diversion of the existing services.
05 Temporary Lighting and Power 01 Provision of adequate temporary lighting and power in compliance with Electrical Service Provider's requirements.
02 Paying all costs and charges, deposits, etc.
07 Temporary Fencing and Gates 01 Provision of temporary fencing and gates as shown in the relevant drawings.
02 Obtaining licence and paying all charges.
10 Surveying Equipment for the 01 Provision of surveying equipment and the protective items.
Engineer
11 Site Staff's Site Office 01 Requirements in respect of size, amenities, and furniture and equipment.
02 Payment of all maintenance, running costs, etc. and removal on completion.
25
01 PRELIMINARIES
14 Water Quality Supervision 01 Water quality supervision for all streams and rivers at locations as directed, to the satisfaction of the relevant
Authority.
02 Sampling.
15 Workmen Accommodation, 01 Provision of workmen accommodation, temporary stores, sheds and sanitation facilities canteen with necessary
Temporary Stores, Sheds and water and drainage system and septic tank to comply with Authorities’ requirements.
Sanitation Facilities 02 Payment of all fees, maintenance, running costs, etc. and removal on completion.
16 Sheds etc. 01 Provision of sheds, etc. in compliance with the Authorities’ requirements.
02 Payment of all fees, maintenance, running costs, etc. and removal on completion.
17 Walkie-Talkie 01 Number of sets of walkie-talkies for use by site supervisory staff during the full period of the works.
02 Payment of all charges for permits including renewal of permits from all relevant Authority.
18 Signboard 01 Provision of signboard to Authority's requirements and/or as shown in the relevant drawings
02 Payment of all charges for permits including renewal of permits from the relevant Authority.
03 Repair and repainting of the signboard on a timely basis and shifting of signboard whenever required.
19 Passenger Hoist and Tower 01 Provision of passenger hoist and tower crane of approved capacity and boom length complete with lightning
Cranes protection and in compliance with the Authorities' requirements. Payment of all charges and fees including the
02 renewal of the licenses, maintenance, running costs, etc. and removal on completion.
20 Plants and Machinery 01 Provision of plants and machinery for the Works.
02 Payment of maintenance, running costs, etc. and removal on completion.
26
01 PRELIMINARIES
22 First Aid Facilities 01 Provision of suitable size first aid facilities for the use of all site staff.
23 Temporary Aircraft Warning 01 Provision of temporary aircraft warning lights on tower cranes to Authority's requirements and approval.
Light
24 Site Fire Prevention and Fire 01 Institution of fire prevention and fire-fighting measures.
Fighting Facilities
02 Institution of awareness among all site staff from the respective parties.
25 Temporary Safety Netting and 01 Requirements to allow for providing and maintaining all necessary protective netting, catching platforms and/or
Catching Platform other measures deemed necessary to the whole of the Works for the safety of the workmen and protection of the
public and properties.
26 Scaffolding for All Trades 01 Supply and erect all necessary temporary scaffolding and special scaffolding, shoring, staging, planked footways,
guard rails and the like for the use of workmen in accordance with the Ordinance and By-Laws; and remove all
scaffolding and plant when no longer required.
27 Walkie-Talkie 01 Number of sets of walkie-talkies for use by site supervisory staff during the full period of the works.
02 Payment of all charges for permits including renewal of permits from all relevant Authority.
10 Completion
01 Removal of Rubbish 01 Keeping the site and buildings, adjacent roads and footpaths, etc. clean during the construction and at
completion.
02 Erection of rubbish chute.
02 Completion 01 Removal of all plant, temporary buildings, sheds, building appliances, apparatus or equipment, etc from the site,
disconnection of all services and leaving the site in a clean and orderly condition.
27
01 PRELIMINARIES
04 Operating and Maintenance 01 Submission to the S.O. six (6) complete sets of operating and maintenance instructions for items incorporated in
Instructions the Works before issuance of Certificate of Practical Completion
05 Defects After Completion 01 Inspection of the works at the end of the Defects Liability Period.
06 Warranties or Guarantees 01 Submission of warranties or guarantees as specified in the Contract within two (2) Weeks from the Date of
Practical Completion of the Works to the Employer.
Assignment to the Employer the benefit of any guarantees and/or quotations for future maintenance when such
02 guarantees and/or quotations extend beyond the Defects Liability Period of the Main Contract.
05 Defects After Completion 01 Inspection of the works at the end of the Defects Liability Period.
28
02 IBS
02 IBS
01 Pre-cast Concrete
02 Formwork
03 Steel & Metal Frame Truss
04 Timber Frame
05 Blockwork
06 Innovative
2. Formwork
a. Refer to Work Section 09: Insitu concrete works.
3. Blockwork
a. Refer to Work Section 11: Masonry.
4. Proprietary Systems i.e. 'Steel & Metal Frame Truss', 'Timber Frame' and 'Innovative'
a. Performance Specification covering the following:
(i) Scope of work (vi) Performance criteria
(ii) Submittals (vii) Delivery, storage and handling
(iii) Codes and standards (viii) Materials
(iv) Design requirements (ix) Fabrication and installation
(v) Testing (x) Warranties
29
02 IBS
Specific rules of measurement 1. Provision of tower cranes, crawler cranes, mobile cranes, etc. and other plant and equipment necessary for the
installation of IBS system are described in the 'Preliminaries' Bill.
2. Voids irrespective of sizes is to be deducted.
2. When IBS is based on 'Design & Build', the following is deemed to be included:
a. The design shall in all respect adequate, accurate, sufficient and fit for its purpose.
b. Submittal of all shop drawings and design calculations endorsed by Professional Engineer registered with the
Board of Engineer, Malaysia.
c. The design shall be based on IBS components selected from the approved IBS Catalogue Pre-Cast Concrete
Components for Building Work.
d. The pricing of the IBS system shall follow the breakdown given in the Tabulated Form for description of
component/item description but on 'lump-sum for each item.
e. Requirements to furnish warranty period of (to state the years and from when).
f. Other requirements (if any).
30
02 IBS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Pre-cast Concrete from 'IBS Catalogue Pre-Cast Components for Building Work ' published by (to name publisher)
31
02 IBS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Precast Concrete m2 01 Hollow Core Slabs 01 (thickness) thick; 01 If sloping slabs irrespective
Decking 02 Precast Concrete (code nr.); as shown of the sloping degree, it
Half Slabs in the drawing shall be so described in
(drawing nr.)/model Level Two.
02 Code nr.' is obtained from
the selected IBS catalogue
32
02 IBS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Precast staircase nr 01 Straight flight 01 (dimensional 01 'nr' means a flight of
02 U-flight description) steps stairs.
03 L-flight (code nr.); as shown in 02 Code nr.' is obtained
04 Spiral drawing (drawing from the selected IBS
nr.)/model catalogue
02 Formwork
03, 04, 06 Steel & metal frame truss & Timber frame & Innovative
For these Proprietary Systems, Item (2) of “Works and material deemed included which are collectively referred to as 'Preambles'” of this Work Section shall
apply.
05 Blockwork
33
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
03 DEMOLITION, ALTERATIONS, REPAIRS AND CONSERVATION
01 Demolitions
02 Alteration Work to Existing Buildings
03 Repairs/Cleaning/Renovating and Conserving
04 Decontamination
Specific information to be shown 1. For Demolitions, the approximate size and the nr. of storeys of existing buildings to be demolished and whether
in the 2D drawings or to be input up to the lowest floor level only or including the ground floor slabs and foundation; for partial demolition, the
into the 3D models types of structures and/or finishes and/or the mechanical and plumbing services and electrical services, etc. to
be demolished and at which levels; listing of salvaged materials which have credit values.
2. For alteration work to the existing building, ‘removing', 'cutting and forming', 'cutting back projections', 'cutting
back to reduce thickness', 'filling in existing openings' and/or any other type to be shown on the parts of the
building where they are required.
3. For repair/cleaning/renovating/conserving, 'repairing', 'repointing', 'resin impregnation/injection', 'cement
impregnation/injection', re-dressing existing flashings and the like', 'damp proof course renewal/insertion',
'cleaning surfaces', 'renovating and conserving' and any other type to be shown on the parts of the building
where they are required.
34
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
Specific rules of measurement 1. All measurements are nett and do not include any additional area required for working space, etc.
2. The lowest level will include basements.
3. If a floor slab is to be removed, then the lowest level which can be the ground floor or the lowest basement
level (as the case may be) must be stated as to the underside of that slab.
4. The rules within this Work Section do not apply to temporary works.
Works and materials deemed 1. Providing, erecting, altering, adapting and maintaining and removing on completion to the satisfaction of the
included' which are collectively S.O. all necessary shoring, needling and strutting, watering to lay the dust, providing dust sheets, tarpaulin,
referred to as 'Preambles' temporary roof covering, water, chutes, screen sand and any other protection necessary to safeguard the
existing and adjoining works, and clearing away all rubbish and making good all works disturbed.
2. Remove’ shall include cutting out or taking apart as may be necessary for the removal of the items described,
drawing all screws, nails, hooks, clips, bolts and other fastenings including grounds, hackings, and the like
and making good surfaces where applicable.
3. Demolition of walls, partitions, ceilings, floor slabs and the like shall include for all associated finishes,
pipework and cabling, etc. whether concealed or surface mounted, switches, sockets, etc.
4. Making good' shall mean to reinstate to as close to its original conditions as possible and to match existing
works so as to avoid visible junction.
5. Compliance with the Dilapidation Survey, Historical Architecture Building Survey (HABS) (if applicable),
Drawings, and Specification.
35
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Demolitions
01 Demolishing item 01 Whole buildings as 01 Down to the level of 01 removing all debris 01 If there is temporarily
listed below and as the top surfaces of the from site diverting, maintaining or
shown in the drawing lowest ground slab 02 leaving the following sealing off existing
(drawing nr.): (to list Including breaking up materials as the services, it shall be so
the approximate grounds slab and property of described in Level Two.
dimension and nr of foundations Employer: (to list) 02 For 'Parts of structures', if
storeys of the only certain floor/s shall
buildings to be 03 setting aside the be affected, the level of
demolished) following materials such floor/s shall be
for re-use at the 03 identified in Level Two:
designated area To add “NOTES’ after
within the site : (to name of each group of
list) the building
components/items as
02 Parts of structures 01 In-situ reinforced follows:
concrete flat roof (a) The Contractor shall
(thickness) thick satisfy himself as to the
nature of works and
make good all works
disturbed as necessary.
(b) The Contractor will
02 In-situ reinforced be required to repair
concrete upper floor or replace at his
(thickness) thick own expense any
03 Precast concrete plank parts or complete
upper floor (thickness) items which in the
thick opinion of the S.O.
have been damaged
as a result of
insufficient care in
removing, handling
and protecting.
36
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Reinforced concrete (c) The demolition,
staircase (nr.) total rise, alterations, repairs and/or
(width) wide, in (nr.) conservation works shall
flight with (nr.) half be executed in such a
landing manner that there will be
05 Pitched roof, timber a minimum of
construction inconvenience and noise
(dimensional and dust pollution to
description) {measured occupants or to the
on plan} public.
06 Brick/block internal
walls (thickness) thick
07 Brick/block external
walls (thickness) thick
08 Floor finishes; (type)
09 Ceiling finishes; (type) (d) The Contractor shall
10 Ceiling finishes; (type) examine the drawings,
11 Doors, windows and the visit the site, inspect the
like existing premises and
12 Sanitary fittings; (type) satisfy himself as to the
nature and extent of the
work to be demolished,
altered, repaired and/or
conserve. No claim for
extra payment in this
respect will be
entertained.
Any other requirements.
37
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Credit item 01 Credit for salvaged 01 (list all items which
materials which have a credit value)
become the property
of the Contractor
02 Alteration Work to
Existing Building
01 Removing item 01 Existing floor 01 Granolithic paving 01 removing all debris 01 The surveyor shall
finishes from site. choose the unit most
---- 02 Mosaic tiles suitable for the type of
work being removed.
m2 03 Ceramic/porcelain tiles 02 leaving the 02 If removal of screeding
following materials under the
---- 04 Terrazzo tiles as the property of finishes/coverings is
Employer: (to list). required, it shall be so
described in Level Two.
m 05 Marble slabs 03 If there are skirtings, their
---- 06 Granite slabs 03 settings aside the removal shall be deemed
following materials included.
nr 07 Carpet flooring/tiles for re-use at the 04 If not all finishes at every
08 Vinyl tiles designated area part of the existing
09 Parquet/ timber flooring within the site: (to building are to be
list). removed, then the floor
level where such removal
is required shall be so
described in Level Two.
05 If 'making good
structures and preparing
a surface to receive new
finishes/coverings' is
required, it shall be so
described in Level Three.
38
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Existing wall finishes 01 Mosaic tiles 06 If there are cornices,
02 Ceramic tiles their removal shall be
03 Marble slabs deemed included.
04 Granite slabs 07 For 'doors', whether they
05 Plaster are 'single' or 'double'
doors shall be so
described in Level Two.
08 Removal of sanitary
fittings shall be deemed
to include removing traps
and temporarily capping
03 Existing ceiling 01 Mineral fibre ceiling off pipework, or,
finishes boards including metal removing associated
suspension system traps and pipework back
to wall or floor and
terminating connections,
as the case may be.
09 For 'existing plumbing,
mechanical and electrical
02 Gypsum board ceiling installations', the removal
including metal shall be deemed to
suspension system include for the whole
building unless otherwise
stated and making good
all work disturbed.
10 Disconnecting and, if
04 Existing coverings 01 Membrane/Felt required, subsequent re-
02 Metal roofing including connection of plumbing
purlins/cladding rails and electrical or other
03 Roofing tiles including services installations is
battens and felt and deemed included.
sisalation under
39
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
05 Existing doors, 01 Timber doors and
windows and the like frames
02 Metal doors and
frames
03 Roller shutters
04 Roller grilles
05 Timber windows and
frames
06 Metal windows and
frames
06 Existing 01 Balustrades including
balustrades, railings handrails
and handrailings
02 Railings including
handrails
03 Handrails
07 Existing fixtures and 01 Timber counters;
fittings overall (dimensional
description)
02 Timber counters;
overall (dimensional
description)
Timber cupboards;
overall (dimensional
description)
03 Timber cupboards;
overall (dimensional
description)
40
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
09 Existing plumbing, 01 Hot and cold-water
mechanical and plumbing installation
electrical 02 Rainwater plumbing
installations installation
03 Soil and waste
plumbing installation
04 Mechanical ventilation
installation
05 Air conditioning
installation
06 Fire protection
installation
07 Electrical installation
08 Telephone installation
09 Communication
installation
10 Lift installation
11 Escalators installation
41
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Cutting and forming nr 01 Door openings 01 In (thickness) thick 01 (dimensional 01 'Extending and making
02 Window openings reinforced concrete description) good plaster' shall be
wall deemed included.
02 In (thickness) thick 02 If provision of lintel over
brick/block wall the opening is required, it
shall be so described in
Level Two.
03 In (thickness) thick 03 "making good plaster
drywall and preparing surfaces
to receive new" shall be
so described in Level
Two.
nr 03 Blank openings 01 In (thickness) thick 04 The locations or levels
reinforced concrete where such works are
floors required shall be so
described in Level One.
42
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Cutting back to reduce nr 01 On Brick/block walls 01 (area) area of wall;
thickness cutting back by (width)
43
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Repairs/Cleaning/Renovating
and Conserving
44
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Repointing m 01 With cement-lime 01 on brick/block walls 01 Removal of existing joint
(1:1:6); including material and preparation of
raking out joints exposed surfaces deemed
(width) wide x included.
(depth) deep 02 on facing brick
walls
03 on natural stone
walls
45
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
06 Damp proof course m 01 Injected chemical 01 To brickwork 01 (thickness) thick;
renewal/insertion damp proof courses drilling holes at
02 To blockwork (centre) centres
08 Renovating and m2 01 Cutting out defective 01 to a minimum depth 01 The unit of measurement
conserving; concrete concrete and of (depth) shall be left to the discretion
--- replacing with new; 02 to a minimum depth of the surveyor but shall
m bonding new to of (depth) and reflect the size and extent of
existing with (width) wide the work.
bonding agent
--- 03 to a minimum depth
nr of (depth), (width)
wide and (length)
long
--- 04 (dimensional
description)
item
46
03 DEMOLTION, ALTERATIONS, REPAIRS AND CONSERVATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
09 Renovating and m2 01 Cutting out, 01 to a minimum depth
conserving; decayed, defective of (depth)
brickwork/blockwork --- and cracked work; 02 to a minimum depth
10 Renovating; m replacing with of (depth) and
engineering brickwork materials to match (width) wide
11 Renovating; facing --- existing; bonding to 03 to a minimum depth
brickwork existing with mortar of (depth), (width)
12 Renovating; natural nr wide and (length)
stonework long
--- 04 (dimensional
description)
item
47
04 EXCAVATING, FILLING AND SITEWORKS
04 EXCAVATING, FILLING AND SITEWORKS
01 Site Clearance
02 Bulk Excavations
03 Foundation Excavations
04 Filling
05 Sundries
48
04 EXCAVATING, FILLING AND SITEWORKS
Specific information to be shown 1. For site clearance, the acreage to be cleared, the extent of lifting turf for preservation ( if any), the number and
in the 2D drawings or to be input location of existing trees to be relocated (if any).
into the 3D models 2. For bulk excavation, existing levels/contours and the required formation levels and/or reduced levels; rock levels
or estimated quantity of rock (if any); the area and depth for any removal of unsuitable material from the site;
surplus excavated material to be removed to Contractor's own dumping ground or designated dumping ground.
3. For foundation excavation, total depth of excavation; rock levels or estimated quantity of rock (if any).
4. For filing, the source, and the type and the required levels.
5. For sundries, the extent and the location.
Specific rules of measurement 1. The measurement for excavation and disposal shall be those before excavation i.e. measured nett. No allowance
shall be made to any subsequent variations to bulk or any extra space required to accommodate earthwork
support, formwork and working space.
2. The measurement of filling shall be those after consolidation. All extra fill materials required due to consolidation
and penetration into the subsoil shall be deemed included.
3. Unless otherwise stated, depths of excavation are measured from the general formation levels to the bottom of the
excavations.
4. Definition of 'rock' and hard material shall be based on that defined in the 'Specification'.
49
04 EXCAVATING, FILLING AND SITEWORKS
2. Foundation Excavation
a. Excavating in whatever type of material met with excluding rock and hard material as defined in the Specification
met with on the surface or in the excavations.
b. Getting the material out of the excavations.
c. Levelling bottoms of the excavations to falls or cambers and compacting the same.
d. Trimming sides of the excavations from vertical, battering or sloping faces.
e. Upholding and maintaining sides of the excavations by whatever means necessary including the use of bentonite
and any special shoring or sheet piling etc. as may be necessary but which do not form a permanent part of the
works to be executed, but excluding any planking and strutting to be left in or any sheet piling, etc. which form a
permanent part of the work to be executed.
f. Backfilling of selected excavated materials into the excavations and compacting the same by methods and in the
manners as specified in the Specification.
g. Multiple handling and transporting above the site.
h. Deposit, spread and level in making up levels of surplus excavated materials within the site.
i. Keeping the excavations free from storm, percolating or spring water by pumping or whatever other means
necessary.
j. Disposal of surplus excavated materials (the balance after backfilling) shall include for multiple handling of the
materials or transporting the material about the site as may be necessary prior to disposal.
k. In between and around the piles.
