B14 F BOOM
MAINTENANCE MANUAL
CONTENT
1 PRELIMINARY REMARKS 5
1/1 SAFETY 5
2 DESCRIPTION 8
2/1 EXPLANATION 8
2/2 FEATURES 8
3 MAINTENANCE OPERATIONS 10
3/1 FIRST ENTRY INTO SERVICE 10
4 TIGHTENING TORQUES 12
5 LUBRICATION 13
6 OPERATING METHODS 14
6/1 REMOVING AND REFITTING A EXPENDABLE PIN SET. 14
8 LIFTING - HANDLING 19
8/1 LIFTING POINTS. 19
1 PRELIMINARY REMARKS
1.1 SAFETY
The informations contained in this manual must be studied and thoroughly assimilated
before undertaking any maintenance work on the equipment
WARNING Operation, maintenance and adjustments are only allowed to persons with
specific training in operation and maintenance of the equipment. Read the operating
and maintenance instructions before using or servicing the equipment.
WARNING: Before starting any maintenance operation ensure that the machine is in a
safe location with good safety, ventilation and lighting conditions. Ensure that lifting
equipments and pedestals are compatible with elements’ weight. Follow all the safety
instructions and ware safety protections as gloves, goggle, helmet, safety boots, ear
protectors.
WARNING: Before any operation stabilize and fix steadily all the elements on suitable
pedestals. Stop the power packs, switch the general power breaker. Place a tag or a
board to warn other members of the personnel that maintenance work on the machine
WARNING is in progress.
WARNING: Pressurized oil jets could cause severe injuries. Before any operation on
hydraulic circuit, STOP the power packs and release remaining pressure in
components by operating hydraulic control levers several times. Always release the
WARNING static pressure in cylinders before disassemble them.
NEVER WORK ON AN OPERATING CIRCUIT.
WARNING: While tests are in progress, do not allow any other member of the
personnel to stand in the area surrounding the machine. Stay at the control station to
be able to stop the movement and switch off the power pack.
WARNING
CAUTION: Always use suitable tools and work in a clean place when dismantling and
assembling hydraulic components. After removing cylinders the hydraulic inlet/outlet
ports must be plugged to prevent dirt and air intrusion during operation.
WARNING: The operator must always wear required personal protection, such as safety
helmet, protective overall, safety boots, hearing protectors, safety goggles etc.
SAFETY
Do not attempt any such repairs or adjustments that you do not fully
understand.
Certain workstages require the use of the feed mechanism during the repair.
Make sure then that:
Before starting any repair-work move away from the area where you have just
drilled.
Always wear protective clothing, eye protection, earmuffs, safety footwear, and
other safety equipment required by the work.
2 DESCRIPTION
2.1 EXPLANATION
B14 F BOOM are multidirectional, easy-to-use and easy-to-maintain booms used in small
galleries and medium sections.
They have a mechanical auto-parallelism feature with a adjusting cylinder.
They can be used for face, wall, roof or floor drilling and for initiating cross-cuts, by swinging
the drill feed through a combination of 6 movements.
2.2 FEATURES
• Boom weight without hoses: 1350 kg
• Hydraulic pressure in cylinders: 210 bar
• Movements amplitude.
3°
2000 maxi
F 40°
C
E 320°
90° D 29 °
C’
B 40°
36° A
40°
36°
1193 mm 2000 mm
7
8 1
2
9
5 11
6
10
4
3
3 MAINTENANCE OPERATIONS
CAUTION: The safety of users and the reliability of the boom depend on the maintenance
operations and imply the use of genuine SANDVICK TAMROCK SECOMA spare parts.
All defective parts must be immediately replaced.
WARNING: Maintenance, adjustment and repairs are restricted to qualified personnel
with special training for the particular equipment. Always read the instructions
carefully before starting any maintenance work.
WARNING
WARNING: While tests are in progress, do not allow any other member of the personnel
to stand in the area surrounding the machine. Stay at the control station to be able to
stop the movement and switch off the power pack.
WARNING
NB: You can recover all these operations in the periodic maintenance table (last page
of this manual) we invite you to use this document.
