Prat yr GB CREST BUILDER SDN. BHD. MAIN BUILDING WORKS FOR CADANGAN PEMBANGUNAN 1 BLOK HOTEL 44 TTINGKAT (317 BILIK) DENGAN 2 TINGKAT BESMEN YANG MENGANDUNGI i. 2 ‘TINGKAT LOB! DAN SERVIS (ARAS TANAH & ARAS. 40) 1 4 TINGKAT RUANG MEKANIKAL DAN RUANG PEKERJA (ARAS 1. ARAS 4) ti, 34 TINGKAT HOTEL PENGINAPAN (ARAS §- ARAS 38) iv. 6 TINGKAT KEMUDAHAN REKREASI / KOLAN RENANG (ARAS 39 - ARAS 43, TERWASUK ARAS 40 MEZANIN) v. 1 TINGKAT RUANG MEKANIKAL LIF (ARAS 44) vi. TEMPAT LETAK KERETA MEKANIKAL BERTINGKAT (ARAS TANAH - ARAS 18) DI ATAS LOT 700,791, 792 & 793, JALAN IMI, SEKSYEN. ‘67, KUALA LUMPUR, "WILAVAH PERSEKUTUAN UNTUK MEGA’ “CAPITAL DEVELOPMENT SON BHD PROJECT QUALITY PLAN Sa SS Ce PREPARED BY: GAGC ENGINEER REVIEWED BY: HEAD, aAGC Name: Mazlaigs Masa Desinaton: AGC Enghaer lation "ene Manager QAQC bai Dat ‘APPROVED BY. PROJECT MANAGER VERIFIED BY: SUPERINTENDING OFFICER ams: Chen Ghee Leong Name: Decaation Project Menage Company Date Dat Name & Strate oa” MAIN BUILDING WORKS FOR CADANGAN PEMBANGUNAN 1 BLOK HOTEL 44 TINGKAT (317 BILIK) DENGAN 2 TINGKAT BESMEN YANG MENGANDUNGI: |. 2 TINGKAT LOBI DAN SERVIS (ARAS TANAH & ARAS 40) i 4 TINGKAT RUANG IMEKANIKAL DAN RUSNG PEKERJA (ARAS 1 - ARAS 4) li 34 TINGKAT HOTEL PENGINAPAN (ARAS § - ARAS 38) iv. 6 TINGKAT KEMUDAHAN REKREASI / KOLAM RENANG (ARAS 39 - ARAS 43, TERMASUK ARAS 40 MEZANIN} v1 TINGKAT RUANG IMEKANIKAL LIF (ARAS 44) vi. TEMPAT LETAK KERETA MEKANIKAL BERTINGKAT (ARAS TANAH - ARAS 18) DI ATAS LOT 790, 791, 792 & 793, JALAN IMBI, SEKSYEN 67, KUALA LUMPUR, WILAYAH PERSEKUTUAN UNTUK MEGA CAPITAL DEVELOPMENT SDN BHO PROJECT QUALITY PLAN RevO "MAW Bus WORKS FOX GROANGAN PENOANGUNAN 7 WLOKWOTELEYTNGKRT ELT BU) | ‘Devon? rnc Bsn vate MaaDUN 2 THGKAT COB DAN SENS LAS ANA TINCT RUAN MEXAMIALOAN RUANG PEEHIAARAS1-ARS 38 eanasaa ‘war HOTEL PENGIMAPAN (AAS =ARAS 4 THAT KEMUDACAN RENNES] KOLAN ent anas39 anna, xtAavx AUAS 0 teAU 9 TGRAT RUAN ERA Cee) | (se) Tetra (TAK KENTA MEXANIAL BERTIGRAT(ARAS TAMA aS 3 ATAS| or 790,792. 783, LAN, SEVEN, KUALA LMP, ULAYAKPERSERUTUAN UUNTUKIAG CAPITAL DEVELOPMENTSON BNO. et: ES/CAPRTPOP feed [atoms ie Pag Lots ‘TABLE OF CONTENTS PROJECT QUALITY PLAN AMENOMIENT AND REVISION RECORDS pisrmauTion ust Genera 3A Scope 32 Quality otey 33 Project Qulty Objectives 3.4 Project Onaniation chart ‘CONTRACT INFORNAATION PRouEcr DEScRPTION 5. Scope of Work 52 Pre Contraction Stage 53. Consructin Stage and Sequence of Works 5 Post constriction Stage 55 steLayoutPian ‘appended ‘PROJECT ORGANIZATION 661. Ghent and onsltans Team Partie 652 Main Convactor Oniation Chet event {63 Main Contactor’ Team Partcdars nd Resporsibltes PROJECT ADMISTRATION 7A Stautry nd Regulatory Reairement 72. Control of Documents 73. Conrolotnecrds 74. Progress Metings 25 inspectonand Test ian (17) Appendiec 75. Inspectonana Test Status 12- Work Wetted Statement Ust Appendix 73. Progress port 73. Work Maer Propane pendix 720 Conta af ontring and Messing Devices 71 Ineral Guay Ava 732 Control Non-Conoring Product 743 Inspeetonand Testing 7136 Preventive Action aa ea a ean {asic tmcent Rae ava oan Rone Pein ane ANAS ae Peis) |sictcraeantacransh staan Be aha eee LUNTUK MEGA CAPITAL DEVELOPMENT SON BHO ne [ net wo: cse/caayea? evo [ethoate: raa2018 Page 2023, 8 APPENDICES Appenctx Se Lopstilan & ste Layout Pan ‘opens 8- Project rganzation Chart ‘Append nection & Test Pan (TP) ‘ppendiO-Lstof Genera Method of Statement ‘Append E Master Programme Append Inaevon Check ppandi Ls of Genera Form 1.0 PROJECT QUALITY PLAN AMENOMENT AND REVISIONS RECORD ‘amendments ad esos inthe POP are summa below: Pages fevsion | Ruston Date GB ‘wai Boins WORKS FOR GROANGAN PROANGUNAN 1 BLOX HOTEL 44 TNGRRT GL UTR ‘DENGAN 2 TINGAT BESMEN Yas RELGANOUNGI 2 KAT LOB DAM SNS [ARAS TAKA ‘Eas ag NK RUG HEAAMIEAL DAN RUA PORERIA (RAS ANAS) 38 "INKAT HOTEL PENGINAPAD ARAS ARAS 30 6 TMGRATKEMUDAAN ERNE / KOLAR Ramm, | ica rnsr teria soon eer sat sain 5/0 | (or 7, mi, 7828 783, JALAN MB, SECSYEN 7 KUALA LUMPUR, WRAYAN PERSEKUTUAN Ut ca Stone Ten eroipan [wo [ eons as [paar 20 oxsunonusr The following personnal shal be sued canvled copies ofthis POP. They elas be provide tall future smendrent and resion tothe sme Repreducton ofthese POP in any form is not permited unless is authorized by the QAGC Department Name Company Designation | Copy No ‘ae Puniths vathanar Ra crestouier | Senioranager | Master ‘Sin Bh ‘oxac ‘Me Chen chee Leong euauier | Poe nase 1 | wai aut WR FoR CADANGAN PEMANGUNAW XaLOXHOTELATTNGRAT 17 BUR) —] Tar Wort PENGMAPAN AAS 5 = ARAS 38S TINGRAT KEMUOAAN RERRES/XOLAM rena tes nna, Tennsc-an 0 MeEAMN)¥eLTMGRAT RUN ERA ‘tes a) eb Tak RETA Mean BENTIMGRAT (AAS ANAM AAS 8] DATS Bia rsebaler SP | (yg, 292 4735 ALAN I SESYEN 6, KUALA LUMPUR, WLAYAN PERSENUTUNN a Ne: S/EAPRUPOP