50
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Site Clearance
01 Clear the entire site item 01 of trees (irrespective 01 Removing trees is deemed
within the Contract of tree girth), to include removing the
Boundary vegetation, crops, stump and roots unless
loose vegetable otherwise stated.
matter, rubbish,
debris, unwanted
materials, disused
structures, etc. and
remove from site; as
directed by S.O.
{approximate
(acreage) acres}
51
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Bulk Excavations
52
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Extra over for m3 01 using pneumatic tools;
breaking up rock at to Authorities approval
any and by licenced
depth specialist; removing
from site
03 Extra over for 02 using chemical
breaking up hard means; to Authorities
material at any depth approval and by
licenced specialist;
removing from site
03 using control blasting;
to Authorities approval
and by licenced
specialist; removing
from site
53
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 To reduce levels m3 01 oversite; remove
excavated materials
to Contractor's
dumping ground:
average (depth) deep
02 oversite; remove
topsoil to be
preserved; deposit in
temporary spoil
heaps on site;
average (depth) deep
03 Foundation Excavations
54
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
06 Extra over for m3 01 using pneumatic tools;
breaking up rock/hard to Authorities approval
material at any depth and by licenced
for all types of specialist; removing
excavation from site
02 using chemical means;
to Authorities approval
and by licenced
specialist; removing
from site
03 using control blasting; to
Authorities approval and
by licenced specialist;
removing from site
55
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Filing
56
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
05 Sundries
57
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Moisture barrier m2 01 (nr) layer (thickness) 01 laid on hardcore 01 No allowance is made for
thick polythene sheet laps at joints.
moisture barrier 02 All turn-ups, turndowns,
laps, and joints deemed
included.
03 Forming holes deemed
included.
04 Narrow widths and small
quantities deemed
included.
03 Geotextile fabric m2 01 (thickness) thick; 01 horizontal
anchoring with (type) 02 sloping
03 vertical
58
04 EXCAVATING, FILLING AND SITEWORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
05 Berm drains, slope item 01 construct berm drains,
embankments and slope embankments
sumps and sumps; including
all necessary
excavation, concrete
lining, formwork, fabric
reinforcement and
close turfing to sloping
surfaces; as detailed
in Drawing (drawing
nr)/model
59
05 GROUND REMEDIATION AND SOIL STABILISATION
05 GROUND REMEDIATION AND SOIL STABILISATION
01 Ground remediation
02 Soil stabilisation
03 Instrumentation
Specific information to be shown 1. For ground remediation, the type/s and details and locations.
in the 2D drawings or to be input 2. For soil stabilisation, the type/s and details and locations and the requirement for pull out test.
into the 3D models 3. For instrumentation, the type/s and numbers and the locations to be installed and for monitoring, the frequency of
reporting.
Specific rules of measurement 1. All measurements of area are nett and do not include for any additional area required for working space, etc.
60
05 GROUND REMEDIATION AND SOIL STABILISATION
Works and materials deemed' 1. Disposal off site of all surplus excavated materials
which are collectively referred to 2. Disposal of all surface water
as the Preambles
3. Support to faces of excavation unless not at the discretion of the contractor
4. Working space
5. Excavation and filling for temporary works unless not at the discretion of the contractor
6. Levelling, grading, trimming and compacting surfaces exposed by the excavations
7. Curved work
8. Multiple handling of excavated materials on site
61
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Ground remediation
62
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
03 Vertical drains m 01 supply and install
(type) (dimensional
description) pipes
including punching
through geotextile
separator; all in
accordance with
Drawing (drawing
nr.)/model
63
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
05 Surcharge m3 01 Fill to the required 01 With imported selected 01 to surcharge area;
levels including the material and to the including removal from
formation of slopes S.O.'s approval the site upon the expiry of
02 With suitable material the surcharge period of
excavated from the (months) months
borrow pits from the
adjacent land and to
the S.O.'s approval
03 With imported common
filter sand and to the
S.O. approval
64
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Soil stabilisation
65
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Soil nailing nr 01 (dia.) diameter (grade) 01 (length) long
Grade galvanised
deformed bar
complete with head
assembly and
approved centralizers
at (spacing) spacing;
including drilling hole
minimum (dia.)
diameter through
whatever material
except rock; grouting
with non-shrink grout
Grade (grade); as
shown in Drawing
(drawing nr)/model
---- ----------------------
m 02 extra-over for drilling
minimum (dia.)
diameter hole through
rock material
66
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
nr 02 Reinforced vibrated in-situ 01 (dimensional
concrete Grade C (grade) description)
P soil nail pad; including l
layer of BRC mesh
(gauge) and formwork; as
shown in the Drawing
(drawing nr)/model
67
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
nr 02 Pull out test on soil nail 01 to (nr) times the
working load of
(nr) KN
68
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
05 Horizontal drain nr 01 Supply and install (dia.) 01 To earth 01 (length) long
diameter horizontal 02 To natural hard
perforated drain wrapped material
with filler fabric including 03 To rock
all necessary jointing as 04 To unsuitable
shown in Drawing material
(drawing nr)/model 05 To artificial hard
material
69
05 GROUND REMEDIATION AND SOIL STABILISATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
03 Instrumentation
70
06 PILING WORKS
06 PILING WORKS
01 Bakau piles
02 Precast concrete piles
03 Precast concrete spun piles
04 Precast prestressed concrete piles
05 Cast-in-place bored piles
06 Contiguous bored piles
07 Micro piles
08 Interlocking steel sheet piles
09 Isolated steel piles
10 Soldier piles
11 Testing
Information to 1. General requirements applicable to all types of piling systems e.g. soil investigation reports, tolerances, piling program, records,
be provided in nuisance and damage, damage to piles, safety precautions, definition, etc.
the
Specifications
2. Specification for the following: (to group those applicable to each type of piling system)
a. General k. Code of Practice u. Marking, handling and storage of piles
b. Materials l. Equipment and plant v. Tolerances in pile dimensions
c. Stacking and storing m. Site condition w. Repair and lengthening of pile
d. Pitching and driving n. Ground condition x. Cutting and stripping of pile heads
e. Pile extension o. Site surface, etc y. Straightness of piles
f. Cut off level of piles p. Boring pile shafts z. Grout and grouting
g. Obstruction to piles driving q. Underground services aa. Reinforcement
h. Heave r. Pile shoes ab. All types of pile testing
i. Workmanship s. Supply of piles
j. Defects on piles while driving t. Production of piles at site
71
06 PILING WORKS
Specific 1. For Bakau piles, the number, the length and diameter of the piles; total penetration depth and jointing details (if any).
information 2. For Preformed piles, the diameter and pre-bored length (if any); type, number, the length and diameter/size of preformed piles; the
to be shown commencement level, total penetration depth and jointing details (if any); pile shoe (if any); the cut-off level.
in the 2D 3. For bored piles, type, number, and diameter of bored piles; the commencement level, total penetration depth and allowance for
drawings or boring through rock; type and grade of concrete and reinforcement detail; permanent casing (if required); structural steel supports
to be input whether Consultant's or Contractor's design for contiguous bored piles ( if Consultant's design, then Consultant to give details).
into the 3D
models 4. For interlocking steel sheet piles, type and mass(kg/m2) of steel piles; whether permanent or on a rental basis; area and
maximum length of sheet piles; structural steel supports whether Consultant's or Contractor's design (if Consultant's design, then
Consultant to give details.
5. For Isolated steel piles, type and x-sectional dimension and mass (kg/m); commencement level and total penetration depth and
jointing details (if any); toe and capping plates detail (if any);
6 For Soldier piles, type and x-sectional dimension and mass (kg/m); commencement level and total penetration depth and jointing
details (if any); the Group of sawn timber boarding; structural steel supports whether Consultant's design or Contractor’s design (if
Consultant's design, Consultant to give details.
7. For testing, the types, loading and nr for each type required.
72
06 PILING WORKS
Works and 1. General
materials Breaking pile head shall deem to include cutting, trimming, stripping, dressing for key, straightening and bending bars as necessary
deemed included' for pile cap connection and dispose surplus pile of varying length off site.
which are
collectively
referred to as
'Preambles'
2. For pre-formed concrete piles
a. Piling
(i) All labour and materials for complete pile installation inclusive of wastage
(ii) All necessary excavation works incidental to piling
(iii) Driving piles singly or in cluster
(iv) Re-driving of upheaved pile, if any
(v) Replacement of damaged pile and any pile which failed under tests
(vi) Filling up with approved fill materials any gap appearing between pile and ground due to displacement of ground on
completion of piling
(vii) Normal wet weather delays
(viii) Standing time for equipment and labour due to all the foregoing circumstances
(ix) Staging and platform for the installation of piles on embankments and slopes
73
06 PILING WORKS
3. For bored cast in place concrete piles
a. General
(i) Boring shall be deemed to include disposal of excavated materials off the site including the use of temporary casing, and/or the
use of stabilising agent e.g. bentonite for stabilising the pile boring and enlarged bases.
(ii) Suitable type of construction to suit dry, wet or cased depending on soil conditions shall be deemed included.
(iii) Pre-boring shall deem to include backfilling, hoisting, pitching and driving of piles.
(iv) Permanent casing deemed to include the supply, jointing of casings, driving heads and shoes where
applicable.
(v) All labour and materials for complete pile installation inclusive of wastage.
(vi) All necessary excavation works incidental to piling.
(vii) Installing, coring, boring, etc. in all soil (excluding solid rock) to the given level including all labour, equipment, plant and tools,
and disposal of excavated materials off the site to Contractor's own dump.
(viii) Empty bores shall deem to include filling empty bores with sand or other suitable material.
(ix) Providing pile shoes or formation of enlarged bases.
(x) Normal wet weather delays.
(xi) Replacement of any pile that fail under test.
(xii) Standing time for equipment and labour due to all the foregoing circumstances.
(xiii) Staging and platform for the installation of piles on embankments and slopes.
74
06 PILING WORKS
a. Testing
(i) Testing of piles is deemed to include for the provision of monitoring details with calculated movements to the bored piles
installed and also movements to existing structure above and below the ground.
(ii) For PDA test, is deemed to include provision and setting up the necessary equipment, plant and tool including preparing pile
heads, the provision of temporary works and staging and manpower to carry out dynamic load tests using a Pile Driving
Analyser complete with CAPWAP analysis.
(iii) For Static Load Test, it is deemed to include mobilisation and demobilisation upon completion of all necessary equipment,
kentledge, etc. preparing pile heads to the required level, and attendance of surveyors and supervision during the test.
75
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Bakau piles
76
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Supply, transport, pitch nr 01 (dia.) diameter
and drive bakau piles average (length) long
including cutting off at each
required level
77
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
78
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
(c) reports for all piles
duly tested signed by
the Contractor and
Engineer's or S.O.'s
representatives as
work proceeds.
(d) The Contractor shall
allow the temporary
works design to
address matters of
safety, security and
stability of the
strutting if deemed
necessary by the
Engineer.
(e) Any other
requirements.
79
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Drive only (type of m 01 (X-sectional 01 If the piles are rake and/or
pre-formed concrete dimension/diameter) in water, it shall be so
piles) singly or in piles stated in Level One.
cluster; commencing 02 Type of piling method to
from (level) level be stated in the Heading
e.g. use of Hydraulic
hammer or Jack in
Machine.
80
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
06 Break up and cut off to nr 01 (X-sectional
the required level dimension/diameter)
including cutting, piles
trimming, stripping,
dressing for key,
straightening and
bending bars as
necessary for pile cap
connection and dispose
surplus pile of varying
lengths on or off site as
directed for
81
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
82
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Boring m 01 Bore vertical hole 01 (dia.) diameter bored 01 Applicable to the three
at any depth piles {in (nr) nr} types of piles.
commencing from
(level) level and
through whatever
soil strata (except
rock as described)
02 Bore vertical hole
commencing from
(level) level and
through
bedrock/rock
83
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
05 Breaking pile head nr 01 Break up and cut off 01 (dia.) diameter pile 01 Applicable to the three
to the required level. head types of piles.
07 API pipes m 01 Supply and install 01 (dia.) diameter (OD), 01 Applicable to Micropiles
pipe N80 used API (thickness) thick in only.
pile (dia.) diameter
micropiles {(ton) ton}
08 Permanent casing m 01 Supply and install 01 (dia.) diameter 01 Applicable to cast- in-
permanent casing micropiles {(ton) ton} place bored piles only.
through limestone
cavity
84
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
09 Structural steel supports item 01 design, supply and 01 Applicable to
install temporary Contiguous bored piles
internal strutting for only.
contiguous bored
piles including
subsequent removal
from site and
closing of openings,
etc.
85
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
86
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
03 Cut-off or trim steel m 01 In varying length
sheet piles to the
required level
87
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Supply, deliver to m 01 Universal bearing piles 01 (X-sectional 01 Type of treatment, coating
site, handle and pitch 02 Circular section piles dimension) x (mass) or cathodic protection (if
isolated steel piles kg/m any) shall be stated in
Level Two.
03 Drive only isolated m 01 Universal bearing 01 (X-sectional 01 If the piles are rake and/or
steel piles singly or in piles dimension) x (mass) in water, it shall be so
cluster; commencing kg/m described in Level Two.
from (level) level 02 Circular section piles
02 Type of piling method to
be stated in the Heading
e.g. use of Hydraulic
hammer or Jack in
Machine.
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
07 Capping plates 01 To universal 01 X-sectional
(dimensional bearing piles dimension) x (mass)
description) Grade kg/m
(grade) plate welded 02 To circular section
with and including (nr) piles
nr (dia.) diameter high
tensile U-bar girth
(girth) long as shown
in Drawing (drawing
nr)/model
89
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
10 Soldier piles
90
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
91
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
08 Removing soldier item 01 extracting piles,
piling upon removing boarding,
completion strutting and waling
from site; making good
all work disturbed
11 Testing
92
06 PILING WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
05 Proof coring as nr 01 Allow for proof coring 01 on (dia.)
described to a required depth diameter/(size) piles
from the pile head and
to pressure grout with
an approved material
the cored hole after
completion
93
07 DIAPHRAGM WALLS AND UNDERPINNING
07 DIAPHRAGM WALLS AND UNDERPINNING
01 Diaphragm Walls
02 Underpinning
Information to be provided in the 1. General requirements are applicable to all types of retaining wall and underpinning structure e.g. soil investigation reports,
Specification layout and detail drawing, limit of works, method of work, commencing level of excavation, etc.
2. Specification for the following: (to group those applicable to retaining and underpinning structure)
a. General g. Materials l. Drainage
b. Definition of retaining h. Execution m. Installation
structure
c. Dimension i. Geosynthetic quality n. Construction
d. Code of Practice assurance requirement o. Testing of fill material
e. Submittal design for j. Bedding and slope p. Tests of reinforcing
approval protection elements
f. Design criteria k. Separation and
stabilisation
Specific information to be 1. For diaphragm walls, the commencement level, the width and maximum depth; allowance for rock; type & grade of concrete for
shown in the 2D drawings or to diaphragm walls and capping beams; product name of the waterstop joints and its location at diaphragm walls; ground anchors
be input into the 3D models details (permanent or temporary) or temporary internal strutting to be designed by the Contractor.
2. For underpinning, the brief description of work and the method of underpinning; the depth and maximum width.
2. For underpinning
a. In the event that the underpinning is of such an extent that it cannot easily be measured in accordance with these rules,
the works shall be measured in detail in accordance with the rules for the relevant trades required. In this case, the work
shall be described as 'In works of underpinning'.
94
07 DIAPHRAGM WALLS AND UNDERPINNING
Works and materials 1. For Diaphragm walls
deemed included' which are a. Excavation and disposal.
collectively referred to as b. Earthwork support.
'Preambles' c. Preliminary trenching.
d. All working space.
e. Disposal of ground and surface water.
f. Backfilling.
g. Surface treatments.
h. Vertical check including labour, test equipment and submission of records
i. Multiple handling of excavated materials and transporting about the site
2. For underpinning
a. Temporary support of existing structures
b. Excavation and disposal.
c. Earthwork support.
d. Preliminary trenching.
e. All working space.
f. Disposal of ground and surface water.
g. Cutting away existing foundations and footings and disposal
h. Preparing the underside of existing work.
i. Backfilling.
j. Surface treatment.
k. All new work associated with the process of underpinning.
l. All making good if specified
3 ‘Preambles' related to 'Excavating', 'In-situ Concrete', 'Reinforcement', and 'Formwork' items under this Work
Section shall be in accordance with those as stated in the appropriate Work Sections to which they correspond.
95
07 DIAPHRAGM WALLS AND UNDERPINNING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Diaphragm walls
96
07 DIAPHRAGM WALLS AND UNDERPINNING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
04 Excavating m3 01 For diaphragm wall in 01 (width) wide; (depth)
alternate sections or maximum depth
other methods approved
by the S.O.; in whatever
soil strata; commencing
from existing ground
level; including removal
of surplus soil and filing
excavated trench with
bentonite slurry
97
07 DIAPHRAGM WALLS AND UNDERPINNING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
06 Waterstop joints m 01 (Product name/code) or 01 (width) wide horizontally;
other equal and approved in diaphragm wall
PVC waterstop;
embedded in concrete; 02 (width) wide vertically; in
including special welded, diaphragm wall
purpose-made or special
angles, intersections and
connectors {measured
net - no allowance made
for laps}
98
07 DIAPHRAGM WALLS AND UNDERPINNING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
11 Temporary internal item 01 Design, supply and 01 If the Consulting
strutting install temporary king Engineer designs such
post and internal temporary internal
strutting for diaphragm structing system, then
walls including such work is to be
provision of all measured in accordance
necessary piling with the rules of the Work
equipment to drive in Section: Structural
king post and the metalwork.
subsequent removal of
all temporary king post
and internal strutting
13 Ground anchors nr 01 (nr) KN working load; 01 through (width) wide 01 (length) long 01 Whether the ground
(nr) number of diaphragm walls; to anchors are permanent
strands; covered with whatever soil strata or temporary is to be
PVC sheath stated in the Heading.
and grease; including
strand holding
head, drilling, and
cement grout; as
shown in Drawing
(drawing nr)/model
14 Withdrawing ground item 01 This item is only required
anchors, removing if the ground anchors are
from the site; making temporary.
good all work
disturbed.
