POI Batch I – 38 Sites

35 sites was finished. 2 sites are on going.

Contact
Site ID Maincont Subcont RFS Target Last Milestone Next Milestone OSP Daily Activity Team Leader
Number

30/7 :Erection Section 2,


Sahabat 085340390504
Tower erection LOM Tower : onsite Holland (SMS)
GROP0032 SANSAINE Makna Sejati, W33 Tower erection OG OSP already integarted with Telkom 082231303434
Fnish Plan RFI W33 Idamsar (FH)
PT (Idamsar FH)

30/7 :
0812-4865-
Berkat Hijau Tower Erection done,
OSP Resurvey Done 08/06, APD OSP Jendri Sansaine 9217
MLAP0358 SANSAINE Makmur Abadi, W33 Tower erection Fnish RFS BTS Foundation done,
Approve, Not yet Start OSP Fajar (FH) 082175296645
PT Pole panel KWh done
(Fajar FH)
Fence foundation done,

烽火通信@信息通信专家
Phase 1-POI-GROP0032 (POI_MELAWI_TANJUNG LAY)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

- 27/7 : LOM closed


Tower erection OG Erection Section 2, Power
- Continue Erection
Sulawesi CME OSP already LOM Tower. Foundation W33 - Continue Mini CME
integarted with Telkom Plan RFI W33 Start - Monitor Plan RFI W33

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-POI-MLAP0358(POI_PULAU TALIABU_BOBONG)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

OSP Resurvey Done 08/06, APD OSP Approve,


Not yet Start OSP
Today activity 25/07: OG FENCE, PLN Power
Connection administration OG, PLN Power
Connection administration OG (waiting sign from
Maluku CME OG Tower Erection Finish Mini CME Power and OSP 30-Jul-22 RFS POI and integration OSP
Fenty Shu & Anca BHMA), ME-Grounding mat
NY MOS, KWH Pole NY MOS,
Material OSP , Pole MOS at Taliabu, Cable FO
still on STO Sanana.
No team from Sansaine

Photo1 Photo 2

烽火通信@信息通信专家
POI Batch 2 – 6 Sites

RFS Next
Region Site ID Maincont Last Milestone OSP Daily Activity Team Leader Contact Number
Target Milestone
Kalimantan KLBP0010A PT. RPA SITAC ready Power Material Preparation APD OG, proposed PLN Kun Basuki +62 811-1772-
(POI_MELAWI_TANJUN W38 Foundation 411
G LAY) Start
Kalimantan KLBP0011A(POI_SINTA PT CGL SITAC ready Power Material Preparation APD OG, Max +62 812-8452-
NG_SUNGAI ANA) W38 Foundation proposed PLN after Monev Bakti 3699
Start 29/7/2022
Kalimantan KLBP0012 (POI_KAPUAS PT. SKI Bore Pile OG Bore Pile OG Material Preparation 30/7 : Bore pile OG Sugeng +62 818-1818-
HULU_PUTUSSIBAU W38 Perubahan Design Pondasi bore 5090
KOTA) pile 30/7
Kalimantan KLTP0001 PT. ANS Pass pra DRM Soiltest Material Preparation Sitac OG, proses negotation lease Isnaini +62 821-5309-
(POI_SERUYAN_PERSIL W38 land 0809
RAYA)
Sumatera SMUP0001 (POI_NIAS PT. Zhoung Fu Tong Indonesia Soil Test,APD SKOM Material Preparation 29/7 : Soil test done,APD OG M.Tiarmansyah 089629689510
W38
SELATAN_HILITOBARA)
Sumatera RIAP0001 PT. Rekayasa Prima Mandiri Soil Test,APD SKOM Material Preparation 30/7 : Soiltest done 30 Jul. Anton 081389767399
(POI_KARIMUN_TANJU temporary report plan submit 1
NG BATU) Aug 22,
W38 IW still OG, ada perubahan
persetujuan warga. plan
pertemuan IW 1 Aug malam

烽火通信@信息通信专家
Phase 1-POI-KLBP0010A (POI_MELAWI_TANJUNG LAY)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

APD Approved 7July


2022
(Upgrade power
only)
Sitac Process : Need
Power
redesign solar Plan Submit APD :28 July 2022
Kalimantan APD OG CME Foundation 30-Jul-22 RFI/RFS
Plan Start CME : 29 July 2022
panel position due to
swadow from
Start
tower existing (
payranometer),
Pic. Allan,Dodi
Defrian

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-POI-KLBP0010A (POI_MELAWI_TANJUNG LAY)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