revo [tone Raaoue Pagar 20 Genera 3a Scope aa ‘This Project ality Pn (PP) sal describe nl about the projet and all ea members who serve this projet thrcugh a stategy by placing quly asthe provi shal spec the quay practices (e.g operaing plies, quality management system procedures and work method Statements tbe folowedin meeting the dent's requremens This POP shall be reviewed and updated every thee 3} month oe as when required 0 Incorporate any changes or amendment sring. Snir Project Manager Project Manage hal Uupiste any changes and obtain approval rom Execute Deir ~ Projet. Thereafter the POP amendment recor wl be updated an authored an ora amended page according the oar inthe Ostribton it “he olde is esponsle to destroy superseded document and replace it with the amended or latest copies. ualy Poy ‘rest suler Group provides construction and infrastructure works and series related to the Industry shall comply with our Qualty Poley 35 follow and inline with ISO 50012035 2). Consistent reeting our customer's and iterestd parts expectations 3) Contra even mero ou quality of prosts and services ©} Comphing with all apcablecomplance obligations to which our company subscribes 4) Promoting and communicating the Qualty okey to al employees inching persone working on bt an ensure waabe tothe ple 2} Establishing clly objectives and target based on the evaluation on the rk managerent of ur bsiness ets products ana saves 4) Be proactive and ste for contnul improverient of our procestes and the Quay Management tem 4) Prong conanuouswaring to employees and externa partes to nculeate an Iterated Management Stem Be "Wav 90 NG WORKS FOR CRDANGAN PEOANGUNAN TAX WOTEL A TNGIRT 7 HI [DeVGR naa sna ve MaANDUN 2 KAT COB DAN SENS ANAS TAMA "INGKAT HOTEL PENGINAPADARASS-ABAS 30 6 TEVGRATKEMUDAKANREERESI/KOLAM Ieuan furs aaa, ents atas ten TONE AAS renters | (995 40s TEPAT ETA ERETA MIKANKALSERTMGEAT (MAS TAMA AaKS 1) 28S or 70,72 753, LA, SEVEN, KUALA LMP, ULAYAHPERSERUTUAN UUATUKWAEGACAPAL OEVELOPMENTSON BH [ret no casuycaraiece ‘ev:0 [ett oate: 12.2018 age 5023 as Pree’ Quay Objectives The managoment ane staff at Crest Buller Sn Bh shall sive to achieve the flowing poet ‘ust objectives: 8) Toersira> 80% project dalvry on ee foreach pecoct. 1») Toresove te Gartfeate of Prstzal Congleton (CPC) win 1 woe rm te speced data Inthe contactor any een date approved cent ©) Toschiove actal progress sot delayed > 5% am scheduled progres in fair {To nvesiata ad eso cent complan dung corsucion within aroud tne tame of 3 ‘mone om nen ©) To receive Coseato of Making Good Defers (CMOD) at speliag ex dete of Deer, ity DLPY into arace (5) cre s/0 ‘ain Bots WoRKS FOR CRDAWGAN PaAGANGUNAN 1 LOK HOTEL 4 TGA 37 BIT ‘DeNGaw TMGKAT BEEN YANG RANGRNOUNGE 2 INKAT LOB DAN SMS (ASTANA, {Ea MAT RU MHAEAL DAN ANG PRERA ARS ANAS) 28 “NAT HOTEL PENGNAPAN RAS ARAS 30 6 IMGT REMUDRIAN RERREASY/KOLAMA ‘RNA (433 aA ERASER AMAS ECAR). IMGRAT RUAN RAR (ass Teva TAK ENETA MEXAMIKAL BEATINGHAT (AS TAMA AGAS8) 1 RTAS {orn iat, ao. 725, ican seven, xUALALOMPUR Waa eRSEAUTUAM [UnTUKHEGA CATAL DeveLoMMENTSON AH et Ne SAPP feria [tomas 7018 page 3 4.0 CONTRACT INFORMATION Contract No. Way OTE: 4¢TINGEAT (317A OENGAN 2 INGKAT BEEN YANG [E TINGKAT Loa DAW SUR AAS ANAL AAS 0) “Twa RUAN KAN O44 RANG PERERIN (aus aRaSa)| 1M, SOTNGKAT HOTEL PENGIAPAN (AAS ARS 38) Mea wetuoananeneRREAST KOLA RENAN, {Aas 39- ANAS, TERMASUK AAAS 40 MEZANIN) Shear nae tae (nas) Ter tae Retra ROR BERTINGKA (RAS "awa annsa) D1 ATASLOT 79,791, 752893, JALAN MB, SEISYEN 67 KUALA Unum, LATA PERSEKUTUAN UNTUR ORG CRBTA contract Sum a 269, 500,000.00, Date of Ske Posen 2 snuary 2028 Date of Completion 2 Apt 2021 uraton so montis Deft aity Period ra months Liquide & Ascertzined Ru, 000.00 pr day Damages Workmen Compensation 2) Pated 1 Poti No 2) Period Poe Ho ‘of contac som = RN 7 lion emain vali for fllcontrac period & 3 months GB "Ain BULDING WORKS FOR CADANGAN PEIDANGUNAW 1 BLOKHOTEL€TNGERT GH BUR ‘Devan rnc Bese Yas MELGANOUNGK 7 GKAT OO DAN SIMS (ARAS TAMA, ‘Eas as MCHA MAG HANANNEAL DeN wu eked ANAS) 38 "NGKAT TEL PENGINAPAD RAS 5 ARAS 38 6 TINGRATKEMUDAAN RERREASL/ KOLAR ‘ena (nAs39- anna, Yenwasur AS tPA). LFNGRAT RUAN saa UF mm | tas ete saat Lean nunera Mexia tensa amas ANA ANAS 2) ATAS or 90,7 53 tay SesveN 6, KUALA LMU, UHAYAKPERSERUTUAN ey fevid [etowes zaie | aee7orms 5 Scope of Work Te sop of war compris te cnstucton and completion of superar wot for Hck ot at storey heel (17 rors) wth 2 storey taser nud) 2 trey Wy a ever trond oo er) storey mechanical nd worker rom (eve eve) 38 sorey Sezommodatos (Le S~ ee 8) ore fr recent itis swimming pol se 59. Level lg Level #0 meaning) W) 1 srey mechan Yoon (eve 4) imlory mechanical park (Gourd oor ~ Le 8), sweat wes th