You are on page 1of 55

Hydrology

(Hydro Electric Power Dam/Station/Plant).


The Ministry Of Energy Republic Of Benin And University Of Abomey Calavi Newly
Renamed University Of Benin Republic Of Benin.
Signing Of Merging Agreement With Andritz Hydro Co-Operation Company Head
Quarters,Delchi, Austria Europe, And Andritz Beijing China,

& Sinohydroelectric Power cooperation Limited Chine, Beijing ,


For The Engineering And Construction Of Hydroelectric Power Station/(Large Hpp
Dam) At Adjohoun(Adjoho-Un Large Hpp Dam) By 3 Consortiums Into 3 Single
Separate Units To Manage Adjohoun Large Hpp Dam Phase One And Phase.
This Merging Agreement Is Estimated To Produce 4,080megawatts ( MW) Of
Hydroelectric Power At An Estimated Funding Cost Of $ 7.2billion Dollars.
Project was Supervised and approved, by Republic of Benin Parliament, and Benin
Standard Board ( R.O.B.S.B ).
Oueme Delta Large Hpp Station/Dam Phase One 1,( 2,040 MW )
Adjohoun Large Hpp Station/Dam Phase 2, ( 2,040 MW ).
Hydro Type Of Project
Pumped Storage Large Hpp Station/Dam.
Source Of Large Hpp Station/Dam Project Funding
Chancellor Olaf Scholz And German Central Bank And Government.
United State Of America( U.S Government ).
France Government ( Edf).
European Union Central Bank ( E.U.C.B)
World Bank( W.B )
International Monetary Fund ( I.M.F ).
International Finance Co-Operation ( I.F.C ).
Republic Of Benin Central Bank.
Pre- Feasibility Study Conducted By:
Andridz Hydro Co-Operation Company & Andritz Beijing Branch,
Consortium.& Sinohydroelectric Power cooperation Limited
Chine, Beijing, Ministry Of Energy Republic Of Benin.
Oueme Delta River (Large Hpp) Hydro Electric Power Station Or Dam.
The Pre-Feasibility Study ( PFS ) Undertakes Further Project Assessment To Answer
The Following Questions.
To Answer The First ( 1st ) Question, The Project Developer Needs To Assess Its
Financial Attractiveness ( Expected Return On Investment ) And Identify Potential
Deal- Breakers.
(1) Is The Project Financially Viable ?
( 2 ) If So, Which Technical Option / Or Concepts Is Most Attractive?
During The ( PFS )The Design Concept Is Elaborated.
Technical Variants And Options Are Explored And A Preferred Technical Concept Is
Selected-One That Will Maximize Financial Return.
The ( PFS ) Must Also Evaluate Environmental And Social Aspects Of The Project.
A Preliminary Assessment Is Undertaken To Identify Boundary Conditions Under
Which The Project Must Be Developed Further, And To Examine Potential Barriers.
The ( PFS) Phase One(1 )And Phase Two,(2) Requires, A Cute Attention To Hydrological
Data, Which Is The Decisive Factor For Plant Design And Resulting Energy Yield.
Full Clarity On This Issue Is Required Before The Next Phase Two (2|)
Can Be Triggered. The ( PFS) Can Determine That Additional Data May Be Needed.
A Pre-Feasibility Study( PFS) For Small And Large Hpp Is Usually About 30 Pages; For
A Medium/Large Hpp Up To 100 Pages.
The Study Includes A Written Report And Drawings Of Major Elements Such As Plan
Views And Longitudinal Or Cross Sections Of Headworks And Power House About One
Month Is Required To Prepare Of ( PFS ) For A Small And Large Hpp And Three To Six
Months For A Medium/Large Hpp Stations Or Dams.
Typical Table Of Contents For A Pre-Feasibility Study ( PFS ) For Adjoho-N Large Hpp
Station. /Dam.
( 1 ) Introduction
( 2 ) Description Of Project
(3 ) Topography.
( 4 ) Hydrological Analysis And Sediment Transport.
( 5 ) Geology And Geotechnics.
( 6) Assessment Of Seismic Hazards.
(7) Preliminary Environmental And Social Impact Assessment.
( 8 ) Examination And Evaluation Of Layout Alternatives.
( 9 ) Expected Power Production
(10) Civil Engineering Design.
( 11 ) Electro - Mechanical Equipment.
( 12) Grid Connection.
( 13 ) Cost Estimation.
( 14 )Permitting And Licensing Process.
( 15 ) Planning And Project Implementation.
( 16 )Preliminary Financial Analysis.
( 17 )Preliminary Risk Analysis.
( 18 )Conclusion And Recommendation.
Feasibility Study, Conducted By:
Andritz Hydro Co-Operation, Andritz Beijing Branch China,Consortium&
Sinohydroelectric Power cooperation Limited Chine, Beijing, And
Ministry Of Energy Republic Of Benin.
The Feasibility Study On The Adjoho-un Hydro Electric Power Station /Dam ( A.D.F.S )
Is At The Core Of The Project Development Process.
Through Extensive Investigation, The ( A.D.F.S ) Assess Project Viability, Determines
Optimum Project Layout And All Other Requirement To Further The Project
Development Process.
When The (A.D.F.S ) Is Completed For A Viable Project, The Information Should Be
Sufficient To Support A Decision About Whether To Proceed To Project Financing
( Appraisal And Due Diligence By Financial Institutions).
The Adjoho-Un Large Hpp Station/Dam Feasibility Study ( A.D.F.S) Structure Is Similar
To That Of ( A.D.P.F.S ), Except ( A.D.F.S ) Detail Is Built Up By Collecting And
Analyzing Additional Data Such As Soil Investigations Or Drillings, Hydrological
Investigations Environmental Or Social Research, And Including A Detailed Elaboration
Of The Design.
An Equivalent To The ( A.D.F.S. ) From The Former Soviet Union Is In Box 5 - 2 .
The ( A.D.F.S ) Is Built On ( A.D.P.F.S ) Findings Which Examined Several Potential
Technical Concepts And Selected The Most Viable.
The Selected Concept Is Optimized During The Feasibility Study, Which Includes The
Following Core Elements.
Technical Concept:
Specification And Description Of The Most Suitable Layout And Design For Civil Works,
Mechanical, Equipment, Hydraulic Steel Structures, Electrical Equipment And Grid
Connections And Optimization Of The Main Power Plant Parameters Such As Head
Water Level, Installed Flow And So Forth.
Adjoho-Un Hydroelectric Power Station,(Large Hpp Station/Dam )
Republic Of Benin.
( 1 ) Hydrology/ Energy Production: Expected Annual Energy Generation And Impact
Of Dry Years On Power Output.
( 2 ) Geology: Results Of Geological Investigation Particularly For Large Civil
Construction Such As Dams.
( 3 ) Cost Estimates: Detailed Estimates Of Anticipated Capex ( Ideally Based On Budget
Offers ), Including Range Of Contingencies And Opex Estimates.
( 4 ) Power Markets: Identification Of The Off - Taker Of The Generated Electricity,
Preliminary Price And Duration Of The Power Purchase Agreement.
( 5 ) Financial Viability: Detailed Financial And If Required Economic) Analysis
Estimating The Key Financial Parameters (I.R.R,N.P.V,L.U.V, Etc) Which Determine
Project Attractiveness.
(6 )Financing Options: Available Equity, Debt Requirement, And Other Resource,( E.G.
Subsides And Grants ).
( 7 )Permitting: Status Of The Process, Overview Of Outstanding Permits/ Licenses.
( 8) Risk Assessment: Summary Of Key Projects Risk And Mitigation Options.
( 9 )Recommendations: For Undertaking Remaining Project Activities.
Hydrology.
(Hydro Electric Power Dam/Station/Plant)
I Recommend That The Ministry Of Energy In The Republic Of Benin In Partnership
With Andritz Hydroelectric Power Co-Operation, & Andritz Beijing,&
Sinohydroelectric Power cooperation Limited Chine, Beijing,
Would Sign An Emerging Agreement(S.O.M.A) For The Engineering And Construction
Of Hydroelectric Power Dam At Adjoho-Un In The Adjoho-un, Bonou, Dangbo, (A.B.D.)
Metropolitan Assembly,) Efficiently Utilizing The Oueme River, In The Oueme Region
Or Department.
I Recommend Setting Up (Adjohoun HPP Commission) To Contract Any
Internationally Recognized Consortium To Conduct, A Pre-Feasibility, And Feasibility
Study, Including Assessment Of Site Located, Acquisition Of International Or Local
Permitting, And Licensing, and also promote or create a support climate, or enabling
environment, through Government’s supportive supplies of logistics’, heavy machinery
and equipment, Technical skilled labour, Civil Works skilled Labour, Gride Connection
Skilled labour, Civil and hydroelectric engineering experts, to provide expert advise,
Would Project ,Their Long Awaited Expectation Of Hydro Power Production In The
Republic Of Benin.
I Recommend Hydrology Investment Should Be The Fundamental Investment Priority
Of Any Robust Or Growing Economy, Based On It High Demand Within The ECOWAS
Sub-Region.
GOVERNMENT SPECIAL DELEGATION TO DELCHI AUSTRIA ANDRITZ
CO -OPERATION,HEADQUARTERS.

