2. + lA eR a IRA
teem _Tarbela 5" Extension Hydropower Project Management Department
POWERCHINA Power Construction Corporation of China Limited
Our Ref. No. PCCCL/TS-CIVIL/2022- 722 Date: Sep, 2022
Project Manager
‘Tarbela 5 Consultants (TSC)
HPD Office, Tarbela Dam
Ghazi, KPK
Subject: Request to Confirm the Quantities of IT Equipment Under Additional Scope
of Work
-Ref- 1. TSHP-TSC- MEM-CD-000107/ 00729 Dated 26 August 2022
2. PCCCL/TS-CIVIL/2022-696 Dated 26 August 2022
Dear Sir,
Reference is made to your letter at Ref-1) whereby, the Engineer has accepted the Quotation
of M/s EMERGING SOLUTIONS, Subsequently, the Contractor issued the PO to the said
Supplier and instructed him to provide/install the IT Equipment in Engincer’s offices at the
earliest. In this respect, the supplier accompanied Engineer’s representative, visited the
Engineer’s office on 01* September, 2022.
Over the course of his visit to the Engineer’s offices, a different method/additional scope of
work for the installation of IT Equipment was conveyed, as had been conveyed earlier at the
time of submission of Quotations such as it was communicated by the Engineer's
representative that supplier would not be required to install/perform PVC ducting, digging,
PVCiflexible piping as well as the provision/installation of brackets for routers.
According to the revised method/additional scope of work, the supplier would also be
required to install/perform PVC Ducting, Digging & PVC/flexible piping and Brackets for’
Routers, Whereas the said items are not covered under the scope of approved Quotation and
are inevitable/indispensable for the commencement of said job. Besides, the supplier has
noted that as per revised method/procedure the Quantity of the items mentioned in the
approved Quotation will considerably be increased so, the same rates would not be applicable
for excessive quantities,
Foregoing in view, you are requested to please confirm the accurate quantities required for
extended/requisite compliance so that the Contractor could acquire a separate Quotation
accordingly.
Your Prompt feedback is requested in this regard, and may enable the Contractor to proceed
with the subject job at the earliest.
Yours Faithfully,
Power Construction Corporation of China Ltd.,
byl
(Hua Chao)
Acting Project Manager
cc
1) CE/PD, Tarbela 5! Extension HPP, WAPDA, Ghazi, KPK
2) File
‘Site add: China Camp, Tarbola 5® Extension Hydropower Project, Tarbela Dam, KPK, Paki
‘B (92)0938-281099 Fax: (92) 0938-281077 Esmail: PCCCI_ TS@163.com
aHaTo
PCCCL-T5-CIVIL-2023-387 1st Interim Substantiation of Claim No.13 Claim On Account of 1% Increase in Sales Tax Announced by The Ministry of Finance and Revenue Government of Pakistan PDF