99
07 DIAPHRAGM WALLS AND UNDERPINNING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Underpinning
04 Reinforcement t
05 Brickwork or m2
blockwork
06 Tanking
100
08 CRIB WALLS, GABIONS, AND REINFORCED EARTH
08 CRIB WALLS, GABIONS, AND REINFORCED EARTH
Information to be provided in 1. General requirements e.g. soil investigation reports, tolerances, records, nuisance and damage, damage to structure,
the Specification safety precautions, definition etc.
2. Contractor Designed Crib Wall & Contractor Designed Reinforced Earth Wall
Performance Specification covering the
following:
a. Scope of f. Performance criteria
work
b. Submittals g. Delivery, storage, and
handling
c. Codes and h. Materials
standards
d. Design i. Fabrication
requirements
e. Testing Warranties
3. For gabion, the detail specification for the type of fill to baskets, specified treatment of basket fill and the specified
handling details.
Specific information to be 1. For crib wall and reinforced earth, the location, area, and height where are
shown in the 2D drawings or required.
to be input into the 3D 2. For gabions, the type and dimension (including the gauge) of gabions; the thickness and the formation of the wall
models built by gabions.
Specific rules of 1. For Contractor Designed Crib Wall (Crib Wall) & Contractor Designed Reinforced Earth Wall (R.E. Wall)
measurement a. As these are contractor designed items, they are priced as 'lump sum' items with the cost breakdown given
and in the event of any variation which does not affect the overall design, it would be evaluated based on the
unit rate derived from dividing the 'lump sum' price by the approximate area (measured on front face) given in
the Level 1 of the item description.
2. For gabions
a. Area is measured on the front face.
101
08 CRIB WALLS, GABIONS, AND REINFORCED EARTH
Works and materials deemed 1. For Contractor Designed Crib Wall (Crib Wall) & Contractor Designed Reinforced Earth Wall (R.E. Wall)
included' which are a. All ancillary and other works and expenditures whether or not separately mentioned or described in the
collectively referred to as Performance Specification or in the Bill which are indispensably necessary to carry out and bring to completion
'Preambles' of the works or which may contingently become necessary to overcome difficulties before completion.
2. For gabions
b. Gabion baskets are deemed to include assembling, tying, fixing, bracing and tying lids.
c. Filling is deemed to include compaction and overfilling of fill material.
102
08 CRIB WALLS, GABIONS, AND REINFORCED EARTH
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Contractor designed item 01 Design, 01 Breakdown cost 01 To add 'NOTES' preceding the
crib wall manufacture, first Heading as follows:
supply and install (i) Design fee a The Contractor shall
Crib wall engage a Specialist Sub-
{approximate area (ii) Investigation Contractor who has the
(area) m2}; as works expertise and experience to
shown in Drawing (iii) Excavation work design, supply and install
(drawing nr)/model to facilitate the such wall in accordance
construction of with the Performance
Crib wall Specification in the
(iv) Manufacture, Specification and the
supply and relevant drawings and to
deliver to site Crib the approval of the S.O.
wall components b The Contractor and his
(v) Piling (if any) Specialist Sub-Contractor
(vi) Erection and shall jointly be responsible
installation of Crib to ensure that such walls
Wall are in all respect adequate,
(v) Supply and install accurate, sufficient and fit
mass concrete for its purpose.
levelling pad c The Contractor shall submit
(vi) Supply, fill, all shop drawings and
spread, level, and samples as per
compact granular requirements stated in the
backfill Performance Specification
(vii) Other works to be and be endorsed by a
listed by the Professional Engineer
Contractor that registered with the Board of
are necessary to Engineer, Malaysia.
ensure
completion of the
Crib wall
103
08 CRIB WALLS, GABIONS, AND REINFORCED EARTH
ITEM OR WORK TO UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
BE MEASURED
02 Contractor item 01 Design, 01 Breakdown cost d Before pricing, the Contractor
designed manufacture, (i) Design fee is required to visit the site and
reinforced earth supply, and refer to the drawings for the
wall install extent, the location and the
reinforced earth (ii) Investigation works varying heights shown therein
wall to satisfy himself as regards to
{approximate (iii) Excavation work to facilities for transport and plant
area (area) facilitate the movement, means of access.
m2}; as shown construction of R.E. e Any other requirements (if any).
in Drawing Wall
(drawing (iv) Manufacture, supply
nr)/model and deliver to site
R.E. Wall
components
(v) Piling (if any)
(vi) Erection and
installation of R.E.
wall including
assembling, tying,
fixing, stacking and
tensioning
(v) Supply and install
mass concrete
levelling pad
(vi) Supply, fill, spread,
level, and compact
granular backfill
(vii) Other works to be
listed by the
Contractor that are
necessary to ensure
completion of the
R.E. Wall
104
08 CRIB WALLS, GABIONS, AND REINFORCED EARTH
ITEM OR WORK TO UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
BE MEASURED
03 Gabion basket m2 01 (dimensional 01 (width) wide walls 01 vertical
walls description)
rock-filled gabion 02 battering
with PVC-coated 03 curved on
wire gauge size plan
of (size); as 04 sloping
shown in 05 stepped
Drawing on face
(drawing
nr)/model
105
09 IN-SITU CONCRETE WORKS
09 IN-SITU CONCRETE
WORKS
01 In-situ concrete
02 Surface finishes to in-situ concrete
03 Formwork
04 Reinforcement
05 Designed joints in in-situ concrete
06 Accessories cast into in-situ concrete
07 In-situ sundries
Specific information to be 1. For in-situ concrete, type, strength requirement or a mix of the concrete for each structural or non-structural
shown in the 2D drawings or to member including one or more of the following requirements if required:
be input into the 3D models a. Any limitations on method, sequence of and speed of the pouring, and/or compacted or cured in a particular
way.
b. Watertight work with the use of waterproofing admixture.
c. Specially designed mix and/or a special type of cement e.g. rapid hardening cement, sulphur-resistant
cement, etc.
2. For surface finishes to in-situ concrete, the type of surface finishes to each of the concrete surfaces.
3. For formwork, no specific information as 'formwork' is NOT drawn or modelled.
4. For reinforcement, steel bars exceeding 12 metres in length.
5. For designed joints in in-situ concrete, type, brand, and details of the designed joints and location.
6. For accessories cast into in-situ concrete, type, and location.
7. For sundries, scupper drains, grouting, etc.
106
09 IN-SITU CONCRETE WORKS
Specific rules of measurement 1. For In-situ Concrete
a. Concrete volume is measured nett.
b. No allowance in volume to be made for deflection of formwork.
c. Deduction is not made for reinforcement, steel sections, cast-in accessories but voids irrespective of sizes
are to be deducted.
d. Concrete is deemed cast into formwork unless otherwise described.
e. Concrete is deemed finished as struck from basic finish formwork.
f. All top surfaces and soffits are deemed to finish horizontal unless otherwise stated.
g. All top surfaces are deemed finished tamped.
h. 'poured against faces of excavation', 'laid in bays', 'laid to falls, crossfalls, cambers and/or slopes
irrespective of a degree from horizontal', etc. are not being mentioned in the item descriptions but are
deemed to have been observed from the drawings or models and allowed for accordingly.
2. For Reinforcement
a. All mild steel and high tensile steel bar reinforcement shall be in lengths not exceeding 12 metres unless
otherwise stated.
b. No allowance has been made in the weights of steel reinforcement for tying wire, spacers, chairs, rolling
margin or the weight of weld metal and are deemed included.
c. Voids irrespective of any sizes for fabric reinforcement shall be deducted.
d. Bent fabric is deemed to include fabric that is wrapped around steel members.
e. Chairs and connectors are deemed included unless not at the discretion of the contractor.
f Fabric reinforcement shall deem to cut to size well lapped at joints and embedded and measured nett (no
allowance made for laps).
107
09 IN-SITU CONCRETE WORKS
3. For Formwork
a. No allowance in volume to be made for deflection of formwork.
b. Formwork to vertical surfaces i.e. columns, walls, etc. is to include for strutting to any height required.
c. `Left in' formwork shall mean formwork, which will form a permanent part of the Works.
d. Voids irrespective of any sizes shall be deducted.
e. No deduction shall be made for beam intersections.
f. Formwork to secondary beams shall be measured up the sides of main beams, but no deduction shall be
made from the formwork of the main beam where the secondary beam intersects it.
g. Formwork to beams that intersect with stanchion casings or columns shall be measured up to them on all
sides. No deduction shall be made from the formwork to stanchion casings or columns at these
intersections.
h. Strutting height ‘exceed 3.50m’ shall mean any height as shown in the relevant drawing above 3.50m.
108
09 IN-SITU CONCRETE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 In-situ concrete
109
09 IN-SITU CONCRETE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
m 16 Extra over for forming 01 to underside apron 06 'Slabs' includes ground slabs
thickening slabs, footpaths, and beds, lift pit slabs,
paving and the like basement slabs, retaining wall
slabs, suspended floor slabs,
suspended roof slabs,
suspended landing slabs,
suspended ramp slabs,
suspended gutter slabs and
the like.
07 'Walls' includes basement
walls, retaining walls, lift pit
walls, shear walls, balustrade
walls and the like.
08 'Beams' includes ground
beams, floor beams, transfer
floor beams, ramp beams, roof
beams, landing beams,
staircase beams, arch beams
and the like.
09 'Columns' includes all types of
columns, piers, and stiffeners.
10 'Extra over for forming
thickening' shall deem to
include all necessary
excavation, sawn formwork,
sand blinding and hand
packing hardcore to slopes.
110
09 IN-SITU CONCRETE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Formwork
111
09 IN-SITU CONCRETE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
m2 05 Sides of and soffits of 01 strutting not
beams exceeding
06 Sides and soffits of 3.50m
transfer beams
112
09 IN-SITU CONCRETE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
05 Permanent formwork; m2 1 Soffits of slabs 01 strutting not 01 Type and ’brand’of permanent
(thickness) thick steel exceeding 3.50m formwork shall be described in
sheet (type) ; 02 strutting exceeding the ‘Heading’.
including welding to 3.50m
structural steelwork
as supports
2 Soffits of transfer slabs 02 strutting exceeding
3.50m
03 strutting exceeding
3.50m
06 Contractor Designed Item 1 Design, manufacture, 01 Breakdown cost 01 To add ‘NOTES’ preceding the
slipform system supply, and install (Contractor is ‘Heading’ as follows:
slipform, and use of the required to give a a) The Contractor is
slipform in accordance breakdown cost for responsibility to study the
with the Performance the use of slipform structural design as to whether
Specification in the which, among other it is suitable to use the slipform
Specification things, shall include and to ensure that the slipform
the supply cost o fall is in all respect adequate,
components of the accurate, sufficient and fit for
slipform e.g. hydraulic its purpose
pump components, b) The Contractor shall submit
yoke legs, walkaway all shop drawings and method
brackets, lifting jacks, statement for the slipform work
strand rods, etc, the including any change in the
installation cost, the concrete mix for the approval
usage cost, design of the S.O. before the
fee and the dismantle commencement to the works.
cost. c) Any other requirements (if
any).
113
09 IN-SITU CONCRETE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
04 Reinforcement
02 (diameter)
03 In footpaths, pavings, road diameter; links,
and the like stirrup, binders
and the like
04 In slabs 03 (diameter)
diameter; curved
05 In coffered/waffle slabs 04 (diameter)
diameter; helical
06 In walls 05 (diameter)
07 In beams diameter; as
chairs or stools
08 In columns 06 (diameter)
diameter; splice
connectors
sleeve and
wedges
09 In steps, staircase and 07 (diameter)
strings and the like diameter; welded
10 In structural toppings joints
114
09 IN-SITU CONCRETE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Fabric reinforcement m2 01 In foundations 01 BMC Ref Nr
(reference nr)
02 In footpaths, pavings,
road and the like
03 In slabs
04 In coffered/waffle slabs
05 In walls
06 In steps, staircase and
strings and the like
07 In structural toppings
115
09 IN-SITU CONCRETE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Spout pipes nr 01 Cast into concrete walls 01 (dimensioned 01 Kind of materials and if
description) painting required, the type
02 Weep pipes 02 Cast into concrete columns and number of coats shall be
03 Column guards 03 Cast into concrete slabs so described in the Heading.
116
10 PRESTRESS/PRECAST/COMPOSITE CONCRETE
10 PRESTRESS WORKS AND PRECAST CONCRETE
01 Prestress works
02 Precast concrete
Specific information to be 1. For prestress works, location and the various effective forces on each of the structures e.g. beams, slabs, etc. to
shown in the 2D drawings or to be prestressed.
be input into the 3D model 2. For precast concrete, the dimensions of each precast members e.g. columns, beams, slabs, walls, cladding,
staircase, sills, copings, drains, etc. and their locations; the grade of concrete and the reinforcement details for
associated works e.g. make-up strip, concrete topping, etc.
Specific rules of measurement 1. Deduction are not made for reinforcement, cast-in accessories, conduits, etc.
2. Fabric shall be measured as the area covered. No allowance has been made for laps.
117
10 PRESTRESS/PRECAST/COMPOSITE CONCRETE
Works and materials deemed 1. All precast concrete components is deemed to include:
included which are collectively a. Reinforcements and projecting reinforcements for lapping into the main structure
referred to as the 'Preambles' b. Lifting hooks
c. Moulds and casting
d. Keyed finish to external surfaces to receive tiling and fair finish to all other surfaces
e. Cast-in brackets, plates, U-bars, stainless steel bolts washers, and brackets, etc. welded or built into the main
structure
f. Holes, sleeves, rebates, notchings, sinkings, mortices and the like
g. Hoisting, placing in position, setting, bedding, jointing and pointing in cement mortar and/or grouting with non-
shrink cement and sand mortar including cutting-off lifting hooks
h. Temporary supports, ties, etc.
i. Concrete packing before fixing of precast units in position
j. Neoprene or plastic spacer tubes and applying silicone sealant to all joints
k. All making good
l. Casting in conduits, forming chases, opening, holes and the likes for Mechanical and Electrical installation.
m. Supply to include delivery transportation, protection, unloading to the site for storage
118
10 PRESTRESS/PRECAST/COMPOSITE CONCRETE
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS AND
MEASURED GLOSSARY
01 Prestress works
119
10 PRESTRESS/PRECAST/COMPOSITE CONCRETE
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS AND
MEASURED GLOSSARY
02 Precast concrete
01 Precast Concrete Frame nr 01 Precast concrete 01 (dimensioned 01 If there is a corbel at the column
Structures frame description) columns; head, it should be stated in
as shown in Drawing Level Two stating the size.
(drawing nr)/model 02 Sloping beams shall be so
stated in Level Two.
02 (dimensioned
description) beams; as
shown in Drawing
(drawing nr)/model
120
10 PRESTRESS/PRECAST/COMPOSITE CONCRETE
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS AND
MEASURED GLOSSARY
02 Precast Concrete m2 01 Hollow-core slabs 01 (thickness) thick 01 Sloping slabs/beams shall be so
Decking stated in Level Two.
02 Half slab
121
10 PRESTRESS/PRECAST/COMPOSITE CONCRETE
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS AND
MEASURED GLOSSARY
03 Precast Concrete Walls, m2 01 Cladding panels 01 (thickness) thick 01 Horizontal, vertical or sloping
Partition and Panels 02 Wall units shall be so described in Level
Two.
05 Precast concrete sills, nr 01 Precast concrete 01 (dimensioned 01 Precast concrete surfaces water
lintels, copings, sills description) drain is deemed to include
channels, and channel 02 Precast concrete excavation, all moulds, finishing
slabs, drains and the lintels fair on exposed faces, hoisting,
likes 03 Precast concrete bedding and pointing in cement
cover slabs mortar (1:3), all ends, angles,
and all necessary formwork and
m 04 Precast concrete 01 overall (dimensioned reinforcement; laid to falls.
coping description)
122
11 MANSORY
11 MASONRY
01 Brick/block works
02 Glass block works
03 Natural stone rubble works
04 Sundries
Specific information to be 1. For brick and block Walling, the type of brick/block and the thickness; finished fair and curved profile (if any)
shown in the 2D drawings or to 2. For glass block walls and natural stone rubble walls and dressings, thickness; the name of manufacturer/supplier
be input into the 3D models (if required) and curved profile (if any)
3. For all items in the Sundries, the width/thickness/diameter/length as the case may be.
Specific rules of measurement 1. Walls are measured on the centre line of the material unless otherwise stated.
2. 'Curved' means a curved profile at a radius as shown in the drawing.
3. No deduction is made for stiffeners and lintels for the measurement of wall area.
4. No allowance is made for laps for damp proof courses
5. Thicknesses stated are nominal.
6. All wall dimensions exclude applied finishes.
123
11 MANSORY
Works and materials deemed 1. For brickwork and glass block works, the following items is deemed to include:
included' which are collectively a. All rough and fair cutting
referred to as the 'Preambles' b. Oversailing and receding courses
c. Rough relieving and discharging arches
d. Wedging and pinning
e. Raking out joints for flashing, roof coverings, etc. and pointing with mortar
f. Bedding plates
g. Bedding and pointing frames
h. Parging and coring flues
i. Labour eaves filling
j. Plumbing
k. Angles
l. Forming square and rebated reveals, cut squint or birdsmouth
m. Forming, leaving or cutting chases, holes, and mortices
n. Cutting and pinning and/or building in
o. All making good
p. Sundry items of a like nature
124
11 MANSORY
2. For blockwork and natural stone rubble works, the following items is deemed to include:
a. All specially made block (or brickwork and/or in-situ concrete in lieu) or selected stone rubble
b. All rough and fair cutting
c. Oversailing and receding courses
d. Plumbing
e. Edges
f. Forming square and rebated reveals
g. Notches
h. Cutting and pinning at top
i. Cutting at ends and around openings
j. Cutting and bonding at intersections, angles, and irregular angles
k. Raking out joints for flashing, roof coverings, etc. and pointing with mortar
l. Bedding plates
m. Bedding and pointing frames
n. Parging and coring flues
o. Labour eaves filling
p. Forming, leaving or cutting notches, chases, holes, and mortices
q. Cutting and pinning and/ or building in
r. All making good
s. Sundry items of a like nature
125
11 MANSORY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS AND
MEASURED GLOSSARY
01 Common Clay Brick m2 01 Walls 01 half brick thick 01 generally 01 To add 'NOTES' preceding the
02 Facing brick; finished 02 Walls; skin of 02 one brick thick Heading as follows:
fair on both sides and hollow walls 03 one and a half brick
pointed with a neat 03 Walls; built thick (a) Precast lintel or reinforced
recessed joint on the against other 04 brick on edge concrete lintel including all
works proceeds work (thickness) thick necessary formwork and
03 Engineering brick 04 Walls; used as reinforcement over
04 Cement and sand brick formwork doors/windows/opening
05 Solid concrete block 05 Walls; bonding to where necessary, all mild
06 Lightweight aerated other work steel bonding ties with one
core block end hooked and cast into
07 Hollow-core block concrete and the other end
08 Precast concrete vent build into brickwall and
block; finished fair on reinforced vibrated grade
both sides and pointed C25P stiffeners as shown
with a neat recessed in the relevant drawings are
joint on the works deemed included.
proceeds
09 Concrete Masonry (b) Laying of brick and block
Units (CMU) walling is deemed to
include cement mortar (1:3)
with plasticiser and for
laying of half brick/block
wall, it is deemed to include
a layer of 'exmet' at every
fourth course in addition.