S.E.M President Patrice Talon. ..................................................


Signed; ...................................................
Date; ..................................................
Speaker Of Parliament
( R.O.B ) Louis Vlavonou Gbehonu.;.............................................
Signed; .................................................
Date; .................................................
Miniter Balogun Wadagni.; .................................................
Signed; .................................................
Date; ................................................
Minister Of Energy
Jean Cloude Houssou.; .....................................................
Signed; .....................................................
Date; .....................................................
FORMER S.E.M
President Thomas Boni Yayi.; ....................................................
Signed; ....................................................
Date; ....................................................
Former SEM
Vice President Lionel Zinsou.; ...................................................
Signed; ...................................................
Date; ..................................................
Hon Aureline Agbenocei
Minister For Foreign Affairs, ...................................................
Signed; ...................................................
Date; ..................................................
Hon Jose Tonato: .................................................
Minister For Physical
And Durable Development.
Signed; .................................................
Date; .................................................
Hon Name: ..................................................
Minister For Defence
Signed: .................................................
Date: .................................................
Andritz Hydroelectric Power Dam/station, Contract Witnesses
Former SEM President Matteiu Kerekou & Mr Modeste Kerekou.
Signed; ……………………………………………………………………………….
Dated;…………………………………………………………………………………
Hydrology.
(Hydro Electric Power Dam/Station/Plant).
I Recommend That The Ministry Of Energy In The Republic Of Benin In Partnership
With Andritz Hydroelectric Power Co-Operation, & Andritz Beijing,&
Sinohydroelectric Power cooperation Limited Chine, Beijing,
Would Sign An Emerging Agreement(S.O.M.A) For The Engineering And Construction
Of Hydroelectric Power Dam At Adjoho-un In The Adjoho-un, Bonou, Dangbo, (A.B.D.)
Metropolitan Assembly,) Efficiently Utilizing The Oueme Delta River, In The Oueme
Region Or Department. I Recommend Setting Up (Adjohoun HPP Commission) To
Contract Any Internationally Recognized Consortium To Conduct, A Pre-Feasibility,
And Feasibility Study, Including Assessment Of Site Located, Acquisition Of
International Or Local Permitting, And Licensing, Would Project ,Their Long Awaited
Expectation Of Hydro Power Production In The Republic Of Benin.
I Recommend Hydrology Investment Should Be The Fundamental Investment Priority
Of Any Robust Or Growing Economy, Based On It High Demand Within The ECOWAS
Sub-Region.
Board Executives; ANDRITZ CO-Operation.

Wolfgang Leitner ………………………………………………


Signed; ......................................................
Date; ......................................................
Humbert Kofler ……………………………………………...............................
Signed; ...................................................................................
Date; .........................................................
Norbert Nettesheim…………………………………………………………………………...........
Signed; ................................................................................................
Date; ................................................................................................
Joachim Schonbeck;...............................................................................
Signed; .................................................................................
Hydrology.
Hydro Electric Power Dam/Station/Plant).
I Recommend That The Ministry Of Energy In The Republic Of Benin In Partnership
With Andritz Hydroelectric Power Co-Operation, & Andritz Beijing,(China)&
Sinohydroelectric Power cooperation Limited Chine, Beijing,
Would Sign An Emerging Agreement(S.O.M.A) For The Engineering And Construction
Of Hydroelectric Power Dam At Adjoho-un In The Adjoho-un, Bonou, Dangbo, (A.B.D.)
Metropolitan Assembly,) Efficiently Utilizing The Oueme River, In The Oueme Region
Or Department.
I Recommend Setting Up (Adjohoun HPP Commission) To Contract Any
Internationally Recognized Consortium To Conduct, A Pre-Feasibility, And Feasibility
Study, Including Assessment Of Site Located, Acquisition Of International Or Local
Permitting, And Licensing, Would Project ,Their Long Awaited Expectation Of Hydro
Power Production In The Republic Of Benin.
I Recommend Hydrology Investment Should Be The Fundamental Investment Priority
Of Any Robust Or Growing Economy, Based On It High Demand Within The ECOWAS
Sub-Region.
Date; ...............................................................................
Wolfgang Semper; .................................................................................
Signed; .................................................................................
Date; .................................................................................
Christian Nowotny;................................................................................
Signed; ................................................................................
Date; ...............................................................................
Alexander Leeb; ...............................................................................
Signed; ..............................................................................
Date; .............................................................................
Wolfgang Bernhard;...........................................................................
Signed; ...........................................................................
Date; ..........................................................................
Jurgenhermann Fechter;..................................................................
Signed; ..................................................................
Date; ..................................................................