APD Approved 7July


2022
(Upgrade power
only)
Sitac Process : Need
Power
redesign solar Plan Submit APD :28 July 2022
Kalimantan APD OG CME Foundation 30-Jul-22 RFI/RFS
Plan Start CME : 29 July 2022
panel position due to
swadow from
Start
tower existing (
payranometer),
Pic. Allan,Dodi
Defrian

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-POI-KLBP0011A (POI_SINTANG_SUNGAI ANA)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

APD Approved 7July


2022
(Upgrade power
only)
Sitac Process : Need
Power
redesign solar Plan Submit APD :28 July 2022
Kalimantan APD OG CME Foundation 30-Jul-22 RFI/RFS
Plan Start CME : 29 July 2022
panel position due to
swadow from
Start
tower existing (
payranometer),
Pic. Allan,Dodi
Defrian

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-POI-KLBP0012 (POI_KAPUAS HULU_PUTUSSIBAU KOTA)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

Bore pile ( 9 point), ETF.3 .8


Tower Pile cap /Raft
Kalimantan Bore Pile On process Bore Pile 30-Jul-22 RFI Tower SST 4L 72 Height Heavy
Foundation Foundation

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-POI-KLBT001 (POI_SERUYAN_PERSIL RAYA)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

Plan Soil test 30/7, ( ANS , Pic. Arief Gunandar)


Kalimantan SITAC ready Soil test Soil test APD 30-Jul-22 Tower SST 3L 32 Height Light

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-POI-SMUP0001 (POI_NIAS SELATAN_HILITOBARA)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

Need approaching and re negotiation among


SITAC FH and Land Lord
Sumatera SITAC ready SITAC SITAC Soil test 30-Jul-22 CME start Comcase from Land lord ( 84 Mio)
Tower SST 3L 32 Height Light

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-POI-RIA0001(POI_KARIMUN_TANJUNG BARU)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

Need approaching and re negotiation among


SITAC FH and Land Lord .
Comcase from Land lord( 90 Mio)
Sumatera SITAC ready SITAC SITAC Soil test 30-Jul-22 CME start
and surrounding site .
Tower SST 4L 72 Height Heavy

