CHELSEA PARKPLACE - MOCK UP SCHEDULE

MOCK-UP SCHEDULE CHELSEA


Jun-22 Jul-22 Aug-22

ONWARDS
01-Jul-22
02-Jul-22
03-Jul-22
04-Jul-22
05-Jul-22
06-Jul-22
07-Jul-22
08-Jul-22
09-Jul-22
10-Jul-22
11-Jul-22
12-Jul-22
13-Jul-22
14-Jul-22
15-Jul-22
16-Jul-22
17-Jul-22
18-Jul-22
19-Jul-22
20-Jul-22
21-Jul-22
22-Jul-22
23-Jul-22
24-Jul-22
25-Jul-22
26-Jul-22
27-Jul-22
28-Jul-22
29-Jul-22
30-Jul-22
31-Jul-22
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####

#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
#####
Days to complete Status (Ahead/Delay
Planned Planned Original Schedule Impact/ Days to complete
CLASSIFICATION POC (Original Date - Current based on Original
Start Finish Duration Projected Finish Date)
(Projected-Current Date)
Schedule)

MILESTONE
ROOM F - 1BR 07-Jun-22 25-Aug-22 79 04-Sep-22 13 23
ROOM G - STUDIO 07-Jun-22 25-Aug-22 79 04-Sep-22 13 23
ROOM K - 2BR 07-Jun-22 25-Aug-22 79 04-Sep-22 13 23
STAIRCASE (FE-2) 01-Aug-22 25-Aug-22 24 28-Aug-22 13 16
HALLWAY 15-Jul-22 27-Aug-22 43 05-Sep-22 15 25
Removal of shoring jack and reshoring works 13 100% 0 0 completed
07-Jun-22 20-Jun-22 20-Jun-22
and CIP concreting works
CIP Walls 15-Jul-22 18-Jul-22 3 100% 18-Jul-22 0 0 completed
Interior Wall Works 07-Jun-22 03-Aug-22 57 80% 13-Aug-22 0 1 delayed!!
Waterproofing works 25-Jul-22 27-Jul-22 2 75% 12-Aug-22 0 0 delayed!!

PUNCH WORKS
Concrete Toppings 25-Jul-22 27-Jul-22 2 0% 16-Aug-22 0 4 delayed!!
Metal Railings 05-Aug-22 10-Aug-22 5 0% 15-Aug-22 0 3 delayed!!
Window Works 05-Aug-22 10-Aug-22 5 0% 15-Aug-22 0 3 delayed!!
Ceiling Works 01-Aug-22 15-Aug-22 14 56% 20-Aug-22 3 9 near due date
Tiling Works 01-Aug-22 08-Aug-22 7 0% 15-Aug-22 0 3 delayed!!
Doors and Hardware 10-Aug-22 15-Aug-22 5 0% 20-Aug-22 3 8 near due date
Painting Works 10-Aug-22 22-Aug-22 12 10% 31-Aug-22 10 20
Cabinetries and Countertop 10-Aug-22 20-Aug-22 10 0% 30-Aug-22 8 18
T&B Accessories 05-Aug-22 10-Aug-22 5 0% 15-Aug-22 0 3 delayed!!
Water Tightness 22-Aug-22 25-Aug-22 3 0% 29-Aug-22 13 17
Elec & Auxilliary 07-Jun-22 25-Aug-22 79 70% 06-Sep-22 13 25
Plumbing and Sanitary 07-Jun-22 25-Aug-22 79 90% 31-Aug-22 13 20
Fire Pro 01-Jul-22 25-Aug-22 55 75% 06-Sep-22 13 25
Mechanical 01-Jul-22 25-Aug-22 55 85% 01-Sep-22 13 20
Punchlist 01-Jul-22 25-Aug-22 55 0% 03-Sep-22 13 23
Handover (MOCK-UP) 25-Aug-22 25-Aug-22 1 0% 06-Sep-22 13 25