Alexander Isola; .................................................................


Signed; .....................................................................
Date; .....................................................................
Mmonika Kircher; .......................................................................
Signed; ........................................................................
Date; ........................................................................
Georg Auer; .........................................................................
Signed; ...........................................................................
Date;
Andreas Martiner; ..........................................................................
Signed;
Date;
Monika Suppan;
Signed; .........................................................................
Date; .........................................................................
Hydrology.
Hydro Electric Power Dam/Station/Plant).
I Recommend That The Ministry Of Energy In The Republic Of Benin In Partnership
With Andritz Hydroelectric Power Co-Operation, & Andritz Beijing,&
Sinohydroelectric Power cooperation Limited Chine, Beijing,
Would Sign An Emerging Agreement(S.O.M.A) For The Engineering And Construction
Of Hydroelectric Power Dam At Adjoho-un In The Adjoho-un, Bonou, Dangbo, (A.B.D.)
Metropolitan Assembly,) Efficiently Utilizing The Oueme River, In The Oueme Region
Or Department.
I Recommend Setting Up (Adjohoun HPP Commission) To Contract Any
Internationally Recognized Consortium To Conduct, A Pre-Feasibility, And Feasibility
Study, Including Assessment Of Site Located, Acquisition Of International Or Local
Permitting, And Licensing, Would Project ,Their Long Awaited Expectation Of Hydro
Power Production In The Republic Of Benin.
I Recommend Hydrology Investment Should Be The Fundamental Investment Priority
Of Any Robust Or Growing Economy, Based On It High Demand Within The ECOWAS
Sub-Region.
It Is My Ideology That, For Any Developed Economy With An Estimated Power
Generation Of 4.050 Megawatts - To 10,000 Megawatts Of Power Can Possibly Attract
49.05% Percent Of Foreign Direct Investment.
(A.I.E.E. C) Vision Mandate
The Vision Of The, Annual International Cotonou Energy Efficiency Summit (C . E.E. S.)
Mission Is To Bridge The Energy Deficit Or Gab In The Benin Economy Exchange
Expertism In Sustainably Energy, Plan, Legislate, Energy Sector Performance
Assessment, And Discuss Energy Sectors Policies, Initiatives, And Programs, Within The
Republic Of Benin And The Eco Was Sub-Region.
Encourage Bigger Budget Sustainable, Renewable Energy Sector Investment Especially
In The Hydrological Sector Or Industry.
Discuss Possible Future Sources, Of Project Funding In The Republic Of Benin, Eco Was
Sub-Region And African Continent, Discuss Price Deflation And Inflation In The
European Energy Market And The Way Forward.
OUEME DELTA RIVER AUTHORITY (O.D.R.A)& ANDRITZ
HYDRO ELECTRITIC POWER,
CO-OPERATION &ANDRITZ BEIJING CHINA, & ANDRITZ
CONSULTANCY COMPANY LTD.& Sinohydroelectric Power
cooperation Limited Chine, Beijing.
Adjoho-un HPP Dam Commission Through The Efforts And Laid-Down National
Security Strategic Internal, External, Including Territorial Boarders, Peaceful Security
Measures Put In Place To Ensure The Safety Of The Hydrological Architectural
Designing, Project Financing, Site Location, International Licensing/Permitting,
Engineering, Construction, And Commissioning For Efficient, And Effective
Operationalization’s Of The Oueme Delta River Hydro Power Station Or Dam Are As
Follows
The Ministry Of Information (R.O.B) (MOI)Ministry Of Education (M.O.E) R.O.B) And
Civil Social Republic Of Benin (S.C.E) (R.O.B) Educate The General Public Should Set-
Up A Committee To Base On Outcomes The Pre-Feasibility, And Feasibility Study And
Its Implementations Of The Adjoho-un HPP Dam, Policy Agreement.
This Committee Should Be Sub-Divided Into 10 Committee’s.
• Ministry Of Energy Public Education Committee(M.O.E.P.E.C)
• Republic Of Benin Police Service Public Education Committee
• (R.O.B).P.S.P.E.C) Inspector General. .




• Republic Of Benin Armed Force’s Public Education Committee.
• ( R.O.B).A. F P.E.C),Chairman & Supervisor, Chief Of Army Staff.
• Brigadier General Franctrucx Gbaguidui.
• As Effort To Pave Way For The Engineering Of Adjoho-un Hpp Dam, And The
Set-Up Of Adjoho-un Hpp Dam Commission,(Oueme River Delta Authority)
(O.R.D.A).
• The Ministry Of Durable Development Chaired By The Hon Minister Jose Tonato
&Hon Alain Monsieur Ouralo, Regional Minister For Littoral Region.
• Has Awarded To, China State Engineering And Construction Company Limited,
Beijing China, And Cotonou, The Architectural Designing, Engineering,
Construction, Tiling Of All Basement Inter-Connecting Roads, Including Parade
Or Ceremonial Grounds, The Architectural Designing, Engineering, Construction
And Commissioning, Of 40,000 Housing Units Of 3,4,& 5 Executive Bedroom
Estates Housing, And 7(Seven Story Floor’s) 1,800 Executive Staff Flats Units, And
Executive Mansions Facilities, To Accommodate Armed Force’s Senior And Junior
Staff, To Motivate And Equip Armed Force’s Men And Women Ready For All
National And International Security Task, Or Assignment This Facilities Shall Be
Commissioned By The; SEM President Patrice Talon, Of All Republic Of
Benin(R.O.B) Armed Forces Basement, To Be Up-Graded Into A World-Class
State Of Act Military And Peaceful Defence Basement.

• Republic Of Benin Naval Forces Public Education Committee
• ( R.O.B).N.F P.E.C),Chairman & Supervisor. Chief Of Naval Staff.
• As Effort To Pave Way For The Engineering Of Adjoho-Un Hpp Dam, And The
Set-Up Of Adjoho-Un Hpp Dam Commission,
• (Oueme River Delta Authority)(O.R.D.A ).
• The Ministry Of Durable Development Chaired By The Hon Minister Jose Tonato
&Hon Alain Monsieur Ouralo, Regional Minister For Littoral.
• Has Awarded To A China State Engineering And Construction Company Limited,
Beijing China, And Cotonou, The Architectural Designing, Engineering,
Construction, Tiling Of All Basement Inter-Connecting Roads, Including Parade
Or Ceremonial Grounds, The Architectural Designing, Engineering, Construction
And Commissioning, Of 40,000 Housing Units Of 3,4,& 5 Executive Bedroom
Estates Housing, And 7(Seven Story Floor’s) 1,800 Executive Staff Flats Units, And
Executive Mansions Facilities, To Accommodate (R.O.B)Naval Force Senior And
Junior Staff, To Motivate And Equip Naval Force’s Men And Women Ready For
All National And International Territorial Water’s (Naval) Security Task, Duties,
Or Assignment This Facilities Shall Be Commissioned By The; SEM President
Patrice Talon, Of All Republic Of Benin(R.O.B) Naval Forces Basement, To Be
Up-Graded Into A World-Class State Of Act Military And Peaceful Marin Naval
Security Defence Operations And National Training Basement.




