TOTAL COST
Machine-
Labor-Intensive Intensive
assembly method assembly
(from 1a) method (from
1a)
Direct materials
8 helicopters x 40,000$ or 36,000$ $ 320,000.00 $ 288,000.00
Direct-assembly labor
9,826 hrs or 5,258 hours x 30$ $ 294,780.00 $ 157,740.00
Indirect manufacturing costs
Equipment related
9,826 hrs x 12$ or 5,258 hours x 45$ $ 117,912.00 $ 236,610.00
Machine-handling related
0.5 x 320,000 or 0.5*288,000 $ 160,000.00 $ 144,000.00
TOTAL ASSEMBLY Cost $ 892,692.00 $ 826,350.00
CUMULATIVE AVERAGE TIME
85% Learning courve
y=ax^b a = 2,000 x = 1, 2, 3, 4 b = ln0.85/ln2 -0.234465
Cumulative Cumulative Cumulative Individual
number of average time (Y): 85% total time time for x-th
units (X) Labor hours (A*B) unit (E7-E6)
1 6,000.00 6,000.00 6,000.00
2 5,100.00 =6000 * 2^-0.23447 10,200.00 4,200.00
3 4,637.49 13,912.47 3,712.47
4 4,335.00 17,340.00 3,427.53
5 4,114.03 20,570.13 3,230.13
6 3,941.87 23,651.19 3,081.06
7 3,801.94 26,613.57 2,962.38
8 3,684.75 29,478.00 2,864.43
TOTAL COST
Labor-Intensive
assembly method
(from 1a)
Direct materials
8 systems x 30$ $ 1,280,000.00
Direct-manufactoring cost
3,685 hrs x 30$ $ 110,550.00
Overheads
TOTAL COST
Cumulative Cumulative
Cumulative Additions to
Average Time Total Time:
Number of per Unit: Labor- Labor - Cumulative costs at 30$ Cumulative
Units Costs
Hours Hours
1 6,000.00 6,000.00 $ 180,000.00 (6,000*30) $ 180,000.00
2 5,100.00 10,200.00 $ 306,000.00 (10,000*30) $ 126,000.00
4 4,335.00 17,340.00 $ 520,200.00 (17,340*30) $ 214,200.00
8 3,684.75 29,478.00 $ 884,340.00 (29,478*30) $ 364,140.00