Ariel Wore i) Mae Wore ¥) aera! Wooo estucure Mons 1) Uanisape Wats twee 52 Preconstruction Stop 1) To appoint Senior Project Manager / Project Manager / Senor Projet Engineer forthe project andesblsh construction eam a pet approved Organon Char 1) Propare Work Programme Based on the Outine Tender Work Pograrnme subi luring ender soge ii) Prepare Toys pan for temporary facts and tities with consideration a she onan andcansta. I) To sebmie necessary docaments to relevant authors for requred permis before Commencement of work on ste +) Weshal sub bond andnsranc as rue inthe contract. W) Mobilize and sup temporary fates ard ules as per approved lop pan vi) Procurement of supplies and subconactors, Study constuction drawings and daly ary {ueriesin ance of constuction work to ensure smooth progress! work vit) To carryout survey work tocheck on editing ste satin ot anda ull structures elo ammencement of work. 13} Toprepare eject Quaity anand Heath & Safety Plan fr implementation on te, "aan BULBING WORKS FOR CROANGAN PEMBANGUNAN x LOK NOTE 2 GAT 7 BT [DENGAN 2 TMGKAT BESMEN YANG MMNGANOUNGE 2 IKAT OBI DANSE (ARAS TANI. ‘Ens TAT UAL AAA DAN ANG IRENA ARS AAS) 28 TAT HOTEL PENGINAPAW RAS ARAS 3 6 TINGHATKEMUDRWAN RERREASI/KOLAM ‘RNA 4533 - ,YERMASURAMAS 0 meCAU 7. TIMGRAT RUAN RAIN (ans to Tera era RETA MECAMKAL BERTMGHAT (AAS TNA AHAS 8) RTS reseBuee SI | ran, 702.8 795, IALAN i SEKSYEN 6, KUALA WMPUR, WLAYANPERSENUTUAN [UMTUKCHGA CATAL DevELOMMENTSON AHO et ne SAPP fevio [tomar 2018 Page 801 53. Construction stage ard Sequence of Works sa ss Site moiaton plang wil consist of plening of tower cane latin, poser holt 88 fe, storage yd guard pos ee. ofr Appendix Sh Logit Pan The works are dive nto ares an working trades. The sequence of works I 35 shown nthe Werk Programme wth the consideration of priors area fr sectional handing ove resources tte conton andconsrit 531 WorkMethosiogy 1) Convertina formark tom ground evel unl Level 18 and system formwork for level 1 ems willbe wed for hs project 1) Covert wil be supplied by ready mix concrete supplier and poured by ung towereranes, mobile eras ana concrete pu, i) A&E services ae under CB Tech Sdn hand this specaeed work wil be ‘rove with shop drawing, inspection and tes plans, spetion checklist a ‘work meted statements blor commencement of work 532 Plantand Mathinery ‘Major plants tothe deployed fr this project are mainly tower cranes, moble cane and ‘aneete pump, concrete mr, passonger ht, fuse chute ad ete Post Construction tage ‘Any defects ented during these patods sal be handled at per non conformance proce ‘As Suit drawing, certs, wartanes and 0 & M maial shal be prepared or obtained fom ‘ubeontractore upon exmpliton ofa contactor ade where appa Upon completion of the projct he project fina account sabe tne, Site ayout an Pease refer to Append 2 for sit yout pln GB cst eers/0 "RW Bs WORKS FOR GRDANGAN PEHOANGUNAN YBLOK HOTEL 44 TNGRT 1 BUR (Devo: TING BEM YANG MENGANDUNGY 2 TIVGIAT LOM DAN SETS [ANAS TAMA ‘tanasaq ie Thar RUAN HxABIEAL OAK UA ooRENIA nae ANAS) 38 "WNGKAT HOTEL PENGINAPAD ANAS 5 ANAS 8 6 TNGRAT KEMUDAHANREERESI/KOLANE outa (nas 39a, Tents Anas 0 ten TRENAT AUN EN (has 4, TeMPAT ETA ERETA MEXANKAL BERTNGHAT (ASTANA ARS 1) 01 ATS or 7s, 1,72. 783, 8. SES¥EN, KUALA MPU, AYA PERSERUTUMN UNI WEA CAPITAL OEVELOPMENTSON BNO Re No: S/N TPO? reco [@tome: miao8 Pages 60 PROIECT ORGANIZATION 61 Clentand Consultant Team ‘chet {Wy meg Copia Development Sn hd L128, Wisma Wont ara lon Kiva, Mont Kare 50980 Kus tompur ‘eho3.6n13 3178 arc, ‘fs Pokaan Reka okt Sn hd 4, Jan Dato Ha Eso Komplks Dama) 0400 Kuss Lumpur et 03-4000 3812 Fo 03.4000 2827 esign architect sco Aeetects ees Teck Lim Read, Sngspore 056365, Te 65-6308 5458| Fa 65-6328 5450 Cov & tract ngiser | ADG Matix Conauiting 1446 loc £2, Oataran Prima Jaan PU 424 49701 Petaling aya Selangor dar san ‘els03-7890 1817 Fo 03-780 1816 Fngneer Mechanical & Bete | Nov (4) Sdn ahd Unit 803, lek 6, Pho Damansara 2 talan igh 46350 Petaing re Selangor dart Ehsan {eon 73508871 Fc o3 7508872 Landscape Architecture Prac Design Sdn Bh 5-4, BangunanPerdgangan 07 £00 lan Sen Senne 51000 ent, Kuala ump e05 4007 3466 ‘Hn OBI WORKS OR XDANGAN PaRANDNANY BOR HOTEL A GAT 337 ‘Duca Tena SSE vw HNCATOUNGL GHA OO SENS ARASTARA ‘ans ana aea nue tas De Rn Deka ana aN) ae ‘cca Hore PGP (AAAS 5-ARAS 8) RAT EUDAAN EMEA] KOARA ‘zfs nena asset an RAN AA resets | fam, aa anna eee KOMAMDR AR PERRO ‘et Nor CISB/CAPRRYPC tov: [et Date: 1212018 [Pave tooras Interior Designer ‘ls Woter studio Sdn hd 2:1, BlckE, Second Flo Megan Avene 189 aan Ton Rak 100 Russ Lumpur Tel 03-2168 4689, Fc 03-2698 2854, Facade Constant Meiohardt Fagade Technolony (S)P/Sute 17.02, Level 17, Amoda, 2 salon i 5100 ula Lumpur Tek 03-27109488 