We furnish here below the BEST FINAL OFFER for CTI CERTIFIED ‘ADVANCE 2020’ - SERIES A LINE OF FRP INDUCED DRAFT COUNTER
FLOW COOLING TOWER for your ready reference.
Visit - www.cti.org
Cooling Tower [ HSN CODE : 8419 8940 ]
Validity : 60 days
Delivery Period : 7 to 8 weeks
GST : Extra @ 18%
Transit Insurance : Purchasers responsibility.
Payment Terms : 30% advance / 70% against proforma invoice before dispatch
Note :
1. Technical Data Sheet is enclosed.
2. Specification Sheet enclosed.
3. Price inclusive of Installation Charges.
With Regards,
Satish K
Advance Cooling Towers Pvt. Ltd
No.185/7, Chandra Plaza, 3rd Floor,8th F Main, 25th Cross, 3rd Block, Jaya Nagar
Bangalore - 560011
Karnataka, India
MOBILE : 9740870244, D : 08041609214
DATA SHEET OF ADVANCE COOLING TOWERS SHEET - I
Sr. DESCRIPTION A - 91 A - [ 3 ] 91
No.
1 Location HYDERABAD
2 Elevation 545 Mtrs.
3 Air Inlet Temperature (Dry Bulb) 32.00 oC
4 Air Inlet Temperature (Wet Bulb) 25.60 oC
5 Water Inlet Temperature 33.88 oC
6 Water Outlet Temperature 28.45 oC
7 Water Flow Rate 136.08 CMH 408.24 CMH
8 No. of Cells Per Cell Three Cells
9 Type of Fill MUNTERS C-10-12
10 Tower Dimensions
With Sump : Length 3910 mm 11730 mm
Width 3910 mm 3910 mm
Height 4800 mm 4800 mm
Without Sump : Length 3760 mm 11280 mm
Width 3760 mm 3760 mm
Height 3900 mm 3900 mm
11 Tower Weight
With Sump : Shipping Weight 1875 Kg. 5625 Kg.
Operating Weight 4975 Kg. 14925 Kg.
Without Sump : Shipping Weight 1625 Kg. 4875 Kg.
Operating Weight 2120 Kg. 6360 Kg.
12 Fan Diameter 2400 mm 2400 mm
13 No. of Blades 3 Nos.
14 Fan Motor 15.000 KW 15.000 KW x 3 Nos
15 Fan RPM 477 rpm
16 Inlet / Outlet Size 250 mm NB
17 Overflow / Drain Size 100 mm NB
18 Float Valve Size 50 NB
19 Quick Fill Size 50 NB
20 Pumping Head 5M
21 Total Cooling Capacity Required 755244 Kcal / Hr. 2265732 Kcal / Hr.
22 Air Volume 150754 CuM / Hr.
23 Sump Capacity / Basin Volume 3100 Litres 9300 Litres
24 Total Water Loss : Evaporation 1434 lph 4302 lph
25 Total Water Loss : Drift 7 lph 21 lph
26 Total Water Loss : Blow Down @ 4 Cycles 471 lph 1413 lph
27 Total Make up Water Quantity 1912 lph 5736 lph
Advance Cooling Towers Pvt. Ltd.
CIN: U25209GJ1981PTC004462
Bangalore: No.185/7, Chandra Plaza, 3rd Floor, 8th F Main, 25th Cross, 3rd Block, Jayanagar,
Bangalore - 560011 E mail: yogesh@advance2020.com ; satish@advance2020.com
Advance Cooling Towers Pvt. Ltd.
CIN: U25209GJ1981PTC004462
1. Kindly Note: The prices does not include the cost of foundation, piping, valves, water
circulating pumps, base frame, VFD, Control Panel, Sound attenuator, Vibration
Isolator, Anti Vibration Mountings, Solid Water Level Control Package, Control System
for Operating through BMS, Electrical cables, Scaffolding ect. Hot Dipped galvanized
suction strainer, motor starters which do not fall in our scope.
3. House Keeping, Removal of Packing Material Scrap and sending them to scrap yard not
in our Scope.
Warranty
All the components are guaranteed against defects in material, workmanship and deficiency In
performance for a period of 12 months from date of Installation or
15 months from the Date of shipment, whichever is earlier.
With Regards,
B. Srinivas
For Advance Cooling Towers Pvt. Ltd,
Mobile 98493 30918,
Telefax: 040 2404 6736,
Bangalore: No.185/7, Chandra Plaza, 3rd Floor, 8th F Main, 25th Cross, 3rd Block, Jayanagar,
Bangalore - 560011 E mail: yogesh@advance2020.com ; satish@advance2020.com
Advance Cooling Towers Pvt. Ltd.
CIN: U25209GJ1981PTC004462
Advance 2020 (Energy Efficient & Low Noise) Modular Induced Draft Counter flow Cooling Tower.
The Basin and casing shall be supported by heavy gauge C Rolled section hot-dip galvanized steel for
long life and durability.
Standard accessories shall include overflow, drain and brass make-up valve with plastic float.
The Casing and Basin shall be made out of FRP with both sides Gel coated for smoothness from inside
and pigmented from outside.
AXIAL FANS
Fans shall be heavy duty Axial type statically balanced. The fans constructed of hollow FRP/ extruded
aluminum alloy blades, installed in a closely fitted cowl with venturi air inlet. Fan screens shall be
galvanized steel mesh and frame, bolted to the fan cowl.
