ADVANCE COOLING TOWERS PVT. LTD.

A – 1/3 , G.I.D.C INDL ESTATE,


PARDI - 396125
TEL: 09574131444
E-mail: sales@advance2020.com
Corporate Identity Number : U25209GJ1981PTC004462
Goods and Services Tax Number : 24AADCA2073R1ZH
Permanent Account Number : AADCA2073R

OFFER

TO :- Synergy Infra Consultants Pvt. Ltd Email: mahesh.av@synergyinfra.com


#25, Jayabheri Pine Valley, Gachibowli, Mobile:
Hyderabad - 500032 Telephone:
Andhra Pradesh, India

FROM :- Satish K Date: 21/12/2018


Ref :- Job: Capacity 200 TR AC Load Quotation No : ACTPL/BAN//18-19/CT/7550

Kind Attn: Mr Mahesh Kumar

Dear Sir / Madam,

We furnish here below the BEST FINAL OFFER for CTI CERTIFIED ‘ADVANCE 2020’ - SERIES A LINE OF FRP INDUCED DRAFT COUNTER
FLOW COOLING TOWER for your ready reference.
Visit - www.cti.org
Cooling Tower [ HSN CODE : 8419 8940 ]

Model No : 3A-91 [With Basin] Three Cell With IE-3 Motor


Inlet/Outlet Temp. 93 / 83 Deg F
Wet Bulb Temp. 78 Deg F
Flow Rate 1800 USGPM
Rate Qty. Amount
Basic Price INR 1,760,000.00 1 INR 1,760,000.00
Freight INR 120,000.00

Validity : 60 days
Delivery Period : 7 to 8 weeks
GST : Extra @ 18%
Transit Insurance : Purchasers responsibility.
Payment Terms : 30% advance / 70% against proforma invoice before dispatch

Note :
1. Technical Data Sheet is enclosed.
2. Specification Sheet enclosed.
3. Price inclusive of Installation Charges.

With Regards,
Satish K
Advance Cooling Towers Pvt. Ltd
No.185/7, Chandra Plaza, 3rd Floor,8th F Main, 25th Cross, 3rd Block, Jaya Nagar
Bangalore - 560011
Karnataka, India
MOBILE : 9740870244, D : 08041609214
DATA SHEET OF ADVANCE COOLING TOWERS SHEET - I

Sr. DESCRIPTION A - 91 A - [ 3 ] 91
No.
1 Location HYDERABAD
2 Elevation 545 Mtrs.
3 Air Inlet Temperature (Dry Bulb) 32.00 oC
4 Air Inlet Temperature (Wet Bulb) 25.60 oC
5 Water Inlet Temperature 33.88 oC
6 Water Outlet Temperature 28.45 oC
7 Water Flow Rate 136.08 CMH 408.24 CMH
8 No. of Cells Per Cell Three Cells
9 Type of Fill MUNTERS C-10-12
10 Tower Dimensions
With Sump : Length 3910 mm 11730 mm
Width 3910 mm 3910 mm
Height 4800 mm 4800 mm
Without Sump : Length 3760 mm 11280 mm
Width 3760 mm 3760 mm
Height 3900 mm 3900 mm
11 Tower Weight
With Sump : Shipping Weight 1875 Kg. 5625 Kg.
Operating Weight 4975 Kg. 14925 Kg.
Without Sump : Shipping Weight 1625 Kg. 4875 Kg.
Operating Weight 2120 Kg. 6360 Kg.
12 Fan Diameter 2400 mm 2400 mm
13 No. of Blades 3 Nos.
14 Fan Motor 15.000 KW 15.000 KW x 3 Nos
15 Fan RPM 477 rpm
16 Inlet / Outlet Size 250 mm NB
17 Overflow / Drain Size 100 mm NB
18 Float Valve Size 50 NB
19 Quick Fill Size 50 NB
20 Pumping Head 5M
21 Total Cooling Capacity Required 755244 Kcal / Hr. 2265732 Kcal / Hr.
22 Air Volume 150754 CuM / Hr.
23 Sump Capacity / Basin Volume 3100 Litres 9300 Litres
24 Total Water Loss : Evaporation 1434 lph 4302 lph
25 Total Water Loss : Drift 7 lph 21 lph
26 Total Water Loss : Blow Down @ 4 Cycles 471 lph 1413 lph
27 Total Make up Water Quantity 1912 lph 5736 lph
Advance Cooling Towers Pvt. Ltd.
CIN: U25209GJ1981PTC004462

"ACCEPTABLE" Water & make-up Water Chemistry


should fall within the following limits :
TDS 700 Max
1) pH Between 6.5 to 8
2) Chlorides < 50 ppm
3) Hardness at CaCo3 < 50 ppm
4) Sulphates < 50 ppm
5) Sulphides < 1 ppm
6) Silica < 30 ppm
7) Iron < 1 ppm
8) Manganese < 0.1 ppm
9) Suspended Solids (Non - Abrasive) < 50 ppm
10) Oil and Grease NIL
11) Organic Solvents NIL
12) Organic Nutrients NIL
13) Free Chlorine < 1 ppm

