You are on page 1of 1

NO. ITEMS SUB-ITEMS TYPE OF DESIGN WORKS NO.

OF TENDER DRAWINGS REMARKS


1 ring beam structure design drawings + calculation
2 excavation works drawings + calculation
3 support works drawings UE-12A-T-EXC-006
shaft
4 reinforcement schedule design drawings
5 structures design drawings + calculation
6 backfill works deisgn drawings UE-12A-T-STR-010
7 excavation works drawings + calculation
8 support works drawings + calculation
UE-12A-T-EXC-001
9 layout & profile & cross section drawings
10 open-cut(CH27) drainage design drawings
11 reinforcement schedule design drawings
12 structure design drawings + calculation UE-12A-T-STR-013
13 backfill works deisgn drawings
14 excavation works drawings + calculation
15 support works drawings + calculation
UE-12A-T-EXC-009
16 layout & profile & cross section drawings
17 open-cut(CH55) drainage design drawings
18 reinforcement schedule design drawings
19 structure design drawings + calculation UE-12A-T-STR-013
20 backfill works deisgn drawings
21 initial support works drawings + calculation UE-12A-T-EXC-002/003/005/007/008
UE-12A-T-STR-001
22 tunnel 3&4 concrete support works drawings + calculation UE-12A-T-STR-004 Including tunnel 3(TBM&NATM), tunnel 4(NATM)
23 reinforcement schedule design drawings UE-12A-T-STR-003
24 joints & water stops drawings UE-12A-T-TYP-001
25 excavation works drawings + calculation
26 support works drawings
ventilation access UE-12A-T-STR-009
27 reinforcement schedule design drawings
28 structures design drawings + calculation
29 tunnel transition typical design with elevation drawings UE-12A-T-STR-014
30 layout & cross section drawings Including tunnel 3(TBM&NATM), tunnel 4(NATM)
tunnel monitoring sections UE-12A-T-CSS-001/002/004
31 monitoring proposal report
32 excavation works drawings + calculation
33 TBM dismantle section support works drawings + calculation UE-12A-T-EXC-004
34 structure design drawings + calculation
Note: 1. other designs or design changs which are not mentioned in this list will be finalized under supplement agreement or negotiation with ED&PMC.
2. TBM machine and segment design is not responsibility of ED&PMC.

You might also like