You are on page 1of 3
110912022, 00.08 Your Results for: Site ‘Your Rasuls for “TruaFalsa’ 'True/ False" Print this page: Introduction to Operations and Supply Chain Summary of Results Management, 3e (International edition) Book Title: Introduction to Operations and Supply Chain Management, 3/e (International Edition) 50% Correct of 10 Scored items: 5 correct: EEE 50% 5 Incorrect: II 50% Book Author: Bozarth Location on Si Chapter 4: Business Processes > Online More information about scori Study Guide > True/False Date/Time August 31, 2022 at 6:38 PM (UTC/GMT) Submitted: 1. Gir ‘A team of workers at a cafeteria maps the food preparation and serving process. This map is of a primary process. Your Answer: True CORRECT. When making a process map It is important to completely detail every step of all activities in the process. Your Answer: True Correct Answer: False INCORRECT, It is important that too much detail is not included in the map. One of the rules offered in the discussion is to "keep it simple, ‘A process containing multiple loops is probably less productive than one containing no loops. Your Answer: True CORRECT. ‘A company produces 10 units using two employees, each of which works an eight-hour day. The efficiency of the process is 62.5%. Your Answer: True Correct Answer: False INCORRECT. The productivity is 0.625 units per hour. The efficiency is unknown since we don’t know the process standard A college dormitory housing official tours the local four star hotel to study the reservation system and housekeeping services, This comparison is classified as process benchmarking oned.co.uklema_je_bozarth_intopscman_9/229/57293/14667044.curindex him! 118 ‘0108/2022, 00:08 Your Answer: True CORRECT. In order to determine why half of the faculty refuses to participate in the Faculty Senate, the ad hoc committee should use a fishbone diagram. Your Answer: True CORRECT. A professor is interested in examining the relationship between a student's midterm score and the number of homework problems handed in on time. The best continuous improvement tool to use would be the histogram. Your Answer: True Correct Answer: False INCORRECT. The best tool to use would be the scatter plot, which shows the relationship between two variables. Business process reengineering (BPR) is designed to change an existing process in an. incremental fashion. The process owners that use BPR should always feel that the process can be performed a little better than it currently is. ‘Your Answer: True Correct Answer: False INCORRECT. BPR is a radical redesign of business processes, not an incremental approach. Level 2 of the Supply Chain Operations Reference (SCOR) model divides SCM activities into the process types: Planning, Execution, and Enable. Your Answer: True CORRECT. 10. CEGEaB ‘The SCOR model requires that the information and physical flows required to plan, source, make, deliver and return a product are the same regardless of the product's degree of customization. Your Answer: True Correct Answer: False INCORRECT. A product that is made to stock will have radically different requirements than one that is made to order or engineered to order. hitps:lwps.pearsoned.co.uklema_je_bozarth_intopscman_31229/57293/14667044.cwrindex html 110912022, 00.08 ‘Your Rasuls for “TruaFalsa’ E-mail Your Results My name is (first last): E-mail my results to E-mail address: Send as: O me Text v O instructor Tet v Om Text v O other Text v Copyright © 1995-2013 Pearson Education. All rights reserved. ‘Legal and Privacy Notice '¢_bozarth_intopscman_3/229(57290/14867044.culindex hil

You might also like