126
11 MANSORY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS AND
MEASURED GLOSSARY
m 06 Columns 01 overall 01 generally 02 For walls, tapering one side or
07 Attached (dimensioned two sides or curved profile shall
projection; description) be so described at Level Two.
finished fair and
pointed with a 03 For ‘columns’, whether ‘vertical’,
neat recessed ‘battered’, or ‘curved’ shall be so
joint on exposed described in Level Two.
faces
04 For ‘Attached projection’ whether
‘vertical’, ‘horizontal’, ‘raking or
‘curved’ shall be so described in
Level Two.
05 For ‘CMU’,whether CMU is of
m 08 Sills, steps, 01 overall 01 generally 'integrated or 'tongue and groove'
coping, thresholds (dimensioned type or normal type is to be
and the like description); brick- described in the Heading.
on-edge; finished 06 For 'sills, steps, coping,
fair face and thresholds and the like', 'bullnose
pointing to exposed bricks' or 'bricks with one
faces bevelled edge' and whether
horizontal, raking, curved or
weathering shall be so described
in Level Two.
.
m 09 Arches; including 01 Brick-on-edge; 01 forming arch;
centering; flat overall overall
(dimensioned (dimensioned
10 Arches; including description) description);
centering; finished fair
segmented face and
12 Arches; including 02 Brick-on-end; pointing to
centering; semi- overall exposed faces
circular (dimensioned
12 Arches; including description)
centering;
bullseye
127
11 MANSORY
128
11 MANSORY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS AND
MEASURED GLOSSARY
10 Vibrated reinforced in- m2 01 In infill; well 01 Concrete Masonry 01 (thickness) thick 01 The 'm2' is the same area as
situ concrete; Grade compacted to Units (CMU) wall the CMU wall but not the actual
(Grade of concrete) 'quantity' required which can
only be computed by referring
11 High tensile steel bar kg 01 in infill to to the CMU detail for the infill.
reinforcement
01 Hollow glass block; m2 01 Walls 01 (thickness) thick 01 Curved profile or other profile
pointing both sides as shall be described in Level
works proceeds with Two.
(type of material) 02 If it is to be from a specific
manufacturer, it shall be so
described in the Heading.
129
11 MANSORY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS AND
MEASURED GLOSSARY
04 Sundries
03 Damp proof courses m 01 Hessian reinforced 01 (width) wide 01 Damp proof courses are
bituminous felt deemed to include:
02 Polymer-based (a) forming laps, ends, and
bituminous felt angles
(b) pointing exposed edges
(c) bonding to damp-proof
membranes and the like
(d) cement mortar (1:3)
mortar
130
12 WATERPROOFING
12 WATERPROOFING
Specific information to be shown 1. The system and selected manufacturer's brief specification to each area.
in the 2D drawings or to be input 2. The extent of coverage.
into the 3D models
Specific rules of measurement 1. The area is measured flat - no allowance for upturns, skirting, etc and with no differentiation as to the size of the
2. area begin waterproofed.
All voids are deducted.
Works and materials deemed 1. Narrow widths
included' which are collectively 2. Forming arises, fair edges, butt joints, angles, ends, outlets and any other sundry items of a like nature
referred to as 'Preambles' 3. All surface preparation work and waterproofing treatment to the area around pipes, outlets, corners, ends,
angles, junctions, upturn, etc.
131
12 WATERPROOFING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Cementitious system m2 01 (system from selected 01 Covering; to concrete 01 generally 01 Whether 'horizontal',
waterproofing base 'sloping' (irrespective of
manufacturer) or other 02 Coverings; to brickwork the degree), vertical,
equal and approved base raking or stepped shall
cementitious system be so described in Level
Two. In addition, if
curved profile, it shall
also be added in Level
Two.
132
12 WATERPROOFING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Liquid applied roofing m2 01 (system from selected
system waterproofing
manufacturer) or other
equal and approved
---- liquid applied roofing -------------------------- --------------------
m system 01 Skirtings; to concrete 01 girth/height
base
02 Skirtings; to brickwork
base
03 Fascias; to brickwork
base
04 Fascias; to concrete base
05 Gutters; to concrete base
06 Channels; to concrete
base
07 Valleys of roof; to
concrete base
08 Kerbs; to concrete base
133
13 ROOFING
13 ROOFING
01 Roofing tiles
02 Metal roofing
03 Insulation
04 Flashings, gutters and the like
05 Roof-lights and special sheets
Information to be provided in 1. General - pitch and laps for each type of roof covering shall be strictly in accordance with the manufacturer's
the Specification instructions and all roof covering accessories shall be of the same material as the general covering.
2. Types of roofing tiles and their respective BS/ MS code and the requirements for laying of tiles and their accessories in
accordance with manufacturer's instructions.
3. Types of metal roofing and their respective BS/ MS code, and the detailed specification of surface finish, the
composition of the metal, the fixing requirements and the accessories, and the warranty required, all in accordance with
manufacturer's instructions.
4. Types of insulations and their respective BS/MS code and detailed specification.
Specific information to be 1. For roofing, quality, profile, type, name of the manufacturer/supplier and product series codes; timber battens/steel
shown in the 2D drawings or purlin; verge, hip capping, ridge capping, valleys and the like.
to be input into the 3D 2. For aluminium foil insulation, number of layers and whether single-sided or double-sided; for rockwool and glass fibre
models slabs, the thickness and weight per m3.
3. For flashings, gutters and the like, the type and gauge and the type of joints; diameter/girth; outlet at gutters.
Specific rules of 1. Slate or tile roofing, and roof decking shall be measured as carried out.
measurement 2. Bitumen-felt or other types of waterproofing membrane or screeds to RC roof are measured under the 'Waterproofing'
work section.
3. Sheet metal roofing and gutters shall be measured as the area of the finished surface.
4. Deduction shall be made for all voids irrespective of sizes.
5. When the word 'on' or 'fixed to’ follows by a sub-component in Level One or Level Two, it is assumed that the provision
of such sub-component is included in the building component/item unless stated otherwise.
'Works and materials deemed 1. For Roofing tiles and metal roofing
included' which are a. Laps
collectively referred to as b. All straight, skew and circular cutting at eaves, verges, top edges, abutments, valleys, hips and the like
‘Preambles' c. Holes for pipes and the like
d. Bedding, pointing, finishing with mortar fillets
2. For flashing and cappings
a. Laps, passing in the running lengths, fixing and pointing of edges and the types used either shown in the drawings
or accordance with the manufacturer’s recommendation.
134
13 ROOFING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Roofing tiles
01 Clay roofing tiles m2 01 On and including 01 Pitch (nr) degree 01 generally 01 Quality, profile, and type
02 Concrete roofing tiles (dimensioned 02 Vertical coverings 02 complete with one shall be stated at the
03 Shingle tiles description) sawn 03 Conical as shown layer of single- Heading. Normally, the
04 Slate tiles pressure treated in Drawing sided aluminium name of the series from
Grade (grade) (drawing nr)/model foil sisalation the manufacturer shall also
timber battens at 04 Elliptical as shown be described.
(length) centres; in in Drawing
accordance with (drawing nr)/model
the manufacturer’s
instructions
-----------------------
------- 07 extra over for
nr verge end capping
08 extra over for 3
ways presses
round apex
09 extra over for vent
135
13 ROOFING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Metal roofing
01 Tile-effect metal decking m2 01 On and including 01 Pitch (nr) degree 01 generally 01 Quality, profile, and type
02 Profiled steel decking metal purlins with 02 Vertical coverings 02 complete with one shall be stated at the
03 Profiled aluminium alloy self-tapping screws 03 Conical as shown layer of single- Heading. Normally, the
decking and other fixing in Drawing sided aluminium name of the series from
accessories in (drawing nr)/model foil sisalation the manufacturer shall also
accordance with the 03 complete with one be described.
manufacturer's 04 Elliptical as shown layer of single-
instructions in Drawing sided aluminium
(drawing nr)/model foil sisalation and
02 On and including 05 Curved (thickness) mm
(dimensional thick glass fibre
description) sawn slab with
pressure treated galvanized
Grade (grade) chicken wire net
timber battens at
(length) centres; in
accordance with the -----------------------
manufacturer's 04 extra over for
instructions ridge cappings
------- 05 extra over for hip
m cappings
06 extra over for
valleys
07 extra over for
------- verges
nr -----------------------
08 extra over for
verge end capping
09 extra over for hip
end cappings
extra over for vent
10 cappings
136
13 ROOFING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Insulation
01 Aluminium foil insulation m2 01 One layer of single- 01 pitch (nr) degree 01 If a curved profile, it shall be
sided; on 02 vertical coverings so described in Level Two.
timber/metal 03 conical as shown in
02 Battens drawing (drawing
One layer double- nr)/model
sided; on 04 elliptical as shown
timber/metal in drawing (drawing
battens nr)/model
137
13 ROOFING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Galvanised steel sheeting m 01 (gauge) gauge; with 01 box gutters; (girth) 01 Downpipes cast in the
02 Zincalume sheeting water-tight soldered girth; fixing with concrete columns or laid in
seams and joints; and including trench shall be so described
including painting approved in Level Two.
with (painting galvanised mild
system) to exposed steel brackets; 02 Flashing is to include
metal surfaces including extra for stepped, raking, curved, etc
stop ends and as shown in the relevant
rainwater pipe drawings.
02 outlets
half-round gutters;
(dia) diameter;
fixing with and
including approved
galvanised mild
steel
brackets; including
extra for stop ends
and rainwater pipe
outlets
138
13 ROOFING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 rainwater
downpipes; (dia.)
diameter/ (girth)
girth; fixing with
approved
galvanised mild
steel brackets;
including extra
04 bends and shoe
vent pipes with
mosquito proof wire
mesh; (dia.)
05 diameter
flashings; (girth)
06 girth
spout pipe; (dia)
mm diameter;
(length) mm long;
cast in concrete
139
13 ROOFING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
140
14 CARPENTRY
14 CARPENTRY
01 Timber framing and prefabricated structures
02 Boarding, panelling, decking, casings, and linings
03 Proprietary Timber Roof Truss System
04 Metal accessories
Specific information to be 1. For timber framing, the following information on timber : (i) the specific type of timber e.g. Resak, Balau, etc. or 'Group' of
shown in the 2D drawings timber e.g. Group A, B, etc. (ii) sawn or wrot timber (iii) whether 'pressure treated' and (iv) size for each type of timber
or to be input into the 3D members e.g. rafters, purlins, wall plates, ceiling joists, etc. ; and the fixing and connection details.
models 2. For prefabricated structures, the following information on the timber and the structures, (i) the specific type of timber e.g.
Resak, Balau, etc. or 'Group' of timber e.g. Group A, B, etc, (ii) sawn or wrot timber (iii) whether 'pressure treated' (iv) size
for each type of timber members e.g. rafters, top and bottom chords, ties, struts, etc. comprised in each type of roof trusses
or portal frames and the 'reference' name given to each type of roof trusses or portal frames and its span over wall plates
and length of overhang; and the fixing and connection details.
3. For boarding, panelling, decking, casings and lining material, the types of material e.g. MBF, cement fibre sheet, SF
magnesium board. Plywood (MR bonded), etc; the usages e.g. for decking, panelling, casing, etc; and the fixing details.
4. For Proprietary Timber Roof Truss System, the type of roofing and ceiling that it supports.
5. For metal accessories, type and size, and detail.
141
14 CARPENTRY
Specific rules of 1. Length of members is the overall length with no deduction for splay cut or mitred ends.
measurement 2. Strutting is measured through the structural members being stiffened.
3. The length of a bolt is measured over the head.
4. No allowance is made for the mass of welds, bolts, nuts, washers, rivets, and protective coatings.
142
14 CARPENTRY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Timber framing m 01 Sawn 'Pressure Treated' 01 Rafters and 01 nominal 01 Specific types of timber
Group timber associated roof (dimensioned e.g. resak, Balau, etc.
02 Wrot 'Pressure Treated' timbers description) or 'Group' of timber
timber 02 Purlins e.g. Group A, B, etc.
03 Wrot Timber 03 Wall plates shall be described in
04 Roof and floor joists Level One.
05 Ceiling joist 02 Curved profile shall be
06 Beams described in Level
07 Posts or columns Two.
08 Partition and wall 03 Timber framing is
members deemed to include
09 Struts, ties and collars fixing and connecting
and the like with bolts, gang nails,
10 Kerbs, bearers and the slicing plates, gussets,
like webs, etc. on-site and
11 Herringbone strutting any type of joint e.g.
to floor joists tongued and grooved
12 Block strutting to floor joint, tongued, grooved
joists and V-jointed, rebated
13 Grounds joints, butt joints, etc.
14 Battens
15 Packing pieces 04 Prefabricated
---- ------------------------ ----------------------- structures, e.g. roof
m2 16 Battening plugged to 02 nominal trusses, portal frames,
walls and columns (dimensioned etc, is deemed to
17 Battening plugged to description) include all rafters, top
ceiling and beams members; at and bottom chord, ties,
18 Framework to eaves (width) wide struts, etc. and all
soffits centres fabricating, cutting,
19 Framework to ducts fixing and connecting
and pipe casings with bolts, gang nails,
20 Framework to false slicing plates, gussets,
beams webs, etc. off-site and
21 Framework to cornices its erection on-site
143
14 CARPENTRY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Prefabricated structures nr 01 Sawn 'Pressure 01 Roof trusses; Type 01 (type) pitch at including delivery to
Treated' timber (type) as shown in (degree) degree; site, hoisting and site
02 Wrot 'Pressure Treated' Drawing (drawing nr) / (length) span over bolting/gang nailing.
timber model wall plates; (length) If there are different
03 Wrot Timber 02 Portal frames; Type 02 overhang types of roof trusses
(type) as shown in (length) span; and portal frames, then
Drawing (drawing nr) / (height) high from separate supporting
model base to apex information at Level
Two and Level Three
shall be created for
each type.
144
14 CARPENTRY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Medium density fibreboard m2 01 Decking 01 To floors 01 plugged to concrete 01 Curved profile shall be
(MDF) 02 To landings 02 plugged on and so described in Level
02 Cement fibre sheet including Three.
03 SF magnesium board (dimensional
04 Plywood; MR bonded description)
05 Plywood; WBP bonded grounds; at (width)
06 Formica laminated plastic centres; plugged to
sheet concrete
02 Panelling 01 To walls and columns
145
14 CARPENTRY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Metal accessories
147
15 GENERAL JOINERY
15 GENERAL JOINERY
01 Frames and finishings
02 Doors
03 Windows
04 Skylights
05 Staircases and steps
06 Balustrades, railings, and handrails
07 Proprietary operable wall system
08 Toilet cubicle system
09 Gypsum board partition
10 Furniture and fittings
11 Ironmongery
Information to be provided 1. Refer to ' Information to be provided in the Specification in 'Carpentry' where applicable.
in the Specification
2. Joinery works (generally)
3. Doors
4. Ironmongery
Specific information to be 1. For Frames and Finishings, specific type of timber e.g. Nyatoh, Resak, etc or 'Group' of timber e.g. Group A, B, etc.
shown in the 2D drawings
or to be input into the 3D 2. For Doors, specific type of timber e.g. Nyatoh, Resak, etc or 'Group' of timber e.g. Group A, B, etc for doors, door
models frames, architrave, etc; whether 'Pressured Treated'; types of doors e.g. flush door, panelled door, fire doors, etc with
full details including dimensions.
3. For Windows, specific type of timber e.g. Nyatoh, Resak, etc or 'Group' of timber e.g. Group A, B, etc for window
frames, mullion, transoms, cills, architrave, etc; types of windows e.g. casement windows, composite window, etc with
full details including dimensions
4. For Skylights, Staircases and Steps, specific type of timber e.g. Nyatoh, Resak, etc or 'Group' of timber e.g. Group A,
B, etc with full details including dimensions
For Balustrades, railings, and handrails, specific type of timber e.g. Nyatoh, Resak, etc or 'Group' of timber e.g. Group
5. A, B, etc with full details including dimensions
148
15 GENERAL JOINERY
6. For Proprietary Operable Wall System, the 'Brand' name; the number of panels; whether acoustic wall or other special
requirements
7. For toilet cubicle system, the 'Brand'; thickness and type of board; overall front length, wall depth, and wall height;
number of cubicles with doors
8. For gypsum board partition, the thickness of boards and the framing detail; finishing to the boards; if with glazing, the
thickness, and type of glass; if with insulation, the type; if a specific type is required, the 'Brand' name
9. For furniture and fittings, specific types of timber e.g. Nyatoh, Resak, etc or 'Group' of timber e.g. Group A, B, etc;
type of furniture and fitting e.g. cabinets, wardrobes, counters, shelving, etc and each of their dimensions.
10. For ironmongery, the schedule of ironmongery and the dimensioned description for each type.
Specific rules of 1. Length of members is the overall length with no deduction for splay cut or mitred ends.
measurement
149
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Wrot and framed nr 01 Door frame sets; fixing 01 (x-sectional 01 Specific type of timber e.g.
'Pressure Treated' in position; prepare and dimensional Nyatoh, Resak, etc or 'Group'
timber apply (painting system) description) door of timber e.g. Group A, B, etc.
to all exposed timber frame to overall to be described in the
surfaces after fixing (dimensioned Heading.
description) door 02 If there are security bars in
opening; as shown the window frame sets, it
in Drawing (drawing shall be so described in Level
nr)/model One.