Republic Of Benin Air Force Public Education Committee
(R.O.B).A.F.P.E.C).Chairman & Supervisor. Chief Of Air Staff.
• As Effort To Pave Way For The Engineering Of Adjoho-Un Hpp Dam And Set-Up
Of Adjoho-Un Hpp Dam Commission,(Oueme River Delta Authority)(O.R.D.A)
• The Ministry Of Durable Development Chaired By The Hon Minister Jose Tonato
&Hon Alain Monsieur Ouralo, Regional Minister For Littoral Region.
• Has Awarded To A China State Engineering And Construction Company Limited,
Beijing China, And Cotonou, The Architectural Designing, Engineering,
Construction, Tiling Of All Basement Inter-Connecting Roads, Including Parade
Or Ceremonial Grounds, The Architectural Designing, Engineering And Construction
And Commissioning, Of 40,000 Housing Units, And Executive Staff Flat 3,4,& 5
Bedroom Facilities 7(Seven Story Floor’s) 1,800 Executive Staff Flats Units, And
Executive Mansions Facilities, To Accommodate (R.O.B)Air Force’s Senior And
Junior Staff, To Motivate And Equip Air Force Men And Women Ready For All
National And International Territorial Air Space Security Task, Duties, Or
Assignment, This Facilities Shall Be Commissioned By The;
• SEM President Patrice Talon, Of All Republic Of Benin (R.O.B) Air Force
Basement, To Be Up-Graded Into A World-Class State Of Act Military And
Peaceful Territorial Air Space Defence Operations And National Training
Basement.


Republic Of Benin Fire Services Public Education Committee (R.O.B) .F.S .P.E.C),
Chairman & Supervisor. Chief Of Fire Staff.
• As Effort To Pave Way For The Engineering Of Adjoho-Un Hpp Dam And Sst-Up
Of Adjoho-Un Hpp Dam Commission,(Oueme River Delta Authority)(O.R.D.A)
• The Ministry Of Durable Development Chaired By The Hon Minister Jose Tonato
&Hon Alain Monsieur Ouralo, Regional Minister For Littoral.
• Has Awarded To A China State Engineering And Construction Company Limited,
Beijing China, And Cotonou, The Architectural Designing, Engineering,
Construction, Tiling Of All Basement Inter-Connecting Roads, Including Parade
Or Ceremonial Grounds, The Architectural Designing, Engineering And Construction
And Commissioning, Of 40,000 Housing Units Of 3,4,& 5 Executive Bedroom Estates
Housing, 7(Seven Story Floor’s) 1,800 Executive Staff Flats Units, And Executive
Mansions Facilities, To Accommodate Senior And Junior (R.O.B)Fire Service’s Officer’s
And Motivate Them For All National Fire Security And Safety Task, Duty Or Assignment,
This Facilities Shall Be Commissioning By The,

• SEM President Patrice Talon, Of All Republic Of Benin (R.O.B) Fire Force
Basement, To Be Up-Graded Into A World-Class State Of Act Internal Fire
Operations And Peaceful Internal Fire Safety And Fire Alert Education Security
Training Basement.



Republic Of Benin Prison Services Public Education Committee (R.O.B).P.S
P.E.C).Chairman & Supervisor, Chief Of Prison Staff.
• As Effort To Pave Way For The Engineering Of Adjoho-Un Hpp Dam And Set-Up
Of Adjoho-Un Hpp Dam Commission,(Oueme River Delta Authority)(O.R.D.A).
• The Ministry Of Durable Development Chaired By The Hon Minister Jose Tonato
&Hon Alain Monsieur Ouralo, Regional Minister For Littoral.
• Has Awarded To A China State Engineering And Construction Company Limited,
Beijing China, And Cotonou, The Architectural Designing, Engineering,
Construction, Tiling Of All Basement Inter-Connecting Roads, Including Parade
Or Ceremonial Grounds, The Architectural Designing, Engineering And Construction
And Commissioning, Of 40,000 Housing Units Of 3,4,& 5 Executive Bedroom Estates
Housing, And 7(Seven Story Floor’s) 1,800 Executive Staff Flats Units, And Executive
Mansions Facilities, To Accommodate Senior And Junior Prison Services Officer’s This
Facilities Shall Be Commissioning The By; SEM President Patrice Talon, Of All
Republic Of Benin (R.O.B) Prison Force Basement, To Be Up-Graded Into A
World-Class State Of Act Prison Service’s And Peaceful Internal Prison Services
Reforms, Innovations And Technology Driven Advanced Basement. Ministry Of
Works And Housing Public Education –Committee(M.O.W H.P.E.C)(R.O.B)
• Ministry Of Health Public Education Committee.
• (MO.H. P.E C )(R.O.B)
• Ministry Of Water Resources Public Education Committee
(M.O.W.R.P.E.C)R.O.B).


Republic Of Benin Police Services Public Education Committee (R.O.B) .P.S .P.E.C),
Chairman & Supervisor. Chief Of Police Staff.
• As Effort To Pave Way For The Engineering Of Adjoho-Un Hpp Dam And Set-Up
Of Adjoho-Un Hpp Dam Commission,(Oueme River Delta Authority)(O.R.D.A)
• The Ministry Of Durable Development Chaired By The Hon Minister Jose Tonato
&Hon Alain Monsieur Ouralo, Regional Minister For Littoral Region.
• Has Awarded To A China State Engineering And Construction Company Limited,
Beijing China, And Cotonou, The Architectural Designing, Engineering,
Construction, Tiling Of All Basement Inter-Connecting Roads, Including Parade
Or Ceremonial Grounds, The Architectural Designing, Engineering And Construction
And Commissioning, Of 40,000 Housing Units Of 3,4,& 5 Executive Bedroom Estates
Housing, 7(Seven Story Floor’s) 1,800 Executive Staff Flats Units, And Executive
Mansions Facilities, To Accommodate Senior And Junior (R.O.B) police Service’s
Officer’s And Motivate Them For All National Police Security And Safety Task, Duties Or
Assignment, This Facilities Shall Be Commissioned By The,

• SEM President Patrice Talon, Of All Republic Of Benin (R.O.B) Police Services
Basement, To Be Up-Graded Into A World-Class State Of Act Police Services
training Basement, or college, to promote effective, efficient Internal Police
Service Operations, it is believed that this would encourage and also promote
Peaceful Internal and external Police services delivery, and encourage public
Safety measure’s And Public awareness of the importance for Peace, stability, and
security Education.


