GANDHINAGAR DOC. NO.: 410/FDN-3A
UPLIFT RESISTANCE TOWER: CH+1.5 to +9m EQ BE
CALCULATION SOIL : WET

SOIL
TOP W BOT W HEIGHT VOL PORTION
PART MM MM MM M^3
MUFF 650 650 225 0.0951 MUFF
CHM TOP 650 650 1500 0.6338 TOP
CHM BOT 650 650 900 0.3803 BOT
SLAB1 1740 1740 200 0.6055 BOT
SLAB2 4690 5190 250 6.1061 BOT
SLAB2 5190 5190 100 2.6936 BOT
LEAN 5190 5190 50 1.3468 BOT
CONC CONC CONC
CONC VOL IN VOL UNIT WT WT = VOL*UNIT WT
M^3 KG/M^3 KG
MUFF CVMUFF 0.0951 2400 228
TOP SOIL CVTOP 0.6338 2400 1521
BOTTOM SOIL CVBOT 7.0919 1400 9929
BALANCE CVBAL 2.6936 1400 3771 42.057
LEAN CONC CVLEAN 1.3468 1240 0 5.387

TOTAL WT OF CONC WT CONC KG 15449

BOTTOM SOIL
HEIGHT Hb M 1.350
TR WIDTH Wtr M 5.190
LG WIDTH Wlg M 5.190
TH THb DEG 15
H*TAN(TH)top Kb=Hb*TAN(Th) 0.3617 1.3500*TAN(15)

TOTAL EARTH VOL Evbot = Hb*Wtr*Wlg 36.3637


+ Hb*(Wtr+Wlg)*Kb 5.0689
+ π*Hb*(Kb)²/3 0.1850
Evbot M^3 41.6177 36.3637+5.0689+0.1850

NET EARTH VOL NEVbot = Evbot-CVBOT = M^3 34.5258 41.6177-7.0919


UNIT WT KG/M^3 940 1
WT OF BOT SOIL WT BOT NEVbot*Unit Wt KG 32454 34.5258*940*1.000
TOP SOIL
HEIGHT Ht M 1.500
TH THt DEG 30
H(TAN TH)top Kt 0.8660 1.5000*TAN(30)
H(TAN TH)top+bot Kt+Kb 1.2278 0.3617+0.8660
AREA BOT Ab =Wtr*Wlg 26.9361
+2*Kb*(Wtr+Wlg) 7.5095
+ π*(Kb)² 0.4111
34.8567 26.9361+7.5095+0.4111
AREA TOP At =Wtr*Wlg 26.9361
+2*(Kt+Kb)*(Wtr+Wlg) 25.4882
+ π*(Kt+Kb)² 4.7356
57.1599 26.9361+25.4882+4.7356

TOTAL EART VOL EVtop =Ht/3 * 0.5000


At+Ab+Sqrt(At*Ab) 136.6530
68.3265 0.5000*136.6530

NET EARTH VOL NEVtop M^3 67.6928 68.3265-0.6338


UNIT WT KG/M^3 1440
WT OF TOP SOIL WT TOP 450 KG 97478 67.6928*1440.00

WTCONC+WT TOP+WT BOT 150 KG 145381 15449+32454+97478


ANCHORAGE KG 145381

Case1 Case2
UPLIFT LOAD KG 140917 130185
UPLIFT CAPACITY KG 145381 145381
FOS OBTAIN 145381/140917 145381/130185 1.032 1.117
FOS REQ 1.000 1.000
OK OK