You are on page 1of 5

~/';.

/3 ,1~d)N
lJ". l} P':. .J.fJ Ii?
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila

DEPARTMENT ORDER ) SUBJECT: DESIGN STANDARDS FOR TOURISM


) AND FARM TO MARKET ROADS

No. 11
---------
)
)
Series of 2014 b)'obt"l/.3 )
x-x-x-x-x-x-x-~-x-x- )

In line with the mandate of the Department to ensure the quality and safety of road infrastructure,
hereunder are the prescribed minimum design standards for tourism and farm to market road projects, for
the guidance and compliance of all concerned.

Requirements
Design Element Tourism Roads Farm to Market Roads
(Figure 1) (Figures 2 & 3)
Portland Cement Concrete
Pavement Type PCCP
Pavement (PCCP)
Fig. 2: Minimum of 4.0m for two-
lanes
• Average daily traffic of
Pavement Width· less than 200
Minimum of 6.1 m for two lanes
Fig. 3: Minimum of 5. Om for two-
lanes
• Average daily traffic
between 200-400
Minimum of230mm (9 inches) Minimum of 150mm (6 inches)
(Higher thickness of pavement (Higher thickness of pavement may
may be adopted but shall be be adopted but shall be verified
verified from pavement design from pavement design analysis
analysis using AASHTO method usmg AASHTO method as
Pavement Thickness
as contained in the DPWH Design contained in the DPWH DeSIgn
Guidelines Criteria and Standards Guidelines Criteria and Standards
considering the latest Annual considering the latest Annual
Average Daily Traffic and Axle Average Daily Traffic al1d l\xle
Loading). Loading).
Shoulder
• Width • Minimum of 1.5m • Minimum of 1.5 m
• Material • Minimum of gravel surfacing • Minimum of gravel surfacing
Roadway Cross Slope 1.50 % for PCCP 1.50% for PCCP

Shoulder Cross Slope 3.0% for Gravel Surfacing 3.0% Gravel Surfacing
Radius of Horizontal
Minimum of 50m Minimum of30 m
Curve
Length of Tangent between
Minimum length of 30m Minimum length of 30 m
I reverse curves.
I:tO, No, 11 s.2014 J>age20f2
c -
Tourism Roads Farm to Market Roads
(Fi!!ure 1) (Fi2ures 2 & 3)
_n.

LeIlgth ofVenical Curve Minimum length of 60m Minimum oflength of 60 m


... -

• 60 kmlhr for flat terrain


Desigu Speed • 40 kmlhr for rolling terrain 30 kmJhr for all terrairt type
• 30km/hr for ffiountainous
terrain
Minimum of 0.50% on cut section Mlliimuffi of 0.50% on cut section
Longitudinal Grade and maximum of 12% on cut/fill and maximum of 12% on cut/fill
section section
• Cut slope of 1.5:1 to 1:1 for • Cut slope of 1.5:1 to 1:1 for
common materials common materials
• Cut slope of 0.5:1 to 1:1 for • Cut slope of 0.5:1 to 1:1 for
Side Slope Ratio (H: V) rippable rock rippable rock
• Cut slope of 0.25: 1 to 0.5: Ifor • Cut slope of 0.25:1 to 0:5:1 for
hard/solid rock hard/solid rock
• Minimum fill slope of 1.5:1 • Minimum fill slope of 1.5:1
• Box culvert: 25 - year flood • Box culvert: 25 - year flood
with sufficient freeboard to with sufficient freeboard to
contain the 50- year flood contain the 50- year flood

Road Drainage • Pipe culvert: 15 - year flood • Pipe culvert: 15- year flood
with sufficient freeboard to with sufficient freeboard to
contain the 25-year flood contain the 25-year flood
• Minimum size of 910 mm in • Minimum size of 910 mm in
diameter. diameter.

Slope protection As needed As needed


Refer to DPWH Highway Safety
Road Safety Devices • Refer to DPWH Highway
including Pavement Safety Design Standards, Part Design Standards, Part 2 (May
Markings 2 (Mav 2012) 2012)
Accessibility Requirements As needed
As needed
for Persons with Disabilitv
Bridges • Permanent structures (concrete • Permanent structures (concrete
or steel) or steel)
• Structural design based on • Structural design based on
AASHTO HS20-44, usmg AASHTO HSI5-44, using OAg
. 0.4g ground acceleration ground acceleration coefficient
coofficient for seismic. analysis for seismic analysis and 50-
and 50- year flood frequency year flood frequency for
for hydraulic analysis. hydraulic analysis.
• Carriageway Width = 6.70m • Carriageway Width:
- 4.60m (for 4.0m roadway
width Fig. 2)
- 5.6Om (for 5.Om roadway
width - Fig. 3)

This Order shall amend/modify Department Order No. 46, s. 2012 and othe; previous Issuances
inconsistent herewith and shall take effect immediately.