Republic Of Benin immigration Services Public Education Committee
(R.O.B) .I.S .P.E.C), Chairman & Supervisor, Chief Of immigration Staff.
• As Effort To Pave Way For The Engineering Of Adjoho-Un Hpp Dam And Set-Up
Of Adjoho-Un Hpp Dam Commission,(Oueme River Delta Authority)(O.R.D.A)
• The Ministry Of Durable Development Chaired By The Hon Minister Jose Tonato
&Hon Alain Monsieur Ouralo, Regional Minister For Littoral Region.
• Has Awarded To A China State Engineering And Construction Company Limited,
Beijing China, And Cotonou, The Architectural Designing, Engineering,
Construction, Tiling Of All Basement Inter-Connecting Roads, Including Parade
Or Ceremonial Grounds, The Architectural Designing, Engineering And Construction
And Commissioning, Of 40,000 Housing Units Of 3,4,& 5 Executive Bedroom Estates
Housing, 7(Seven Story Floor’s) 1,800 Executive Staff Flats Units, And Executive
Mansions Facilities, To Accommodate Senior And Junior (R.O.B) immigration Service’s
Officer’s And Motivate Them For All National immigration Security And Safety Task,
Duties Or Assignment, This Facilities Shall Be Commissioned By The,

• SEM President Patrice Talon, Of All Republic Of Benin (R.O.B) immigration


Services Basement, To Be Up-Graded Into A World-Class State Of Act
immigration Services training Basement, or college, to promote effective, efficient
Internal immigration Service Operations, it is believed that this would encourage
and also promote Peaceful Internal and external immigration services delivery,
and encourage public Safety measure’s And Public awareness of the importance
for Peace, stability, and immigration security Education.
OUEME RIVER DELTA AUTHORITY ( O.R.T.A ) &
Sinohydroelectric Power cooperation Limited Chine, Beijing.
Adjoho-Un HPP Dam Commission
( A.D.H.P.P.D.C ).
( 1 ) Chief Supervision Engineer ( Hpp )
Name: .Jean Peter Cloude Dossou & Professor clement Baglo.
Signature: .............................................................................................
Date: ......................................................................................................
Tenure Of Office: ..................................................................................
Field Of Specialty: Electric & Civil Engineering.
Name Of Institution Attended: ............................................................
Years Of Practical Experience: ............................................................
From: ....................................................................................................
To: ...........................................................
Deputy Supervising Engineer ( Hpp )
(2)Name:. Charles Balogun
Signature:................................................................................................
Date: ........................................................................................................
Tenure Of Office: ......................................................................................
Field Of Specialty: .Civil & Electric Engineering.
Name Of Institution Attended: ..............................................................
Years Of Practical Experience: ...............................................................
From: .......................................................................................................
To: ............................................................................................................
Member Engineering Supervising Department ( Hpp ).
(3)Name: Dr Serge Adjovi .
Signature: ...............................................................................................
Date: ........................................................................................................
Tenure Of Office: ......................................................................................
Field Of Specialty: I.C.T & Electric Engineering.
Name Of Institution Attended: ..............................................................
From: ......................................................................................................
To: ...........................................................................................................
Years Of Practical Work Experience: ....................................................
From: ......................................................................................................
To: ...........................................................................................................
(4)Chiarman Adjoho-Un Dam Commission
Name: ...Professor De Cruz .
Signature: ...............................................................................................
Date: .........................................................................................................
Tenure Of Office: .....................................................................................
Field Of Specialty: ..................................................................................
Date Of Appointment By President:........................................................
Name Of Institution Attended: ...............................................................
Years Of Practical Work Experience: ......................................................
From: .......................................................................................................
To: ............................................................................................................
( 5 ) Vice Chairman
Name: ..Professor K. Isidore Gandaho.
Signature: ..............................................................................................
Date:......................................................................................................
Tenure Of Office: ................................................................................
Field Of Speciality: ...........................................................................
Date Of Appointment By President: .................................................
Name Of Institution Attended: ..........................................................
From: ..................................................................................................
To: .......................................................................................................
TYPICAL ADJOHO-UN HPP COMMISSION
DEVELOPMENT STEPS:
BANK MAIN ACTIVITIES (DEVELOPMENT)
PERSPECTIVE:
PHASE 1: Oueme Delta River Site, Identification/Concept
I, Identification Of Potential Site(S)
II, Funding Of Project Development
Iii, Development Of Rough Technical Concept.
PHASE 2: Oueme Delta River Pre-Feasibility Study (A.D.P.F.S)
I, Assessment Of Different Technical Options.
Ii, Approximate Cost/Benefits.
Iii, Permitting Needs.
Iv, Market Assessment.
PHASE 3: Oueme Delta River Feasibility Study ( A.D.F.S )
First Contact I, Technical And Financial Evaluation Of Preferred
With Project Develop.

Ii, Assessment of Financial Options.


Iii, Initiation Of Permitting Process.
PHASE 4, Oueme Delta River Hpp Dam Financing/Contracts.
Due Diligence I, Permitting
Financing Concept Ii, Contracting Strategy.
Iii, Supplier Selection And Contract Negotiation.
Iv, Financing Of Project.
PHASE 5, Adjoho-Un Hpp Dam Detailed Design.
LOAN: I, Preparation Of Detailed Design For All Relevant Lots.
Agreement Ii, Preparation Of Projects Implementation Schedule.
By European Iii, Finalization Of Permitting Process.
Central Bank,
( E.U.C.B)(I.F.C )
(World bank)( W.B)
German Government,
( E.U.C.B),(I.M.F),
European
Investment Bank (E.U.I.B)
France Government,
Republic Of
Benin, Bank Of Benin
( B.O.B ).
PHASE 6: Oueme Delta River Hpp Dam Construction;
By Andritz Hydro Co-Operation Delchi Austria
Individual I, Construction Supervision.
Review Of Ii, Construction Supervision By (I.F.C )
Construction. International Finance Co-Operation.
PHASE 7: Oueme Delta River, Hpp Dam Commissioning:
Independent I, Performance Testing.
Review Of Ii, Preparation Of As Build Design If Required.
Commissioning.
List Of Hpp Membership Associations.
(1)Austria And The Republic Of Benin Society Of Civil Engineers
( A.R.O.B.S.C.E.)Member Republic Of Benin.
(2) International Task Committee On Pump Storage Large Hpp And Storage
Scheme.
( I.T.C.O.P.S.L.H.S.S).Member Republic Of Benin.
(3) International Hydropower Association ( I.H.P.A) Member Republic Of
Benin.
( 4 )International Commission On Large Hpp Dam( I.C.O.L.H.P.D ) Member
Republic Of Benin.
( 5 )International Hydro Energy Association ( I.H.E.A ) Member Republic Of
Benin.
(6 ) United Nations Environment Program me, On Dams, And Electric
Dams Development Projects.(U.N.E.P.D.E.D.D.P)Member Republic Of
Benin.