MOCK-UP SCHEDULE CHELSEA


CLASSIFICATION

Days to complete Days to complete Status (Ahead/Delay Unit F Remarks - 1 Bedroom Hallway & Lift Lobby
Planned Planned Original Schedule Impact/
Start Finish Duration Projected Finish
(Original Date - (Projected-Current based on Original Unit K remarks Unit H & G Remarks - Studio
Current Date) Date) Schedule)
POC
MILESTONE
ROOM F - 1BR 07-Jun-22 25-Aug-22 79 04-Sep-22 13 23
ROOM G - STUDIO 07-Jun-22 25-Aug-22 79 04-Sep-22 13 23
ROOM K - 2BR 07-Jun-22 25-Aug-22 79 04-Sep-22 13 23
STAIRCASE (FE-2) 01-Aug-22 25-Aug-22 24 28-Aug-22 13 16
HALLWAY 15-Jul-22 27-Aug-22 43 05-Sep-22 15 25
Removal of shoring jack and reshoring works 07-Jun-22 20-Jun-22 13 100% 20-Jun-22 0 0 completed Done Done Done Done
CIP Walls 15-Jul-22 18-Jul-22 3 100% 18-Jul-22 0 0 completed Done Done Done Done
Interior Wall Works 07-Jun-22 03-Aug-22 57 80% 13-Aug-22 0 1 delayed!! Waiting for MEPF's to complete the rectification. Done Done Done
Waterproofing works 25-Jul-22 27-Jul-22 2 75% 12-Aug-22 0 0 delayed!! For approval of BV - already inspected but need to check again for leak test Approved by BV flood testing - for tile installation to proceed August 10, 2022 Approved by BV flood testing - for tile installation to proceed August 10, 2022 -
Concrete Toppings 25-Jul-22 27-Jul-22 2 0% 16-Aug-22 0 4 delayed!! Balance to complete (by ADCI) Balance to complete (by ADCI) Balance to complete (by ADCI) -

Metal Railings 05-Aug-22 10-Aug-22 5 0% 15-Aug-22 0 3 delayed!! Balance to complete (by ADCI), Preparation of PR by BV to submit on Aug 10, 2022 (11Aug) As per ADCI Balance to complete (by ADCI), Preparation of PR by BV to submit on Aug 10, 2022 (11Aug) As per ADCI Balance to complete (by ADCI), Preparation of PR by BV to submit on Aug 10, 2022 (11Aug) As per ADCI -
railings, tempered glass, mirrors and countetops have already awarded to a supplier, PO to follow. railings, tempered glass, mirrors and countetops have already awarded to a supplier, PO to follow. railings, tempered glass, mirros and countetops have already awarded to a supplier, PO to follow.

Handover of punchlist by Ascent to Intact (Tomorrow Aug 10, 2022). BV to coordinate with intact Handover of punchlist by Ascent to Intact (Tomorrow Aug 10, 2022). BV to coordinate with intact Today. Handover of punchlist by Ascent to Intact (Tomorrow Aug 10, 2022). BV to coordinate with intact
Window Works 05-Aug-22 10-Aug-22 5 0% 15-Aug-22 0 3 delayed!! Today.(10Aug) Intact provided fabrication status, aluminums frames and handles are locally ready, the (10Aug) Intact provided fabrication status, aluminums frames and handles are locally ready, the (approved) Today.(10Aug) Intact provided fabrication status, aluminums frames and handles are locally ready, the None
(approved) glass importation is underway, expected to arrive at port 31August, fabrication and perimeter glass importation is underway, expected to arrive at port 31August, fabrication and perimeter glazing is on (approved) glass importation is underway, expected to arrive at port 31August, fabrication and perimeter
glazing is on 05Sep. 05Sep. glazing is on 05Sep.
Ceiling Works 01-Aug-22 15-Aug-22 14 56% 20-Aug-22 3 9 near due date Balance to complete ( Ceiling Boards). (10Aug) pending wiring installation prevents the ceiling board installationBal
(11Aug)
ance toSome
compl
ceilieteng( need
CeilingtoBoards).
be rectiffi(10Aug)
ed as per
pending
APD suggesti
wiring inostallati
n on prevents the ceiling board installationBalance to complete ( Ceiling Boards). (10Aug) pending wiring installation prevents the ceiling board installationBalance to complete (DTCS) - Need to complete the MEPF's work to proceed with works.

