You are on page 1of 3

Helping Hands

SE 4351.001 - Requirements Engineering


Website: https://helpinghandsfordisabilities.weebly.com/
Team Leader: Ethan Arnold
Team Members:
Ethan Arnold (ema190000, ema190000@utdallas.edu)
Saud Baig (ssb190008, ssb190008@utdallas.edu)
Thais Campanac-Climent (tcc180002, tcc180002@utdallas.edu)
Kevin Galdamez (kjg180004, kjg180004@utdallas.edu)
Acer Jagrup (acj190005, acj190005@utdallas.edu)
Donovan Johnson (dxj180011, dxj180011@utdallas.edu)
Thomas McClintic (tjm180003, tjm180003@utdallas.edu)

Work Distribution
By signing this document, you believe that the work distribution in section 1.3 is complete and
accurate:

● Ethan Arnold 14% contributed

● Saud Baig 14% contributed

● Thais Campanac-Climent 14% contributed

● Kevin Galdamez 14% contributed

● Acer Jagrup 14% contributed

● Donovan Johnson 14% contributed

● Thomas McClintic 14% contributed


Outline
1. Introduction
1.1 Project overview
The goal of our project is to create a mobile app which aids blind people with indoor
navigation. The app will be created for the Android operating system using the Java
programming language for one hallway in ECSS on the third floor as a proof-of-concept
application. Various stakeholders will need to be considered when it comes to
developing this application such as the blind people, caregivers/family members, and
emergency medical services.
1.2 Project deliverables
Phase Deliverable Due Team Standards Tools (SDK)
Date Leader / Template
Preliminary ● Team name Sept. 1 Ethan ● Google Docs
Project ● Team organization Arnold ● Weebly
Plan ● Team leaders
● Deliverables
● Team website URL
● Tools used
● Brief description of
project

1.1 Interim ● Preliminary project Sept. 29 Thomas WRS ● Google Docs


Project I description McClintic Template ● Weebly
● Mockup and prototype ● Android SDK
(screenshots) ● Figma
● Presentation and
submission of PPT
● Questionnaire 1

1.2 Final ● WRS document Oct. 11 Saud Baig WRS ● Google Docs
Project I ● Updated PPT (if Template ● Weebly
needed) ● Android SDK
● Evolving project plan

2.1 Interim ● Product vision Nov. 15 Thais WRS ● Google Docs


Project II document Campanac Template ● Weebly
● WRS document -Climent ● Android SDK
● Evolving project plan ● RE-Tools
● Process specs
● Questionnaire 2

2.2 Final ● Presentation and demo Nov. 29 Donovan WRS ● Google Docs
Project II ● Hard copy of - Dec. 3 Johnson Template ● Weebly
documents listed above ● Android SDK
● Compressed file ● RE-Tools
containing all
documents
1.3 Evolution of this document
Name Items Done Date

Thais Campanac-Climent ● Created initial website 8/28/22


● Created PPP Document with Outline,
Team Members, and Work Distribution

Thais Campanac-Climent ● Inserted PPP table and completed layout 8/31/22


of the titles
● Completed title section

Saud Baig ● Introduced project in the overview 8/31/22


● Filled in deliverable information

Kevin Galdamez ● Updated the project schedule/deliverables 8/31/22

Ethan Arnold ● Updated tools for each phase of the 8/31/22


project
● Added Team Meeting Log with an
overview of the last meeting

Thomas McClintic ● Updated deliverables 8/31/22

Acer Jagrup ● Added standards and templates 8/31/22


● Document formatting, minor corrections

Team Meeting Log


August 30, 2022
The team met informally (as not all members were able to participate) in person and
discussed the requirements of the first deliverable of the project (Preliminary Project
Plan). Details such as the website, team organization, necessary tools, and project
overview were discussed.
Members present: Acer, Thais, Ethan, Donovan
Members absent: Thomas (sick), Saud (schedule conflict from next class), Kevin

You might also like