Estimated Time Required To Identify An Adjoho-Un Hpp:


Type Of Hpp Time Required For First Phase Assessment
SHPP 1 - 6 Months.
MLHPP 4 Months - 1 Year.
Medium And
Large Hpp.
OUEME DELTA RIVER AUTHORITY & ANDRITZ HYDRO-ELECTRITIC POWER
CO-OPERATION COMPANY,&ANDRITZ BEIJING CHINA.& Sinohydroelectric
Power cooperation Limited Chine, Beijing.Gross Electricity Generation
From Stored Pumped Energy In The Eu15 =CH16++ NO1+ IS2. Pumped
Storage Hydropower Plants As Well As Storage Hydropower Plants, Having
Additional Natural Flow, Store Energy In The Form Of Water In A Upper
Reservoir, Pumped From Another Reservoir At A Lower Elevation. The
Highest Generation Exclusively From Pumping Can Be Observed In
Germany, France, Republic Of Benin, And Austria.
FLAG COUNTRY CODE (GWH)
Austria AT 3, 536
Republic Of Benin BN 5, 770
Iceland IS 0
Belgium BE 1,100
Bulgaria BG 486
Cyprus CY 0
Czech Republic CZ 1,276
Hungary HU 0
France FR 4, 960
Germany DE 5, 921
Italy IT 1,432
Luxembourg LU 1,431
Spain ES 3,228
United Kingdom GB 2,739
Switzerland CH 1,567
Portugal PT 1,139
Poland PL 603
Norway NO 1,099
Romania RO 374
Latvia LV 0
Slovenia SI 283
Slovakia SK 271
Sweden SE 127
United States Of USA 13,765.
America.
DR Congo DRC 40,000.
Ethiopia ETP 6,020.
Angola AGL 2,020.

TOTAL (GWH) 99,147.


Oueme Delta River Authority, Republic Of Benin,&Andritz
Hydro Electricpower,Co-Operation,&Andritz Beijing China ,&
Sinohydroelectric Power cooperation Limited Chine, Beijing.
Installed Turbine Capacity Of Hydropower Plants With Pumping Function In
The EU14 CH12 +NO1 + IS2
Reversible Pump-Turbine/Motor-Generator Assemblies Can Act As Both
Pumps And Turbines Are Installed In A Numerous Of Storage And All
Pumped Storage Hydropower Plants, Italy, France, Republic Of Benin And
Germany Are The Top Four Countries For Installed Storage And Pumped
Storage Capacities.
FLAG COUNTRY CODE MW(Megawatts)
Austria AT 5,231
Republic Of Benin BN 4,080
Belgium BE 1,310
Bulgaria BG 1,013
Czech Republic CZ 1,172
France FR 7,115
Germany DE 6,822
Italy IT 7,592
Luxembourg LU 1,296
Spain ES 5,967
United Kingdom GB 2,744
Switzerland CH 1,839
Portugal PT 1,789
Poland PL 1,782
Norway NO 1,397
United States Of USA 13,765
America.
DR Congo DRC 40,000.
Ethiopia. ETP 6,450.
Angola AGL 2,100.

TOTAL (MW) 113,464


Oueme Delta River Authority, Republic Of Benin, & Andritz Hydro-Electritic Power Co-
Operation Company,&Andritz Beijing China,& Sinohydroelectric Power
cooperation Limited Chine, Beijing.
The Gross Electricity Generation From Storage Hydropower Plants
Generated By Natural Flow And From Pumped Storage Hydropower Plants
Plays A Significant Role Across Europe And Africa And In Meeting A
Carbon-Free Emission Energy System In Europe And Africa.
This Electricity Is Reliable And Generally Without Major Power
Fluctuations.
 Table Of Nations With Pumped Storage Hydro Power
Station.

 Country Code MW
 Austria AT 5,231
 Republic Of Benin BN 4,080
 Belgium BE 1,310.
 Bulgaria BG 1,013
 Croatia HR 2,930.
 Czech Republic CZ 1,172
 France FR 7,115
 Germany DE 6,822
 Italy IT 7,592.
 Spain ES 5,967
 United Kingdom GB 2,744.
 Switzerland CH 1,839.
 Portugal PT 1,782.
 Norway NO 1,397.
 Luxemburg LU 1,296.
 United State Of America USA 13,765.
 DR Congo DRC 40,000.
 Ethiopia ETP 6,020.
 Angola AGL 2,100.
Oueme Delta River Authority, Republic Of Benin, And Andritz Hydro-
Electritic Power Co-Operation Company & Andritz Beijing China,&
Sinohydroelectric Power cooperation Limited Chine, Beijing,
Technical Feasible Hydropower Potential In The E.U 18 +CH 1+NO1+IS2, A
Considerable Potential For Hydropower Exists But Investments Are Stalled
By Market Failures And Successes. A Stable Regulatory Framework
Ensuring A Level Playing Field For All Generation And Storage
Technologies Is Needed.