4 TIGHTENING TORQUES
For basic genuine SANDVIK TAMROCK SECOMA™ screws and nut use the following
tightening torque:
220 Nm
600 Nm 220 Nm
600 Nm
Tightening torque
of the expendable
pin set see page 13
220 Nm
800 Nm
Tightening torque
of the expendable
pin set see page 13
5 LUBRICATION
Use Mobilith SHC 220, Mobilgrease HP 222 or equivalent.
GREASE POINTS
There is a grease nipple on any expendable pin. There is two grease nipples at each end of
any rotary actuator.
• CAUTION: Check that the rotary actuator grease discharge valves are working properly. They
are situated at the opposite side of each grease nipple. Those valves must release excess
grease to avoid over-pressure and over-stress on actuator’s seals and flanges.
Remove faulty valves.
6 OPERATING METHODS
WARNING: Before starting any maintenance operation ensure that the machine is in a
safe location with good safety, ventilation and lighting conditions. Ensure that lifting
equipments and pedestals are compatible with elements’ weight. Follow all the safety
instructions and ware safety protections as gloves, goggle, helmet, safety boots, ear
protectors.
Refitting:
• Grease all parts.
• Centre the expendable pin in its housing Figure B
• Position spacers, expendable blocking cone and
caps
(See figure B).
• Torque tighten the screw according to the
diameter
(See page 9).
• Operate several movement cycles and retighten
the screw.
• Check an retighten at weekly operation
maintenance session.
BALL
JOINT
BRACKET BRACKET
D 40 D 45 200 Nm 190 Nm
D 50 D 57 300 Nm 290 Nm
D 60 D 68 500 Nm 490 Nm
When a cylinder is removed, make sure that no part of the boom is left
unsupported
Removal:
• Line up the boom horizontally and align it with jumbo’s expendable pin.
• Remove the drill feed assembly.
• Sling boom.
• Stop the power pack and release remaining pressure in hydraulic components and hoses by
operating control levers several times.
• Disconnect hydraulic hoses and plug the inlet/outlet ports.
• Remove the boom swing cylinder.
• Extract swinging expendable pin set and remove the boom.
Refitting:
• Check elements condition, replace if necessary.
• Assemble and lubricate elements.
• Connect hoses.
• Bleed and breeze hydraulic circuit.
• Proceed tests.
Removal:
• WARNING: Stop the power packs and proceed an hydraulic circuit decompression.
• Before removal mark the relative position of boom’s elements with actuator’s flanges.
• Sling or stand the elements with adapted devices to prevent a sudden fall of moving parts.
• Disconnect hydraulic hoses and plug the inlet/outlet ports.
• Secure an fasten the rotary actuator to prevent it’s fall.
• Remove it.
Refitting:
• Check expendable pin play, and adjust if necessary.
• Exchange all flanges screws.
• Apply LOCTITE ADHESIVE 317 on surfaces.
• Torque tighten flanging screws.
For more informations about the cylinders mounting, see the cylinder
maintenance manual in SECTION 1.
WARNING: Pressurized oil jets could cause severe injuries. Before any operation on
hydraulic circuit, STOP the power packs and release remaining pressure in
components by operating hydraulic control levers several times. Always release the
WARNING static pressure in cylinders before disassemble them.
NEVER WORK ON AN OPERATING CIRCUIT.
8 LIFTING - HANDLING
8.1 LIFTING POINTS.
WARNING: Before starting any maintenance operation ensure that the machine is in a
safe location with good safety, ventilation and lighting conditions. Ensure that lifting
equipments and pedestals are compatible with elements’ weight. Follow all the safety
instructions and ware safety protections as gloves, goggle, helmet, safety boots, ear
protectors.
• WARNING: Check the cables you use, they must be in good condition and fit the weight of
the assembly you are going to lift.
• Fasten correctly the elements before starting operations (See Figure 1).
YES
OUI YES
OUI
NON
NO NON
NO
Support
Drill glissière only:
feed support seul: 250 kg Boom
Bras without
sans le drill feedde
support support:
glissère:1100
1100kgkg
Figure 1
PERIODS DONE
Shift 50 PH 200 600 1200 1800 2400 3600 B14 F BOOM YES NO
PH PH PH PH PH PH
R R R R Leakage detection
R Remove boom.
P Inspect all elements.
remove worn out parts.
V Tests
O