Llgting Censutane Nips Pett EI Mie oad 03-13 ational Desan Centre Singapore 188968, 566956233 Kitchen Constant Spacesced Desien Bama Buble Perl Taran Bt Perma e100 cheras ek 9-244 3691 Noise & vibration constant | Universit Teknologi malaysia (UT¥) Jaan Sultan Yahya Peta Tek 03-2615 4995 Fo 03-25932854 Quanity Surveyor Norther im Pruning Sn he 24 Bock Glrse Busnes Centre No.0sen Sf talons ays 47301 Petaling ya ‘03-7208 8138 Fa 03-72049107 B crsesuoers/s | (AS, "HN BULDING WORKS FOR ADANGAN PERANGUNAN # BOK VOTE 24 TGRAT 37 BH) ‘ene Tncear GES Yes MENGRNOUNGL 2 GAT 03 DAN SEIS (ARAS TAN ‘Bas a NCAA RUAN MTKARIEAL OAM RUAN PRERUA AA 3 Aas) 2 “GAT HOTEL PENGINAPAN RAS ARAS 3) 6 TINGERTKEMUDANAN RERREASI/ KOLAMA ‘Renan (4839 A338 YEUOASURAMAS 0 MECAN)¥.LTNGRAT RUAN MURAL UF JM TEMPAT LETAKEMETAMERANIAL UERTINGHAT GAS TARA AROS) RTAS {or 0, a 7924799 LAN ay, SEY 67, KUALA LUMPUR WHAVAW RASERUTUAN a CVC fevc0 [Atoow: 018 Foae 110128 62 Projet Organization hart ‘The projet oganieion chart shal be spprovedby SO Aefer Appendix 8 >rojet Organization chat ain ‘RISE BUILDER SDN BHD. | Yore Shane Ming Contactor Managing Detor (iey pescnne Yong Tok eng Behttock ua Beste Ofcer ith Devan Nair Kale ead of WSSE Dept chen chee Leong Project Morager Senor Manager NGC lye Tuck Yow Contact Manager erey tg Techni Manager David Leong MRE Manager spum Purchasing Manager ober tam Pant & Machinery Manager, SHooh eco nance Manager (63) cenbaeers/2 "ATW BOG WORKS FOR GADANGAN PMIBANGUNAN 1 BLOX HOTEL 4 TNGRT 7 UR Devan rca asta vas LGANOUNGL 2 TGRAT LOM DAN SIMS ANAS TAMA ‘ease MCHA RANG Hat¥aea DAN RUAN PoREiAARAS ANAS) 38 "INGKAT HOTEL PENGINAPAD ANAS 5 ARAS 38 6 TEVGRATKEMUDAHANREEREASI/KOLANE Renan (nas 39 Anas, enWASUR ANAS MECNN) TRON UA ena Cas eto Tesaar Leta neta cxanienttenrivenaatas TAMA ANAS 3) ATS or 7,29 953 Le SExSYEN 6, KUALA WMP, UAYANPERGEROTUMN ee: SP HTPOP ‘vie [etowe: miaoi8 Peo 5.3. Maln Contactor Team members Panels and Responsible 0. ‘Name Deimation — Responsibies offer + Toplanand mento project, 4 Tecaordinte aroureoraocaton for rect, 4 Tocnsure aks are implemented a projet 1 Apron of the Projet Gusity Pan ‘verallesponsbty and authority forthe total project management. Coordination ad cons fr the projct ata Adminstration of tho project organ. ase’ rpresentatve 150 egal wsting the projec ste and work ocation and attending project meeting approprate 1+ Responsible or ensuigthat the project ealty and emironmental management ste, that anna be resved tough the normal procedors. ‘+ Ensuring te project budge ard roftabity laigets ar achive ‘+ Ensring the projet iar is adequately resourced to manage the projet ‘+ Rosposil for ensuing that he projec quality management stem netablshed,docomente, and implomenta to meet C8 Employers 1 Ssopuarsing OS® interests n mater relating ‘compliance with the egltons and requirement. Project orator Projet Marager + Head of overall project team Oversea the smooth operation on al aspect at project ste Ue wth tents and constants + To contol and management of the construction + Toensure project quality standard try lowed 1 Te coordinate of overall construction acts and To meet the scheduled physical progres of project. To sched, revew and monitor progres of work, Toreview work ethad statement Te handle ad cent complaint atthe ste To manage project gudelinetandaed creeuieersy | (AMS. "Hin SULDING WORKS FOR CADANEAN POMBANGUNAN 1 LOX HOTEL 44 TGEAT (7 HOR Dew TGA BSR aN MENGADDUNGL 2 TINGHAT LOI DAN SERS (ANAS TANA Eas ais TNGEAT RUAN MRANAL Dad RUAN PERE (ARs XARA 4) 28 ‘TNGUAT HOTEL PENGINAPAN RAS ARAS 3) 6 TINT REMUDAIAN RERREAY/ KOLAM ‘nan (4339 43 <8 YEUOASUR ARASH MEER) INGRAM QAR $M TEMPAT ETAKERETA MEKANAL BERTINGHAT (AAS ANA -ARAS 1) ORAS {70,1 7928793 JALAN ay, Eye 67, KUALA LUMPUR, WLAVAN PeRSEAUTURN Re Ns CVPR fev [eoow mazes | eos 04, Assistant ject Manoger 05. castngncer 06. areiect Coordinator 07. ste upervioe To asst projec manager to cooaae af evel cosiruion eis ans manpower Supervision for subcontractor’ construction work ‘sss projet manaper on review ane approval for the subcontractors work and test procedure Sst project manager to marage projet Budeine stander ‘asst superior in planing, Implementing and monitoring constuction acute and resources 1B report nancenformanceacites and fo ecu withthe relevant personnel on covredtie. and prevenve actions. Te rae requer for Information to consultant and fotonup To check all construction drawings, Nghight dscrepancis and eso To asst PIC the over planing,scheculng and tracking of construction ett “To prepare progress report, loc planning and method of constuction To suporise architectural works atte Coordinate with cent, engineer, areects and subcontractor regarding architectural ses Assst_ Projet Manager in