03 Curved profile (if any) shall be
so described in Level Two
nr 2 Window frame sets; 01 (x-section 04 Fixing in position' is to include
fixing in position; dimensional mild steel holdfast, infill,
prepare and apply description) window packing pieces, fixing
(painting system) to all frames to (overall cramps, dowels, etc.
exposed timber dimensional 05 Painting to door and window
surfaces after fixing description) window frames includes 'prepare and
opening; as shown prime' back of frames before
in Drawing (drawing fixing.
nr/model)
150
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
nr 03 Window frame sets; 01 to (overall
comprising (x-section dimensioned
dimensional description) window
description) of frames, opening; as shown in
(x-section dimensioned Drawing (drawing
description) of mullions, nr)/model)
(x-section dimensioned
description) transoms
and (x-section
dimensioned
description) cills; fixing
in position; prepare and
apply (painting system)
after fixing
151
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Wrot and framed m 01 Architraves; prepare 01 (x-section
'Pressure Treated and apply (painting dimensioned
timber finishing system) to all exposed description)
timber surfaces
02 Cornices; prepare and
apply (painting system)
to all exposed timber
surfaces
03 Mouldings, dado rails
and the like; prepare
and apply (painting
system) to all exposed
surfaces
04 Window boards;
prepare and apply
(painting system) to all
exposed surfaces
05 Skirtings; prepare and
apply (painting system)
to all exposed surfaces
06 Nosings and the like;
prepare and apply
(painting system) to all
exposed surfaces
07 Cappings; prepare and
apply (painting system)
to all exposed surfaces
152
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Doors
01 Wrot and framed nr 01 Flush door ;(thickness 01 overall (dimensioned 01 Specific type of timber e.g.
'Pressure Treated' and type) plywood on description); hollow Nyatoh, Resak, etc or 'Group'
timber both sides and timber core construction of timber e.g. Group A, B, etc.
lipping all round; 02 pair overall to be described in the
complete with (dimensioned Heading.
(dimensioned description); hollow 02 Waterproof plywood, veneer
description and type of core construction; plywood, zinc sheet, and any
timber) door frame and including labour for other surface finishes to one
fixing in position; forming rebated side or both sides of the flush
prepare and apply meeting stiles door (if any) shall be so
(painting system) to all described in Level One.
exposed timber 03 If there is 'heelstones', it shall
surfaces after fixing; be so described in Level Two.
hanging; as shown in 04 If the 'door frames' does not
Drawing (drawing come with hinges, then '{butts
nr)/model measured separately}' shall
be added after 'hanging'' in
Level One.
nr 02 Panelled door; (the nr. 01 overall If there is 'architrave', its
of panels); complete (dimensioneddescrip 05 dimensional description and
with (dimensioned tion); solid core type shall be so described in
description and type of construction Level One.
timber) door frame and 02 If there is 'glazed single panel
fixing in position; pair overall 06 and the like' as part of the
prepare and apply (dimensioned door, its thickness and type of
(painting system) to all description); solid the glass and the dimensional
exposed timber core construction; description of glazing beads
surfaces after fixing; including labour for shall be so described in Level
hanging; as shown in forming rebated One.
Drawing (drawing meeting stiles If there is any moulding to the
nr)/model 07 panel, it shall be so described
in Level One.
153
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
nr 03 Fire-rated door to 01 overall (dimensioned 08 If there is opening infilled with
Bomba's approval; description); (nr) wired glass with timber
covered both sides with hour rated beadings as observation
paint grade plywood 02 pair overall panel or infilled with louvres
with intumescent strips; (dimensioned covered one side with anti-
(dimensioned description); (nr) vermin wire netting, and the
description) (type) hour rated; including like to the door, they shall be
timber door frame; labour for forming so described in Level Two.
prepare and apply rebated meeting 09 If the 'door' is sliding or
(painting system) to all stiles folding on track, it shall be so
exposed timber described with the track
surfaces; including butt included in Level Two.
hinges and 10 Fixing in position' is to include
ironmongeries mild steel holdfast, infill,
packing pieces, fixing cramps,
dowels, etc.
11 Painting to door frames
includes 'prepare and prime'
back of frames before fixing.
154
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Window
01 Wrot and framed nr 01 Casement Window; 01 overall (dimensioned 01 Specific type of timber e.g.
'Pressure Treated' complete with description) Nyatoh, Resak, etc or 'Group'
timber (dimensioned of timber e.g. Group A, B, etc.
description) (type of to be described in the
timber) window frame; Heading.
and fixing in position; 02 If there are mullion, transom,
opened in ( nr.) panels and cill within the window
infilled with (thickness) frame, each with its size shall
thick (type) glass with be described in Level One.
glazing beads; prepare
and apply ( painting
system) to all exposed
timber surfaces after
fixing; as shown in
Drawing (drawing
nr.)/model
155
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
nr 02 Composite window
comprising (nr.) nr. equal
panels; complete with
(dimensioned description)
(type of timber) packing
piece and (dimensioned
description) (type of
timber) window frame;
and fixing in position;
each panel infilled with
(thickness) thick (type)
glass with glazing beads;
prepare and apply
(painting system) to all
exposed timber surfaces
after fixing; as shown in
Drawing (drawing
nr.)/model
nr 03 Fixed louvre window;
complete with
(dimensioned description)
(type of timber) packing
piece and (dimensioned
description) (type of
timber) window frame with
grooves; Infilled with
(dimensioned description)
(type) glass louvres; and
fixing in position; prepare
and apply (painting
system) to all exposed
timber surfaces after
fixing; as shown in
Drawing (drawing
nr.)/model
156
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
nr 04 Adjustable louvre window; 01 Infilled with 01 overall
complete with (dimensioned (dimensioned
(dimensioned description) description) (type) description)
(type of timber) packing glass louvres fixed to
piece and (dimensioned and including (product
description) (type of name/code) a set of
timber) window frame; (single/dual control)
and fixing in position; galvanised steel
prepare and apply aluminium lacquered
(painting system) to all finished adjustable
exposed timber surfaces louvre frame including
after fixing fixing to window
frame and (nr) nr
jambs with (nr) clips
and (nr) operating
handle and all
necessary screws
and accessories; as
shown in Drawing
(drawing nr.)/model
157
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
04 Skylights
01 Wrot and framed nr 01 Skylights; complete with 01 overall 01 Specific type of timber e.g.
'Pressure Treated' (dimensioned description) (dimensioned Nyatoh, Resak, etc or 'Group'
timber (type of timber) frame; and description) of timber e.g. Group A, B, etc.
fixing in position; opened to be described in the
in ( nr.) of panels infilled Heading.
with (thickness) thick
(type) glass with glazing
beads; including all
ironmongery; prepare and
apply ( painting system) to
all exposed timber
surfaces after fixing; as
shown in Drawing
(drawing nr.)/model
158
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
159
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
160
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Design, supply, nr 01 overall (dimensioned 01 The number of panels (if any) shall
fabricate, and install description) be so described in Level One.
Proprietary Operable 02 If the acoustic wall system or other
Wall System; as special requirements is required, it
shown in Drawing shall be so described in the
(drawing nr.)/model Heading.
03 To add 'Notes' preceding the
Heading comprising the following:
(a) Design, supply, install, and
commission shall be from
approved
manufacturer/supplier, and
the design shall be
adequate, accurate and fit
for its purpose.
(b) Submittal of all shop
drawings indicating the
System supplier's detailed
material and fabrication
specifications and
installation instructions
together with catalogues,
hardware, fastenings, and
other dates as required and
to relevant approval before
proceeding with the work.
(c) Submittal of a warranty (to
state the validity period) on
the materials and
workmanship in an
approved format.
(d) Any other requirements (if
any).
161
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
162
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Full partition m2 01 Constructed of two skins of 01 painted on both 01 If there is door in the partition, it
(thickness) thick gypsum sides with shall be so described as '
board in taped and flushed (painting system) opened for door' & also to state
joint complete with g.i. 02 finished on both the type of framing for the door
framing and other sides with veneer but the door is measured under
necessary accessories; as wallpaper of Work Section 15: 'Joinery'.
shown in Drawing (drawing 'standard' colour 02 If specific 'brand' of gypsum
nr.)/model board is to be used, it shall be
so described in Level One.
02 Partially glazed m2 01 Constructed of two skins of 03 If there is any infill e.g. rockwool
partition (thickness) thick gypsum insulation, fiber glass insulation,
board in taped and flushed etc, it shall be described in Level
joint complete with g.i. One.
framing and other 04 Curved profile shall be so
necessary accessories; described in Level Two.
opened for and including 05 If veneer wallpaper is of special
(thickness) thick (type) color, it shall be so described in
glass panels with glazing Level Two.
gasket; as shown in
Drawing (drawing
nr.)/model
163
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
164
15 GENERAL JOINERY
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
11 Ironmongery
01 Supply and fix nr 01 Nylon ring butt hinges 01 overall (dimensioned 01 If specific brand is required, it
02 Fix only 02 Stainless steel hinges description) shall be so described in Level
03 Cylindrical locksets One.
04 Mortice locksets 02 Fixing ironmongery is deemed to
05 Barrel bolts include the following:
06 Flush bolts (a) Fixing with screws of the
07 Cylindrical padlocks same finish as the
08 Door selectors ironmongery
09 Recessed flush pulls (b) Cutting, sinking, boring
10 Push plates and morticing as required
11 Door stops (c) Oiling, easing and
12 Set of sliding gears adjusting all moving parts
13 Master keying system (d) Taking out and refixing
for various locksets after painting where
necessary
(e) Leaving in perfect
working order
(f) Handing the keys
properly labelled to the
Architect/S.O. on
completion
165
16 STRUCTURAL METALWORK
16 STRUCTURAL METALWORK
01 Structural steelwork
02 Pressed steelwork
Information to be provided 1. The relevant Malaysian or British Standard for which each of type and grade of structural steel framework including
in the Specification bolts, washers, surface preparation, priming, etc. have to comply with
2. Clearance and tolerances
3. Connections, bolting, holes, welding
4. Handling, delivery to site and storage
5. Erection
6. Bedding and grouting
7. Testing on-site
8. Painting steelwork
9. Fire protection of structural steelwork
10. Shop drawings
Specific information to be 1. For structural steelwork (generally), the BS/MS code and grade of steel; type of surface preparation e.g. wire brush,
shown in the 2D drawings sandblasting to a required standard; type of paint and number of coats.
or to be input into the 3D 2. For unfabricated steelwork, in addition to those stated in Item 1, the types of structure and their respective structural
models steel sections with normal sizes and weight per m including the fixing and connections details.
3. For fabricated steelwork, in addition to those stated in Item 1, the types of fabricated steelwork with respective span and
height from ground to eave including size and weight per m for each structural steel sections comprised therein and the
fixing and connections details and with proper referencing for identification purposes.
4. For pressed steel, the type of steel, gauge, and type of section.
Specific rules of 1. Length of members is measured overall length with no deduction for splay cut or mitred ends.
measurement 2. In computing the weight of steelwork, no deduction is made for splay cuts, mitres, notches, holes, and slots.
3. The weight of irregularly shaped plates is computed net.
166
16 STRUCTURAL METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Structural steelwork
01 Hot Rolled t 01 Stanchions and columns 01 H-sections 01 (dimensioned 01 The BS/MS code and grade of
Unfabricated 02 Beams and girders 02 Universal columns description) x steel, and the type of surface
Steelwork 03 Rafters 03 Universal beams (weight) kg/m preparation work e.g. wire brush,
02 Cold Formed 04 Struts 04 Castellated universal sandblasting to a required standard
Unfabricated beams and the type of paint and number of
Steelwork 05 Lip channel coats shall be stated at the
06 Angles Heading.
07 Joists 02 Curved, chambered, cranked
08 Square hollow members and the like (if any) shall
sections be so described in Level Three.
09 Rectangular hollow 03 Weight per cubic metre for mild
sections steel where it is not specified it is
10 Circular hollow assumed for the purpose of
section calculation to be 7.85 tonnes per
11 Universal structural m3.
tees 04 Fabricated steelwork e.g. portal
frames, roof trusses, girder trusses,
lattice trusses, is deemed to include
all stanchions, rafters, struts, top
chords, bottom chords, etc. making
up the trusses/frames, and all
welding, fabricating, cutting, fixing,
and shop bolting off-site or on-site
and its erection on-site including
delivery to site, hoisting, site bolting
and/or welding, etc., and all
necessary plates, cleats, brackets,
stiffeners, packing pieces, gussets,
shear connections and the like.
167
16 STRUCTURAL METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Hot Rolled nr 01 Portal frames; Type 01 (span) overall span;
Fabricated Steelwork (reference) as shown in approximately
04 Cold Formed Drawing (drawing (height) high from
Fabricated Steelwork nr)/model ground to eaves
02 Roof trusses; Type
(reference) as shown in
Drawing (drawing
nr)/model
03 Girder trusses; Type
(reference) as shown in
Drawing (drawing
nr)/model
04 Lattice trusses; Type
(reference) as shown in
Drawing (drawing
nr)/model
168
16 STRUCTURAL METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Pressed steelwork
169
17 METALWORK
17 METALWORK
01 Doors
02 Windows
03 Proprietary door frame
04 Adjustable glass louvre frame
05 Roller shutter
06 Roller grilles
07 Balustrades, railings, and handrails
170
17 METALWORK
Specific information to be shown in 1. For Doors, details of doors including showing the dimensions, the type of material e.g. mild steel, galvanized
the drawings or to be input into the mild steel, aluminium, etc. with its thickness, type of door e.g. flush door, louvred door, proprietary door ( to
3D model state supplier/manufacturer's name and the type), etc. type of coating for aluminium doors e.g. natural
anodized, bronze anodized, etc. and its thickness, painting system for mild steel, and thickness and type of
glass if with glazing.
2. For Windows, details of windows including showing the dimensions, the types of material e.g. mild steel,
galvanized mild steel, aluminium, Zincalume, etc., with their thicknesses, types of window e.g. louvred window,
side hung window, composite window, etc., type of coating for aluminium windows e.g. natural anodized,
bronze anodized, etc. and its thickness, painting system for mild steel, and thickness and type of glass.
3. For Proprietary Door Frame, supplier/manufacturer's name or brand and door opening size.
4. For Adjustable Glass Louvre Frame, the type of material and whether single or dual control.
5. For Roller Shutter, the type of material e.g. galvanized mild steel, powder coated mild steel, extruded
aluminium, Zincalume steel, etc. model from supplier/manufacturer, whether lightweight, heavyweight or fire-
rated, whether manual or motor-operated, and with perforation holes or other feature.
6. For Roller Grilles, the type of material e.g. extruded aluminium, stainless steel, etc. model from
supplier/manufacturer, and whether manual or motor-operated.
7. For Balustrades, Railing, and Handrails, details including showing the height, the type of material e.g. mild
steel, galvanized mild steel, stainless steel, aluminium, etc. type of coating for aluminium e.g. natural anodized,
bronze anodized, powder-coated, etc. and its thickness, painting system or powder coat for mild steel, and if
with glass panels, the type e.g. tempered, laminated, etc. and its thickness.
Specific rules of measurement 1. Length of members is measured overall length with no deduction for splay cut or mitred ends.
2. The size given for irregular panes shall be the smallest rectangular size from which the pane can be obtained.
171
17 METALWORK
Works and materials deemed 1. General metalwork:
included' which are collectively a) Weight of weld metal and rolling margin
referred to as the 'Preambles' b) All straight, raking, bevel and splay cutting and notching
c) All shop and site drilling, holes and openings (no deduction in weight being made for same)
d) Marking, hoisting and erecting including temporary braces and supports.
e) Setting out, levelling and plumbing
2.
Gratings, ladders, stair balustrade, railings, and gates
All labour, materials, and appliances in welding.
172
17 METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Doors
173
17 METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Windows
01 Mild steel; (thickness) nr 01 Louvred windows; 01 overall size 01 If the window is 'Contractor
metal thickness; including complete with (dimensioned designed window', it shall be so
prepare and apply (painting framing; infilled with description) described in Level One.
system) to all exposed (dimensioned 02 If the windows are double-glazed,
surfaces after fixing description and type) it shall be so described in Level
02 Galvanised mild steel; glass; fixing in One including the airspace width
(thickness) metal thickness position and and the gas filling in between.
03 Powder-coated mild steel; including 03 If sub-frames are required, it shall
(thickness) metal thickness ironmongery; as be so described in Level One.
04 Stainless steel; (thickness) shown in Drawing
metal thickness (drawing nr)/model
05 Aluminium; natural
anodised; (thickness) metal 02 Side hung casement
thickness windows; complete
06 Aluminium; bronze with framing; infilled
anodised; (thickness) metal with (thickness) thick
thickness (type) glass;
07 Aluminium; powder-coated; including glazing
(thickness) metal thickness gasket and sealant;
08 Zincalume; (thickness) fixing in position and
metal thickness including
09 Electro galvanised steel; ironmongery; as
(thickness) metal thickness shown in Drawing
10 Zincanneal; (thickness) (drawing nr)/model
metal thickness
174
17 METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
175
17 METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
176
17 METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
05 Roller Shutter
01 Galvanised mild steel nr 01 (model from the 01 to suit opening 01 If it is with perforation holes,
02 Mild Steel selected supplier / (dimensional colorbond steel, etc, it shall
03 Extruded aluminium manufacturer) description) be so described in the
04 BHP Zincalume steel lightweight roller Heading.
05 UV protected shutters
polycarbonate multiple 02 For 'fire rated steel', the fire-
panels 02 (model from the rated 'hour' shall be so
06 Fire-rated steel selected supplier / described in the Heading.
manufacturer)
heavyweight roller 03 For 'mild steel', if painted, the
shutters painting system shall be so
described in the Heading; if
03 (model from the powder coated, it shall be so
selected supplier / described in the Heading
manufacturer) fire- including its thickness.
rated shutters
04 Whether the roller shutter is
'manual spring operated' or
'motor operated including
motor, shutter box, push
button switch, guide rails and
all accessories' shall be so
described in Level One.
177
17 METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
06 Roller grilles
178
17 METALWORK
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
179
18 CLADDING AND COVERING
180
18 CLADDING AND COVERING
Contractor designed curtain walling
1. Performance Specification' covering the following:
2 Perforated panels
(i) Thickness of metal
(ii) Type, spacing, pattern of perforations
(iii) Margin
(iv) Flatness of sheets and plates
(v) Fitting details
Specific information to be shown in 1. For cladding work, the brand name, the type of finishing and the type of system; dimension of fin and sunshade
the 2D drawings or to be input into (if any).
the 3D model
2. For curtain walling, the type of system, and type and thickness of the glazing.
Specific rules of measurement 1. As cladding/walling is a contractor designed work, the items related thereto are either measured nett area or
net length with no allowance made for boundary work i.e. work associated with closing off or finishing off
claddings or covering at the external perimeter and at the abutment with different materials and opening work
i.e. work associated with closing off or finishing off claddings and coverings at the perimeter of an opening or a
void; in addition, these items would mean to be inclusive of all ancillary and other works and expenditure
181
18 CLADDING AND COVERING
whether or not separately mentioned or described in the Specification or in the Bill which are indispensably
necessary to carry out and bring to completion of the cladding/walling works or which may contingently become
necessary to overcome difficulties before completion.
Works and materials deemed 1. Aluminium composite panel' is deemed to include all aluminium runner sub-frames, non-magnetic stainless-
included' which are to be collectively steel fasteners, santoprene/EDPM gasket fixing anchors, aluminium brackets, stainless steel mandrel blind
referred to as 'Preambles' rivets, weather seal sealant, and all necessary accessories.
2. Aluminium fins is deemed to include galvanised mild steel bracketing, silicone sealant, and bracket rod infill.
Aluminium sunshade' is deemed to include fixing screws, bolts, nuts, and other accessories.
