Professional Documents
Culture Documents
FOR CONSTRUCTION
SLAB REINFORCEMENT FOR BEAM HOLE (NOTES : THIS STANDARD IS NOT APLICABLE FOR PRESTRESSED BEAM) 10 July 2023
(1) LOCATION OF SPLICING/JOINT (2) ANCHOR SMC3.2 PROJECT - 22.011
(NOTES) 1) lx : EFFECTIVE SPAN OF
SHORTER DIRECTION FIXED END SLAB CANTILEVER SLAB (1) RANGE OF OPENING FOR BEAM KAJIMA VIETNAM
2) : LAPPING LOCATION
a OUTER SUPPORT b CONTINUOUS . MAIN BEAM
OF MAIN REBAR
3) BASICALLY FOR CANTILEVER
> B/2
L2h
> B/2
ADDITIONAL CONCRETE
(INNER) SUPPORT
ONE HALF OF TOP L2 (DRAFT)
L2h REBAR SHALL BE ≥ D/4 AND 200 MM. ≥ D/4 AND 150 MM.
SLAB, MAIN REBAR JOINT
≥8d
L3 25d
≥8d
IS NOT ALLOWED
L3 CONTINUOUS
D D D D
L2 L2 4 4
D
ADDITIONAL CONCRETE
CL
L2
15d
L3
B L3 L3 > B/2
l0 l0
5 5
25d
≥8d
L2
> B/2 P+50 AND >150 P l0
15d
≥8d L2h
L3
lx/4
1) ONLY CIRCLE SHAPE IS APPLICABLE.
WIREMESH
2) THE DIAMETER OF HOLE SHALL BE LESS THAN D/3.
NOT LESS THAN 2 CROSS BARS IN CASE OF HOLE LOCATION IS WITHIN l0/5 FROM COLUMN SURRACE, THE DIAMETER OF HOLE SHALL BE LESS THAN D/5.
3) IN CASE OF THE DIAMETER OF HOLE IS NOT LESS THAN D/4, THE NUMBER OF HOLE SHALL BE 3 OR LESS IN A BEAM
SEE GENERAL STANDARD OF RENFORCEMENT 4) IN CASE OF ( D≥600 AND R≤100) OR (D<600 AND R≤ 50), ADDITIONAL REINFORCEMENT IS NOT REQUIRED.
>B/2 P
L>h
≥8d
(2) HOLE INTERVAL REV DESCRIPTION DATE
WIREMESH
DEFORMED BAR
R1
R2
2. SUPPORT OF MAIN REBAR 3. REINFORCEMENT FOR SLAB OPENING
SHORTER DIRECTION (1) ≤ 300x300 (2) ≤ 700x700 (3) CONTINUOUS OPENINGS P = 3(R1+R2)/2
SUPPORT D12 ( OPENING < 150 ∅ ) 0 Issue Draft 10 July 2023
(SECONDARY BAR MAY BE USED) L2 L2 >100 CLIENT:
L2
BAR SUPPORT
c
L2
(1) R ≤ D/6
c
L2
SMC MANUFACTURING
L2
L2
(VIETNAM) CO.,LTD.
d
(NOTES) ALTERNATIVE TO SUPPORT ADDITIONAL
TOP BAR IS ACCEPTABLE a a
L2
2L
b
R
L2
ADDITIONAL APPROVED BY
REINFORCEMENT: REINFORCEMENT: REINFORCEMENT: HORIZONTAL REBAR 2-D12
a, b : SAME SIZE AS SLAB REBAR a, b : SAME SIZE AS SLAB REBAR a,b,c : 2-D12 AND SAME SIZE AS REBAR
SAME NUMBER AS CUT BAR SAME NUMBER AS CUT BAR (ARRANGE UNDER THE TOP BAR) 500 500
GENERAL DIRECTOR MATSUI TAKAO
c: 1-D12 AND SAME SIZE AS REBAR c: 2-D12 AND SAME SIZE AS REBAR d : SAME SIZE AS SLAB REBAR
(ARRANGE UNDER THE TOP BAR) (ARRANGE UNDER THE TOP BAR) SAME NUMBER AS CUT BAR GENERAL CONTRACTOR :
L2
lo
3,0
lo AND≥L2
R
00
L2
1,0
L2
L2 ADDITIONAL HORIZONTAL DESIGN COODINATOR :
D
P REBAR
KAJIMA DESIGN ASIA PTE LTD.
80 Marine Parade Road, #14-01/03 Parkway Parade
lo' lo' AND≥L2 Singapore 449269
L2 R L2
(NOTES) (NOTES) (NOTES) STRIRRUP BELOW HOLE DESIGN CONSULTANTS :
1) ARRANGE UNDER THE TOP BAR 1) lo, (lo') < 1000 1) lo, (lo') < 1000 ADDITIONAL DIAGONAL REBAR
2) ARRANGE UNDER THE TOP BAR 2) ARRANGE UNDER THE TOP BAR INTES COMPANY LIMITED
1.5D 3rd floor, SB Building, 140 Bach Dang, Ward 2,
USUAL RANGE USUAL RANGE Tan Binh District, Ho Chi Minh City, Vietnam
REINFORCING RANGE
5. SLAB DROP ( STIRRUP @50)
>t
2-b NOTES:
2t a (NOTES) 1) STIRRUP SPACING SHALL BE 50MM IN THE REINFORCING RANGE.
t < e ≤ 2t
e
≥8d
b : 1 SIZE UP FROM SLAB REBAR BUT OUTER STIRRUP SHALL NOT BE LESS THAN D12. DESIGN COORDINATOR:
t
PROJECT:
(1) lo ≤ 750 (2) lo ≤ 1,000
SMC MANUFACTURING (VIETNAM)
CL CL 3RD FACTORY - PHASE 2 PROJECT
1-D12
D10@200
D10@200
150
120
LOCATION :
1-D12
LOT B-2 & LOT B-4, ROAD D2, LONG DUC INDUSTRIAL PARK, AN
PHUOC COMMUNE, LONG THANH DISTRICT, DONG NAI PROVINCE,
100
VIET NAM
90
SCALE:
A1=NTS 07/2023
DETAIL DESIGN DRAWING
DRAWING No : 0
SMC3.2-22.011-KVN-DD-00-ST-104