A DRAINAGE WORKS
Wastage -
130.00
Add unloading 5.00
Add lay 13.00
148.00
Add main contractor's profit 15% 22.20
TOTAL 170.20
say 170/no
Wastage -
198.00
Add unloading 5.00
Add lay 13.00
216.00
Add main contractor's profit 15% 32.40
TOTAL 248.40
say 248/no
Wastage -
92.00
Add unloading -
Add lay -
92.00
Add main contractor's profit 15% 13.80
TOTAL 105.80
say 105/no
Calcalation:-
225mm/25 = 9
BQ Rate RM230 / 9 = RM25.56/m for 25mm dia
say 153/m
app1 /1
BUILT UP RATE Appendix 1
Calcalation:-
RM1200 /(0.75*0.75) = RM2,133.33
Say 12,800.00
Say 4,800.00
Calcalation:-
RM750 /(0.8*0.8) = RM968.49
Say 1,452.00
Say 653.00
Say 2,180.00
app1 /2