1

Managing Capacity and Demand

Student Name:
Course Name:
Unit Code:
Instructor:
Due Date:
2

Managing Capacity and Demand


The number of goods a company can yield in a given amount of time using the
resources at its disposal is referred to as capacity. The total hours a firm works in a given
shift, the total transitions a company operates each day, the average days a corporation works
per week, and the amount of weeks a firm operates annually are all factors that go into
determining capacity.
The firm's capacity must be proportional to the amount of operations. As a result, the
production capacity of a production system is a critical component of the system. Workforce
and equipment capacity planning are two terms used to describe the collection of activities
that are projected to design and sustain client services. A capacity plan for a make-to-order
environment is designed to generate a considerable time, personnel, apparatus, and
constituents to conduct a firm's operations. Creating a master schedule, developing
production plans, and arranging final scheduling and planning are the three critical phases of
dealing with capacity issues in the make-to-stock environment. The production plan defines
the stages of output groups that will be used to meet the demand for the product. Provides a
more detailed explanation of what a firm will provide under the parameters in the master
schedule of the contract.
Master Scheduling is a phrase used to refer to the planning process of a multitude of
tasks simultaneously. While the capacity plan organizes cumulative customer requirements
into timings, the master schedule blocs actual instructs into timings, which contrasts with the
capacity plan. The master scheduling team, which includes HR, sales, and production
members, evaluates the master scheduling replacements and establishes priorities for the
master scheduling process. As a result, all firms must use effective demand management and
capacity planning strategies in order to provide excellent customer service.
A technique for altering the master schedule in order to meet the needs of essential
resources is called Rough-Cut Capacity Planning. Machinery, workforce, space, and supplier
capability are considered in rough-cut capacity planning. It ensures that an organization has
sufficient capacity to satisfy the needs necessary to meet the master schedule's criteria.
Additionally, it assists marketing and production companies in balancing the available
capacity against the desired capacity, as well as in negotiating adjustments to the master plan,
among other things. In order to change the master schedule, a company can do so by
changing the master schedule dates or by reducing and increasing the master schedule
amounts, among other things.
Capacity Enhancement
3

The capacity cushion is a result of insufficient capacity planning. The level of service
relies on the amount of slack available. For example, when it comes to fire fighting, peak
demand capacity is underutilized, which leads to underutilization of the service overall.
Rate of Utilization
It is possible to compute the utilization rate by dividing the amount of time spent in
usage by the amount of time available.
Availability
The availability of a resource is defined as the amount of time it is thought to be
suitable for use.
There are several mechanisms for aligning supply and demand in the services sector.
Some strategies include job planning, increasing customer relations, developing customizable
capacity, modularizing consumption, incorporating value benefits, boosting off-peak
consumption, and precise revenue management.
The following characteristics are ideal for revenue management: perishable inventory,
changing demand, a large capacity for cost modification, a zero net sales cost, relatively
stable efficiency, and the ability to customer segmentation.