DAILY PLAN : 16 Aug-22 DAILY OVERBURDEN PLAN


ACTUAL REQUEST
PIT YAKUT No LOADER UNIT ID TYPE HAULER RIPPING DOZING GRADING PDTY PIT BLOCK DISPOSAL DISTANCE
ELEVASI LEVEL
PROD.

1 CAT 6015B CAT 6015B-110 HD 7 NO YES YES 650 B-07 DISPOSAL KARET 300 0 0 9490
2 HITACHI 1200 Hitachi 1200-47 HD 5 NO YES YES 500 B-12 OPD B 1.500 0 0 6871
3 SANY 750 SANY 750-88 ADT 3 NO YES YES 350 B-02 OPD B 450 0 0 4809
4 CAT 374F CAT 374F-107 ADT 4 NO YES YES 350 B-08 DISPOSAL KARET 300 0 0 5110
5 SANY 750 SANY 750-84 ADT 3 NO NO YES 350 BACAN OPD B 300 0 0 4809
6
8
9
10
DAILY COAL PRODUCTION PLAN 31089 BCM
EXCA No

IPD BACAN 117 LOADER UNIT ID TYPE HAULER PIT BLOCK CLEANING GRADING PDTY DISTANCE SEAM INSPECTION PROD.

1 HX340SL HX340SL-116 IVECO 11 B-05 YES NO 160 20.000 Y5 YES 2391


EXCA EX- PIT YAKUT 2
R 01 ACHIEVEMENT 2391 MT
PIT BACAN EXCA OVERBURDEN REMOVAL TANGGAL 15 August 2022 COAL PRODUCTION TANGGAL 15 August 2022 SR

116 MTD PLAN MTD ACT MTD ACH DAILY ACH PROD PLAN PROD ACT MTD PLAN MTD ACT MTD ACH DAILY ACH PROD. PLAN PROD. ACT MTD PLAN MTD ACT. DEVIATION
No 284.760 310.169 109% 125% 19.504 24.440 63.068 47.321 75% 99% 4.795 4.740 4,52 7 145%
EXCA EXCA 47
117 IMPROVEMENT
OPD A EXCA 107 1 PUMPING BLOK 12
2 PEMBUATAN SETTLING POND PIT YAKUT
3 SPREADING SOIL IPD SAFIR (LAHAN BUSTAMIN DAN LARANG)
EXCA
110 4 PEMBUATAN PARKIRAN DI AREA WC PORTABEL
5 CONTINUE SPREADING SOIL IPD KARET KE ARAH BENCH PERTAMINA
OPD B 6 PEMASANGAN PITA UNTUK PEMBUATAN SETTLING POND DI PIT YAKUT
EXCA 88
7 PEMINDAHAN MCC KE PIT YAKUT
8 DRUM-DRUM BEKAS OLI DI WORKSHOP LAMA
EXCA
EX-R 02 9 PERCEPATAN FINALISASI PIT BACAN ARAH SELATAN
10 DRUM-DRUM BEKAS OLI DI WORKSHOP LAMA
EXCA 84 DISPOSAL KARET
11
12
13
NO UNIT DIGGER OB REMOVAL 14
1 EX88 CONTINUE STRIPPING KE ARAH BARAT BLOK 4 15

2 EX110 CONTINUE STRIPPING BLOK 7 16

3 EX107 LOADING SOIL BLOK 8 17

4 EX84 LOADING OB SEAM 8 PIT BACAN 18 Agreed by: Agreed by: Agreed by: Agreed by: Agreed by: Agreed by: Agreed by: Agreed by:
5 EX47 CONTINUE STRIPPING KE ARAH CROPLINE SEAM 3 BLOCK 3 & 4 19

NO UNIT GENERAL 20
1 EX-R 02 CLEANING SEAM 3 BLOK 12
3 EX-R 01 CLEARING BLOCK 8
4 EX 005 CLEANING SEAM 7 DAN 8 PIT BACAN PIT ENGINEERING ENGINEERING PRODUKSI HAULING SHE PLANT HRD & GA LOGISTIC

INVENTORI COAL

SEAM 7 BACAN MT
SEAM Y_05 MT

SEAM 3 BLOK 2 787 MT


SEAM Y 03 BLOK 1211.838 MT
SEAM 7 BACAN 595 MT