FAN MOTOR
Suitable capacity totally enclosed fan-cooled (TEFC) fan motor(s), will be furnished suitable for outdoor
service on 415 volts, 50 hertz, and 3 phase AC supply. The Fan Motor shall be IE-2, 4 poles, and shall be
vertically flange mounted. IE-3 motor can also supply on demand with additional cost implication
DRIVE
The fan shall be mounted below the Fan bearing on a shaft, driven by a belt. The drive arrangement
shall have FRP cover for protection.
Bangalore: No.185/7, Chandra Plaza, 3rd Floor, 8th F Main, 25th Cross, 3rd Block, Jayanagar,
Bangalore - 560011 E mail: yogesh@advance2020.com ; satish@advance2020.com
Advance Cooling Towers Pvt. Ltd.
CIN: U25209GJ1981PTC004462
FILL
The Cooling Tower Fill shall be of Virgin PVC (Polyvinyl Chloride) of cross-fluted design for optimum
heat transfer and efficiency. The cross fluted sheets shall be bonded together and the edges double
folded for strength and durability. The PVC fill shall be resistant to rot, decay, or biological attack.
ELIMINATORS
The eliminators shall be constructed entirely of inert polyvinyl chloride (PVC) in easily handled sections.
The eliminator design shall incorporate two changes in air direction to assure complete removal of all
entrained moisture from the discharge air stream. Maximum drift rate shall be less than 0.005% of the
circulating water rate.
LOUVERS
The louvers shall be constructed from polyvinyl chloride (PVC). The louvers shall be mounted in easily
removable frames for access to the Basin for maintenance. The louvers shall be suitable angled and
spaced to prevent splash out and block direct sunlight.
FINISH
All Basin and casing materials will be 2 side finished in standard colour with NPG, u. v. stabilizer gel
coat.
ACCESS LADDER
For sizes greater than 2.4 M wide a GI Ladder of formed / Rolled channels shall be provided with
platform for easy access to Motor.
Bangalore: No.185/7, Chandra Plaza, 3rd Floor, 8th F Main, 25th Cross, 3rd Block, Jayanagar,
Bangalore - 560011 E mail: yogesh@advance2020.com ; satish@advance2020.com
Manufacturers of : FRP COOLING TOWERS
1. Price Basis
Prices are quoted on ex-works, Pardi (Gujarat) basis, “freight to pay” at actuals. Excise Duty is not applicable to us.
2. Deliver
y
Normally within 4 to 6 weeks, subject to “force-majeure”, conditions and payment terms being met. Whilst all
efforts will be made to despatch according to schedule, no penalty will be acceptable to us for late delivery, or
subsequent delays thereof in erection & plant commissioning.
Loading of the Cooling Tower components is in ADVANCE’s scope. However, unloading and shifting of the
material to the place of Installation, whether on ground floor, terrace or any other place, will be in Client’s scope.
3. Payment
30% advance alongwith confirmed order with balance 70% against proforma invoice prior to despach.
Installation charges (erection) will be paid to us prior to commencement of work.
5. Insurance
To be arranged by buyer at their cost for all risks, including erection risk. Our responsibility ceases at the time goods
are handed over to carriers. We shall not be responsible for any consequential loss or damage arising out of or
connected with this sale.
6. Demurrage
Demurrage incurred due to no-acceptance of documents or delay in retiring goods from carriers, or for any other
reason directly attributed to buyer will entirely go to buyers account.
7. Interest
Will be applicable at the rate of 30% automatically on all delayed payment.
8. Ownership of goods
Goods delivered will remain our property until they have been paid for in full. Acceptance or other undertakings will
not be regarded as constituting payment until they have been completely redeemed. As such, we will be entitled to a
general lien on any material & equipment in customers possession for any monies due to us from the customer.
9. Inspection
Visual inspection of cooling tower components will be allowed at our Pardi Works by prior appointment.
The Cooling Tower comes into existence after assembly on foundation at site.
10. Installation
Advance Notice of 2-4 weeks is normally required for commencing erection work. Confirmation that foundation is
ready and materials are at site of erection is required prior to sending our erection crew. Facilities to be provided free
at site by customer include accommodation, electric power for portable tools, locked and secured storage space,
hoisting & scaffolding equipment. Tower components must be made available within 50 feet of actual installation
area. Surplus materials after erection will remain our property and must be returned to us on demand.
11. Validity
60 days from the date of our quotation.
12. Cancellation
If for some reson buyer wished to cancel the order placed, then we reserve the right for forfeit all or part of the
advance money received by us to compensate us for the expenses and work done till date of cancellation.
13. Warranty
We guarantee the cooling tower components & equipment against defect in material and workmanship when erected,
operated and maintained as per our indications for a period of 15 months from despatch of the tower or 12 months
after installation, whichever ends earlier. Our liability is limited to the repair/replacement of defective parts ex-factory
Pardi. Apart from this we shall not be liable to pay any compensation for direct or indirect loss caused in consequence
of the above faults.
14. Force-majeure
All delivery and shipment dates shall be subjected to delays directly or indirectly caused by or contributed to any
manner by fire, floods, accidents, riots, war, government interference, embargoes, strikes, go-slow, lockout, shortage
of labour, fuel, material of supply, inadequate transportation facilities or any other causes, which is beyond the control
of the company. No liability shall attach to the company for non-performance or delayed execution of any contract (or
any part thereof as a result of any of these aforesaid causes beyond the company’s control).