3.
4. Aluminium curtain walling' is deemed to include fixed and openable top hung panels formed by transoms,
mullion, and fins, steel support structures, glazing material, neoprene/EPDM glazing gasket, structural sealant,
and 2-hrs fire stop rockwool insulation, aluminium bend sheet capping and flashing, flame barrier, brackets,
bolts & nuts, weep holes, lockset and all other necessary accessories and cleaning upon completion.
5. Perforated panel' is deemed to include the support system, all necessary channel, angle bars, fixing anchors,
fixing brackets, metal screws, bolts and nuts, support plates and other accessories and painting systems
related thereto.
182
18 CLADDING AND COVERING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
183
18 CLADDING AND COVERING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
184
18 CLADDING AND COVERING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Perforated panel
185
19 FLOOR, WALL AND CEILING FINISHES
01 Finishes to floors
02 Raised access floors
03 Finishes to walls and ceilings
04 Suspended ceilings
05 Accessories
Information to be provided in the 1. General specification and requirements of the components of the finishing.
Specification 2. Types of plaster work and their respective composition, mix and application.
3. Types of paving work and their respective composition, mix and application.
4. Types of tiling work and their respective compliance with MS and application.
5. Types of ceiling work and their respective specification including compliance with MS and the specification of
the suspension systems.
6. Types of granite and marble slabs and their respective source of supply, method of fixing, types of impregnators
used, requirement for dry-lay, etc.
Specific information to be shown 1. For paving, total thickness and surface treatment e.g. wood trowelled, steel trowelled, power-floated or the use
in the 2D drawings or to be input of hardener, dust proofers, carborundum grains or the like ; laid 'level' , 'falls' or 'falls and crossfalls' ; curved
into the 3D models profile ,anti-slip grooves and the like , and the use of waterproofing admixture (if required);
2. For flooring and tiles, the types, the sizes , names of the manufacturers /suppliers and the product series codes
and total thickness; use of waterproofing admixture (if required); laid in pattern or in more than one colour or
with underlay or required sanding and floor dressing, coved or nosing tiles or others (if required); curved profile
(in any);
3. Raised access floor - the type of panels, height, panels with service outlet boxes and fire barrier (if any); for
proprietary system, the name of manufacturer/supplier and the type in addition to the aforesaid.
4. For plaster/skim coat, the types and thickness; curved profile, forming grooves, sloping and the like (if any)
5. For suspended ceiling, the type, the size and thickness of panels; product name and series code of the
panels/board (if required) & type of suspension system; light troughs, bulkhead, access panels, arches, domes
and the like and precast plaster cornices and mouldings (if any).
6. For accessories, type and dimension; location.
186
19 FLOOR, WALL AND CEILING FINISHES
Specific rules of measurement 1. Area is measured net in contact with base.
2. Widths or thicknesses stated are the width or thickness of each finished face.
No measurement allowance is to be made in net area for laps, dressings or any other labour.
3. No deduction from the areas of finishing is made for grounds.
4. Width' is to be also meant the 'extreme' width where applicable.
5. High or Height is meant from the structural floor level to soffit of finish ceiling or isolated beam.
Works and materials deemed 1. For 'Finishes to floors' & 'Finishes to walls and ceilings'
included' which are collectively a. Narrow widths and small quantities.
referred to as 'Preambles' b. Temporary rules, temporary screeds, temporary supports and template.
c. Cleaning, raking out joints, hacking, slurrying and wetting the base to form a key.
d. All notching and holes.
e. Straight, raking and curved cutting.
f. Working or fitting up to and making good around frames, light fittings, grilles, air bricks, sanitary fittings,
switches, sockets, pipes, brackets and the like.
g. Joints between different types of finishes.
h. Joints between new and old finishes.
i. Dubbing out to achieve the nominal thickness stated.
j. Groin point and other intersections of curved surfaces.
k. In respect of linear items: Short lengths, formed, cut or purpose-made angles, junctions and ends.
l. In respect of in-situ finishings: internal angles, arises, rounded edges, quirks, throats, rounded coves and
external angles of any radius.
m. In respect of mosaic: setting one row of tesserae at an angle of 45 degrees at junctions of horizontal and
vertical surfaces.
n. In respect of carpeting: sewn and taped seams in carpets and underlays; matching patterns in patterned
carpets; stair rods, carpet clips and the like; ends, angles and intersections; square cutting, raking cutting,
curved cutting, notches, rounded corners, cutting around profiles of steps and the like.
187
19 FLOOR, WALL AND CEILING FINISHES
o. In respect of granite and marble slabs to walls and ceilings: metal anchorages and all necessary fixing
accessories; application of impregnator to all sides except the exposed surfaces.
p. Masking of adjacent work.
q. All other sundry items of a like nature.
4. For Accessories
a. fixing ties,
b. temporary means of support.
188
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Finishes to floors
01 Cement pavings m2 01 To concrete base 01 level; (thickness) 01 Watertight work with the use
02 Granolithic pavings thick of waterproofing admixture (if
any) shall be so described in
02 falls or falls and the Heading.
crossfalls;
average 02 Nature of surface treatment
(thickness) thick e.g. wood troweled, steel
troweled, power-floated or the
use of hardener, dust
proofers, carborundum grains
or the like shall be so
described in Level One.
06 Narrow-width structures
include skirtings, risers,
treads, edges of slabs, wall
string to stairs, open strings,
kerbs, scupper drains and the
like.
189
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Carpet tiles flooring m2 01 To troweled smooth 01 on level floor 01 generally 01 The sizes, the names of the
04 Machine turfed carpet screeded bed; 02 on floor: falls or manufacturers/suppliers, and
flooring (thickness) total falls and the product series code, if
05 Laminated strip flooring thickness with crossfalls; required, shall be so
06 Engineered timber flooring approved adhesive average described in the Heading.
07 Bamboo flooring 02 To troweled smooth (thickness) thick
08 Vinyl flooring surface; (thickness) 02 Watertight work with the use
09 Parquet flooring thick with approved of waterproofing admixture (if
adhesive any) shall be so described in
Level One.
190
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
---- --------------- --------------- 07 For 'flooring', if 'underlay' is
m 03 On concrete base 01 (dimensioned required, it shall be so
of narrow-width description) described in the Heading.
structures
04 Extra over for
coved tiles 08 For 'flooring' if 'sanding and/or
Extra over for floor dressing is required, it
05
nosing tiles shall be so described in Level
One
191
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
---- --------------- ---------------
m 03 On concrete base 01 (dimensioned
of narrow-width description)
structures
---- ---------------
m 04 Extra over for
coved tiles
192
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
193
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 'narrow-width structures'
---- --------------- -------------- include sills. capping, coves,
m 04 To narrow-width 01 (thickness) thick cornices, fascias,
structures and (girth) girth architraves, mouldings and
the like
194
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
08 Ceramic tiles m2 01 To screeded bed 01 To walls and columns 01 generally
09 Polished porcelain tiles (thickness) total
10 Homogenous tiles thickness; with
11 Terrazzo tiles mortar; pointed with
12 Glass mosaic tiles matching colour
02 To trowelled smooth
screeded bed;
(thickness) total
thickness with
approved adhesive;
pointed with
matching colour
---- -------------- ---------------
m 02 To narrow-width 01 (dimensioned
structures description)
195
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
13 Marble tiles/slabs m2 01 To a metal support 01 To walls and columns 01 generally
14 Granite tiles/slabs system; (thickness) total
thickness; pointed with
approved sealants
coating with a coat of
approved masonry water
repellent impregnator
02 To screeded bed
(thickness) total
thickness; with mortar;
pointed with approved
sealants coating with a
coat of approved masonry
water repellent
impregnator
03 To trowelled smooth
screeded bed; (thickness)
total thickness with
approved adhesive;
pointed with approved
sealants coating with a
coat of approved masonry
water repellent
impregnator
196
19 FLOOR, WALL AND CEILING FINISHES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Suspended ceilings
01 Zinc-coated and m2 01 (dimensioned 01 On aluminium grid 01 ceilings; not 01 The product name and/or
aluminium/zinc-coated description) suspension system; all exceeding 3.50m series code, if required,
steel panels/board; in accordance with the high shall be so described in
02 Linear strip ceiling manufacturer's the Heading.
03 Plasterboard instruction 02 ceilings exceeding
04 Mineral Fibre boards 3.50m high 02 Whether 'exposed' or
05 Fibre cement ceiling 02 On hot-dipped 'concealed'
panels galvanized support suspension/support
06 Glass fibre reinforced system; all in system shall be so
gypsum (GRG) accordance with the described in Level Two.
manufacturer's
instruction 03 Curved profile, sloping
and the like shall be so
03 On timber framing; as described in Level Three.
shown in the drawing ---------------
---- (drawing nr.)/model 03 extra over for light
nr troughs; state the
size
05 Accessories
01 Metal lathing m 01 To walls and 01 (width/girth length) 01 The product name and
02 PVC corner strips columns width/girth series code (if any) shall
be so described in the
Heading.
198
20 GLAZING
20 GLAZING
01 Glazing
02 Contractor designed glass system
Specific rules of measurement 1. Glazing supplied as part of a window, door or other component is measured elsewhere with those components.
2. Measurement of irregular shape glazing shall be based on the smallest rectangular area from which it can be
3. obtained.
199
20 GLAZING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Glazing
01 Float glass; (thickness) m2 01 To wood with wood 01 generally 01 'clear', 'tinted', 'bronze-tinted',
thick beads 'sandblasted surface one
02 Figured glass; (thickness) side', 'acid embossed surface
thick 02 To metal with metal one side', etc, shall be so
03 Georgian wired glass; beads described in the Heading.
(thickness) thick
04 Tempered glass; 03 To double glazing; 02 Whether with 'glazing
(thickness) thick hermetically sealed; compound', 'neoprene
05 Laminated glass; infilled (thickness) gaskets', etc, shall be so
(thickness) thick airspace with gas described in Level One.
06 Tempered laminated glass;
(thickness) thick 03 Glass blocks are measured in
07 Acrylic panel; (thickness) accordance with the rules of
thick Work Section: Masonry.
08 Polycarbonate panel;
(thickness) thick 04 'Irregular in shape' other than
square or rectangular shall be
so described in Level One.
05 Louvre blades; to a
slotted wooden frame
200
20 GLAZING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
201
20 GLAZING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 The 'assemblies' is deemed to
include the glass fins and
stiffeners, suspension and fixing
accessories, stabilisers, silicon
sealants, gaskets, bedding strips,
all jointing and glazing
accessories and all other work
necessary to complete the
installation.
03
Curved profile (if any) shall be so
described in Level Two.
202
21 DECORATION
21 DECORATION
Specific information to be 1. For painting, the painting system to each type of surfaces from a selected manufacturer.
shown in the drawings or to be 2. For decorative papers or fabric, 'product name' for the type of decorative papers or fabric from a selected
input into the 3D model manufacturer to each area.
Specific rules of measurement 1. The area or girth measured are that covered.
2. The girth of frames and the like is calculated from one edge to the other overall trims, architraves, stops and the like
3. and assume.
4. Painting to all types of doors and windows is measured flat on both sides.
203
21 DECORATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Prepare and apply m2 01 One coat of (product 01 Plastered walls 01 generally 01 'Narrow width structures'
name/code) wall and columns include sills, cappings, coves,
sealer and two coats cornices, fascias, architraves,
of (product 02 Skim-coated wall mouldings, skirting, dado
name/code) emulsion rails, bands, balustrades,
paint from 03 Fair face concrete railings, handrails, door
(manufacturer's vent block wall frames, edge of slabs, kerbs
name) or other equal and the like
and approved. 04 Gypsum board 02
wall If painting is by 'spraying
02 Two coats of method', it shall be so
(product name/code) 05 Cellulose fibre described in Level One.
emulsion paint from cement board
(manufacturer's wall
name) or other equal
and approved.
204
21 DECORATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
06 Plastered ceilings 02 not exceeding
and beams 3.50m high
above finished
07 Gypsum floor level
plasterboard
ceilings
08 03 exceeding
Mineral fibre board 3.50m high
ceilings above finished
09 floor level
Cellulose fibre
cement board
ceilings
----- ---------------
m ---------------
m 10 Narrow-width 04 (dimensioned
structures description)
205
21 DECORATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Prepare and apply m2 01 One coat of 01 Flush doors 01 generally
(product 02 Glazed doors
name/code) primer, 03 Louvred doors
one coat of (product 04 Panelled doors
name) undercoat 05 Glazed casement
and two coats of windows
(product name)
enamel paint from 06 Composite
(manufacturer's casement
name) or other windows
equal and approved
07 Skylights
02 (nr) coats of
(product
name/code) varnish
from
(manufacturer's
name) or other
equal and approved
03 (nr) coats of
(product
name/code) stain
and (nr) coats of
(product
name/code) lacquer
from
(manufacturer's
name) or other
equal and approved
206
21 DECORATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Prepare and apply m2 One coat of (product 01 Metal doors 01 generally
name/code) primer, one 02 Mild steel grille
coat of (product doors
name/code) undercoat 03 Mild steel louvred
and two coats of doors
(product name/code) 04 Glazed metal
enamel paint from casement
(manufacturer's name) windows
or other equal and 05 Composite metal
approved casement
windows
06 Metal skylights
m2 One coat of (product 01 Gutters 01 girth not 01 'Small pipe' shall mean any
name/code) primer, one 02 Flashings exceeding pipe which is equal to or less
coat of (product 03 Small pipes 300mm than 100mm diameter while
name/code) undercoat 04 Large pipes 'large pipe' for pipe more
and two coats of 02 girth exceeding than 100mm diameter.
(product name/code) 300mm
enamel paint from
(manufacturer's name)
or other equal and
approved
207
21 DECORATION
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
kg One coat of (product 01 structural
name/code) primer, two steelwork
coats of (product
name/code) enamel
paint from
(manufacturer's name)
or other equal and
approved
02 Preparing, sizing and m2 01 (product name/code) 01 Walls and 01 generally 01 Wall and columns' and
hanging with approved (type) decorative columns 'Ceilings and beams' can be
adhesive paper from of any type of surfaces e.g.
(manufacturer's 02 Ceilings and plastered surfaces, gypsum
name) or other equal beams board surfaces, steel
and approved surfaces, etc.
---- --------------- ---------------
m 03 Narrow width 02 (dimensioned
structures description/girth)
208
22 DRAINAGE AND PIPING WORKS BELOW GROUND
209
22 DRAINAGE AND PIPING WORKS BELOW GROUND
n. Anchors and thrust blocks ag. Backfilling trench excavation az. Joints and jointing materials
o. Cutting pipes ah. Compaction ba. Testing pipelines
p. Deflection at certain joints ai. Miscellaneous bb. Manholes
q. Stream and river crossing aj. Soft refill material-special bc. As-Built Drawings
measures
r. Measurement of sewer ak. Surface reinstatement in
installation asphalt roads
s. Trench excavation al. Maintenance
Specific information to be 1. Rock level or estimated quantity of rock at the pipe trenches area.
shown in the 2D drawings 2. Details of all types of drains, piping works, manholes, sumps, marker posts, etc.
or to be input into the 3D 3. BS/MS codes for all types of pipes and valves, and brand and Class of culverts.
model
Specific rules of 1. The depth for excavation shall mean the invert depth of the pipe/drain; therefore, the actual depth of excavation shall add on
measurement the bed that the pipe/drain laid on.
2. Drains and pipes are measured from the external face of a manhole to the external face of manhole or accessory.
210
22 DRAINAGE AND PIPING WORKS BELOW GROUND
e. Upholding and maintaining sides of the excavations by whatever means necessary including the use of bentonite and
any special shoring or sheet piling etc. as may be necessary but which do not form a permanent part of the works to
be executed, but excluding any planking and strutting to be left in or any sheet piling etc. which form a permanent
part of the work to be executed.
f. Backfilling of selected excavated materials into the excavations and compacting the same by methods and in the
manners as specified in the Specification.
g. Multiple handling and transporting above the site.
h. Depositing, spreading and levelling in making up levels of surplus excavated materials within the site.
i. Keeping the excavations free from the storm, percolating or spring water by pumping or whatever other means
necessary.
j. Disposal of surplus excavated materials (the balance after backfilling) is to include for multiple handling of the
materials or transporting the material about the site as may be necessary prior to disposal.
211
22 DRAINAGE AND PIPING WORKS BELOW GROUND
(viii) Forming permanent vertical joints along with concrete pipe bedding as required.
(ix) Purpose-made brackets and hangers within chambers, etc.
(x) Building in ends of pipes into or concrete chambers including providing brick-on-edge arch and concrete lintels
over pipes and making good works around.
(xi) Cleaning out the interior of pipes and preparing ends of pipes for pipe joints and jointing.
(xii) Cutting pipes for chamfers, bends, junctions and for jointing, etc.
(xiii) All mechanical and flexible couplings and suchlike joints shall include all nut, bolts, plain and spring washers,
gaskets, etc. for making the complete connection.
(xiv) External protection on all flanged joints and flexible couplings.
(xv) All exposed cast iron or steel pipes in chambers or above ground etc. are deemed to include painting with three
coats of bituminous paint.
(xvi) Pipe fittings include bends, junctions, inspection pipes, rodding eyes and the like.
212
22 DRAINAGE AND PIPING WORKS BELOW GROUND
(xi) Pipes are deemed to include for all running joints, short lengths, sockets, connectors, back nuts, elbows,
bends, tees, diminishing pieces, plugs and such as items.
213
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Excavating m3 01 For pipes and beds 01 (dia.) diameter 01 To add 'NOTES' preceding the
trenches pipes; (depth) Heading as follows:
average deep
(a) All excavation items shall
be deemed to commence
02 For precast concrete 01 (depth) average from reduced/platform
drains and beds deep level unless otherwise
stated.
03 For culverts (b) Any other requirements.
214
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
05 Beds and surrounds on
both sides of precast
concrete block drain;
including blinding
06 Precast concrete U m 01 Laid to falls on concrete 01 (width) Internal 01 Precast concrete U drain' and
drain beds {measured width x (depth) 'half-round precast concrete
07 Half-round precast separately}; in (length) deep to invert drain' shall deem to include all
concrete drain length moulds and finished fair on
08 Half-round glazed exposed faces.
ware drain
nr 02 Extra over for (height)
high cascades; including
all necessary concrete,
formwork and excavation
215
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
11 Cement and sand m2 01 Drain walls; including 01 half brick thick 01 Refer 'Preambles' for Masonry
brick (thickness) cement and which is applicable to these
12 Common clay brick sand rendering with an 02 one-brick thick items.
approved plasticiser 03 (thickness) thick
finished with steel trowel
on the exposed surfaces;
complete with (diameter)
diameter PVC as weep
holes with stone
aggregate wrapped with
a wire mesh filter.
