You are on page 1of 3
ori0sr2022, 00:32 Your Results for “Trusso! 'True/ False" Print this page: Your Results for: Site : Introduction to Operations and Supply Chain Summary of Results Management, 3e (International edition) Book Title: Introduction to Operations and Supply Chain Management, 3/e (International Edition) Book Author: Bozarth 60% Correct of 10 Scored items: 6 corect: EEE 60% 4 Incorrect: MI 40% More info ation about scorin : Chapter 12: Managing Production Across the Supply Chain > Online Study Guide > True/False Date/Time August 31, 2022 at 7:02 PM (UTC/GMT) Submitted: 1, GEEEIEEND vena choice between the two, most producers would rather have booked orders than forecasted demand, Your Answer True CORRECT. 2 CEE available to promise inventory consists of all parts and raw materials that can be turned into product for the current period. Your Answer: True Correct Answer: False INCORRECT. ATP inventory is finished goods that can be promised to the next customer(s) that call 3. GEEEEEEEMD the planning horizon for the master schedule is determined by the lead time required to source the parts and bulld the product Your Answer: True CORRECT. 4, GEES np is used to manage dependent demand inventory. Your Answer: True CORRECT. 5. QEEEEEEB A bill of material shows how the components in a product structure tree are put together. Your Answer: True Correct Answer: False .oned.co.uklema._je_bozarth_intopscman_/229/57294/14667369.cwrindex him! 118 ‘0109/2022, 00:32 ‘Your Rasults for “TruaFalsat INCORRECT. The opposite is true; a product structure tree shows how the components in a bill of material are put together. 6. GEEEEEED in an ep record, the scheduled receipts are items that are already on order. Your Answer: True CORRECT. 7. CE fa parents at level 2 of a product structure tree, the child is at level 1 Your Answer: True Correct Answer: False INCORRECT. If a parent is at level 2, the child is at level 3. 8. EEE ra small change in the requirements for a Level 0 item causes dramatic changes on the requirements for Level 3 items, then MRP nervousness is said to exist. Your Answer: True CORRECT. 9. LINED The critical ratio is the ratio of the due date to the time it takes to perform a job, Your Answer: True Correct Answer: False INCORRECT. The critical ratio is the ratio of the time until the job is due to the time remaining to complete the job, 10, GEE Distribution requirements planning is a supply chain approach to material requirements planning, Your Answer: True CORRECT. E-mail Your Results My name is (fist last): E-mail my results to: E-mail address: Send as: OD me Text v hitps:lwps.pearsoned.co.uklema_je_bozarth_intopscman_229/57294/14667369.cwrindex html ori0sr2022, 00:32 Your Results for “Trusso! O instructor Text v Om Text v Copyright © 1995-2013 Pearson Education. All rights reserved. ‘Legal and Privacy Notice '¢_bozarth_intopscman_3/223(5723414867369.culindex hel

You might also like