project planing, ‘coordinate and oversee all architectural fishes ‘work at te Supervise day today operation of project nd ensure AV relted ecitecturl works ne cari ot 3 par eaings Asst superior inspection ard supervision of se ror 1a check on mtr recog check for materia elven 1 check before, during and ater constuction a hghieht non-conforming setvies to sbeonractors rng te epecton “a ensue projet document and record ar boot cxery and aatableat all times ia seo “o prepare Site Diary report on CAS / architectural "Bos WORKS FOR GRDANGAN PGNBANGUNAN 1 BLOK HOTEL TNGRT G7 [BeNOR TNGKAT Bes Yas =XGRNOUNGE 2 GKAT LOM DAN SIMS [ANAS TAMA re) {Ears MCHA RUAMGHa¥aea DAN RUA PeREIA nae ANAS} 38 TINA HOTEL PENGINAPAA (ARASS-ARAS 38) 6 TIMGRATKEMUDARANRERREST/ KOLAR Ceti, | (AS 8 TEMPAT ETAKKERETA MORANIKAL ERTIRAT(ARAS TAMAR AWS 18] ATAS ‘| Cor7an, ms, 72875, sAL an, SexSYEN 6, KUALA MMPOR, WKAR PERSERUTUAN UNTURIAGA CAPITAL OEVELOPMENTSON BND et Ne: SCAPRTPOR eva [otoae: mua Pao 08, Land Survetor + To plan ay sorey work to ensure smocth edition of ork Check sting ot of rag. Set out the survey conta stem Oversee the setting ou ee, se Setup cont poi and Ta Toestableh boundary surveys Mantain, carte” and safe seep the survey insouments. 08, aaa Manager 1+ Tosarve asthe Management fepresentative forthe company Qualty Manogenent tern, + To ensure thats Quoty Management sytem is tablished, implemented and maintained + To monitor the implement of the Gualty Management System a all levels of the corgantaton ‘To ensure ongoing conformance ofthe sjstem In accordance with M550 901-2008 *+ To report on the performance and eflectveness of the Quay Management Sytem ofthe Group to ‘he Management Review Commitee * To propose improvement ofthe Groups Cuaity Managernent system ‘+ Temonitor and ore up iter rdeastorer complaints 1 To prepare QA Aarenes Tang materi for Inernal GA Tealning and Quast Management System pretetation to clent a and when ead 1 To prepare Project Qualty Plan (POP) fr project ste rd enteral NER ‘anacoftier + To ensure that corrective and preventive actions are Inplace note. Tovey out other job asignments a5 and when required by the Project vector + To asst QAQC Manager on GMS implementation Te assst QNOC oer on diy ust nepection. ‘anaC Supersor 10. Safety Mancger 1+ TopeepareErirnmentl Safty & Heath Pon. + To ereate"Oeeuptional Safety and Heath Management System awareness 10" all team ‘wari BONG WORKS FOR CROANGAN PENAVGUNAN 1 BOK HOTEL AE TNGRRT 7 ‘ean TNGRAT BES YANG EEXGANUNGI 2 TNGKAT LOM DAN SETS [ANAS TAMA MIA RUAMG MANGAL OAM UA exEUA AA AAS) 34 Enaw (44339 ana YASUE ANAS 0 MEENUN)TMGRAT AN AAA enna | 0s eta TAR KENTA MEXANAL BERTINGHAT(ARAS TNA AAS 18D ATAS| or 70,292. 753, aL, SESveN 6, KUALA WUMEPUR, UAYAKPERSEUTURN [URTUKIAGA CAPITAL DEVELOPMENTSON BND ee: SHOPPER fevrd [tomes miaoe Peso 2 “ members at jb tes, + Tochairthe SH Meeting Safety oer + ToimplementESH poly, standards an procedures atjpb ste Environmental ocer— Orgaiing safety meetings an inspection on ES Safety Supervisor + To attend to RKP inspection and interaleterat Estauct + Tomainaines recor + Toconduct Tol Box Stiga and when required Machinery Manger 4+ Toplan and arang of machinery to projet te Machinery Supeisor ‘Te check and verify all wachinry malnterarce / repairand rental at eee ste, Contact Mandgse ‘+ Propare procurement schedule for uantty Surveyor subconacor 1+ Prepare 80 and procurement document for gustation 1 Tabulate and arrange negotite/ eat with subcontractor 1 Prepare progress paymanttosubeontractar ‘Preparation of) Os) for lent and Mae Manager + Tocoorinate and plan Mi E work tte, Uses wih cent consukans and SC for ME Werks, 1 Prepare Ma equipment celery schedule + To coordinate method statement from NSC 1+ To conduct ME Coordination meetings and tend ste meetings + To rabe Request For tefomation to consultant Prepare and coorinate handover process. Prepare M 8 E Progress Repr, claims and ‘hse up ae NERS ME coordnator “+ Prepare Ste Oley and progress report for MBE vor ‘+ Prepare request for inspection M& € instalation "nN BULDING WORKS FOR HDANGAN PEMBANGUNAN 1 LOK VOTE 44 TVGRAT G37 BURT ‘DENGAN: TNGKATBESMEN YANG MENGANDUNGE 2 TINGKA LO DAN SRM (RAS ANA ‘Banas MAT nae MENA DAN RUA eka anes ANAS) > “TGKAT HOTEL PENGINAPA [RASS ARAS 3) 6 TINGHATKEMUDAIAN REEREAS! KOLAMA ‘ena fasts, Yeast MMA Mz MSHA RUAN AAR ramos | (aa ssa Tar LTA anera MEKANNAL BENTINGHAT (AAS TAM OAS) 1 ATAS S18 | orzo, 72 8 785, 1LAN ha, SASH 6, KUALA LUMPUR WLAVAI PERSEXUTURN a CSAP rerio [atooe: azo Tage 160% 4+ Dist in closing MBE NERS, progress rape, Inspection with authorities and atlend meeting at requires ‘+ Drange inspection and teetng & commissioning for MBE wore ‘Check and sutrt ME shop deawing ad #5 Buit Drawings 