➢ Before inspection crane should be isolated from power source, it should be lockout and tagout
and barricaded.
➢ I am doing inspection as per Standard BS EN 7121-2-7: 2012, /SP 2275 and Astron Inspection
Procedure T3-TEP-LEP-202
➢ First, I prefer to check previous report and its highlighted items which need to give more care,
maintenance report and daily checklist. If any thing highlighted on previous report, then I will
give more focus on highlighted comment form previous report.
➢ I will note down its manufacturer details along with serial number and all other information.
➢ I will check for visual examination against its defect especially in the part like
1. End carriage structure
2. Long travel drive, wheels, axles, bearings, brake
3. Bridge girder
4. Crab structure
5. Cross travel drive, wheel, axles, bearing and brake.
6. Cross travel rails
7. Hoist mechanism including motor, brake, gearbox, drum, and bearings.
8. Wire rope and its termination and anchorages, rope guide and pressure arm, sheaves,
sheaves pin, bottom block of hook.
9. Check for electric control panel
10. Check for operator cabin and sitting if applicable.
11. Limit switches such as travel limit switch and hoist limit switches.
12. Platform and ladders if applicable
13. Supporting structure.
14. Gantry beam, rail, and fixings.
15. End stops and buffers
16. Down shop conductor system (festoon cable, Shrouded conductor system, cable reeling
drum etc.)
➢ Once visual examination done, I will focus on following Assessment criteria.
1. Alignment (span difference, level difference, line deviation and track inclination)
2. Corrosion
3. Crack
4. Distortion
5. Damage
6. Functionality
7. Leakage
8. Lubrication
9. Marking
10. Mode of operation
11. Rope fit
12. Rope reeving
13. Rope specification
14. Rope condition
15. Obstruction
16. Security, seizure
EOT GENERAL INSPECTION PROCEDURE WHICH I FOLLOW