DESIGN PROPOSAL
CLIENT: MJ CONTRACTOR
DATE : 15-10-2018
NOTES
STANDARD DRAWING NOTES:
9. FOR CONCRETE BEAM THAT RESIST SECONDARY BEAM, THE FOLLOWING
1. ALL DIMENSIONS SHOWN ARE IN METER UNLESS NOTED OTHERWISE
DETAILING SHALL BE USED:
2. ALL WORKS TO BE COMPLETED IN ACCORDANCE TO CLIENT REQUIREMENT
3. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR COLUMN SECONDARY
BEAM
MAINTAINING EXCAVATIONS IN A STABLE CONDITION
12d
SUPPORT SUPPORT
4. THE CONCRETE COVER SHALL SATISFY THE FOLLOWING REQUIREMENTS: Ln/4 12d
12d 12d
12d Ln/4
HB
SLAB ≥ 20 MM 12d 12d
SPAN
BEAM AND COLUMN ≥ 40 MM Ln/2
6 5 m - WB ≥ 0.3HB
PROJECT
d ≥7 - B1 ≥d
BAR DIAMETER (d)
- B2 ≥d
HB
A B CONSTRUCTION OF CV. VIJAYATEX
B2
B1 TENSION REINFORCEMENT BAR AREA
SHALL NOT EXCEED 2.5% OF BEAM
≥7 WB CROSS SECTIONAL AREA ADDRESS
THE HOOP STIRRUPS SHALL BE INSTALLED 5m
VARYING ONE TO ANOTHER BETWEEN A AND B
75 m
≥
m or 11. FOR PAD FOOTING FOUNDATION, THE REINFORCEMENT DETAILING SHALL JLN. AHMAD YANI III
m 6 d
or COMPLY WITH THE FOLLOWING REQUIREMENTS:
6d
SUPPORT SPACING OF STIRRUP TITLE
(SPECIFIED IN THE NEXT CLAUSE)
SUPPORT SUPPORT
MIN. 150 MM
HB
MAXIMUM SPACING 300 MM 50 MM LEVELING COURSE ABOVE SOIL DRAWN BY : HW, ST, MEngSc
12d 12d
SPAN
Ln/2
DESIGNED BY : HW, ST, MEngSc
SUPPORT STIRRUPS THE DEPTH OF FOUNDATION SHALL BE DETERMINED BASED ON THE SOIL
STARTING 50 MM FROM COLUMN FACE BEARING CAPACITY OBTAINED FROM SITE SOIL INVESTIGATION.
CHECKED BY :
Ln = CLEAR SPAN THE MINIMUM FACTOR OF SAFETY OF 3.0 SHALL BE USED BY USING THE
SERVICEABILITY LOADING CONDITION
L
APPROVED BY :
PAGE : 1
NOTES
STANDARD DRAWING NOTES: (CONTINUED)
12d
12. THE STIRRUPS DETAILING OF COLUMN SHALL SATISFY THE FOLLOWING
REQUIREMENTS:
≥75mm or 6d
ANGLE 90O
H
LAP LENGTH MAX. OF:
SUPPORT STIRRUP
- 61 x COLUMN HEIGHT
LENGTH MAX. OF:
- 450 MM
- 61 x COLUMN HEIGHT
- 450 MM
≥75mm or 6d MAX. 150 MM
ANGLE 135O
FOR LONGITUDINAL BAR WITH DIAMETER > 32 MM, THE STIRRUP'S SPACING AT THE SPAN SHALL BE THE MINIMUM OF:
- D/2
DIAMETER SHALL BE NO LESS THAN 13 MM - 48 x DIAMETER OF STIRRUP
H
- 16 x DIAMETER OF LONGITUDINAL BAR
PROJECT
THE LONGITUDINAL BAR AREA SHALL NOT EXCEED 8% OF COLUMN
CROSS-SECTIONAL AREA AND SHALL BE MINIMUM OF 1% OF COLUMN CONSTRUCTION OF CV. VIJAYATEX
CROSS-SECTIONAL AREA
+0.00
ADDRESS
13. THE STRUCTURAL DETAILING IS PROVIDED FOR THE STRUCTURE TO 21. THE REINFORCEMENT BAR FOR BOTH LONGITUDINAL AND STIRRUP SHALL
TITLE
BEHAVE AS MODERATE MOMENT RESISTING FRAME IN ACCORDANCE TO USE THREAD BAR WITH MINIMUM YIELD STRENGTH OF 420 MPA IN
SNI 1726-2012 FOR SEISMIC DESIGN OF BUILDING ACCORDANCE TO SNI 2847-2013 CLAUSE 3.5.3.7 (ASTM A1064M)
STANDARD DRAWING NOTES
15. THE LOADING REQUIREMENTS IN THE DESIGNING STAGE IS IN 22. THE BENDING RADIUS FOR REINFORCEMENT BAR SHALL COMPLY WITH THE
ACCORDANCE TO 1727-2013 TAKEN AS 0.96 kN/m2 IMPOSED DEADLOAD, 0.96 FOLLOWING REQUIREMENTS: (SNI 2847-2013 CLAUSE 7.2)
2 2
kN/m ROOF LIVE LOAD AND 4.96 kN/m FLOOR LIVELOAD D10 - D25 : 6d ISSUE NO. DESCRIPTION
16. THE MINIMUM ALLOWED CONCRETE COMPRESSIVE STRENGTH SHALL BE D29 - D36 : 8d 1 - DATE: 24/09/18 INITIAL DESIGN
NO LESS THAN 17 MPA (SNI 2847-2013 CLAUSE 5.1.1), THIS DESIGN ADOPTS D44 - D56 : 10d 2 - DATE: 15/10/18 FOUNDATION REV.
