Subiect:
Request foi lnsp€ction of installation of First Fix (fire alarm @ fire fighting) for Novec System in Basement Floor - at the Straight Area
1 - Low Voltage Room No 4- Zone A
For Contractor
Brooq Arabia For Contracting Est. Eng'Abdullah Altayeb
To : The Walk
Date:
4t4t2022 Eng' Nizar Abbas
Attn: MEP Director
#,X*nH,?irri&"0
nments:
M GA\
eLreJ
F RDt tA lo \2e
Eng. Mohammad
Date: Consultant Date: Project Director
A: : Reiected F: