@ of Ay BE OA RA
Tarbela 5" Extension Hydropower Project Management Department
_ Bem Power Construction Corporation of China Limited
Our Ref. No. PCCCL/TS-CIVIL/2022-7?30, Date: gn September 2022
Project Manager
Tarbela 5 Consultants (TSC)
HPD Office, Tarbela Dam Project
Ghazi, KPK
Subject: Reply to Health and Safety Inspection Report No: 127
Ref. TSHP-T5C-XXXX-MEM-HS-000127/00773 Dated: 2nd September 2022
Dear Sir,
Reference is made to your above referred letter regarding the subject Health and Safety
Inspection report No: 127. The Contractor paid serious attention to these issues, and
immediately organized rectification. The attached rectification report is hereby submitted for
your information.
Yours Faithfully,
Power Construction Corporation of China Ltd,
Ag
(Hua Chaoy
Acting Project Manager
Enclosure: Rectification of Health and Safety Inspection Report No: 127
cc
1) CE/PD, Tarbela 5" Extension HPP, WAPDA, Ghazi, KPK
2) File
‘Site add China Camp, Tarbela 5” Extension Hydropower Projet Tarbela Dam, KPK, Pakistan ~ 23470
‘8 (92)0938-281099 Fax: (92) 0938-281077 E-mail: PCCCL_T5@163.comRectification of Health and Safety Inspection Report No: 127
Descriptions of the
observations
Corrective actions
taken
Besides advising several
times training messy live
electric cables are
repeatedly observed in
Intake Pit. There is no
judgment which cable is live
electric wire and which one
is for pressurized water.
Although the Contractor has
provided stands/frames for
electric cables but still they
are found inside water.
There is major hazard of
electrocution of whole area.
Moreover, they pose slip
and trip hazard,
Power lines have been
separated from the water
lodges area.
‘At Outlet area, workers are
fixing hooks for wire mesh
at more than 2m height.
No platform or ladder is
used and workers are
climbing directly on the
rock. Fall hazard exists
which may cause severe
injuries.
Ti order to prevent such
unsafe activities on the
site, we have invited all the
Chinese in-charge to the
conference room and in the
presence of all the
participants, they have
been informed about the
unsafe activity on the site
and they have been strictly
instructed find a good way
to enhance the activity at
site safe and sound do not
endanger any workers.
provide safe ladder to work
Photo
1at height should be as per
the standard, scaffolding
should be as per the
standard.
Shoterete is in progress at
Outlet slopes, Only 2 of 6
workers are having safety
goggles while they all are
lacking other mandatory
PPE. Shoterete particles
discharges with pressure
which may bounce and get
into eyes or hit the face of
's involved causing
Mandatory PPE have been
provided to the workers,
‘At Outlet slopes, working
platform is used for
| shotcrete at night shift. The
| said platform is absolutely
not safe in all manners.
Appropriate scaffolding
has been erected. All
standard precautions have
been taken in scaffolding.
The following steps are
taken: Base plate, triangle,
wooden planks all planks
are tied, top rail, mid rail,
Toe board, proper ladder
with handrail, Inclined
support.Workers are observed in
loose dress at workplace.
It was said that they are
newly hired and the worker
put his shirt inside his
shalwar. Loose dress has
hazard of nip point and
loose parts of the dress may
get entangled in rotatory
parts of machinery.
Uniform has been provided
to the mentioned worker.
Further, the in-charge of
grouting section is strictly
instructed not to allow any
body to enter the site in
loose clothing, first
provide them with uniform
and then allow them to
center the site.
Drilling machines for
grouting has been observed
fixed near main access road
at Intake site.
Barricades are provided
only with safety cones and
safety jersey barriers.
‘The drilling machine has
been removed from the
mentioned location.Chinese worker has been
‘observed working in
rotating machinery.
Its rotatory parts may have
nip point the naked hand.
Furthermore, working
without safety gloves
make the worker more
vulnerable to hazards.