Photo1 Photo 2

烽火通信@信息通信专家
Repeater status – 23 Sites
9 sites was finished. 14 sites are on going.
Site ID Maincont Subcont RFS Target Last Milestone Next Milestone Topology Daily Activity Team Leader Contact Number
Tirta Celebes Mandiri,
PT GROP0041 (RFS) --- GROR033 (setting Efdi 0811-3352200
GROR033 SANSAINE 12-Jul-22 Rebaring-Retaining Wall OG Pouring 30/7 : CPR done,Plan Pouring 03/8/2022
Animus, PT / Mandra angkur & langsir material / Animus) Firman FH 081808176966 (Firman FH)
Jasa, PT.
Update 30/7 :
Profesional Teknologi SLGP0101 (RFS) --- SLGR0104 (Erection Top 'Erection finished,
SLGR0104 FIBERHOME 20-Jun-22 Erection Finish RFI Dede Heriawan 81310570538
Telekomunikasi, PT Done 24/7, Tower Ladder OG / FH-PTT) Mini CME OG, Fence OG
Material grounding, Power dan Ti on sites
SLTP0422 (RFS) --- SLT00522 (Excav OG /
CPR plan submit 2/8
Berkat Hijau Makmur BHMA) --- SLTR0001 (SETTING Didin / Eka Chandra 0819-5986-5266 / 081316413688
SLTR0001 SANSAINE 20-Jul-22 Formwork + Setting anchor Pouring plan pouring 5/7
Abadi, PT ANGKUR(CPR Plan 28/7) / BHMA) --- Tri Novandi (FH) 081222214957 (Tri Novandi FH)
hauling material PC, Gravel and Sand OG
SLT00535 (RFI OG 90% / Infratel)
Value SLTP0406 (RFS) --- SLT00362 (SKOM) -- -rebaring OG,
SLTR0416 SANSAINE 13-Jul-22 Lean concrete Done Pouring M Fadli +62 812-8049-9190
Telecomunication, PT SLTR0416 (Lean Concrete) plan take over by Fiberhome
SLTP0414 (RFS) --- SLT0066 (Curring time
waiitng FE site SLT0066 - Plan erection 1/8, - ETF.8/8.
SLTR0432 SANSAINE Reka Matra Bestari, PT 15-Jun-22 TI Install done RFS from 17/07/Kedung Nusa Buana) -- SLTR0432 Halomoan 0818-0404-4404
material Tower on site
(TI Install OG)
SLTP0422 (RFS) --- SLT00319 (RFS) ---
SLT00325 (Excav OG perbaikan / Lindu) ---
SLT00326 (Excav Done / Lindu) --- SLT00328 - MW installation NE : done,
SLTR0433 SANSAINE Lindu Putra Utama, PT 31-May-22 TI Install done RFS Yanto 81344894211
(SKOM Done / BHMA) --- SLT00323 (Rebaring Depend on SLT323 - CPR OG, plan pouring 3/8
Done / Lindu) --- SLTR0433 (TI Installation OG
(Remain MW Antenna NY))
SLTP0401 (RFS) --- SLTR0434 (SKOM /
Value - Excavation on hold
SLTR0434 SANSAINE 13-Jul-22 Excavation OG Excavation Finish Buana Nevea) --- SLT00219 (CPR submission M Fadli +62 812-8049-9190
Telecomunication, PT Plan take Over by Fiberhome
OG / Valtel)
SLUP0001 (RFS) --- SLU00018 (Excav OG
ETF 28/7/ Giga) --- SLU00016 (Mini CME OG - Excation OG - plan pouring 15/8
SLUR0001 SANSAINE Giga Putra Sukses, PT 31-Jul-22 Excavation OG Rebaring Halomoan 0818-0404-4404
ETF 28/7 / Giga) --- SLUR0001 (Excav OG / - uplink site dependency (SLU00016 & SLU00018)
Giga)
Tower erected Done, Ladder Done, TI instalation OG, RFS on
NTTP0010 (RFS) --- NTT00165 (Pointing MW Thomas Surya 082187011620
NTTR0364 SANSAINE Suryatech, PT 15-Jun-22 RFI RFS plan 28/7.
OG) --- NTTR0364 (Pointing MW ) Bakti (FH spv Zone 1) 0877-8435-1177 (Bakti FH Zone 1)
still retaining wall OG and fence OG ( plan target finish 22/07)
MLAP0358 (Erection Done/ Equipment
foundation Done) --- MLA00312 (Rectify
rectification of excavation Done, need re-tidy leveling soil, local
Berkat Hijau Makmur Excav) --- MLA00362 (RFI OG) --- MLAR0377 Jendri-Sansaine 0812-4865-9217
MLAR0371 SANSAINE 30-Aug-22 Rectification Excavation Rebaring/Formwork finish material need ASAP at site for Rebaring (rebar iron NY, cement
Abadi, PT (Rebaring OG) --- MLAR0378 (Excav OG) --- Tomy Darianus (FH) 0813-3619-4362 (Tommy FH)
NY, sand NY, gravel stone NY, spacer iron NY)
MLA00337 (Curring Time Done) --- MLAR0376
(Erection OG) --- MLAR0371 (Rectify Excav)
MLAP0358 (Erection Done/ Equipment
foundation Done) --- MLA00312 (Rectify
hold by community, ada tunggakan pembayaran material alam;
Berkat Hijau Makmur Excav) --- MLA00362 (RFI OG) --- MLAR0377 Jendri-Sansaine 0812-4865-9217
MLAR0376 SANSAINE 16-Aug-22 Tower erection OG Tower erection finish BA already created by Kades Loseng (27.44 mio), soil land
Abadi, PT (Rebaring OG) --- MLAR0378 (Excav OG) --- Tomy Darianus (FH) 0813-3619-4362 (Tommy FH)
slide (need rectification)
MLA00337 (Curring Time Done) --- MLAR0376
(Erection OG)
MLAP0358 (Erection Done/ Equipment 30/7 :
foundation Done) --- MLA00312 (Rectify CPR submit
Berkat Hijau Makmur Jendri-Sansaine 0812-4865-9217
MLAR0377 SANSAINE 30-Aug-22 Rebaring/Formwork OG Pouring Finish Excav) --- MLA00362 (RFI OG) --- MLAR0377 Plan pouring
Abadi, PT Fajar (FH) 082175296645 (Fajar FH)
(Rebaring OG) --- MLAR0378 (Excav OG) ---
MLA00337 (Curring Time Done)
MLAP0358 (Erection Done/ Equipment Farrel Sansaine-
Berkat Hijau Makmur foundation Done) --- MLA00312 (Rectify Already started excavation (photo NY), escort by Babinsa 0812-4865-9217
MLAR0378 SANSAINE
Abadi, PT
30-Aug-22 Excavation OG Excavation finish
Excav) --- MLA00362 (RFI OG) --- MLAR0377 (Polisi)
BHMA
0813-3619-4362 (Tommy FH)
(Rebaring OG) --- MLAR0378 (Excav OG) Tomy Darianus (FH)
22/07: Pouring OG ( Chinmey /Pedestal SST.72 m Heavy) hold
by SPV CME due to after check diagonal anchor not match ( Jendri Sansaine /
MLUP0459 (RFS) --- MLU0068 (Rebaring OG / Dev. 4 cm ).
Berkat Hijau Makmur Christian Adhi Putra 0812-4865-9217 / 0816-1870-029
MLUR0492 SANSAINE 30-Aug-22 Rebaring/Formwork OG Rebaring/Formwork finish BHMA) --- MLU00483 (RFI / BHMA) --- CPR on preparation 18/07;
Abadi, PT BHMA 0889-5242-021 (Catur FH)
MLUR0492 (Rebaring/Formwork OG / BHMA) Tower material at WH FH Ambon (re-plan target Pickup 20/07).
| MLU0068 (Rebaring Done, CPR Preparation, re-plan submit Catur (FH)
22/07)
烽火通信@信息通信专家
Phase 1-REPEATER SITE- GROR033
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

