China State Construction & Package

Structure: Permanent bridge at southern access road Comment by: Reply by: Sheet
Engineering Cooperation (CSCEC) UECP
Load Test Report for Pre-stress Girder PMDSC Unit CSCEC 1
Comment Management Sheet ICB-2A

Engineer’s original comment CSCEC reply to the original comment Engineer's follow-up Comment CSCEC follow-up reply
No
Date: June 16th 2022 Date: June 27th 2022 Date: August 18th 2022 Date: August 22nd 2022
The proposed test load is not The computed deflection seems erroneous. This has
accounting for the serviceability to be computed with post-tension, primary &
Noted. Load computation is carried out for two possible
stress incorporating traffic loads. secondary creep, shrinkage etc. The relevant
time gaps of 60 days and 90 days from casting the girder to
1 The calculation is carried out only duration for creep and shrinkage shall be calculated
Revised accordingly girder testing. Deflection is computed using FEM models
for construction load during the by the actual duration between the date of beam cast
incorporating concrete time-dependent properties.
concreting. Thus the test load is and the testing date. This is to be performed before
compromised and does not cover the design test.
the expected scope.
Check the anticipated deflections. The anticipated deflections are
2 This is to be evaluated for the obtained from the finite element
girder with the design test load. model. Revision is not needed.
End of Comment