Works: A - 1/ 3, GIDC Industrial Estate, Pardi - 396125, Gujarat

Bangalore: No.185/7, Chandra Plaza, 3rd Floor, 8th F Main, 25th Cross, 3rd Block, Jayanagar,
Bangalore - 560011 E mail: yogesh@advance2020.com ; satish@advance2020.com
Advance Cooling Towers Pvt. Ltd.
CIN: U25209GJ1981PTC004462

1. Kindly Note: The prices does not include the cost of foundation, piping, valves, water
circulating pumps, base frame, VFD, Control Panel, Sound attenuator, Vibration
Isolator, Anti Vibration Mountings, Solid Water Level Control Package, Control System
for Operating through BMS, Electrical cables, Scaffolding ect. Hot Dipped galvanized
suction strainer, motor starters which do not fall in our scope.

2. Loading of the Cooling Tower Components is in Advance’s scope. However, unloading


and shifting of the material to the place of Installation, whether on ground floor, terrace
or any other place, will be in your scope.

3. House Keeping, Removal of Packing Material Scrap and sending them to scrap yard not
in our Scope.

Warranty

All the components are guaranteed against defects in material, workmanship and deficiency In
performance for a period of 12 months from date of Installation or
15 months from the Date of shipment, whichever is earlier.

With Regards,
B. Srinivas
For Advance Cooling Towers Pvt. Ltd,
Mobile 98493 30918,
Telefax: 040 2404 6736,

Works: A - 1/ 3, GIDC Industrial Estate, Pardi - 396125, Gujarat

Bangalore: No.185/7, Chandra Plaza, 3rd Floor, 8th F Main, 25th Cross, 3rd Block, Jayanagar,
Bangalore - 560011 E mail: yogesh@advance2020.com ; satish@advance2020.com
Advance Cooling Towers Pvt. Ltd.
CIN: U25209GJ1981PTC004462

SPECIFICATIONS FOR ‘ADVANCE 2020’ COOLING TOWERS

Advance 2020 (Energy Efficient & Low Noise) Modular Induced Draft Counter flow Cooling Tower.

BASIN & CASING

The Basin and casing shall be supported by heavy gauge C Rolled section hot-dip galvanized steel for
long life and durability.

Standard accessories shall include overflow, drain and brass make-up valve with plastic float.

The Casing and Basin shall be made out of FRP with both sides Gel coated for smoothness from inside
and pigmented from outside.

AXIAL FANS
Fans shall be heavy duty Axial type statically balanced. The fans constructed of hollow FRP/ extruded
aluminum alloy blades, installed in a closely fitted cowl with venturi air inlet. Fan screens shall be
galvanized steel mesh and frame, bolted to the fan cowl.

FAN MOTOR
Suitable capacity totally enclosed fan-cooled (TEFC) fan motor(s), will be furnished suitable for outdoor
service on 415 volts, 50 hertz, and 3 phase AC supply. The Fan Motor shall be IE-2, 4 poles, and shall be
vertically flange mounted. IE-3 motor can also supply on demand with additional cost implication

DRIVE
The fan shall be mounted below the Fan bearing on a shaft, driven by a belt. The drive arrangement
shall have FRP cover for protection.

Works: A - 1/ 3, GIDC Industrial Estate, Pardi - 396125, Gujarat

Bangalore: No.185/7, Chandra Plaza, 3rd Floor, 8th F Main, 25th Cross, 3rd Block, Jayanagar,
Bangalore - 560011 E mail: yogesh@advance2020.com ; satish@advance2020.com
Advance Cooling Towers Pvt. Ltd.
CIN: U25209GJ1981PTC004462
FILL
The Cooling Tower Fill shall be of Virgin PVC (Polyvinyl Chloride) of cross-fluted design for optimum
heat transfer and efficiency. The cross fluted sheets shall be bonded together and the edges double
folded for strength and durability. The PVC fill shall be resistant to rot, decay, or biological attack.

WATER DISTRIBUTION SYSTEM


The spray header and branches shall be constructed of Heavy duty, polyvinyl chloride pipe for
corrosion resistance and shall have a steel connection to attach the external piping. The piping shall be
removable for cleaning purposes. The water shall be distributed over the fill by precision molded ABS
spray nozzles with large orifice openings to eliminate clogging.

ELIMINATORS
The eliminators shall be constructed entirely of inert polyvinyl chloride (PVC) in easily handled sections.
The eliminator design shall incorporate two changes in air direction to assure complete removal of all
entrained moisture from the discharge air stream. Maximum drift rate shall be less than 0.005% of the
circulating water rate.

LOUVERS
The louvers shall be constructed from polyvinyl chloride (PVC). The louvers shall be mounted in easily
removable frames for access to the Basin for maintenance. The louvers shall be suitable angled and
spaced to prevent splash out and block direct sunlight.

FINISH
All Basin and casing materials will be 2 side finished in standard colour with NPG, u. v. stabilizer gel
coat.

ACCESS LADDER
For sizes greater than 2.4 M wide a GI Ladder of formed / Rolled channels shall be provided with
platform for easy access to Motor.