170 PROJECT IMPLEMENTATION 7A statutory and Regulatory Reauirements ‘he comtrton ofthe project shal comply wth al cutent appieble Malaysian Sattory and egulatory Reuierents acai but nt lenied t: |) The Tow andCounte Planning et 1976 5) The Uniform Eling By-Law 1984 i) Stet Orinaye and Bung Act 974 IN) Facris and Machinery At 1867 ¥)—Oceupationselety and Heath Ae 1998 VW) FreSeriees et vi) Construction ndusty Development Board et ai) Dewan Banda Kus Lumpur 72 contolot Documents The purpose of dacutent contol to desrite th way contol ae applet al documentation and data inthe proj to ensure the cect and appropiate documentation i avaible 9 3nd hen vege, 1) Projet related docunts which neue but may not be ltd to Al orauings 1 Isretions tom cents, authorities, architects and enor) Corespondence (om cet, autores, archets, engineers, sbeortractors, supers, consultants an internal meme). Contratdocumerte Secteation and standard Inspection an Tes records (Test Report pectin checks) Purchase Order /Delvery Order il Creates Minats of meats Request Fr formation (RF "WAIN BUNDNG WORKS FOR CADANGAN PENGANGUNAN 1 BiOK HOTEL 4 TNGEAT 517 BK [DENGAN 7 TNGHATBESMEN YANG MENGANDUNGE' 2 TIGKAT LOM DAW SURV ANAS TAMA ‘oA HOTEL PENGINAPAD AAAS 5 ANAS 3 6TGEATKEMUDAVANRERRESI/ KOLA Bee Cem» | tas ato roar LTA HERETA MEXAMHALSERTOGHAT(ARASTANAR RARS 1) 0 ATAS O10, 7028793 LAN, SEVEN, KUALA LUMPUR, UILAYAKPERSCROTURN [UMTUKtHEGA CABAL DevELOPMENTSOM BHO etnoscisefxwnvrar [meio [tones ino [Papel 13 1 1b) A otemal generated documents shall have approprte evilon number Le. work ‘rogram, wrk method slatements, inspection ata test pln ete ©) contled documents for the project fe. Ste Organization Char, Master Weck Programme) sal be approved authored personnal 4) Al obsolete ecumens required fo legal or knowledge and preservation purpose sal be {ultabyientied, The obolte document shal ber the “SUPERSEDED” strip in ed hdendone ban authored person on every poe Fhe document ©) Drawing Reise shall be used to record all consruction drawings and as bul drawings received at project ste, control f Records The purpose 0 eau records ae identfe,caletes, indexed and fed and maintained to rable rete eremie, 2} All quality rear shall be stored ané maintained for minimum retention period a5 so ‘etn inthe FecordsRtention it, 1») Upon completion of projet relevant project quay records shall be Wentied and archived y he respective cstdin, Progress Meetings The Fequroment ofthe Progress Mecting shall be documertod as Minutes of Nesting and the tialor mesings tobe ald are a flows (the equency of neting led ere are subject to change a and when equ), 2} The element tnteml communication take into account al tage of construction ‘They a6 a sted blow: ee Meet Tag ating duction Fi, Covrepordence Email, Memo, Ltr, facsimile, 1b) TRetypes nd reqvencies of mating srng Construction tage: io [Tet ientng [recy hapason [onde 1 |stewscieg —fronniny | soronatan | 858 Consrar WSC 2 [Reems 7 Jean [semirme | cas /Subconnsc 3 [isivtcica —_[rontiy | esiiinge |e sub cnnsc ‘an BULB WORKS FOR AOA PGANGORN 1 LOX HOTEL 2 NGA THUR 5) nasa ¢tMoea nan esc One nuawarein (anes s-aaass te “TNGeaTHOTE PENGINAPAN (AAS ARAS 3]. 6TINGKATKEMUDAVAN REXREAS KOUAMA env (es onus, enasux ans oct Tt Mune ERO (esa ee Ata RARE BERTIGRAT (AS TNA ARAS 1) ATAS Ces OUTEe SIO | Sry, 789 & 793, JALAN IM, SERSYEN 67, KUALA LUMPUR, WLAVAN PERSERUTUAN Une cc ana evEoPME SON Tek een ‘evo [eons aaa0 agents 75 tapecton 8 est a) 6 ” ‘A nspetion and te: shall be conducted as per the Inspection an Test Plans (TP) dence of Corformity with the ateptance eer maintained, Inspection an Test Pan shal be avaiable for material same approval, material resin, process and final inspection and tess. The inspection and test plan shall fine al relevant Inspection ad testa: preconstruction, contruction and post constuction stages for bldg \workend ita wor, a8 shall prepare TF and fora to eleva constant for spprva. The IT hal contain the folowing ites TL nspetion est Atty 5 Paltot inspection / Test HL Respenibity I. Recaplanc Cera &Fregueney ¥.