You are on page 1of 9
@ of Ay BE OA RA Tarbela 5" Extension Hydropower Project Management Department _ Bem Power Construction Corporation of China Limited Our Ref. No. PCCCL/TS-CIVIL/2022-7?30, Date: gn September 2022 Project Manager Tarbela 5 Consultants (TSC) HPD Office, Tarbela Dam Project Ghazi, KPK Subject: Reply to Health and Safety Inspection Report No: 127 Ref. TSHP-T5C-XXXX-MEM-HS-000127/00773 Dated: 2nd September 2022 Dear Sir, Reference is made to your above referred letter regarding the subject Health and Safety Inspection report No: 127. The Contractor paid serious attention to these issues, and immediately organized rectification. The attached rectification report is hereby submitted for your information. Yours Faithfully, Power Construction Corporation of China Ltd, Ag (Hua Chaoy Acting Project Manager Enclosure: Rectification of Health and Safety Inspection Report No: 127 cc 1) CE/PD, Tarbela 5" Extension HPP, WAPDA, Ghazi, KPK 2) File ‘Site add China Camp, Tarbela 5” Extension Hydropower Projet Tarbela Dam, KPK, Pakistan ~ 23470 ‘8 (92)0938-281099 Fax: (92) 0938-281077 E-mail: PCCCL_T5@163.com Rectification of Health and Safety Inspection Report No: 127 Descriptions of the observations Corrective actions taken Besides advising several times training messy live electric cables are repeatedly observed in Intake Pit. There is no judgment which cable is live electric wire and which one is for pressurized water. Although the Contractor has provided stands/frames for electric cables but still they are found inside water. There is major hazard of electrocution of whole area. Moreover, they pose slip and trip hazard, Power lines have been separated from the water lodges area. ‘At Outlet area, workers are fixing hooks for wire mesh at more than 2m height. No platform or ladder is used and workers are climbing directly on the rock. Fall hazard exists which may cause severe injuries. Ti order to prevent such unsafe activities on the site, we have invited all the Chinese in-charge to the conference room and in the presence of all the participants, they have been informed about the unsafe activity on the site and they have been strictly instructed find a good way to enhance the activity at site safe and sound do not endanger any workers. provide safe ladder to work Photo 1 at height should be as per the standard, scaffolding should be as per the standard. Shoterete is in progress at Outlet slopes, Only 2 of 6 workers are having safety goggles while they all are lacking other mandatory PPE. Shoterete particles discharges with pressure which may bounce and get into eyes or hit the face of 's involved causing Mandatory PPE have been provided to the workers, ‘At Outlet slopes, working platform is used for | shotcrete at night shift. The | said platform is absolutely not safe in all manners. Appropriate scaffolding has been erected. All standard precautions have been taken in scaffolding. The following steps are taken: Base plate, triangle, wooden planks all planks are tied, top rail, mid rail, Toe board, proper ladder with handrail, Inclined support. Workers are observed in loose dress at workplace. It was said that they are newly hired and the worker put his shirt inside his shalwar. Loose dress has hazard of nip point and loose parts of the dress may get entangled in rotatory parts of machinery. Uniform has been provided to the mentioned worker. Further, the in-charge of grouting section is strictly instructed not to allow any body to enter the site in loose clothing, first provide them with uniform and then allow them to center the site. Drilling machines for grouting has been observed fixed near main access road at Intake site. Barricades are provided only with safety cones and safety jersey barriers. ‘The drilling machine has been removed from the mentioned location. Chinese worker has been ‘observed working in rotating machinery. Its rotatory parts may have nip point the naked hand. Furthermore, working without safety gloves make the worker more vulnerable to hazards. Safety gloves have been provided to the workers 8. | At Intake site, the tanker of the cement comes for | grouting section after in every two or three days. The vehicles and the drivers | were private. When emptying the tankers at site, during this process, they have not any PPEs. Such as safety helmet and reflective hi vest. "The matter has been discussed with the in- charge grouting team and they have been instructed not to allow any body to enter the work site without PPE. At Intake site, Live electric | wires found in the water of grouting section, also joints of the cables is in water. electric current is transmitted faster in on wet surfaces, you stand a chance of getting an electric shock. shock may lead to jury such as physical shock, muscle paralysis, and involuntary muscle-reaction. The electric cables have been removed from the water and additionally the site electrician has been informed about the proper insulation of all the electric cables in the work place area. All electrical cables are inspected by the PCL HSE inspector, if he observes any damaged cable or weak insulation, So it is taken into the notice of the electrician. ‘At Intake site, Damage welding cable found with welding plant of grouting section on site. Damage welding cable has been replaced with the new one. without safety shoes at the site and site Engt Chinese ‘was found without safety helmet at the site. 11, | At powerhouse site, no hard | Mentioned berm has been ‘guard rail/fencing available on the edge of the fourth berm, 12. | Atthe intake site, grouting | Mandatory PPE have been section labor was found —_| provided to the said workers. ‘At the powerhouse area dumper no's 1- 12 back tire was found not in good condition. Dumper no's 1-12 tyre has been replaced with the new one. Water cooler lid was not found with cooler and water glass also not found. Water glass have been provided with water coolers. 15, At the intake site, the right- side front light of Dumper No. 1-46 was not working and the driver was found in loose clothing without green vest and without safety shoes. Dumper No. 1-46 the right-side front light has been repaired. PPE have been provided to the driver. 16. | Atthe penstock site Forman | Penalty notice have been (Naveed) was found without | issued to the Foreman safety helmet, green vest | Naveed for the violation of ‘was not worn and was the safety rules. found without safety shoes at the site, 17. | NEAR MISS The matter has been Near miss event happened at powerhouse back slopes, when workers of Saleem foreman, pulling the grouting machine, at that time the live electric cable of the grouting machine break from the joint due to stretching. due to which the spark was create. workers ‘were near at that time, and they could injure due to electric shock, but everyone was safe. Electric shock may lead to death or injury such as physical shock, muscle paralysis, and involuntary muscle-reaction. brought to the notice of the Electrical In-charge and they have been strictly instructed about such | incidents. That all elect il cables should be properly insulated and | without any joints at the cable site If a joint is necessary to extend the cable, the joint should be properly taped/insulated and the cable should not be stretched. ‘At penstock backslopes, excavator machine doing cutting and excavation, the loaded dump trucks cross near the excavator machine but there is no safety person with the excavator machine to control the traffic. The excavator could trip over and crash. Or even the swinging arm of the machine could hit somebody. This raises the safety concem, ‘A flagmen has been appointed with the excavator machine, 19. ‘At penstock back slopes, contractor using unsafe scaffold structure for placing the shot concrete on slope. Contractor using stones under the standards of scaffold structure for levelling. There is no base plate and sole plate available. Planks are not tied. Many time we observed this unsafe activity ‘on site and mentioned in our observation report. But contractor not showing any interest and not taken any safety precaution about this unsafe activity. “Appropriate scaffolding has been erected at the penstock area inspection has been carried out with the HSE TSC Engineer and found satisfactory.

You might also like