1. Flag Country Code GWH/A


1. Austria AT 56,000
ii. Republic Of Benin BN 56,700
1. Belgium BE 500
iii. Bulgaria BG 14,800
iv. Czech Rep CZ 3,380.
v. France FR 120,000
vi. Latvia LV 4,000
vii. Germany DE 24,700
viii. Slovakia SK 6,607.
ix. Italy IT 65,000.
x. Slovenia SI 8,800
xi. Luxemburg LU 140.
xii. Romania RO 40,000
xiii. Spain ES 61,000
xiv. Sweden SE 130,000
b. United Kingdom GB 5,311
i. Switzerland CH 41,000
ii. Portugal PT 24,500
iii. Poland PL 12,000
iv. Norway NO 300,000
v. Greece GR 20,000
vi. Hungary HU 4,590.
vii. Iceland IS 64,000
viii. Cyprus CY 23,500.
c. United States Of America USA 13,765.
d. DR Congo DRC 40,000.
e. Ethiopia ETP 6,020.
f. Angola AGL 2,020.
g. Total GWH/A 1,148.333.
DIPLOMATIC MISSIONS.
I Recommend The Establishment Of Diplomatic Embassies, In
Both Administrative Capitals, Delchi And Cotonou, Or Porto
Novo, Diplomatic Relations Between Austria And The Republic Of
Benin Should Be Strengthened.
In The Long Standing, Committed, Relations Of This Two
Nations.
Diplomatic and executive ministerial team lead by SEM President
Patrice Talon on a 3(three) day visit to the Republic of Austria,
based on his earlier communication, on phone with president of
Austria, and Alexander Sallenberg, and Sebastian Kurz chancellor
of Austrian government and team of executive minister’s
including other, ( Republic of Benin )( R.O.B)government
business meetings and negotiations with Andritz hydro power co-
operation ltd, Chairman/Chief executive officer wolfgang Leitner
and andritz hydro power co-operation executive board members,
in Delchi it was also an opportunity to strengthen, Republic of
Benin and Republic of Austria diplomatic relations.
On the second day of the President Patrice talon visit a state
banquet was hold in honor of the President and was decorated
with a national honor of the
(Austrian order of valor award)(A.O.V.A), for his exemplary
leadership in controlling infections, during the pandemic, in his
nation ( Republic of Benin) he lead and influenced other Eco was
nations to emulate and implement his infectious disease
controlling measure’s or strategies. Followed by a diner night
ceremony on the (3rd) third day with the president of Austria.
List Of Andritz Co-Operation, Hydro Electric
Sinohydroelectric Power cooperation Limited Chine, Beijing,
Large Power Station / Dam Contracts Fully Executed In
Africa.
 ( 1 ) Louca Hydroelectric Power Station/Dam.
 2,100 Megawatts ( MW )
 Angola
 At An Estimated Cost Of $4.5 Billion Dollars.
 ( 2 )Oueme Delta River Hydroelectric Power Station/Dam.
 With An Installed Capacity Of 4,080megawatts ( MW ).
 At An Estimated Cost Of $ 7.2 Billion Dollars.
 Republic Of Benin.
 ( 3 ) Renaissance Hydroelectric Power Station/Dam
 With An Installed Capacity Of 6,450megawatts (MW).
 At An Estimated Cost Of $ 40 Billion Dollars.
 (4) Cikandang, Indonesia Peak Power Station/Dam,
 with an installed capacity of,1300MW(megawatts).
 (5)


OUEME DELTA RIVER AUTHORITY,
MINISTRY OF ENERGY,REPUBLIC OF BENIN,
(R.O.B) & ANDRITZ HYDRO-ELECTRITIC POWER CO-
OPERATION COMPANY,&ANDRITZ BEIJING CHINA.&.
Sinohydroelectric Power cooperation Limited Chine, Beijing

OUEME DELTA RIVER AUTHORITY, MINISTRY OF


ENERGY,REPUBLIC OF BENIN,(R.O.B) & ANDRITZ
HYDRO-ELECTRITIC POWER CO-OPERATION
COMPANY,&ANDRITZ BEIJING CHINA,&.
Sinohydroelectric Power cooperation Limited Chine, Beijing.

HYDROPOWER CONTRIBUTES TO REACHING THE European Union E.U.


CLIMATE OBJECTIVES.
 The Hydropower Sector Plays Very Important Key Role In Supporting European
And The Republic Of Benin Clean Energy Transition To Reach Its International
Climate Objectives.
 Hydropower Is Not Only Highly Resources-Efficient (With 85% To 95%)But Also
Crucial In Fighting Climate Change.
 With Its Low-Carbon Footprint, Hydropower Can Provide Significant Volumes Of
Renewable Lo-Carbon Electricity, Both For Base And Peak Load.
 Once Built, Hydropower Infrastructure Can Generate Electricity For Many
Decades, Even For More Than 100 Years.
 For This Reason, Life-Cycle Assessments Of Hydropower Provide A Very Good
Carbon Footprint (Defined As The Total Quantity Of Ghg Emissions For Different
Electricity Generation Technologies Clearly Show That Hydropower Plants Have
The Lowest Carbon Footprint Among All Generation Technologies.
 Furthermore, Hydropower Even Contributes To Avoiding CO2 Emissions.
 Assuming That Hydropower Would Be Replaced By The Current Generations
Mix, Hydropower Avoids About 180Mt Of Co2 Emissions In The EU-28,
Equaling To 15% Of Total Power Sector Emissions.
 Research Even Shows That Each Mwh Of Additional Hydropower Generation
Leads To Saving Between 0.3 To 0.7t Of CO2 20.
 Moreover, Hydropower Shows The Highest Energy Payback Of All Generation
Technologies.
 This Means That Hydropower Has The Lowest Ration Between The Total
Electricity Output Over Its Lifetime And The Energy Needed To Build, Operate,
Maintain And Decommission A Specific Plant.
 During Its Long Lifetime (Up To 80 Years And Even Longer),A Hydropower
Plant Can Generate Far More Than 200 Times The Energy Needed To Build,
Maintain And Operate It.

Andritz Hydropower Co-Operation Hydropower & Sinohydroelectric


Power cooperation Limited Chine, Beijing, Plant Development And
Ministry Of Energy Republic Of Benin,( R.O.B )Low Carbon Footprint &
High Resources –Efficiency.

Hydropower efficiency rates (the highest of all technologies) 85%-95%

CO2-Emission factor 21(among the lowest values of 2.702g


all technologies CO2-
eq/kwh
el.

Avoidance of CO2 emission due to hydropower in


the sector in the EU-28 20
180MICO2(=15% of total CO2 emissions of the power sector.

Savings of CO2-emisions of each additional generated 0.3-


MWh hydropower20. 0.7t of
CO2

Energy payback ratio(the highest of all technologies) 170 -


280

ANDRITZ HYDROPOWER CO-OPERATION,& Sinohydroelectric Power


cooperation Limited Chine, Beijing, AND MINISTRY OF ENERGY,
REPUBLIC OF BENIN,
(R.O.B ) PARTNERSHIP FOR THE MAINTENANCE OF LONG AVERAGE
LIFETIMES OF HYDROPOWER COMPONENTS.

Hydropower components Lifespan

Generator Av.25-45 years.