—Vatiing Document wi Aatony Inspection and est Sus ‘The status of any relevant lgpection and tess conducted shall be clearly Mented in te respective records. ‘The sats shale denen any ofthe flowing terms inspection Test ‘AcEpE Passed ject Falls Work Method Statamnt [obo submtes pon quest) ‘The purpose of work method statement sto desrbe acts and work method tht wil be uted to carry out the werk ad to outline te resources requ fr the execution of work ete sateient sl e submited othe consultant for approval pig cormencng for work ‘rk mthod statement shall conan the following elements Objective i Seape Reference M—Deftons ¥—Responsibities vw Materials i Handing an storage of matrals vil Equipment ‘MAIN BUDE WORKS FOR CADANGAN PEDANGUNAN 1 BLOK HOTEL TNGRT 7 ‘Devan nga BESMEN Yas MENGANOUNGI 2 GKAT OM DAN SERS AAS TAMAR CB Sana xa Ae atwanea Den uA oRea aa AAS) 38 "TNGKAT HOTEL PENGINAPAN (HAAS 5 ARAS 38 6 TINGRAT KEMUDAWAN RERREASI/KOLAN (is so eh ea unetaweanns eenrnchar nas anal nas) ATAS rym, na 879 ILA Sven 6, KUALA WOMPUR WLAYANPERSEXOTUAN crs eers/0 a NCSA ‘vio [eon iio Page 150173 Preparation Works Workethodsogy Testing (asand whan requires 78 Progress Reports ‘Tha Projet Manager stall subi the flowing reper: |. —_-Weehy/Montly Poges Reports as requte by the Cora. Ste Day 19 Master Work Proprmme ‘The folowing the gidelne forthe mater programme as 2 monitoring nd controling tol or ‘the projec progress work using primavera system and MS project: 3) nial programe to obtain aprovl 1} Sharterm programme which tan abstract rm the mater srogra, ©} —_Toprovide sutprogranme or man actives 13) Topropazemeasure tate up st ne when the wos behind schedule ©) Woessary revse program = subject to consultant approval to Incorporate current Sstuntion or tosult pec requement 740 Control of Montoringand Measuring Devices Al survey insrumen’, levels, theoeotes, pressure gauges shal be ealfvated to ensue all inspection, measuring and test equipment ued is accurate ad appropri othe tsk 3) Al inspection, measuring ord test eauipments shal be stored adeauatel to prevent damage 5b) The calibration and testing oganiation shall bean external organization with adequate faces and acceptable standard ol performance, Record or cerieates ofthe resus of craton nd veton are mainte B "HAN BULDING WORKS FOR CADAWEAN PEMBANGUNAN 1 LOK HOTE 44 TINGRAT G7 BHR] Dean 2 Gea Sten YANG MENGANDUNG 2 TNT LOI OAN SERS AAS TANA {ANAS 2). TINGKAT RUAN MIKAIFAL OAM PUAN PERERA ARAS = AAS) “Tv {OTL PENGMLAPAN RASS ARAS 38) 6TINGHATKEMUDAVAREKREAS/ KOLAMA Cama | tts ao Year Let tA MEKAMNAL BENPGHAT (AAS TAM PASO) DATS SI | fons, 9,22 5, aaa SxSte 6, KUALA TOMPUR, WAH PERSEXUTUAN a Ns OSAP fovio [tones iz0H8 rrr 7A internal quay Aude 72 ‘he prpos to determine the efecvenes ofthe Qulty Managemen System andt evaluate the ned for further inproverent and preventive and corectve atin. » a ‘Audit wil be planned and implanted to ensure periode check on the level of ‘compliance tthe established qual tem at least wie a yot Internal qulty ats shal be card out by stall not having cet responsibly the ata being autos ‘Al fing ul be epost operon in charge for review and prompt action to remedy ny deicen Control ot Nonconorning Product “The purpose I to detfed, document, evaluate, segegate of non- 38, ‘Sensi HEAT, SUD-OITRCT OF STARA HUALALUMPR (oncxace 2: surensucrune Won), Rene CSAP [revo [Wtoner transom [pastors ie, Ty Edwin ‘POSED CONSTRUCTION ANO COMPLETION OF MDD DEVTGPRTENT OF2 TOWERS 37 ‘Toners snc APARTMENTS, € STORES PODIUM CARPARK WITH RERERTIONAL FLOOR, ‘STORES ccleaner LEVEL SUB MASEMENT CARIEAND 1 UNIT PPU ATPT 208, Sess, ss, Sub sRCTOF SETAPAK KUALA LUMPUR. (Pacrace 2:surensmucTuRe WORE}, (Cer oder S| Rat Na cameaP HTP evi0 [owes w2012018 | _pagezs TOWER CRANE PROPOSAL ~— B JE y ung ‘si ‘PROPOSED CONSTRUCTION AND COMPLETION OF WINED DIVELOPMENT OF 2 YOWERS 7 STONEY eRe APARTMENTS STORES PODIUM CARPARK WITH RECREATIONAL FLOOR, ‘sons ccc, LEVEL Sub BASEMENT EAROAM AND | UNIT PBU AT PT 388, Sexsre As, sus-sTCT OF ETAPAK KUALA LUMPUR AGE SUPERSTRUCTURE WORKS, a BEAD Pao SITE LAYOUT PLAN Sexsre HAs, SuB-OssRc OF SeTAPAK KUALA LUMPUR (waciace -supenstRucTuRE WORKS) Te SBP POP ‘vio [fone marsow | Paget APPENDIX B sf ‘POSED CONSTRUCTION ANG COMPLETION OF MED DUELOPWENT OF? TOWERS 37 Storr set aan ¢ STO apt CAPAM WW RERATONAL NOON wRLNeuR, ORNS CCHMEREIA,116¥ Secon eas Sot oF SEA (Paciace 2-sueenstnucrune wou) et CSN OP [sono [atone: ware APPENDIX C "MAIN BUILDING WORKS FOR CADANGAN PEMBANGUNAW 1 BLOX WOTEL 48 TINGKAT (317 BK DENGAN 2 TINGKAT BESMEN YANG MENGANDUNGI:|-2INGKAT L081 DAN SERVIS(ARAS TANAI& ARAS 0). €TINGRAT RUANG MEKANIKAL DAN RUANG PEKERIA(ARAS 1 ~ARAS di 34 TINGKAT HOTEL PENGINAPAN (ARAS5-ARAS 38). 