Safety gloves have been
provided to the workers
8.
| At Intake site, the tanker of
the cement comes for
| grouting section after in
every two or three days. The
vehicles and the drivers
| were private. When
emptying the tankers at
site, during this process,
they have not any PPEs.
Such as safety helmet and
reflective hi vest.
"The matter has been
discussed with the in-
charge grouting team and
they have been instructed
not to allow any body to
enter the work site without
PPE.
At Intake site, Live electric
| wires found in the water of
grouting section, also joints
of the cables is in water.
electric current is
transmitted faster in on wet
surfaces, you stand a chance
of getting an electric shock.
shock may lead to
jury such as
physical shock, muscle
paralysis, and involuntary
muscle-reaction.
The electric cables have
been removed from the
water and additionally the
site electrician has been
informed about the proper
insulation of all the electric
cables in the work place
area. All electrical cables
are inspected by the PCL
HSE inspector, if he
observes any damaged
cable or weak insulation,
So it is taken into the
notice of the electrician.‘At Intake site, Damage
welding cable found with
welding plant of grouting
section on site.
Damage welding cable has
been replaced with the new
one.
without safety shoes at the
site and site Engt Chinese
‘was found without
safety helmet at the site.
11, | At powerhouse site, no hard | Mentioned berm has been
‘guard rail/fencing available
on the edge of the fourth
berm,
12. | Atthe intake site, grouting | Mandatory PPE have been
section labor was found —_| provided to the said
workers.‘At the powerhouse area
dumper no's 1- 12 back tire
was found not in good
condition.
Dumper no's 1-12 tyre has
been replaced with the new
one.
Water cooler lid was not
found with cooler and water
glass also not found.
Water glass have been
provided with water
coolers.
15,
At the intake site, the right-
side front light of Dumper
No. 1-46 was not working
and the driver was found in
loose clothing without green
vest and without safety
shoes.
Dumper No. 1-46 the
right-side front light has
been repaired. PPE have
been provided to the
driver.16. | Atthe penstock site Forman | Penalty notice have been
(Naveed) was found without | issued to the Foreman
safety helmet, green vest | Naveed for the violation of
‘was not worn and was the safety rules.
found without safety shoes
at the site,
17. | NEAR MISS The matter has been
Near miss event happened at
powerhouse back slopes,
when workers of Saleem
foreman, pulling the
grouting machine, at that
time the live electric cable
of the grouting machine
break from the joint due to
stretching. due to which the
spark was create. workers
‘were near at that time, and
they could injure due to
electric shock, but everyone
was safe. Electric shock
may lead to death or injury
such as physical shock,
muscle paralysis, and
involuntary muscle-reaction.
brought to the notice of the
Electrical In-charge and
they have been strictly
instructed about such
| incidents. That all
elect il cables should be
properly insulated and
| without any joints at the
cable site If a joint is
necessary to extend the
cable, the joint should be
properly taped/insulated
and the cable should not be
stretched.‘At penstock backslopes,
excavator machine doing
cutting and excavation, the
loaded dump trucks cross
near the excavator machine
but there is no safety person
with the excavator machine
to control the traffic. The
excavator could trip over
and crash. Or even the
swinging arm of the
machine could hit
somebody. This raises the
safety concem,
‘A flagmen has been
appointed with the
excavator machine,
19.
‘At penstock back slopes,
contractor using unsafe
scaffold structure for
placing the shot concrete on
slope. Contractor using
stones under the standards
of scaffold structure for
levelling. There is no base
plate and sole plate
available. Planks are not
tied. Many time we
observed this unsafe activity
‘on site and mentioned in our
observation report. But
contractor not showing any
interest and not taken any
safety precaution about this
unsafe activity.
“Appropriate scaffolding
has been erected at the
penstock area inspection
has been carried out with
the HSE TSC Engineer and
found satisfactory.
PCCCL-T5-CIVIL-2023-387 1st Interim Substantiation of Claim No.13 Claim On Account of 1% Increase in Sales Tax Announced by The Ministry of Finance and Revenue Government of Pakistan PDF