'Plan Pouring 28/7, waiting template


'Local Material Complete, template anchor MOS
21/07, setting Anchor & Hauling material
Still Retaining wall for CPR pouring (Zone E), re-
Rebaring-Retaining Setting anchor + CPR
Sulawesi CME OG Pouring 30-Jul-22 RFI ETF 29-30 July-2022 |CPR Process, re-plan
Wall OG OG
submit 25 July
Efdi (0811-3352200) – SS (Animus, PT / Mandra
Jasa, PT.)
Firman FH (081808176966)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- SLGR0104
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

Start Mini CME and fence OG


Sulawasi CME OG Erection OG Mini CME , Fence OG RFI 30-Jul-22 SLGP0101 (RFS) --- SLGR0104 Dede Heriawan_81310570538 (Profesional
Teknologi Telekomunikasi, PT-FH_)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- SLTR0001
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

'Seeting Anchor and completion photo for CPR ,


SLTP0422 (RFS) --- SLT00522
ETF. 28/7,
(Excav OG / BHMA) ---
Plan pouring 31/8, waiting local material by SS.
Pouring Tower SLTR0001 (SETTING
Sulawesi CME Formwork Setting Anchor 30-Jul-22 ANGKUR(CPR Plan 28/7) /
Didin / Eka Chandra (0819-5986-5266 /
foundation
081316413688)
BHMA) --- SLT00535 (RFI OG
Tri Novandi (FH) 081222214957
90% / Infratel)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- SLTR0416
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

SLTP0406 (RFS) --- SLT00362 Rebaring OG,


Pouring Tower
Sulawesi CME OG Lean concrete Done Rebaring + Formwork 30-Jul-22 (SKOM) -- SLTR0416 (Lean plan pouring 3/8
Foundation
Concrete) M Fadli -+62 812-8049-9190

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- SLTR0432
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

waiitng FE site SLT0066 - Plan erection 1/8, -


ETF.8/8.
No activity, MW antenna already MOS,
SLTP0414 (RFS) --- SLT0066
TI Installation OG TI Installation OG Power waiting uplink site dependency erection progress
(Curring time from 17/07/Kedung
Sulawesi TI OG (Remain MW Antenna (Remain MW Antenna Foundation 30-Jul-22 Nusa Buana) -- SLTR0432 (TI
(SLT0066 : Rebaring Done, CPR Approved
NY) NY) Start already 18/07)
Install OG)
Halomoan (0818-0404-4404) – SS-Reka Matra
Bestari, PT

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- SLTR0416
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

SLTP0406 (RFS) --- SLT00362 '-rebaring OG,


Pouring Tower
Sulawesi SITAC ready Lean concrete Done Rebaring G 30-Jul-22 (SKOM) -- SLTR0416 (Lean plan pouring 3/8
Foundation
Concrete) M Fadli +62 812-8049-9190 ( SS- Surya Tech)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- SLTR0433
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

SLTP0422 (RFS) --- SLT00319


(RFS) --- SLT00325 (Excav OG
perbaikan / Lindu) --- SLT00326 '- MW installation OG,
TI Installation OG (Excav Done / Lindu) --- Depend on SLT325 - CPR OG, plan pouring 3/8
Sulawesi TI OG (Remain MW Antenna TI OG RFS 30-Jul-22 SLT00328 (SKOM Done / BHMA) Yanto 81344894211_ ( SS-Lindu Putra Utama,
NY) --- SLT00323 (Rebaring Done / PT)
Lindu) --- SLTR0433 (TI
Installation OG (Remain MW
Antenna NY))

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- SLTR0434
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

