You are on page 1of 2

G E N E R A L FA C T S H E E T

Asset life assessment

As operating plants come towards


the end of their design life an asset
life assessment is vital to identify
the investment required to restore
integrity and sustain present
operating performance.

This will allow the plant to meet future production What we offer
requirements for the longer term of 10 to 20 years ABB can provide an independent detailed
and provide a focus for both finances and effort. assessment of asset life and the opportunities for
improvement.
There is increasing pressure to run assets far
beyond their design life because replacing them is The study will cover equipment condition, systems
simply not an option. Before deciding to extend an and practices, competencies and skills. It will
assets life operators must prove to themselves and generate a plan for asset life extension, including
often their regulators, that the asset is fit and safe future requirements to maintain equipment
to operate. This can be a difficult hurdle to integrity and reliability by:
overcome.
-- Reviewing key issues affecting asset life
Once assets run beyond their design life new failure -- Determining a view of equipment life based upon
mechanisms and integrity problems occur that site deterioration mechanisms
personnel may have not previously encountered. In -- Providing a detailed profile of future investment
many cases this can cause production to cease required

Below: Investment
unexpectedly and result in costly emergency repairs -- Developing recommended actions to maintain
summary. to get the asset back online. integrity

5
The study can be tailored to meet your needs;
4
depending on requirements the study can be
focused on an entire production site or on a class of
3
Civil and structural
equipment such as boilers or rotating machines. We
Electrical
$M

Instruments
require initial on site discussions with production
2 Machines and solids handling personnel, followed by a further period of data
Piping collection, analysis and evaluation depending on the
1
Fired equipment
scope. The overall program for these studies is
Vessels
typically 6 months.
0
2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022

Year
Business Strategy State of assets

Maintenance organisation and relationships

Long Term Asset Policy Maintenance management


Asset Life Extension Risk Assessment
(? years)

Maintenance methods and planning

Maintenance
Process Safety Inspection Renewal Resource and Central maintenance and technical support
Reliability
Strategy Strategy Strategy Competence Strategy
and TA Strategy

Inspection management

Asset Life Plans


Annual Budgetary Turnaround management
Process

Technical documentation

Spare parts management


Review

— Once the opportunities for improvement are -- The study can aid in providing justification to the
Above: ABB's asset
management process. identified ABB can then help in prioritising authorities that the plant is fit and safe to operate
— improvements, generating solutions and for its extended life
Right: Asset health
check review summary. implementing actions. We can project manage the -- The client will gain confidence in the integrity and
implementation process and, calling upon the vast availability of the asset through the extended
skill set of ABB, can undertake actions ourselves, term. Ensuring that production requirements are
giving you a complete solution to your asset met and allowing safe and reliable operation
problems. without having to invest in a new asset

The asset life assessment follows ABB’s pRIME Why ABB?


philosophy. pRIME (process Reliability and Integrity ABB offer the complete solution; we can provide the
Management Excellence) is about the asset and assessment right through to the implementation of
integrity management improvement journey; it’s resulting actions to ensure the asset is fit for its
recognising the symptoms, diagnosing the issues, extended life.
and implementing improvement / treatment.
Our experienced specialists will apply their
The pRIME approach is a consultancy programme operational heritage to provide pragmatic advice
supported by tried, tested, consistent and coherent and solutions. Each equipment type is studied by
methodologies and capability. Following pRIME appropriate specialists and is supported by other
means a beneficial, cost effective sustainable functional specialists. The team are fully versed in
solution. All processes are risk based, ensuring that the legal requirements for both onshore and
effort is concentrated on areas that will give the offshore assets.
highest return. This approach is supported by a
coherent set of IT tools (pRIME Toolkit), providing a ABB have conducted over 100 multi functional
consistent and efficient approach. studies in many parts of the world and in different
industries. We not only help deliver action plans but
Benefits also impart knowledge through knowledge transfer
-- The study ensures resources are focused in the agreements and may deliver software for ongoing
right areas and provides a basis for ongoing asset use by the client.
life planning and implementation of risk based
philosophies
-- Production losses can be avoided as any potential
failures are identified before they occur
-- Necessary repairs can be planned and carried out
more effectively and cheaply, saving breakdown
costs and reactive repairs
Integrity management/PRS022a/03/18

— —
ABB Limited We reserve the right to make technical We reserve all rights in this document and
Daresbury Park, Daresbury changes or modify the contents of this in the subject matter and illustrations
Warrington, Cheshire document without prior notice. With contained therein. Any reproduction,
WA4 4BT United Kingdom regard to purchase orders, the agreed disclosure to third parties or utilisation of
Phone: +44 (0)1925 741 111 particulars shall prevail. ABB does not its contents – in whole or in parts – is
E-Mail: contact@gb.abb.com accept any responsibility whatsoever for forbidden without prior written consent of
potential errors or possible lack of ABB. Copyright© 2018 ABB
information in this document. All rights reserved
abb.com/consulting

You might also like