Works: A - 1/ 3, GIDC Industrial Estate, Pardi - 396125, Gujarat

Bangalore: No.185/7, Chandra Plaza, 3rd Floor, 8th F Main, 25th Cross, 3rd Block, Jayanagar,
Bangalore - 560011 E mail: yogesh@advance2020.com ; satish@advance2020.com
Manufacturers of : FRP COOLING TOWERS

Terms & Conditions


Scope of Supply
Our scope of supply includes, only design, manufacture and erection of FRP Induced draft type cooling tower assembly
consisting of shell, basin suction tank/connections, fills, fill support, FRP/Aluminium fan assembly fan motor, fan
mounting deck, structural or FRP support legs and internal structurals for supporting of tower. Our battery limit will be
restricted to the flanges of our cooling tower and motor terminals.
Exclusions
Civil works, foundations, all electrical work including termination on Motor Terminals. All plumbing, piping, works and
other equipment exclusive to our flanges, provision of starter, vibration cut out switch, valves, water circulating pumps,
base frame, VFD, Control Pannel, Vibration Isolator, Anti Vibration Mountings, Solid Water Level Control Package,
Control System for Operating through BMS, Electrical cables, Hot Dipped galvanized suction strainer, motor starters,
make drain, quickfill connections and piping etc.
Specifications
We are constantly striving on a day to day basis to improve quality and efficiency of our towers with regard to
components, design & performance. Therefore the specifications, design parameters, drawing ,technical details expressed
in our offers and sales brochures are not binding and are subject to change. We therefore reserve the right to make
modifications and alterations to suit our high standards of manufacture as and when required.

1. Price Basis
Prices are quoted on ex-works, Pardi (Gujarat) basis, “freight to pay” at actuals. Excise Duty is not applicable to us.

2. Deliver
y
Normally within 4 to 6 weeks, subject to “force-majeure”, conditions and payment terms being met. Whilst all
efforts will be made to despatch according to schedule, no penalty will be acceptable to us for late delivery, or
subsequent delays thereof in erection & plant commissioning.

Loading of the Cooling Tower components is in ADVANCE’s scope. However, unloading and shifting of the
material to the place of Installation, whether on ground floor, terrace or any other place, will be in Client’s scope.

3. Payment
30% advance alongwith confirmed order with balance 70% against proforma invoice prior to despach.
Installation charges (erection) will be paid to us prior to commencement of work.

4. Taxes and Duties


Sales Tax, Octroi and any other Government levies applicable of a statutory nature will be charged extra as applicable
at the time of despatch ‘C’ forms must accompany the order.

5. Insurance
To be arranged by buyer at their cost for all risks, including erection risk. Our responsibility ceases at the time goods
are handed over to carriers. We shall not be responsible for any consequential loss or damage arising out of or
connected with this sale.
6. Demurrage
Demurrage incurred due to no-acceptance of documents or delay in retiring goods from carriers, or for any other
reason directly attributed to buyer will entirely go to buyers account.

7. Interest
Will be applicable at the rate of 30% automatically on all delayed payment.

8. Ownership of goods
Goods delivered will remain our property until they have been paid for in full. Acceptance or other undertakings will
not be regarded as constituting payment until they have been completely redeemed. As such, we will be entitled to a
general lien on any material & equipment in customers possession for any monies due to us from the customer.

9. Inspection
Visual inspection of cooling tower components will be allowed at our Pardi Works by prior appointment.
The Cooling Tower comes into existence after assembly on foundation at site.
10. Installation
Advance Notice of 2-4 weeks is normally required for commencing erection work. Confirmation that foundation is
ready and materials are at site of erection is required prior to sending our erection crew. Facilities to be provided free
at site by customer include accommodation, electric power for portable tools, locked and secured storage space,
hoisting & scaffolding equipment. Tower components must be made available within 50 feet of actual installation
area. Surplus materials after erection will remain our property and must be returned to us on demand.

11. Validity
60 days from the date of our quotation.

12. Cancellation
If for some reson buyer wished to cancel the order placed, then we reserve the right for forfeit all or part of the
advance money received by us to compensate us for the expenses and work done till date of cancellation.

13. Warranty
We guarantee the cooling tower components & equipment against defect in material and workmanship when erected,
operated and maintained as per our indications for a period of 15 months from despatch of the tower or 12 months
after installation, whichever ends earlier. Our liability is limited to the repair/replacement of defective parts ex-factory
Pardi. Apart from this we shall not be liable to pay any compensation for direct or indirect loss caused in consequence
of the above faults.

14. Force-majeure
All delivery and shipment dates shall be subjected to delays directly or indirectly caused by or contributed to any
manner by fire, floods, accidents, riots, war, government interference, embargoes, strikes, go-slow, lockout, shortage
of labour, fuel, material of supply, inadequate transportation facilities or any other causes, which is beyond the control
of the company. No liability shall attach to the company for non-performance or delayed execution of any contract (or
any part thereof as a result of any of these aforesaid causes beyond the company’s control).

15. Other particular


Cooling Tower is quoted WITH BASIN, however you will have to provide RCC foundation for Cooling Tower
confirming to our drawing.

Go with the Company that has the Ability, Credibility, Reliability