SLTP0401 (RFS) --- SLTR0434 '- Excavtion OG ( escort by TNI ),


Excavation OG Pouring Tower (SKOM / Buana Nevea) --- - plan pouring 15/8, ( hard soil )
Sulawesi CME OG Excavation OG 30-Jul-22 SLT00219 (CPR submission OG / - M Fadli +62 812-8049-9190
Foundation
Valtel) - ( SS- Surya tech)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- NTTR0364
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

'Tower erected Done, Ladder Done, TI instalation


OG, RFS on plan 28/7.
NTTP0010 (RFS) --- NTT00165
still retaining wall OG and fence OG ( plan target
NTT TI OG RFI TI OG RFS 30-Jul-22 (Pointing MW OG) --- NTTR0364
finish 22/07)
(Pointing MW )
Thomas 082187011620
Bakti (FH spv Zone 1) 0877-8435-1177

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- SLUR001
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

SLUP0001 (RFS) --- SLU00018 '- Excation OG - plan pouring 15/8


(Excav OG ETF 28/7/ Giga) --- - uplink site dependency (SLU00016 &
Excavation OG Rebaring and
Sulawesi CME Excavation OG 30-Jul-22 SLU00016 (Mini CME OG ETF SLU00018)
Formwork
28/7 / Giga) --- SLUR0001 (Excav - Halomoan 0818-0404-4404 ( SS-Giga Putra
OG / Giga) Sukses, PT)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- MLAR0371
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

MLAP0358 (Erection Done/


Equipment foundation Done) --- rectification of excavation Done, need re-tidy
MLA00312 (Rectify Excav) --- leveling soil, local material need ASAP at site for
Power MLA00362 (RFI OG) --- Rebaring (rebar iron NY, cement NY, sand NY,
Excavation OG
Maluku CME OG Excavation OG Foundation 30-Jul-22 MLAR0377 (Rebaring OG) --- gravel stone NY, spacer iron NY)
Start MLAR0378 (Excav OG) --- Jendri-Sansaine ('0812-4865-9217)
MLA00337 (Curring Time Done) - Tomy Darianus (FH) 0813-3619-4362
-- MLAR0376 (Erection OG) ---
MLAR0371 (Rectify Excav)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- MLAR0376
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

MLAP0358 (Erection Done/


Equipment foundation Done) --- Need close payment with local supplier
MLA00312 (Rectify Excav) --- hold by community, BA already created by Kades
Tower erection OG Tower erection MLA00362 (RFI OG) --- Loseng (27.44 mio), soil land slide (need
Maluku CME Tower erection OG 30-Jul-22 MLAR0377 (Rebaring OG) --- rectification)
finish
MLAR0378 (Excav OG) --- Jendri-Sansaine ('0812-4865-9217)
MLA00337 (Curring Time Done) - Tomy Darianus (FH) 0813-3619-4362
-- MLAR0376 (Erection OG)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- MLAR0377
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

MLAP0358 (Erection Done/


Broken bridge again, lean concrete sloping OG
Equipment foundation Done) ---
(waiting mixer on site estimation 30/07, ETF
Power MLA00312 (Rectify Excav) ---
Rebaring/Formwork Pouring Tower 30/07), CPR already approved, Rectification
Maluku CME Foundation 30-Jul-22 MLA00362 (RFI OG) ---
Rebar Fabrication Done, Pouring plan 30/07,
OG Foundation
Start MLAR0377 (Rebaring OG) ---
Plan CPR approved.
MLAR0378 (Excav OG) ---
MW antenna MOS, Fence MOS, SPS MOS
MLA00337 (Curring Time Done)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- MLAR0378
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

MLAP0358 (Erection Done/


Equipment foundation Done) --- Already started excavation (photo NY), escort by
Power
MLA00312 (Rectify Excav) --- Babinsa (Polisi)
Maluku CME SKOM Exacavtion OG Foundation 30-Jul-22 MLA00362 (RFI OG) --- Farrel Sansaine-BHMA -'0812-4865-9217
Start MLAR0377 (Rebaring OG) --- Tomy Darianus (FH) -0813-3619-4362
MLAR0378 (Excav OG)

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- MLAR00376/ REP_PULAU TALIABU_LOSENG)
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

Power
Erection OG
Maluku CME OG Erection OG Foundation 30-Jul-22 Tower Structure Need retaingi wall
Start

Photo1 Photo 2

烽火通信@信息通信专家
Phase 1-REPEATER SITE- MLUR0492
Region Current state Last Week status Current Activity Next state Target Finish Issue/Risk Action Plan

Pouring Tower Back dill ,


Maluku CME Curing time 30-Jul-22 delivery material TI and power Back fill and Mini CME start
Foundation Mini CME

Photo1 Photo 2