25 MPA 23. THE TOLERANCE OF 10 MM FROM THE REQUIRED THICKNESS FOR THE
17. LABORATORY TEST SHALL BE CONDUCTED TO TEST THE COMPRESSIVE CONCRETE COVER CAN BE APPLIED (SNI 2847-2013 CLAUSE 7.5.2)
STRENGTH OF THE CONCRETE MIX WITH CYLINDER SAMPLES FOR THE 24. THE DESIGN OF CONCRETE STAIR IS NOT INCLUDED AND SHALL BE
SAME MIX POURED ON SITE (SNI 2847-2013 CLAUSE 5.6.4.3) CONDUCTED AFTER THE PLAN HAS BEEN APPROVED WITH CLIENT
18. THE CONCRETE MIX THAT HAS BEEN ADDED WITH WATER SHALL NOT BE 25. ALL THE WORK SHALL COMPLY WITH THE HEALTH AND SAFETY
DRAWN BY : HW, ST, MEngSc
USED UNLESS APPROVED BY QUALIFIED ENGINEER (SNI 2847-2013 CLAUSE REQUIREMENTS (K3)
5.10.4) 26. BUILDERS MUST ENSURE THE STRUCTURAL WORKS ARE ADEQUATELY DESIGNED BY : HW, ST, MEngSc
19. THE BUILDERS MUST ENSURE THE CONCRETE TO BE IN HUMID AND WARM SUPERVISED BY QUALIFIED ENGINEER ESPECIALLY DURING CONCRETE
ENVIRONMENT AT LEAST 7 DAYS AFTER THE CASTING CASTING, CURING AND UNINSTALLING THE FORM WORK CHECKED BY :
20. THE CONCRETE COMPRESSIVE STRENGTH SHALL BE TESTED AT THE AGE 27. GROUND BEAM SHALL BE PLACED WHEREVER THERE IS WALLS FOR THE
APPROVED BY :
OF 28 DAYS UNLESS NOTED OTHERWISE GROUND LEVEL
PAGE : 2
NOTES
A
6D13 GROUND BEAM
200
NOTES
90
110
290
GB 50CM
BOREPILE
P3
6D13 5D13 THE FOUNDATION IS DESIGNED BASED ON
P1 P1
THE PROVIDED SOIL INVESTIGATION
90
GB 5CM LEVELING COURSE
7D13 7D13 FROM PT. MATRA BANGUN
TECHNOCONSULT
A
50CM BOREPILE TO BE
DRILLED TO HARD
SOIL LAYER
THE BORE PILE SHALL BE EMBEDDED TO
FOOTING PILE P1
110
REACH THE HARD SOIL LAYER AT 12.5M
GB SCALE - 1:50 FROM THE SURFACE
GB
480
GB GB 130
SECTION A-A THE GROUND FLOOR IS RECOMMENDED
+0.00
2D13
SCALE - 1:50 TO USE CONCRETE SLAB ON COMPACTED
SOIL WITH THICKNESS OF 8-10 CM WITH
8
P1 P1 ONE LAYER OF MK8 OR MK9 TO PROVIDE
30
GB
D8@200 RESISTANCE FOR CRACKING
2D13
20
COMPACTED GROUND BEAM
SOIL
GB GB GB
100
B
CONSTRUCTION OF CV. VIJAYATEX
2150
P1 P1 COMPACTED
30 SOIL 20CM
125
GB HOOK
D13@150
20
ADDRESS
D13@150
COLUMN 20X30
20
70
30
20
JLN. AHMAD YANI III
50
75MM
400
D13@150
GB COVER
GB GB
5CM LEVELING COURSE
ABOVE GROUND
120
P1 P1 70 TITLE
D13@150
GB SECTION B-B
B
FOOTING P2 FOUNDATION PLAN
SCALE - 1:25
SCALE - 1:25 (UNIT IN CM ; BAR DIAMETER AND
SPACING UNIT IN MM)
300
GB GB GB
ISSUE NO. DESCRIPTION
P1 P1 70 1 - DATE: 24/09/18 INITIAL DESIGN
GB GROUND BEAM
2 - DATE: 15/10/18 FOUNDATION REV.
