You are on page 1of 1

Anx-'A'

Electric Supply Free Auth Board - ACE (A) 10 Corps

Summer Season Winter Season

Avg per month Avg per Per Unit Total Units Amount Avg per month Avg per Per Unit Total Units Amount
billing month Cost in Rs. Units as Consumed Over & billing month Cost in Units as Consumed Over & No. of FABs
Ser (After deduction of Units per FAB over & Above (After deduction of Units Rs. per FAB in over & Above
Fmn already Remarks
No. residential accn Consumed in (M) above FAB FAB residential accn Consumed (M) above FAB FAB finalized
recovery from ROR) (a ÷ b) recovery from ROR)
(Rs. in M) (b - d) (c x e) (Rs. in M) (a ÷ b) (b - d) (c x e)
(a) (b) (c) (d) (e) (f) (a) (b) (c) (d) (e) (f)
836 meters defective
1 GE (A) Svcs 390.722 13.024 30.000 11.459 1.565 46.950 355.11 11.837 30.000 10.541 1.296 38.880 200 / 244
Est Cost Rs. 23.588 M

2 CMES (A) Mzd

3 CMES (A) Atd

4 CMES (A) 34 Div

5 CMES (A) FCNA

6 GE (A) Jmr

7 OC 702 PWS

You might also like