Professional Documents
Culture Documents
INT-1
5/7/2022
Contents
1. Column Internals Summary----------------------------------------------------------------------------------------------------------------3
2. Feed/Draw Summary------------------------------------------------------------------------------------------------------------------------4
3. CS-1--------------------------------------------------------------------------------------------------------------------------------------------- 5
3.1. Packing Geometry-------------------------------------------------------------------------------------------------------------------------5
3.2. Design Parameters------------------------------------------------------------------------------------------------------------------------6
3.3. Results Summary--------------------------------------------------------------------------------------------------------------------------7
3.4. By Stage Results-------------------------------------------------------------------------------------------------------------------------- 8
3.4.1. Hydraulic Results----------------------------------------------------------------------------------------------------------------------- 8
3.4.2. State Conditions------------------------------------------------------------------------------------------------------------------------- 9
3.4.3. Physical Properties--------------------------------------------------------------------------------------------------------------------- 10
3.5. Hydraulic Plots----------------------------------------------------------------------------------------------------------------------------- 11
Hydraulic Analysis Report - B1 : INT-1
Number of sections 1
Number of diameters 1
Sections
Section Section
Column Start End Diameter Internals Tray or % Approach Limiting
Height Pressure
1 Stage Stage (meter) Type Packing Type to Flood Stage
(meter) Drop (bar)
0.0014035
CS-1 1 7 0.08 0.75 Packed RASCHIG 86.611 7
8
Page 3 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
2. Feed/Draw Summary
Feed/Draw Summary
1 SOLVENTE Feed
3 Draw
7 GAS Feed
4 Draw
Page 4 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
3. CS-1
3.1. Packing Geometry
Packing Geometry
Vendor GENERIC
Material CERAMIC
Page 5 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Over-design factor 1
Number of curves 5
Page 6 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Messages Summary
Messages
Pressure drop per unit packed heights (frictional) for Stages 2 - 5 are below the minimum pressure drop per unit
packed height (frictional) of 4.167 mm-water/m.
Page 7 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Pressure drop /
Packed height % Capacity % Capacity
Stage Pressure drop (bar) Height (Frictional)
(meter) (Constant L/V) (Constant L)
(mm-water/m)
Page 8 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Liquid Vapor Liquid mass flow Vapor mass flow Liquid volume Vapor volume
Stage
temperature (C) temperature (C) (kg/hr) (kg/hr) flow (l/min) flow (l/min)
Page 9 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Page 10 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Page 11 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Page 12 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Page 13 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Page 14 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Page 15 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Page 16 of 17 5/7/2022
Hydraulic Analysis Report - B1 : INT-1
Page 17 of 17 5/7/2022