D13@200
45
300
GB GB GB 20
D13@150
P1 P1
120
D8@150
30
GB COMPACTED
1250
SOIL
15CM HOOK
DRAWN BY : HW, ST, MEngSc
430 430 COLUMN 20X30
D13@200
860 C C
DESIGNED BY : HW, ST, MEngSc
30
D13@150
20
COVER 75MM
25 25
FOUNDATION AND GROUND BEAM PLAN CHECKED BY :
70 5CM LEVELING COURSE
SCALE - 1:100 ABOVE GROUND
FOOTING P3 SECTION C-C APPROVED BY :
SCALE - 1:25 SCALE - 1:25
PAGE : 3
NOTES
290
290
(20X30) B4 B4 B4
(20X30) (20X30) (20X30) B4
(20X40) (20X40) (20X40)
(20X40) COLUMN
COLUMN B5
120 B1 20X30
(20X50)
35X50 COLUMN (20X40) FLOOR SLAB HAS THICKNESS OF 120MM
20X30
WITH REINFORCEMENT BAR OF D10@200
B2 B4 FOR TOP AND BOTTOM
(20X30) (20X40)
120
B5 B5 DETAIL 2
THE HEIGHT OF 2ND FLOOR ABOVE SHALL
(20X50) (20X50) BE NO MORE THAN 3.75M
B2 150
(20X30)
THE HEIGHT OF FIRST FLOOR SHALL NOT
480
VOID
EXCEED 5.5M
B2
B5
(20X30)
(20X50)
COLUMN COLUMN
35X50 35X50
B3
(30X60)
PROJECT
380
B4 B4 B4 B4
(20X40) (20X40) (20X40) (20X40)
COLUMN
CONSTRUCTION OF CV. VIJAYATEX
COLUMN
35X50 35X50
B3
(30X60)
DETAIL 1
ADDRESS
400
B4 B4 B4 B4
(20X40) (20X40) (20X40) (20X40)
B3
(30X60) FLOOR BEAM PLAN
(UNIT IN CM)
300 B4 B4 B4 B4
(20X40) (20X40) (20X40) (20X40)
ISSUE NO. DESCRIPTION
COLUMN COLUMN
35X50 35X50
1 - DATE: 24/09/18 INITIAL DESIGN
2 - DATE: 15/10/18 FOUNDATION REV.
