You are on page 1of 2

X APPROVED

APPROVED WITH COMMENTS


NOT APPROVED. ADD INFORMATION
FOR INFORMATION
Approvals don’t release the fulfillment of contract obligations
01
DATE 23.03.21 SIGNATURE AMH

02

03

GDF057-BR001-SPL-01

04

05
06

07

08
10 .

Note:
The coordinates indicated by "E" and "N" are coordinates relative to a defined point in
11 the General Layout. They present a turn of 49º in a clockwise direction, coinciding with
09 the Plant North.
The UTM coordinates of reference point in the General Layout are:
E 420800 m
N 2895900 m
12
REFERENCE DRAWINGS

1.- FOR GENERAL LAYOUT SEE DWG: KRO2-ZG00-Q-0001


2.- FOR CIVIL WORKS SEE DWGs: KRO2-ZG40-A-0001...

13
3.- FOR PIPING ARRANGEMENT SEE DWGs: KRO2-WM40-S-0001...
4.- FOR SUPPORTS ARRANGEMENT SEE DWGs: KRO2-WM40-S-1000...
5.- FOR DETAILS SUPPORT SEE DWGs: KRO2-WM40-S-1101...

Reference Drawings
Drawing Number

Engineer's Stamp Contractor's Stamp

14
. . . . .
. . . . .

16 B
A
ISSUED FOR INFORMATION
ISSUED FOR INFORMATION
IFS
JMS
AMH
AMH
09/03/2021
15/12/2020

15 Rev. Description Drawn Checked Date

17
Employer Project
AL-KHOBAR 2 SEAWATER REVERSE
OSMOSIS DESALINATION PLANT

Engineer Contractor

18
- G434- 3001 -RB.1

19
POx No:
Drawing Title
FIELD ISOMETRIC K1/K3
Cod.: SA05C2 - 02 - 5F

GDF057-001 (RACK-01)

SHOP Scale: Drawing No:

KRO2-WM40-O-3001
Sheet:

1 of 2
Rev.

B
X APPROVED
APPROVED WITH COMMENTS
NOT APPROVED. ADD INFORMATION
FOR INFORMATION
Approvals don’t release the fulfillment of contract obligations

DATE 23.03.21 SIGNATURE AMH

GDF057-BR001-SPL-02

01

GDF057-BR001-SPL-03

02

18 17
03
07
06
GDF057-BR001-SPL-04 22
B
12 11
20
21
04
.
05
B 19 Note:
The coordinates indicated by "E" and "N" are coordinates relative to a defined point in
the General Layout. They present a turn of 49º in a clockwise direction, coinciding with
the Plant North.
The UTM coordinates of reference point in the General Layout are:
E 420800 m
25 N 2895900 m

09
16 REFERENCE DRAWINGS

1.- FOR GENERAL LAYOUT SEE DWG: KRO2-ZG00-Q-0001


2.- FOR CIVIL WORKS SEE DWGs: KRO2-ZG40-A-0001...
3.- FOR PIPING ARRANGEMENT SEE DWGs: KRO2-WM40-S-0001...

28 15
4.- FOR SUPPORTS ARRANGEMENT SEE DWGs: KRO2-WM40-S-1000...

08 5.- FOR DETAILS SUPPORT SEE DWGs: KRO2-WM40-S-1101...

13
Reference Drawings

23 24
Drawing Number

27
14 10 Engineer's Stamp Contractor's Stamp

. . . .

26
.
. . . . .
B ISSUED FOR INFORMATION IFS AMH 09/03/2021
A ISSUED FOR INFORMATION JMS AMH 15/12/2020
Rev. Description Drawn Checked Date
Employer Project
AL-KHOBAR 2 SEAWATER REVERSE
OSMOSIS DESALINATION PLANT

Engineer Contractor
- G434- 3001 -RB.1

FIELD
POx No:
Drawing Title
ISOMETRIC K1/K3
Cod.: SA05C2 - 02 - 5F

GDF057-001 (RACK-01)

SHOP Scale: Drawing No: Sheet: Rev.

KRO2-WM40-O-3001 2 of 2 B