You are on page 1of 3
110912022, 00:37 Your Results for: Site ‘Your Rasuls for “TruaFalsa’ 'True/ False" Print this page: Introduction to Operations and Supply Chain Summary of Results Management, 3e (International edition) 60% Correct of 10 Scored items: Book Title: Introduction to Operations and Supply Chain econ timmmmma fo Management, 3/e (International Edition) 4 Incorrect: MI 40% Book Author: Bozarth Location on Si More information about scori Chapter 13: JIT/Lean Production > Online Study Guide > True/False Date/Time August 31, 2022 at 7:07 PM (UTC/GMT) Submitted: 2. GEEEEEED Lean production is applicable only in manufacturing; Just-in-time is appropriate for both manufacturing and services. Your Answer: Truc Correct Answer: False INCORRECT. Lean production has extended to services and all aspects of supply chain management. 2, LEER Jimbo went to the stock room and brought a pallet of parts to the production floor, A full pallet wasn’t needed. So he took a few of them back to the stock room and arranged them neatly on the shelf. This simple move of parts from point A to point B back to point Aadded value to them, Your Answer: True Correct Answer: False INCORRECT. Unnecessary transportation does not add value 3. ED The production process had historically produced about 15% defectives, so batch sizes were increased to account for this phenomenon. As batch sizes are reduced, the lean improvement team can fix problems that are exposed at each stage of the production process. Your Answer: True CORRECT. 4. GEEEEEMD tt es Goofs job to sweep the floor in the afternoons at Wilbert Vaults. As he swept, he thought about the college classes he was taking and how they had introduced him to a number of ideas that might help Wilbert Vaults achieve greater business success. The foreman wasn't interested in any of his “fancy book learning” but was extremely interested in a clean floor. Failure to take advantage of this worker's knowledge and abilities is one of the commonly recognized wastes of production. Your Answer: True CORRECT. oned.co.uklema _je_bozarth_intopscman_/229/57294/1466744 1 curindex html 118 ‘01108/2022, 00:37 5, EE Lean Six sigma simply combines the organizational elements and tools of Six Sigma with Llean’s focus on waste reduction Your Answer: True CORRECT. 6. GEEEEEEMD A keanban system is a pull system Your Answer: True CORRECT. 7. QEETEEEEB ina single card kanban system, the empty container serves as the production signal and the move signal. Your Answer: True Correct Answer: False INCORRECT. The container is the move signal and the production card is retained. 8. GERD tt takes about 30 minutes to make a dozen dweezils, put them in their box, and deliver, them to the point on the production line where they are snapped in to the moon units. If the processing and delivery time is reduced to 25 minutes, the number of kanbans can be reduced Your Answer: True CORRECT. 9, GEEEEEEMB Kanban can be used to link work centers in a factory; it can also be used to link supply partners Your Answer: True CORRECT. 10. EEE re and kanban approaches to production are mutually exclusive. Your Answer: True Correct Answer: False INCORRECT, Some companies use these two approaches together, hitps:lwps.pearsoned.co.uklema._je_bozarth_intopscman_31229/57294/14657441cwrindex html 110912022, 00:37 ‘Your Rasuls for “TruaFalsa’ E-mail Your Results My name is (First last) E-mail my results to E-mall address: Send as: Ome Text v D instructor Text v Om Text v O other Text v Hato. Copyright © 1995-2013 Pearson Education. All rights reserved. ‘Legal and Privacy Notice '¢_bozarth_intopscman_3/223(57294/14667441 culindex hil

You might also like