B3
(30X60)
300
B4 B4 B4 B4
(20X40) (20X40) (20X40) (20X40)
COLUMN COLUMN
35X50 35X50
B3
(30X60) DRAWN BY : HW, ST, MEngSc
150
B4 B4 B4
B4
(20X40) (20X40) (20X40)
(20X40)
CHECKED BY :
MEZZANIE FLOOR BEAM PLAN 2ND FLOOR BEAM PLAN
SCALE - 1:100 SCALE - 1:100 APPROVED BY :
PAGE : 4
NOTES
290
(20X40) (20X40) (20X40) (20X40) (20X40)
B7
B3
(20X60)
FLOOR SLAB HAS THICKNESS OF 120MM
(30X60)
WITH REINFORCEMENT BAR OF D10@200
FOR TOP AND BOTTOM
B5
(20X50)
B5
ROOF SLAB HAS THICKNESS OF 110MM
(20X50) WITH REINFORCEMENT BAR D8@150 FOR
B5 B5 B5 B5
B5
(20X50)
B5
(20X50) (20X50) (20X50) (20X50) (20X50)
TOP AND BOTTOM
480
480
B2 B2
(20X30) (20X30)
B7
(20X60)
DETAIL 3 B3 B4 B4 B4 B4
175
(30X60) (20X40) (20X40) (20X40) (20X40)
B4
B4
(20X40)
(20X40)
B4 B4 PROJECT
380
(20X40) (20X40)
ADDRESS
16D16
B4 B4 B4 B4 JLN. AHMAD YANI III
400
D10@100 SUPPORT
TITLE
B3
(30X60) D10@200 SPAN
FLOOR AND ROOF BEAM PLAN
D10@150 SUPPORT COLUMN DETAILING
D10@250 SPAN
(UNIT IN CM ; BAR DIAMETER AND
30
50
B4 B4 B4 B4 PROVIDE D10@100 AT
SPACING UNIT IN MM)
300
PAGE : 5
NOTES
12
D8 7D16 5D16 D8
D8@100 D8@200
25
25
FLOOR SLAB HAS THICKNESS OF 120MM
60
60
40 MM
COVER
WITH REINFORCEMENT BAR OF D10@200
5D16 7D16
7D16 2D16 5D16
FOR TOP AND BOTTOM
D8@100 5D16 D8@100
2D16
B4(20X40)
30 30
180 40 350 40 180 THE HEIGHT OF 2ND FLOOR ABOVE SHALL
BE NO MORE THAN 3.75M
B3 SUPPORT B3 SPAN
COLUMN COLUMN
35X50 35X50 SCALE - 1:25 SCALE - 1:25
860
DETAIL 1
SCALE - 1:50 3D13 3D13
12
12
40
40
D8@150 D8@300
3D13 3D13
20 20 20
COLUMN
35X50 515
PROVIDE 255 230 PROVIDE
B4 SUPPORT B4 SPAN PROJECT
2U BAR 2D16
D8 65 150
D8@200
150 2U BAR SCALE - 1:25 SCALE - 1:25
D8
3D13 3D16 3D16
20
3D16 2D16
20
D8@200
12
12
20
50
50
20 215 20 D8@100 D8@200
COLUMN
2D16 3D16
JLN. AHMAD YANI III
20X30 COLUMN
35X50 20 20
300 560
B5 SUPPORT B5 SPAN TITLE
860
SCALE - 1:25 SCALE - 1:25
BEAM DETAILING
(UNIT IN CM UNLESS FOR BAR
DETAIL 2
DIAMETER IS MM)
SCALE - 1:50
12
12
12
12
2 - DATE: 15/10/18 FOUNDATION REV.
30
30
40
D8@150 D8@200
60
D8@100
D8@150
2D13 2D13
3D13 20 15
20
3D16
12
DESIGNED BY : HW, ST, MEngSc
30
12
12
D8@150
30
D8@200
60
40
2D13 D8@200
D8@300 20 CHECKED BY :
2D13
15
3D13
5D16
20
B2 SPAN B6 SPAN APPROVED BY :
20
B1 SPAN SCALE - 1:25 SCALE - 1:25
B7 SPAN
SCALE - 1:25 PAGE : 6
SCALE - 1:25
NOTES
15.8
BEAM AND COLUMN DETAILING SHALL
D10@200
+2.50 SECOND FLOOR
+5.50 FLOOR SLAB 120MM THICK REFER TO THE PROVIDED GENERAL
NOTES
20
30
15.6
20
FLOOR SLAB HAS THICKNESS OF 120MM
20 B2
D10@200 WITH REINFORCEMENT BAR OF D10@200
B1 30X60
120 FOR TOP AND BOTTOM
30
D10@150
250
SLAB THICKNESS 120MM
20 THE HEIGHT OF 2ND FLOOR ABOVE SHALL
300
15.8
BE NO MORE THAN 3.75M
SLAB THICKNESS 120MM
D10@200
D10@150
GROUND
BEAM
+0.00 D13@200
FLOOR SLAB
+2.50
PROJECT
STAIRS MEZZANIE TO 2ND FLOOR
STAIRS GROUND TO MEZZANIE
SCALE - 1:50
SCALE - 1:50
CONSTRUCTION OF CV. VIJAYATEX
ADDRESS
SLAB THICKNESS
TITLE
B1 30X60 120MM
30 STAIRS DETAILING
300
15
15.8
75
SLAB THICKNESS 120MM
REINFORCEMENT
375
360
APPROVED BY :
PAGE : 7