t to previous year
Three Phase Locomotive
2021-22(upto July) 2022-23(upto July)
BJU(D PTRU/(
Equipment DDU GMO TOTAL DDU GMO BJU(D) PTRU(D) SPJ(D) TOTAL
) D
Angle transmitter 2 2 1 1 1 1 4
Aux. converter IGBT
9 8 7 24 7 6 12 2 27
(BUR)
Brake system (E-
1 5 1 1 8 2 3 1 4 10
70/Knorr)
Harmonic filter 5 2 7 1 3 7 11
1 1 2 2 1 3
Machine room blower
1 1 2 3 2 1 6
Oil cooler blower unit
Traction converter
21 5 3 29 7 12 9 7 2 37
IGBT (SR)
Transformer 2 1 3 1 4 5
Vacuum Circuit
Breaker (VCB) 1 1 1 3 2 1 1 4
Machine room
blower: 2021-22(upto July) 2022-23(upto July)
DDU GMO BJU(D) PTRU(D) TOTAL DDU GMO BJU(D) PTRU(D) SPJ(D) TOTAL
Avg.Loco holding 18.5 235.5 52 109 415 59 185.25 89 113.25 25.75 472.3
Equip. Population 37 471 104 218 830 118 370.5 178 226.5 51.5 944.6
Avg.No. Of failure 0 1 0 1 2 0 2 1 0 0 3
FRPCPY 0 0.64 0 1.3761 0.7229 0 1.619 1.6854 0 0 0.95278
Traction converter
IGBT (SR): 2021-22(upto July) 2022-23(upto July)
DDU GMO BJU(D) PTRU(D) TOTAL DDU GMO BJU(D) PTRU(D) SPJ(D) TOTAL
Avg.Loco holding 18.5 162 52 109 341.5 55 93.00 96 111 25.75 376.75
Equip. Population 37 324 104 218 683 110 186 192 222 51.5 753.5
Avg.No. Of failure 0 21 5 3 29 7 12 9 7 2 37
FRPCPY 0 19.4 14.42 4.1284 12.738 19.1 19.35 14.063 9.45946 11.65 14.7313
Vacuum Circuit
Breaker (VCB): 2021-22(upto July) 2022-23(upto July)
DDU GMO BJU(D) PTRU(D) TOTAL DDU GMO BJU(D) PTRU(D) SPJ(D) TOTAL
Avg.Loco holding 18.5 235.5 52 109 415 59 185.25 89 113.25 25.75 472.25
Equip. Population 18.5 235.5 52 109 415 59 185.25 89 113.25 25.75 472.25
Avg.No. Of failure 0 1 1 1 3 2 1 0 1 0 4
FRPCPY 0 1.27 5.769 2.7523 2.1687 10.2 1.619 0 2.64901 0 2.54103