6 il | rincxar KeMUOAMAN RECREAS/ KOLAM RENANG (ARAS 39 -ARAS 3, TERIVASUK ‘restr 5/0 | ag 40 gE ZANIN .LTINGEAT RUANG MEKANIKAL LIF (ARAS 44) TEMPAT LETAK ERETA MEKANIKAL BERTINGKAT(ARAS TANAH -ARAS 18) DI ATAS LOT 780, 791, 752 783, JALAN IM SERSYEN 67, KUALA LUMPUR, WILAYAM PERSEXUTUAN UNTUK MEGACAPITAL DEVELOPMENT SON BHO ot. Nes cese/cammejcas [nev-0 [et.oate: 12170 | Pavetott AppeNoKKe-. LUST OF INSPECTION TES PLAN FOR CRS WORKS Tem | Descrntion TP Teference Ro Rev | ecive Date 7 | Reinroncen CONCRETE BSBA CBS/OOE 0 | izonzoie WORKS sonora sna] manne tin a sores sapeeal tr) smunne poe sso} souseran mente a} omamnysnan] seats eee] nye 9 nso] ‘ah’ nsryros str eS eo omarion] sana e:onnsing| pensar -reulina| wereounpinstomeninsny gimme esi amo pa | ‘smarnsoysng] meine a a vermox vexonn ona smwoa| gts] stoner momende ns) — sau AEE ausonoo yong sao} gts) sGenen eopets on] momen ent eel syowaodz: crestor "MAIN BUILDING WORS FOR CADANGAN PENBANGUNAN 1 BLOK HOTELES THGKAT (317 tx) DENGAN 2 TINOKAT BESMEN YANG MENGANDUNGI:.2INGKATLOBIOAN (6/5) SERVIS[ARAS TANAH B ARAS 40). @TINGKAT RUANG MEKANIKAL BAN RUAN PEKERIA(ARAS XARA i 38 TINGKAT HOTEL PENGINAPAN (ARASS~ARAS 28 6 ‘TINGKAT KEMUDAHAN REXREASL/ KOLAM RENANG(ARAS 29 ARAS 4, TERMASUK |ARAS 40 MIEZANIN) v1 TINGKAT RUANG MIEKANIKALLIF(ARAS 8). TEMPRT LETAK [KERETA MEKARKAL BERTINGEAT (ARAS TANAH - ARAS 26) DI ATAS LOT 790, 783, 792 8.783 IALAN IMB, SEXSYEN 67, KUALA LUMPUR, WILAYAM PERSEKUTUAN UNTUK [MEGA CAPITAL DEVELOPMENT SDN BHD fof ne:casaycxmaymoyancn [Rovio |e Ose: v2aacie | Pareto ‘APPPENOIKC UST OF INSPECTION TET PLAN FOR ARCHITECTURAL WORKS, Tem | Dereiptonot iP eit evn | TDR af BRICROR ESSER ARCO o | orzo z PASTORS BTCA ARCROE o | mane 3 SEONG SBCA ARCHOS 0 | maim 7 ‘Ski COATING | CRSA/CAPRINTTARCRAOH 0 | malas 5 TUNE CSAP OS 0 | mora | PANTING WORKS | CRSA/CAPRINTETARCROOS 0 | one 7 | WATERDRODENG | CASH/CAPRITETARCRIOOT 0 | one | DOOR AND WiNbow — | CESB/EAPRIATETARCHTOOS 0 | ono eocodsa orf ‘0 ‘29-9 vod en - i wari fe soanpe oo worsted ctod Lamune -aseaog un pases x posi o5 yan oY mess orper sg ene vonpon vous vemos | vor | | ea nue mapas | wewsireaus| “ispuesuire see | vam ulonon puoeoy|€ TOR | sawedns ng | eee ano Kore vodn ovenndes Saas 2 seneypsee oon | soubeg vba ow s0i98 (pise pIIONeY |b ayaevodeny | 101 wonton ‘aay 191, wopd sg wars fa soanoe oso unonis jusnd homies _mpenig vet a paoeds ove esd oc ony san oan CSS ————_— oes ons ote a ours fe erwnseneies | wines | “aaerueunre aman | youtunret evade | ¢ png ae 903 sein ans ovate enecyouts ly ‘on neu} ‘Seto | _onnene oe] see amon ane vosn wwonten sury|_2 fn meyoede aoc on | uty alg us ow 20198 (misew prey | ag | fovarbais peu —_| Amrasvedso | 50, vonvdsuro moa ‘any 91, oro 4 a sus posey-y vrs wer Seon-8 "23-3 soe em - mg eran fa soanpe oss unos 1 puuosd hosriene _spenig J posse pu pends aeons" sy Ener ee a wometee oes on ote pesos.ony umn vonsene| vor | or | es poornnoenae| sewsineoe| “mwemecnreaneg| aowéupeacese vaso | ¢ psy ae a3 reise une vase sip enayouts ly rey Sano, ‘awe woes vmomomed| ‘ . ‘eeio| onvoene es|_aeie hanes Osnvodn oweondoa Sarena |e pvauswotey| vo | 1 N needs ooo on | nut ong so 298 ‘misew prewedy | en | erg | fovenbayy psuswo | Aagsuodsny | ie) uossedsu ood ‘aay 94, wopte mosey sod en -H yg nearso fa soune no uate nt usoid Konan eva ng paso uw pruning ny be a roe gene funeoune p wien ‘aus ie exw oye Aone hon wn worscsu tuntoon| oeubuy ts a poe 2098 josie oreeeey |b Apgevodeny | 01 uopedsu 3904 ure poeta) [_reamouvranmevaraseo* on a ait Pawnnnrame snort) peasy nosis sent ‘n= ma 3 vod en ag uegeo fq sane oso voRoH6ey et und Kons ceansingaus | yep tue ns ombumowapecsa |» _oevuscngaig| ie hon an veer evowsdsn fanoo| 2 o1| seuss ess seeyonsigng | queowuersoe orwacay| oyesuodeny | sey uon2sdeujo moa fons sway pasey-y voto ert nen n° 3 vod eH ms veuio fg sae ooo uocsE89 6 pusbd Komndne -auliog vn Se pabedon px pone 262800 irs ae —— EET nal aece eee va. ened ajarinen vga supecioon| vor | or | ry pir mronpamny| wrwmigag| “myspuedare nome | pon biyoiganjoveredny |» _speepuean Siem! or |e A onescedsy Sane] osnatn as pas wen ope moomes| naa ce Kea (Sia as pve senenoeee soto, | meubva mab pew 2069 wow rai von wer tao N roid sweden“ sms were ka sue arts unoses und homens _mpenan ut ie prssea nu pone ac bam ete me alata —— 5 RT Ser emotes ones ane yee “oop ume ove mesamerea| vor | [ea pin semparmmy | mewsirese| syopeetonre enna | fe ewoown'seopypuesrean| € vemos oon ory spe see | evs omen ip fue a samang sues y napa 209 “mao ene f s 70M |_onmodns us| ope han even eoronins sane | 2 wadusmasiy| yo | 1 im oneyoats wloo) | saab ils pes on oe Toonm oma | yrsodsng | vou onosesu0 mea ‘fave was juoneeen| ws | WAIN BUTDING WORE FoR CAGRNGANFESNGONAN OK WOTEL a VNGEAT j (317 mu DENGAN zTNGRAT BEEN YANG MENGANDUNG! 2 THNGRAT O61 AN GB SERV ARAS TANAN 2. AMAS 411 4TINGKAT RUANG MERANIKAL DAN RUAN, xen sas = AAS i, 8 THGEATHOTEPENGINRPAN ARNG AAS 8-6 TNS MUA AN REE LAM RENANG (RAS 39 -ARAS,ERMASUR AnAS0EZAUN TK RUANG ERAN (4) TEMPRT TAK ERT HEKANIAL BERTI (ASTANA RAS 18) ATAS LOT 790, 728,72 £179, ALAN MOL, SESVEN 7, LALA LUMPUR, MAYAN PESERUTUAN UN IMEGN CAPA DEVELOP SON aD es nae 5/8 Rf. no: casa/capmymTenee [Rav-0 [ettoate: i2azoe | Peeetott APPPENOKKC-3 LUST OF INSPECTION TEST PLAN FOR MECHANICAL AND ELECTRICAL WORKS Ten | Deseipton cor) evn | ei bate 7 TECTRICALANO | CASB/EAPRIAT RETO oan TELEPHCNE z STREET GHTING | caSO/cAPRYTTETBEMOO «YO | aR

You might also like