216
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
13 Vitrified clay pipes m 01 Laid in trenches; 01 (diameter) diameter 01 The BS/MS code and the type
and fittings embedded in hand {nominal} of joints shall be described in
14 UPVC pipes and compacted (thickness) the Heading.
fittings granular bedding
15 Cast iron pipes and extending halfway up the
fittings side of the pipe; the
16 Precast concrete remainder side fill with
pipes and fittings selected backfill carefully
compacted; including all
necessary aggregate,
bends and other
accessories; all in
accordance to S.O.'s
approval; as shown in
Drawing (drawing
nr)/model.
217
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
19 Precast concrete m 01 (product name/code') 01 (dimensioned
box culverts Class (class) or other description)
equal and approved with {nominal}
dry weather flow; jointed
with cement and sand
(1:3) mortar laid in
trenches; including
(Thickness) concrete
blinding, (Thickness)
vibrated reinforced
concrete Grade 20 bed
with one layer of (BMC
Ref. No) including all
necessary excavation,
backfilling, formwork,
planking and strutting;
complete with precast
concrete lids; all in
accordance with the
manufacturer's
instructions
218
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
20 Precast concrete m 01 (product name/code) 01 (diameter) diameter
pipe culverts 'Class' (class) or other {nominal}; average
equal and approved; (depth) deep
jointed with and including
precast concrete collars
in cement and sand (1:3)
mortar laid and jointed in
trenches; including
(thickness) thick concrete
blinding, (thickness)
vibrated reinforced
concrete Grade 20
219
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
22 Precast manholes nr 01 Constructed of precast 01 (dimensioned
reinforced concrete rings description)
and eccentric cone; {internal}
plastered internally with 02 (dimensioned
(thickness) thick high description) drop
alumina cement; precast manholes {internal}
reinforced cover slab; on
and including (thickness)
thick vibrated reinforced
concrete Grade C(grade)
P bed with one layer of
BMC (nr) with thickness)
blinding; raised with
(thickness) thick concrete
surround encasement;
complete with stainless
steel steps at (centre)
centres; approved heavy
duty ductile iron manhole
cover and frame to
manufacturer's detail;
including all necessary
excavation, formwork,
shoring; as shown in
Drawing (drawing
nr)/model
220
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
23 Brick sumps nr 01 Constructed of one brick 01 (dimensioned
thick (type) brick walls in description)
cement and mortar (1:3); {internal}
plastered internally with
(thickness) thick cement
and sand (1:6) plaster;
on and including
(thickness) thick vibrated
reinforced concrete
Grade C(grade) P bed
with one layer of BMC
(nr) with (thickness)
blinding; complete with
concrete benching,
uPVC half-round main
channel and galvanised
iron grating to suit
opening; including all
necessary excavation,
formwork and concrete
surround; as shown in
Drawing (drawing
nr)/model
221
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Constructed of one brick
thick clay brick walls in
cement and mortar (1:3);
plastered internally with
(thickness) thick cement
and sand (1:6) plaster;
on and including
(thickness) thick vibrated
reinforced concrete
Grade C (grade) P bed
with one layer of BMC
(nr) with (thickness)
blinding; complete with
concrete benching,
uPVC half-round main
channel, (diameter) PVC
as weep holes complete
with (weight/m2)
geomembrane and
(thickness) thick
aggregate surround and
p.c. concrete slabs cover
to suit opening; including
all necessary excavation,
formwork and concrete
surround; as shown In
Drawing(drawing
nr)/model
222
22 DRAINAGE AND PIPING WORKS BELOW GROUND
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Constructed of
(thickness) thick, and
(thickness) thick (type)
brick wall in cement and
mortar (1;3); plastered
internally with (thickness)
thick cement and sand
(1:6) plaster; on and
including (thickness)
thick vibrated reinforced
concrete Grade
C(grade)P bed with one
layer of BMC (nr) with
(thickness) blinding;
complete with
(weight/m2)
geomembrane and
(thickness) thick
aggregate surround and
p.c. concrete slabs cover
to suit opening; including
all necessary excavation,
formwork and concrete
surround; as shown in
Drawing (drawing
nr)/model
223
23 SITE WORKS
23 SITE WORKS
3. Subgrade
4. Subbase
5. Crushed aggregate base course
6. Binder and wearing course
7. Various sport surfacing materials
8. Various road signages
Specific information to be shown 1. For Keystone Retaining wall, the location, area and height where are
in the 2D drawings or to be input required.
into the 3D models 2. For other hard landscaping works, the types and the product names (if required) and their details.
3. For Roads, driveway and carparks, the existing/platform levels, the details of the road, driveway and carpark and
kerbs, and the road marking.
4. For sport surfacing materials, the types and the product names (if required).
5. For resurfacing the existing road, the area for such work, the thickness of the premix, and the area where cutting and
bonding to the existing road.
6. For road signage, the types and the materials to be used for each signages.
224
23 SITE WORKS
2. Unless stated as deemed included all associated excavations, disposal and fillings are measured in accordance with
Work Section 4: Excavating and filling.
4. Road kerbs
a. Road kerbs are deemed to include all necessary excavation, backfilling, formwork, miters, bends, circular section,
etc.
225
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL Notes, comments, and glossary
MEASURED THREE
226
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
m2 05 Prepare, apply and 01 at a rate of (nr)
spread a layer of litre/m2
approved bituminous
tack coat on crusher
run surface
227
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
nr 08 Prepare and apply 01 (width) wide edge
(nr) coats of lines
thermoplastic 02 (width) wide edge
reflective paint on the lines
surface of premix; as 03 (width) wide stop
shown in Drawing lines
(drawing nr)/model 04 (width) wide centre
lines at (length)
spacing
05 (width) wide parking
lines
06 straight directional
arrows
07 turning directional
arrows
08 numbering for
parking lots
228
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
10 Precast concrete
kerbs with one side
batter and rounded
on one edge cost
inconvenient length
and jointed in cement
mortar (1:3); laid o
and (width) wide x
(thickness) thick plain
in-situ concrete
Grade C (grade) P
bed; forming outlet
opening at (centre)
c/c/; painting with
approved black and
white emulsion paint
in (nr) layers on
exposed surface; as
shown in Drawing
(drawing nr)/model
229
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL Notes, comments, and glossary
MEASURED THREE
02 Hard landscaping
01 Contractor Designed item 01 Design, 01 Breakdown cost 01 To add 'NOTES' preceding the Level One
Keystone Retaining manufacture, as follows:
Walls supply and install
Keystone (i) Design fee a The Contractor shall engage a Specialist
Retaining Walls (ii) Investigation Sub-Contractor who has the expertise
{approximate area works and experience to design, supply and
(area) m2}; as (iii) Excavation work install such wall in accordance with the
shown in Drawing to facilitate the Performance Specification in the
(drawing nr)/model construction of Specification and the relevant drawings
Keystone and to the approval of the S.O.
Retaining Wall
(iv) Manufacture, b The Contractor and his Specialist Sub-
supply and Contractor shall jointly be responsible to
deliver to site ensure that such walls are in all respect
Keystone adequate, accurate, sufficient and fit for its
Retaining Wall purpose.
components
(v) Piling (if any) c The Contractor shall submit all shop
(vi) Erection and drawings and sample as per
installation of requirements stated in the Performance
Keystone Specification and be endorsed by
Retaining Wall Engineer, Malaysia.
230
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
(vi) Supply, fill, e Any other requirements (if any).
spread, level
and compact
granular backfill
(vii) Geogrids as
reinforcing
elements
(viii) Other works to
be listed by the
Contractor that
are necessary
to ensure
completion of
the Keystone
Retaining Wall
231
23 SITE WORKS
ITEM OR WORK TO UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
BE MEASURED
03 Steps m2 01 (type) brick steps; 01 overall width
comprising (height) risers (width)
and (width) threads;
jointing in cement and
sand mortar (1:3) and
finished with (thickness)
thick (type) paving; as
shown in Drawing
(drawing nr)/model
232
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 (product name) or 01 on compacted
other equal and crusher run
approved interlocking 02 on concrete base
concrete pavers; laid 03 on compacted
on and including subgrade
(thickness) thick sand
bedding to the
required pattern and
colour as selected by
the S.O.; all in
accordance with the
manufacturer's
instructions and
S.O.'s approval; as
shown in Drawing
(drawing nr)/model
233
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Sport surfacing
234
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
235
23 SITE WORKS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
05 Road signages
01 Supply and install nr 01 Supported by m.s 01 The other end 01 ‘BERHENTI’ sign
road signage post with one end mounted with non- 02 ‘No ENTRY’ sign
embedded in mass illuminated retro- 03 ‘No LEFT TURN’
concrete footing; reflective aluminium sign
including all sheet; as shown in 04 ‘NO THROUGH
necessary the drawing (drawing ROAD’ sign
excavation, nr/model) and in 05 ‘ROAD
formwork, welding accordance to Local INTERSECTION’
and fittings; painting Authority’s sign
to exposed surfaces requirement for
236
24 FENCING, TURFING AND PAINTING
24 FENCING, TURFING AND PLANTING
01 Fencing
02 Turfing and planting
03 Maintenance
a. General
b. Classifications and characteristics of plants
c. Size of plants
d. Handling and planting
e. Soil mixture, soil conditioners and chemical fertilizers
f. Turfing
g. Football and playing fields
h. Maintenance of plant and turf
i. Final handing over
237
24 FENCING, TURFING AND PAINTING
2. Turfing and planting
2. Landscape
2. Landscape
238
24 FENCING, TURFING AND PAINTING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Fencing
01 P.V.C. coated chain m 01 Supported by 01 (gauge) gauge 01 If the fencing is 'to sloping
link fencing (dimensional (dimensioned ground'-, 'set out to curve
description) mild steel description) mesh but straight between posts'
angle post with one overall (height) high. or 'set out to curve between
end embedded into posts'-, it shall be so
concrete Grade 15 described in Level Three.
footing at (length)
centre to centre
including all excavation
and formwork and
painting; complete with
(gauge) PVC coated
galvanised straining
wire thread; as shown
in Drawing (drawing nr)
240
24 FENCING, TURFING AND PAINTING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Close turfing 01 Preparing ground; 01 with (botanical name) 01 If the glass is laid 'on
including all necessary grass sloping surfaces; including
excavation, backfilling, securing turves with pegs', it
trimming and shall be so described in
(thickness) thick of Level Two.
black vegetable solid;
well-watered and
02 Spot turfing
applying approved
fertilizer until well
established
06 Bulbs ad tubers
241
24 FENCING, TURFING AND PAINTING
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
03 Maintenance
242
25 PLUMBING SERVICES
25 PLUMBING SERVICES
Specific information to be shown 1. For cold/hot water installation, the type, the 'Class' and the 'BS/MS Code' of pipes, the diameter of each pipe;
in the 2D drawings or to be input type of taps and valves and their respective type of material; type of water tank and capacity; type of insulation
into the 3D model and the areas that required insulation.
2. For sanitary pipework installation, the type, and the 'BS/MS Code' of pipes and the type of pipe joints, the
diameter of each pipe; reducers, caps, and the like; accessories e.g. floor trap, gully trap, grease trap and
respective details; manholes and their details.
3. For sanitary fittings, schedule of sanitary fittings with the product names/codes and details (where necessary)
4. From Builder's Work In Connection With Sanitary Fittings, the detail of the Builder's work in connection with
sanitary fittings.
243
25 PLUMBING SERVICES
Specific rules of measurement 1. All piped works are measured overall pipe fittings.
2. Flexible pipes and extensible pipes are measured when they are not extended.
Works and materials deemed 1. The following are deemed to be included for pipe works
included' which are collectively a. Running joints, connectors, elbows and bends, sockets, backnuts, fire bends, tees, diminishing pieces,
referred to as 'Preambles' plugs, brackets, offsets, beaded ends, ornamental ends and the like
b. Joints of a special or ornamental character
c. Fittings involving a change of direction of piping
d. All short lengths
e. Sundry items of a like nature
f. For concealed pipework, all cutting to form chases and holes and subsequent making good of all works
disturbed
244
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
01 Coated ductile pipe m 01 Laid in trenches; 01 (dia.) diameter 01 BS/MS Code' nr and the
and fittings; including necessary type of 'Class' shall be
mechanical coupling excavation and stated in the 'Heading'.
plain-end joints reinstatement
02 Steel pipe and fittings; 02 (dia.) diameter; fixed
mechanical coupling in vertical surface
plain-end joints
03 Medium-density 03 (dia.) diameter; fixed
polyethylene pipe and in horizontal surface
fittings; plastic
compression fittings
and joints
04 High-density 04 (dia.) diameter;
polyethylene (HDPE) embedded in wall/floor
pipe and fittings;
plastic compression
fittings and joints
05 Asbestos cement pipe
and fittings; rubber
ring coupling plain-end
joints
06 Galvanised mild steel
pipe and fittings;
screwed socketed
joints
07 UPVC pipe and
fittings; solvent welded
joints
08 Copper pipe and
fittings compression
fittings and joints
245
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
09 Acrylonitrile butadiene
styrene (ABC) pipe
and fittings; solvent
welded joints
10 Stopcocks, valves and nr 01 Bib taps 01 (dia.) diameter; 01 Type of material and
the like jointing to (type) 'BS/MS Code' nr shall be
pipes stated in Level One.
02 Stop valves
03 Gate valves
04 Butterfly valves
246
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
13 Testing and item 01 allow for testing the
commissioning whole of the cold/hot
water installation
system during laying
and on completion;
making good any
defects and leaving
everything in perfect
working order to the
entire satisfaction of
the S.O. and Local
Authority
01 Cast iron pipes and m 01 With caulked lead 01 Soil and vent pipe 01 (dia.) diameter laid 01 BS Code' nr shall be stated
fittings joints in trenches in the Heading.
02 With flexible joints 02 Waste and vent including
pipe necessary
02 UPVC pipes and m 01 With rubber ring joints excavation and
fittings reinstatement
02 With solvent welded 02 (dia.) diameter
joints fixed in vertical
surface
03 (dia.) diameter
fixed in horizontal
surface
nr 04 extra-over for
reducers; (dia.)
diameter
05 extra-over for caps
247
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
06 extra-over for
access pipes;
complete with
inspection door
03 Accessories nr 01 Approved PVC Floor 01 Complete with 01 overall size (dia.)
trap approved stainless diameter
steel floor grating
setting in concrete 02 overall size
slab (dimensioned
description)
248
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
04 Balloon gratings 01 galvanised wire
balloon grating; to
suit (dia.) diameter
pipes
04 Manhole/Septic Tank (Refer to Work Section 22: Drainage and piping works below ground)
249
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
03 Sanitary fittings
01 Supply and Fix the nr 01 Vitreous china wash 01 (product 01 Level Two is an example as
following sanitary basin from name/code)' ; to the information that is
fittings in white (manufacturer's name) (dimensioned required to be provided for
colour unless or other equal and description) complete the particular type of
otherwise stated; approved with 3 semi-punched sanitary fitting as stated in
including tap holes, 13mm Level One. Different product
connections to pipes chrome plated waste name/code in Level Two will
with adaptors as fittings with chain and have different information
necessary jointing rubber plug waste, but this example will form a
and sealing 32mm plastic bottle template for the
compounds and all trap and ( product adjustments to suit.
necessary name) single-lever
accessories 13mm pillar tap; fixed
on and including a
pair of fixing bolts
WST 10 x 140
plugged and screwed
to tiled wall; all in
accordance to the
manufacturer's
instruction and
Architect's approval
250
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
nr 02 Vitreous china water 01 (Product
closet from Name/Code)'; close-
(manufacturer's name) or coupled washdown
other equal and approved pedestal WC with 'S'
trap, complete with 6
litre single flush
cistern and lid,'
(Product
Name/Code)' 13mm
chrome plated angle
valve with wall
flange, 13mm
stainless steel
reinforced flexible
hose, 300mm long,
and seat and cover
(soft close seat);
plugged and
secured closet to
tiled concrete floor
and jointing pan to
soil pipe complete
with all necessary
fixing and making all
connections; all in
accordance to the
manufacturer's
instruction and to the
Architect's approval
251
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
nr 03 Vitreous china soap holder 01 (dimensioned
from (manufacturer's description) semi-
name) or other equal and recessed soap dish
approved
02 semi-recessed
soap and sponge
holder
252
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
nr 05 Vitreous china toilet roll 01 (dimensioned
holder from description) semi-
(manufacturer's name) or recessed toilet roll
other equal and approved holder with rounded
corner
nr 06 Stainless steel urinal stall; 01 overall size 01 Level One is an example
including heavy gauge mild (dimensioned as to the information that is
steel stiffener; complete description); required to be provided for
with (Product Name/Code) including the particular type of
delayed shut-off valve and (dimensioned sanitary fitting. Different
all accessories; as shown description) Product Name/Code in
in drawing (drawing nr) concrete infill Level One will have
different information but
this example will form a
template for the
adjustments to suit.
nr 07 (product name/code)' or 01 (length) long
other equal and approved
acrylic long bath; complete
with pop-up waste,
overflow, trap, wall
mounted bath or shower
mixer with a flexible hose,
hand shower and bracket;
fixing and make all
connections
253
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
nr 08 (product name/code)' or 01 overall size
other equal and approved (dimensioned
stainless steel kitchen sink; description); single
complete with and bowl single drainer
including bracket, 38mm
PVC bottle trap and 02 overall size
standard waste fittings with (dimensioned
plugs and chain; 1 nr description); double
(product name/code) 1/2" bowl double drainer
wall mounted sink tap with
swivel spout, ball lever
handle and quarter turn
ceramic disc; fixing and
making all connections
254
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
nr 11 (product name/code)' or
other equal and approved
shower-head; complete
with chromium-plated
screw down stopcock and
2 1/4" diameter CP brass
shower rose arm and
flange
255
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
nr 15 (product name/code)' or 01 generally
other equal and approved
wall mounted liquid soap
dispenser with ouch
bottom type valve;
including all fixing
256
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Builder's Work In nr 01 Mass concrete stool 01 Constructed of 01 overall size
Connection With vibrated reinforced (dimensioned
Sanitary Fittings in-situ concrete description)
Grade 15P to
receive water
closet; including all
necessary
formwork; finished
on all exposed
surface with (type &
size of tiles) tiles
bedded and jointed
in cement and sand
(1:3) screeded bed
pointed in matching
colour cement
mortar and other
necessary works
257
25 PLUMBING SERVICES
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and
MEASURED glossary
02 Vanity countertop 01 Constructed of 01 overall size
vibrated reinforced (dimensioned
concrete Grade description)
25P; including all
necessary
formwork and
reinforcement;
forming opening to
receive vanity basin
(measured
separately) finished
on the exposed
surface with (type &
size of tiles) tiles
bedded and jointed
in cement and sand
(1:3) screeded bed
pointed in matching
colour cement
mortar and other
necessary works
258
26 MECHANICAL ENGINEERING INSTALLATIONS
26 MECHANICAL ENGINEERING INSTALLATIONS
01 Primary Equipment
02 Ducting
03 Pipeworks
04 Insulation to Ductworks
05 Insulation to Pipeworks
06 Ducting Accessories
07 Anti Vibration
08 Sundries
Information to be provided in the 1. Floor and site plan detailing the layout of systems
Specification 2. System schematics
3. Cross-sections and elevations
4. Detail layouts for plant rooms and main services installation areas.
5. Specific installation details for equipment and fittings.
6. Equipment schedules.
7. Type, quality and size or thickness of materials.
8. Regulations, Standard of Compliance etc.
9. Gauge, thickness or substance of the material
10. Any tests, performance test, witness test, specific test, etc.
11. Capacities, running condition, operational and static load etc. for main services installation
Specific information to be shown 1. For Air Conditioning, type, cooling capacity, type of gas use, type of pipe and BS/MS code and type of
in the 2D drawings or to be input accessories etc.
into the 3D model 2. For Gas Supply System, Refrigeration Installations & Chemical Installations, type of system, tank capacity, size
of pipe and MS/BS code, special fittings and accessories
3. For Fire Fighting System, type of system, tank capacity, size of pipe and MS/BS code, brass works for fittings
and accessories
4. For Medical Suction Installations, Pneumatic Tube Installations, Refuse Disposal Installations, Automatic Control
system, type of system, size of pipe or ducting and MS/BS code, special fitting and accessories
259
26 MECHANICAL ENGINEERING INSTALLATIONS
Specific rules of measurement 1. For Primary Equipment
a. Connection inside the primary equipment’s shall be deemed to be included.