T&B need to verify and check the waterproofing before proceed the tiling works. (10Aug) Ascent can start T&B need to verify and check the waterproofing before proceed the tiling works. (10Aug) Ascent can start T&B need to verify and check the waterproofing before proceed the tiling works. (10Aug) Ascent can start
Tiling Works 01-Aug-22 08-Aug-22 7 0% 15-Aug-22 0 3 delayed!! the tiling work on toilets (11Aug) Tiles are available for pick up in Pasay and Bulacan, ADCI to arrange the pick- the tiling work on toilets (11Aug) Tiles are available for pick up in Pasay and Bulacan, ADCI to arrange the pick- the tiling work on toilets (11Aug) Tiles are available for pick up in Pasay and Bulacan, ADCI to arrange the pick- For PR re-endorsement to PROCOM (August 10, 2022), follow through with PO
up today. up today. up today.
Doors and Hardware 10-Aug-22 15-Aug-22 5 0% 20-Aug-22 3 8 near due date No P.O for door hardware for follow up on PROCOM No P.O for door hardware for follow up on PROCOM No P.O for door hardware for follow up on PROCOM EE/Aux - Metal door by Ascent
Painting Works 10-Aug-22 22-Aug-22 12 10% 31-Aug-22 10 20 On going surface preparation (11Aug) First coating ongoing On going surface preparation On going surface preparation DTCS supply materials
Cabinetries and Countertop 10-Aug-22 20-Aug-22 10 0% 30-Aug-22 8 18 (10Aug) As per Patrick, fabrication is proceeding but delivery will be put on hold until DP is released (10Aug) As per Patrick, fabrication is proceeding but deliv ery will be put on hold until DP is released (10Aug) As per Patrick, fabrication is proceeding but delivery will be put on hold until DP is released -
T&B Accessories 05-Aug-22 10-Aug-22 5 0% 15-Aug-22 0 3 delayed!! Materials are already on-site, for installation (predecessor: tiling works). Materials are already on-site, for installation (predecessor: tiling works). Materials are already on-site, for installation (predecessor: tiling works). NA
Water Tightness 22-Aug-22 25-Aug-22 3 0% 29-Aug-22 13 17 Secure upper floor waterproofing and Intact for doors and windows. Secure upper floor waterproofing and Intact for doors and windows. Secure upper floor waterproofing and Intact for doors and windows. -
Wires and cables - maximum delivery date August 11, 2022 as per supplier. (10Aug) As per supplier they are still Wires and cables - maximum delivery date August 11, 2022 as per supplier. (10Aug) As per supplier they are still Wires and cables - maximum delivery date August 11, 2022 as per supplier. (10Aug) As per supplier they are still
Elec & Auxiliary 07-Jun-22 25-Aug-22 79 70% 06-Sep-22 13 25 completing the wires for delivery, revised sched is on 13Aug. Romsam can start wiring installation for Auxiliary completing the wires for delivery, revised sched is on 13Aug. Romsam can start wiring installation for Auxiliary completing the wires for delivery, revised sched is on 13Aug. Romsam can start wiring installation for Auxiliary As per contractor Romsam delivery of cable trays is on August 10, 2022.
and FDAS and FDAS and FDAS
Plumbing and Sanitary 07-Jun-22 25-Aug-22 79 90% 31-Aug-22 13 20 Balance to complete (Asiawide), Grease trap (balance) Balance to complete (Asiawide), Grease trap (balance) Balance to complete (Asiawide), Grease trap (balance) Balance to complete (Asiawide)
Fire Pro 01-Jul-22 25-Aug-22 55 75% 06-Sep-22 13 25 Balance to complete (Asiawide) Balance to complete (Asiawide) Balance to complete (Asiawide) Balance to complete (Asiawide)

Mechanical 01-Jul-22 25-Aug-22 55 85% 01-Sep-22 13 20 Balance to complete (Ralgo), Kruger Exhaust for DP Release by MC. (11Aug) Exhaust fans delivered on site Balance to complete (Ralgo), Kruger Exhaust for DP Release by MC. (11Aug) Exhaust fans delivered on site Balance to complete (Ralgo), Kruger Exhaust for DP Release by MC. (11Aug) Exhaust fans delivered on sit e
Punchlist 01-Jul-22 25-Aug-22 55 0% 03-Sep-22 13 23
Handover (MOCK-UP) 25-Aug-22 25-Aug-22 1 0% 06-Sep-22 13 25