You are on page 1of 7

PT.

WARLBOR INTERNATIONAL INDONESIA


Kawasan Tunas Industri Kabil Type 5D - 5D1, Kelurahan Kabil, Kecamatan Nongsa - Batam 29467
Kepulauan Riau - Indonesia
DAILY CHECKLIST PREVENTIVE ELECTRICAL MAINTENANCE
Date : Area: Grinding
Check point & methode
Motor Power Station Common Instrumentation

Moisture Sensor
Basebolt tight
Safety Switch

Power Outlet
No Description Remark

Temprature

Cyl. Sensor
Ctrl. Valve
Weighing

Mtr. Freq
EQ Noise
MTC Box
Function

Leakage
Lighting

Sensor
1 Feeding Machine

2 Twin-roll Crusher

3 Vibrating Conveyor VCH0636A

4 Drum Dryer

5 Primary Breaking Cyclone Blanker

6 Bidirectional Screw Conveyor CSP2530

7 Chip Storage Silo

8 Secondary Crusher

9 Cooling Unit CBE-84AF

10 Cyclone Blanker SFX1062B

11 Tertiary Crusher

12 Rotary Vibrating Screen

13 Airflow Screen

14 Return Screw Conveyor

15 Discharge Screw Conveyor CSP2028A

16 Cartridge Filter

17 Dust Screw Conveyor

Fan for Tertiary Breaking Filter


18 (including pipes and accessories)

19 Mixture Tank Vacuum Feeding System


Fan for Primary Breaking Filter
20
(including pipes and accessories)
21 Spiral Ribbon Mixer

22 Powder Silo Vacuum Feeding System

23 Powder Storage Silo

Code Note :

N/R
N/A
x

Inspected by, Supervised by, Approved by,


PT. WARLBOR INTERNATIONAL INDONESIA
Kawasan Tunas Industri Kabil Type 5D - 5D1, Kelurahan Kabil, Kecamatan Nongsa - Batam 29467
Kepulauan Riau - Indonesia

DAILY CHECKLIST PREVENTIVE ELECTRICAL MAINTENANCE

Date : Area : Preparation and dryer


Check point & methode
Motor Power Station Common Instrumentation

Moisture Sensor
No Description Remark

Basebolt tight
Safety Switch

Power Outlet
Temprature

Cyl. Sensor
Ctrl. Valve
Weighing

Mtr. Freq
Function

EQ Noise
MTC Box

Leakage
Lighting

Sensor
AREA PREPARATION AND DRYER
1 Lift

2 Outer Fiber Aquapulper

3 Slurry Feeding Pump SGZ100-350

4 Beating Tank

5 Fiber Concentrometer MBT-2500

6 Refiner 1

7 Refiner 2

8 Screw Pump for Slurry Transfer

9 Shearing Pump

10 Diluted Slurry Tank

11 Flavor Formulating Tank

12 Adhesive Formulating Tank

13 Adhesive Loss in Weight Uniform Feeder

14 Flavor Loss in Weight Uniform Feeder

15 Mixture Tank

16 Powder Loss in Weight Uniform Feeder

17 Powder Vacuum Feeding System

18 Slurry Buffer Tank

19 Finished Slurry Tank

20 Vacuum Unit

21 Finished Slurry Buffer Tank


PT. WARLBOR INTERNATIONAL INDONESIA
Kawasan Tunas Industri Kabil Type 5D - 5D1, Kelurahan Kabil, Kecamatan Nongsa - Batam 29467
Kepulauan Riau - Indonesia

DAILY CHECKLIST PREVENTIVE ELECTRICAL MAINTENANCE

Date : Area : Preparation and dryer


Check point & methode
Motor Power Station Common Instrumentation

Moisture Sensor
No Description Remark

Basebolt tight
Safety Switch

Power Outlet
Temprature

Cyl. Sensor
Ctrl. Valve
Weighing

Mtr. Freq
Function

EQ Noise
MTC Box

Leakage
Lighting

Sensor
AREA PREPARATION AND DRYER
22 Headbox

23 Tunnel-type Steel Belt Dryer

24 Moisture Removal Machine

25 Steel Belt Cleaning Pump Motor

26 Slitting and Rewinding Machine

27 Paper Injection Components

28 Steel Belt Tensioning Oil Pump Motor

29 Paper Injection Components

Code Note :

N/R
N/A
x

Inspected by, Supervised by, Approved by,


PT. WARLBOR INTERNATIONAL INDONESIA
Kawasan Tunas Industri Kabil Type 5D - 5D1, Kelurahan Kabil, Kecamatan Nongsa - Batam 29467
Kepulauan Riau - Indonesia
Date : BOILER AND AIR COMPRESOR
Check point & methode
Temprature Vibration Common Pump

Mechanical seal
water strainer

Basebolt tight

Sealing water
Bearing NDE

Bearing NDE

Lubrication
Bearing DE

Bearing DE
No Description Remark

Oil Level

Impeller
Leakage

Gearbox
Noise

Shaft
Boiler
1 Boiler feed pump A

2 Boiler feed pump B

3 stteam header N/A N/A N/A N/A N/A N/A N/A N/A N/A

4 Manual valve N/A N/A N/A N/A N/A N/A N/A N/A N/A

5 Economizer N/A N/A N/A N/A N/A N/A N/A N/A N/A

6 Air preheater N/A N/A N/A N/A N/A N/A N/A N/A N/A

7 primary air fan

Air Compressor
8 air intake filter N/A N/A N/A N/A

9 Compresor body N/A N/A

10 Oil filter N/A N/A N/A N/A N/A N/A N/A N/A N/A

11 cooling fan N/A N/A N/A N/A

12 Air piping N/A N/A N/A N/A N/A N/A N/A N/A N/A

13 Air receiver tank N/A N/A N/A N/A N/A N/A N/A N/A N/A

14 Drain trap N/A N/A N/A N/A N/A N/A N/A N/A N/A

15 air drayer N/A N/A N/A N/A N/A N/A N/A N/A N/A

16 oil saparator N/A N/A N/A N/A N/A N/A N/A N/A N/A
Code Note :

N/R
N/A
x

Inspected by, Supervised by,


lubrication machine schedule
equipmant date week1 week2 week3 week4 week5 week6
week7 week8 week9