Department of Public Works and Highways


Office of the Secretary

1111111111111111111111111111111111111
WIN4R00883
.'.'.'1.)" ,
ill'
II"'lI
Qv
~
-•••
rl
0
2:
q ~
..c
0 l-
I- E
z E -'()
"
w 0 :E
C') l-
:;E N
:c 1-- E
U z E
w 0
0
:E N
~ W
u.i
~ en
cr::
0-
:::>
U 0
a: I- Z U
o~ Z 0 w
w W
05
100
~:I:
ID
~1
M
:E
~
Z

U
I-
Z
W
~ 0
IJl

Z
en :J
Z :c
Z
0
~ :E :::> :::> I-
:E w en 0 ~
w U w cr:: B ()
~ 0 ~ C> w
$: z C> ....J 0 W
0
cr::
w :5 cr::
~ Ci5
:::> 0
en
cr:: ~ C> (§ C
*1~: I-
0 0 C>
« ~ cr::
0
10 ~ ....•
IJl 0-
~ <C
c:::::C>
0
I")
S 0
0
«
0
0:
0::: :E
en
....J
«
() -
0:
<J=::= 0
10 ~
0

0..
>- ::J
0
I")
~f I- 0
~ l-
w
0:::
a:
::>
(9
o~
05
100
~ili
-
LL
o::t
..-it
0
tNI
--
.....•
""
.....•
0
z -G
q :.c
I-
0 E
E
~0
I- 0 :.c
z
w ..-
10 I-
~ •..... E
:::c z E
u w 00
~ C\I
~ w u.i
« :;;:
0::
CJ)
a- ::>
U 0
I- Z ()
z 0
w () w w
CJ) z Z
~ I- ::i
::.::: z
z W ~ 0
In Z :::c 0 C
o~
05
0::
~1
~ w
~ ()
w
~ 0

~ ::>
!;i:
::>
CJ) 0 ~
w 15
0::
w
C9

I-
()
W
«
0
~ z
L()o ....J 0
~ « -
...-:1:
en ~ 0
0::
0::
~
I-
0::

C9
W
0::
C9
0::
::>
CJ)
0
en ~
0 0 C9 !;i: C§
« z 0::
m a-
~ ‫ן‬-
r::::=::t:> 0
a
a
~r
o
~
.
$
0
w
N
~
« ~
0 ~
(71 0::
.....J «
:E
0
«
()
<F=
0
0
N
- 0
a..
>-
I-
I-
o~
0:: N :E
W ~
«
05
L()o
...-:1:
en 0::
::> LL
C>
LL
••
.,..jj
lCl "
Il"lI
.-i..Ii
..-I
ci
:z
~
q :2
0 l-
E .;.::
l- E 0
z 0 :c
w
::;E
..-
LO I-
E
:c ~ E
u z
<t w 0
0
:E
W
N
~ ui
en
0::
~ ::::>
U 0
I- Z ()
Z 0 W
W
W
:2 I-
() en Z
:::::i Z
o~
n: :ll:: z
z w ~ Cl
J: 0 C
~1
CD
«
Z
0--'
L05
~ :2
w en
::::> ::::>
0
g I-
.•....I :E 0:: is
en '" W
() W
C) w 0
Cl
Z
!d:
C) ...J Cl
en W
en 0
~
0::
0::
0

::s
b:: C)
0 C)

w
0::
!d: C§
~
::::> Cl
a::
•. CD a. « z 0::
~
••••
-:
~
0
0
LO
N
~1:~~
Lq
S W
0
~
« ~
?i
-. 0 a::
«
3:
w
Cl
n:
0::
n: -"
...J
()
. « :E
0
<F=>
0
0
LO

~
~r
0
,-
- 0
a..
N
>-
I- ••••
('i) :E
w a::
o~
0--'
L05

n:
*-
a
'"
0::
::> «
LL
.•....I
en CJ
-
LL

You might also like