1) Excavators in Pits Yakut and Bacan were continuing overburden stripping operations.
2) Dumping of overburden and soil was taking place from the excavators.
3) Preparation work like clearing was also being done to support mining operations.
4) Monitoring of mining activities was conducted by representatives from AKG and KDC.
1) Excavators in Pits Yakut and Bacan were continuing overburden stripping operations.
2) Dumping of overburden and soil was taking place from the excavators.
3) Preparation work like clearing was also being done to support mining operations.
4) Monitoring of mining activities was conducted by representatives from AKG and KDC.
1) Excavators in Pits Yakut and Bacan were continuing overburden stripping operations.
2) Dumping of overburden and soil was taking place from the excavators.
3) Preparation work like clearing was also being done to support mining operations.
4) Monitoring of mining activities was conducted by representatives from AKG and KDC.
Field Observation and Monitoring Name Pradana Budi I Change Shift SIANG Easting 21-Aug-22 Date/Time Pit / Block Yakut/Bacan DISPOSAL OPD B Northing RL Clasification
Area Dumpingan material bagus/clay Exsa R-02 Coal Getting
Seam 8 Bacan
Exsa 88 Striping IB Seam 7/8 Bacan
Area Dumpingan material pasir "hindari
metode freedump potong pucuk"
PT AKG Observer By, Operation PT AKG, Operation PT. AKG
Field Observation and Monitoring Name Pradana Budi I Change Shift SIANG Easting 21-Aug-22 Date/Time Pit / Block Yakut/Bacan AREA WORKSHOP Northing RL Clasification
Exsa R-01 perapian slope kaki
Lanjut penimbunan batupalu di workshop "shift malam" jalan hauling bacan
Exsa R-03 & 108 Lanjut
pembuatan badan jalan
PT AKG Observer By, Operation PT AKG, Operation PT. AKG