You are on page 1of 1

8/19/2022

Indonesia 1 Project

BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision :0


Area/Location : Radioterapi lt.LG Reference drawing No. : S-07
Total :1 BBS No. :1
Grade Rebar (Fy) :
:
Unit
Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Sub Total Length m' Weight Remarks
Weight kg
kg/m'
156 3888 156
1 13 23 4.200 96.6 1.04 100.646

156 6728 156


2 13 12 7.040 84.48 1.04 88.018

750
3 10 69 0.750 51.75 0.62 31.904

100
4 100 10 81 0.300 24.3 0.62 14.981
100

375 120
5 10 23 0.495 11.385 0.62 7.019

Total Weight 242.568


Grand Total Weight 242.568
Calculated by : Checked by : Approved by : Distribution Record :