Turbine Av.35-45 years.
Construction/Building/Dam 80years and longer
Adjohoun hpp dam Pump storage Hydropower Projects

 Hydropower’s Potential For Future Electricity Generation


 Some Hydropower Potential Left
 The Latest Publications And Data Clearly Show That There I Not Only
A Gross Theoretical Hydropower Potential But Also A Considerable
Economically Feasible Potential In Europe And The Republic Of
Benin-Mainly In Norway, Sweden, France, Austria, Republic Of
Benin(R.O.B),Italy And In The Balkan.
 The Technically Feasible Hydropower Potential In The EU-28,&
R.O.B(658 Twh/A)Plus Norway, Switzerland And Iceland Equals To
About 1,000twh/A,A Number As High As The Sum Of Germany’s And
The UK’s Total Gross Electricity Generation In 2017.
 Subtracting The Already Realized Potential From The Technically
Feasible Hydropower Potential Left In Europe & Republic Of Benin,
(R.O.B).Hydropower Facilitate The Integration Of Wind And Solar
Power.
 Hydropower Ha Provide Significant Amounts Of Balancing Power,
Facilitating The Efficient Integration Of The Constantly Increasing
Shares Of Variable Renewables Such As Wind And Solar Power.
 Due To The Projected Increase In Variable Renewables (See Graph
On Accelerated Deployment Of Variable Renewable),The Importance
Of Hydropower Will Rise In The Future, Even Though Today’s
Predictions For See Hydropower Generation To Remain Roughly
Constant.
 Hydropower Will Provide The Future Power System With Storage Or
Pumped Storage Plants And Flexibility Services, Thus Allowing For
Higher Shares Of Wind And Solar Power Without Compromising
Security Of Supply And System Stability.

Accelerated deployment of variable renewables:


Historical and projected net electricity generation in the EU&ROB-28
Historical and projected net electricity generation in the Eu-
ropean Union,EU &Republic of Benin,R.O.B-28
indicator SurveyChart.
Y- Axis
TWh

1.9585

3.0065
2000-2050
17.05

1.905

0.00% 200.00% 400.00% 600.00% 800.00% 1000.00% 1200.00% 1400.00% 1600.00% 1800.00%

X-Axis

Republic of Benin2 European Union2 Republic of Benin European Union

Republic of Benin,(R.O.B)Power Import Chain, From 1961-2021.


Republic of Benin,(R.O.B) Power import Chain,
Chart.

2011-2021 550% 4080% 18.00%


38%

2000-2010 800% 3080% 9.00%


69%
Turbine Type
Y-Axis

1980-1990 300% 2080% 16.50%


70%

1961-1979 400% 1080% 22.50%


60%

0% 500% 1000% 1500% 2000% 2500% 3000% 3500% 4000% 4500% 5000%

Capacity (MW)
X-Axis

Republic of Benin (R.O.B) Andritz hydroplane uk Akosombo Dam

Republic of Benin,(R.O.B)Power Export Chain, From 2020-2060.


Republic of Benin,(R.O.B) Power Export Chain,
Chart.

2011-2021 550% 4080% 18.00%


38%

2000-2010 800% 3080% 9.00%


69%
Turbine Type
Y-Axis

1980-1990 300% 2080% 16.50%


70%

1961-1979 400% 1080% 22.50%


60%

0% 500% 1000% 1500% 2000% 2500% 3000% 3500% 4000% 4500% 5000%

Capacity (MW)
X-Axis

Republic of Benin (R.O.B) Andritz hydroplane uk Akosombo Dam

Energy Storage Mandates/Targets


in Republic of Benin, (R.O.B)
Regional or Department, Power
Supply Chain as of March 2022.
Regional Hydropowe Year Target Policy
Target r Target. Type Document.
Generation
Target.
(MW).
Abomey 5 MWh (for 2020. Mandate AM 92880.
Metropolitian
Assembly. each utility
serving more
than 25,000
customers)
Adjohoun 2,000 MW 2030. Target AdjAssembl
Metropolitian y No. 3723.
Assembly(A.M.A
)
Abomey Calavi 1,500 MW 2025. Mandate AC CASE 48-
Municipality
(aspirational A-3311.
goal of which
350 MW are
mandated)
Parakou 1,000 MWh. 2025. Target PK8170.
Metropolis.

Adjohoun, 4,080 MW 2025. Target AMA 262. —


Hydro
Megawatts.
electritic
Power
Plant.
ANDRITZ Hydro& Sinohydroelectric Power cooperation Limited
Chine, Beijing, has more than 180 years’ experience in turbine
technology and 125 years’ experience in electrical engineering. Find
hereunder a small selection of references and even world records.

 Cleuson-Dixence, Switzerland
 Two world records for the most powerful Pelton turbines (3 x 423
MW) and highest head (1,883 m).
 Sihwa, Korea
 Electro-mechanical equipment including 10 bulb turbines (26 MW
each) for the world's largest tidal power plant.
 Largest tidal power plant Sihwa in South Korea
 Tarbela Dam, Pakistan
 World's largest bifurcation (diameter 13.2m; height 16m); Guinness
Book of World Records
 ( 1 ) Louca Hydroelectric Power Station/Dam.

 2,100 Megawatts ( MW )
 Angola
 At An Estimated Cost Of $4.5 Billion Dollars.
 ( 2 )Oueme Delta River Hydroelectric Power Station/Dam.
 With An Installed Capacity Of 4,080megawatts ( MW ).
 At An Estimated Cost Of $ 7.2 Billion Dollars.
 Republic Of Benin.
 ( 3 ) Renaissance Hydroelectric Power Station/Dam
 With An Installed Capacity Of 6,450megawatts (MW).
 At An Estimated Cost Of $ 40 Billion Dollars.
 (4) Cikandang, Indonesia Peak Power Station/Dam,
 with an installed capacity of,1300MW(megawatts).
Three Gorges (Sanxia), China
 Turbines and generators for the world's largest hydropower plant.
 Successful example of cooperative approach
 Kamolot, Uzbekistan.
Hand in hand with nature
 Traunleiten, Austria
Murkraftwerk Graz, Austria.
 Commercial operation has started
 Kawarsi II, India
 Challenging terrain.
 Schils, Switzerland
 Renewal and energy optimization.
 Overcoming challenges
 Pakistan, Gulpur.
 Achieving climate goals
 Norway, Nedre Otta
 Meeting sustainable energy needs
 Ghana, Kpong.
 News on HPP Assiut, Egypt
 PAC for all four units achieved.
 News on HPP Lysebotn II
 PAC for turbine and generator achieved

 contact us
 ANDRITZ HYDRO GmbH
 contact-hydro@andritz.com
Types of Dams
Dams are classified according to their
Function Served
Storage dams: for permanent water storage
Detentation dams: for flood retention.
Diversion dams: The water level is raised to divert water.
Debris dams: To hold off sediments
Coffer dams: to divert a river.
Gravity Dams.(China )
Run off River Dams.
Pump Storage Dams.
Storage Dams,(R.O.B )Engineering Hydroelectric Power Through Using the
Following Rivers.
(1)Niger River Basin Authority, (2)Kiko River,
(3)Oueme Delta River.
Heights (Classification according to international commission on large
dams (ICOLD)

Drafted & Written by;


Professor J.W.K.D.Adjoho.
Energy Sector Analyst.
Date;24th-03-2021.
Signature:……………………………………………………………………………………………………………………………………………