2. Primary Equipment
a. All accessories deem to be included
b. Items of equipment and ancillaries shall be described with manufacturer's detailed specification
3. Pipe Works
a. The following are deemed to be included for pipe works
(i.) Labours on pipes (e.g. made bends, made springs, made offsets, beaded ends, ornamental ends,
etc.)
(ii.) Joints of a special or ornamental character.
(iii.) Pipe fittings over the pipe in which they occur. Cutting and forming openings and jointing piping to
fitting.
(iv.) Fittings involving a change of direction of piping.
(v.) Testing procedure, testing capacity, testing method
260
26 MECHANICAL ENGINEERING INSTALLATIONS
4. Duct Works
a. The following are deemed to be included:
(i.) Duct fittings over the duct in which they occur. Cutting and forming openings and jointing ducting to
fitting.
(ii.) Fittings involving a change of direction of ducting.
(iii.) Special connection and special joints in ducting.
(iv.) Labours on ductworks (e.g. made bends, made springs, made offsets, beaded ends, ornamental ends,
etc.)
(v.) Duct Service openings (if required.), ceiling opening etc.
(vi.) Fire Damper, electronic filter, Hepa Filter (if required).
(vii.) Testing procedure, testing capacity, testing method etc.
5. Equipment to Ducting
a. The following aredeemed to be included:
(i.) Type, size and method of fixing.
(ii.) All connections and jointing to the ducting works.
261
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
01 Primary Equipment
262
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Gas Supply System nr 01 Meters 01 (Product 01 fixed on the
Name/Code) or external wall
02 Main gas other equal and
03 Condensate receiver approved,
(dimensioned
description),
(capacity) tonne,
(load) rating,
associated
integrated or
remote
ancillaries,
controls, and
indicators or
components
263
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
nr 06 Fire alarms 01 Control gear 01 (Product
02 Junction box Name/Code) or
03 Manual break- other equal
glass approved
(dimension
description)
264
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
05 Chemical Installations nr 01 Cylindrical 01 (Product 01 fixed to a
06 Medical Suction 02 Containers Name/Code) or horizontal
Installations Special Containers other equal and surface
07 Pneumatic Tube approved, 02 fixed to a
Installations (dimensioned vertical surface
08 Refusal Disposal System description),
09 Vacuum Installations (capacity) tonne,
10 Cleanroom Installations (load) rating,
11 Other Installations associated
integrated or
remote
ancillaries,
controls, and
indicators or
components
265
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
02 Ducting
01 Air Conditioning m 01 Galvanised iron duct 01 Fixed to a 01 (dia.) diameter / 01 Ducting (measured overall
Installations 02 Metal duct horizontal surface (x-sectional ducting fittings, short running
02 Gas Supply System 03 Fibre glass duct 02 Fixed to a vertical dimension) length and branches).
03 Fire Protection Services 04 Polymer duct surface 02 Flexible and extensible
04 Refrigeration Installations 05 PVC duct 03 Fixed to the plain ducting profile shall be
05 Chemical Installations metal described in Level Two.
06 Medical Suction 04 Fixed to the glass 03 Curved ducting profile shall
Installations be described in Level Two.
07 Pneumatic Tube 04 Ducting fittings (heat, bolts,
Installations nut and washers) are deemed
08 Refuse Disposal to be included in the
Installations description.
09 Kitchen Exhaust System 05 BS/MS code and Class shall
10 Automatic Control be stated at Level One.
Installations
266
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
03 Pipework
01 Air Conditioning m 01 Galvanised iron pipe 01 Fixed to wall 01 (dia.) diameter / 01 Technical Specification
Installations 02 Copper pipe 02 Fixed in risers or (x-sectional includes normal size, BS/MS
02 Gas Supply System 03 PVC pipe service duct dimension) quality standard and internal
03 Fire Protection Services 04 HDPE pipe 03 Embedded in lining materials.
04 Refrigeration Installations 05 Special made pipe brickwall 02 Flexible and extensible pipe
05 Chemical Installations 06 Pre-insulated G.I. 04 Embedded in (if any) profile shall be
06 Medical Suction Pipe concrete described in Level Three.
Installations 05 Fixed to soffits of 03 The gas service pipe intake
07 Pneumatic Tube slab shall not pass through parts of
Installations 06 Fixed through the substructure which could
08 Refuse Disposal wall/floor be subject to settlement.
Installations including sleeves BS/MS code and Class shall
09 Kitchen Exhaust System 07 Laid in trench; be stated at Level One
10 Automatic Control including all
Installations necessary
excavation and
reinstatement
11 Pipe supports nr 01 Standard 01 Hanged to a 01 (dia.) diameter / 01 The length of the hanger is
02 Non-standard horizontal surface (nr) number for the varying length and
02 Hanged to a pipe works depend on the structure of the
vertical surface building must be referred to
the drawings
267
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
04 Insulation to Ductwork
06 Ducting Accessories
269
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
07 Anti Vibration
01 Air Conditioning nr 01 Rubber mounts 01 Fixed to a 01 (x-sectional 01 BS/MS code and Class shall
Installations 02 Base spring mounts horizontal surface dimension) be stated at Level One.
02 Gas Supply System 03 Air spring mounts 02 Fixed to a vertical
03 Fire Protection Services 04 Seismic mounts surface
04 Refrigeration Installations 05 Neoprene base
05 Chemical Installations mounts
06 Medical Suction 06 Special base mounts
Installations
07 Pneumatic Tube
Installations
08 Refuse Disposal
Installations
09 Kitchen Exhaust System
10 Automatic Control
Installations
08 Sundries
270
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
07 Pneumatic Tube
Installations
08 Refuse Disposal
Installations
09 Kitchen Exhaust
System
10 Automatic Control
Installations
02 Testing and Item 01 Air Conditioning 01 To include chemical
Commissioning Installations treatment, purging,
02 Gas Supply System sterilisation and pressure
03 System Validation Item 03 Fire Protection testing.
services
04 Operation and Item 04 Refrigeration
Maintenance Manuals Installations
05 Chemical
Installations
06 Medical Suction
Installations
07 Pneumatic Tube
Installations
08 Refuse Disposal
Installations
09 Kitchen Exhaust
System
10 Automatic Control
Installations
271
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
05 Drawing preparation Item 01 Schematic drawings 01 Air Conditioning 01 Installation, coordination as
02 Floor plan drawing Installations installing and record
02 Gas Supply drawings.
System
Fire Protection
04 Services
Refrigeration
05 Installations
Chemical
Installations
06 Medical Suction
Installations
07 Pneumatic Tube
Installations
08 Refuse Disposal
Installations
09 Kitchen Exhaust
System
10 Automatic Control
Installations
272
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
06 Training Item 01 Air Conditioning
Installations
02 Gas Supply System
03 Fire Protection
Services
04 Refrigeration
Installations
05 Chemical
Installations
06 Medical Suction
Installations
07 Pneumatic Tube
Installations
08 Refuse Disposal
Installations
09 Kitchen Exhaust
System
10 Automatic Control
Installations
273
26 MECHANICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE Notes, comments, and glossary
MEASURED
07 Pneumatic Tube
Installations
08 Refuse Disposal
Installations
09 Kitchen Exhaust
System
10 Automatic Control
Installations
274
27 ELECTRICAL ENGINEERING INSTALLATIONS
27 ELECTRICAL ENGINEERING INSTALLATIONS
01 Primary Equipment
02 Equipment’s and fittings
03 Electrical Cable
04 Telecommunication cable
05 Final sub-circuit
06 Cable Containment
07 Lightning protection installation
08 Sundries
Specific information to be 1. For the main installation, need to specify type and capacity of distribution board, meter, main switch, ELCB and related
shown in the 2D drawings accessories.
or to be input into the 3D 2. For power installation, need to specify the type of switch socket, number of a gang and rating capacity.
model 3. For lighting installation, need to specify types of lighting, capacity and related accessories.
4. For electrical appliances, need to specify types and size of appliances including related accessories.
5. For conduit and fittings, need to specify the type, size and method of fixing.
6. For cables, need to specify the type, size and classification of the installation.
7. For lightning protection system, need to specify type and size of tapes, test clamps, air terminal and electrode chamber.
275
27 ELECTRICAL ENGINEERING INSTALLATIONS
Works and materials 1. Classification of Works
deemed included and
a. Work together with its metalwork, supports and the like (unless associated with more than one installation) shall
general rules of
be classified as follows and given under an appropriate heading.
measurement, all of which
are to be stated in the (i.) Incoming Services
Preambles (ii.) Electrical Installations
(iii.) Clock Installations
(iv.) Telephone Installations
(v.) Alarm system Installation
(vi.) Sound Distribution System
(vii.) CCTV System Installations
2. Main installation
a. Packaged items of equipment and control gear shall be described in conjunction with the manufacturer's detailed
specification.
b. Connecting cable end or cable-tails to connector-blocks shall be deemed to be included with the item.
3. Cables containment
a. Bending, cutting, screwing, jointing and providing all conduit fitting, except those required shall be deemed to
be included with the conduit items.
b. Cutting and jointing conduits to fittings shall be deemed to be included.
276
27 ELECTRICAL ENGINEERING INSTALLATIONS
c. Cutting, jointing and providing all conduit fittings shall be deemed to be included.
d. Forming holes for conduit entry into other items of equipment shall be deemed to be included.
e. Components for earth-continuity shall be deemed to be included.
f. Cutting and jointing trunking to fittings shall be deemed to be included.
g. Cutting and jointing trays to fittings shall be deemed to be included.
2. Sundries
a. Plates, discs and labels for the identification of plants, cables, switches and the like shall be deemed to be
included with the item concerned.
277
27 ELECTRICAL ENGINEERING INSTALLATIONS
ITEM OR WORK TO BE
UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS &
MEASURED
GLOSSARY
01 Primary Equipment
02 Electrical Installations nr 01 Main switch board 01 (Product 01 fixed to a horizontal 01 Primary equipment is
Name/Code) or other surface defined as plant or
equal approved, fixed to a vertical equipment from
(capacity) volt and 02 which a system
surface
including all originates, e.g. main
necessary switchboard,
accessories distribution board,
main control box and
02 Distribution board 01 Product Name/Code) the like.
amp circuit breaker,
(capacity) amp (nr)
MCB and (capacity)
amp (nr) RCCB (if
any)) and including
all necessary
accessories
278
27 ELECTRICAL ENGINEERING INSTALLATIONS
(Product
Name/Code) or other
equal approved,
06 Transformer 10 (capacity) volt and
including all
necessary
accessories
(Product fixed to a
07 Switch Gear 01 Name/Code) amp 01 horizontal
circuit breaker, surface
(capacity) amp (nr) fixed to a vertical
02
fuses and (nr) surface
switches and
including all
necessary
accessories
279
27 ELECTRICAL ENGINEERING INSTALLATIONS
280
27 ELECTRICAL ENGINEERING INSTALLATIONS
03 Electrical Cable
281
27 ELECTRICAL ENGINEERING INSTALLATIONS
04 Telecommunication cable
05 Final sub-circuit
282
27 ELECTRICAL ENGINEERING INSTALLATIONS
06 Cable containment
01 Conduit 01 Galvanised iron 01 Fixed to a horizontal 01 (dia.) diameter/ (x 01 Generally, all cable
m
02 Trunking 02 Metal surface cross-sectional) containment to be
03 Cable tray 03 Fibre glass 02 Fixed to a vertical measured inclusive
04 Polymer surface of all fittings, i.e.
05 PVC joint boxes,
connectors,
flanges, bends,
tees, junctions,
reducers, spigots,
fire barriers and the
like.
283
27 ELECTRICAL ENGINEERING INSTALLATIONS
NOTES,
ITEM OR WORK TO BE
UNIT LEVEL ONE LEVEL TWO LEVEL THREE COMMENTS &
MEASURED
GLOSSARY
08 Sundries
284
27 ELECTRICAL ENGINEERING INSTALLATIONS
NOTES,
ITEM OR WORK TO BE
UNIT LEVEL ONE LEVEL TWO LEVEL THREE COMMENTS &
MEASURED
GLOSSARY
06 Alarm System
Installation
07 Sound Distribution
System
08 CCTV System
Installations
285
28 TRANSPORTATION SYSTEMS
28 TRANSPORTATION SYSTEMS
Information to be provided 1. Floor and site plan detailing the layout of systems
in the Specification 2. System schematics
3. Cross-sections and elevations
4. Detail layouts for plant rooms and principal services installation areas.
5. Specific installation details for equipment and fittings.
6. Equipment schedules.
7. Type, quality and size or thickness of materials.
8. Regulations, Standard of Compliance etc.
9. Gauge, thickness or substance of the material
10. Any tests, performance test, witness test, specific test, etc
11. Capacities, running condition, operational and static load etc.
12. Mobilization of the equipment
13. Any other special requirements
Specific information to be 1. For lift, conveyor and escalator system overall dimension of the system shall be specified and location of the item
shown in the 2D drawings 2. For assembly of composite items of primary equipment or system shall be stated the dimension and location of the
or to be input into the 3D item
model 3. For, fire stopping and other associated fire protection work shall state the dimension and type of fire stopping with the
requirement of MS or BS
Specific rules of
measurement
286
28 TRANSPORTATION SYSTEMS
3. Mobilization of Item
a. Mobilization shall include all equipment’s and related accessories for transportation of contractor's personnel,
equipment, and operating supplies to the site
4. Composite item
a. Composite item shall include lift and escalator car, sheave and motor, control panel and counterweight and guard rails
5. Fire Stopping
a. Kind and quality of materials
b. Technical specification and BOMBA approval certificate
287
28 TRANSPORTATION SYSTEMS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS &
MEASURED GLOSSARY
288
28 TRANSPORTATION SYSTEMS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS &
MEASURED GLOSSARY
01 Systems 01 (System Description)
connections interface with and
connection to systems
supplied and installed
by others
03 Fire Stopping m 01 Putty 01 To vertical surface 01 (x-sectional 01 Technical Specification
02 Intumescent caulk 02 To horizontal surface dimension) include normal size and or
03 Grout areas of fixing.
04 Mortar
289
28 TRANSPORTATION SYSTEMS
ITEM OR WORK TO BE UNIT LEVEL ONE LEVEL TWO LEVEL THREE NOTES, COMMENTS &
MEASURED GLOSSARY
08 Drawing preparation. Item 01 Schematic 01 Lift Installations 01 Installation, co-ordination as
drawings 02 Escalator System installing and record drawings.
02 Floor plan drawing 03 Conveyor System
03 As-built drawing 04 Overhead
Gantry/Crane
290
29 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATION INSTALLATIONS
29 BUILDER'S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATION INSTALLATIONS
Specific rules of measurement 1. An item shall be given for each and every services installation.
2. Example of installations are cold water services, lighting installation, power installation, lift installation.
3. In the case for large and complex projects, it may necessary to subdivide each installation into locations or levels.
4. This item means every type of general builder’s works necessary in connection with the service installation except
those items included in the specific service rules.
Works and materials deemed 1. Plant bases shall be given in accordance with Precast Concrete Works Section.
included and general rules of 2. Gratings, louvres etc. shall be given in accordance with Metalwork Section.
measurement, all of which are to 3. Platework, fuel hoppers, steel beams and supporting steelwork shall be given in accordance with Steel Works
be stated in the Preambles Section.
291
29 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATION INSTALLATIONS
03 Pipes and duct sleeves nr 01 Galvanised mild steel 01 Casting into Method of fixing shall be
02 Copper reinforced concrete 01 (dia.) diameter 01 described in Level Two.
/(x-sectional
03 PVC 02 Building into brick 02 Nature of the structure
dimension)
04 HDPE walls shall be described in
05 Special made thick
Level Two.
06 Pre-insulated G.I. 03 Building into block 03 Cutting holes for pipes is
07 Metal duct walls deemed to be included
08 Fibre glass duct and described in Level
09 Polymer duct Two.
04 Making good after the
installation is deemed to
include in the
description.
292
29 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATION INSTALLATIONS
05 Catenary cables m 01 Lazy wave 01 eyebolts 01 (dia.) diameter / 01 Method of existing for
02 Free Hanging 02 shackles (x-sectional eyebolts, shackles and
03 Steep Wave 03 straining screws dimension) straining screws shall be
04 U Shape thick described in Level
Three.
06 Bedding and nr 01 Grouting with cement 01 lift door jamb 01 (x-sectional
pointing/units of and sand (1:3) 02 special opening dimension)
equipment, ancillaries
293
29 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATION INSTALLATIONS
03 Cutting and pinning m 01 Galvanised mild steel 01 in walls 01 (x-sectional 01 Nature of the structure
ends of support for dimension) shall be described in
02 Copper pipe
pipes not (exceeding Level Two.
55mm nominal size) 03 PVC pipe 02 in beams 02 spacing of the 02 Pipes shall be grouped
04 HDPE pipe support; (x- together.
05 Special made pipe 03 in columns sectional 03 Pipes are measured
06 Pre-insulated G.I. Pipe dimension) overall fittings, short
03 running length and
for openings; branches.
(dia.) diameter / 04 System of fire-rated
(x-sectional shall be described in
dimension) Level Three.
05 Making good after the
installation and removal
of debris is deemed to
include in the
description.
294
29 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATION INSTALLATIONS
295
29 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATION INSTALLATIONS
296