PERHITUNGAN PAGAR BRC

HARGA PER PANEL DI PT KARYA UTAMA


UKURAN STEEL ( 5 FEBRUARI 2021 ) Expedisi Niaga Logistik Surabaya

NO JENIS/TYPE PAGAR TEBAL


Karyautama-steel.com/pagar-brc-harga-murah-
Melintang Panjang februari-2021-l3ngkap-semua-ukuran m3 Harga/m3

A. PANEL PAGAR ELEKTROPLATING/BRC

1 Pagar BRC FP60 T6.0 6,0 mm 60 cm 240 cm Rp 239,848 0.144 Rp 750,000.00


2 Pagar BRC FP60 T7.0 7,0 mm 60 cm 240 cm Rp 300,677 0.144 Rp 750,000.00

3 Pagar BRC FP90 T6.0 6,0 mm 90 cm 240 cm Rp 253,275 0.216 Rp 750,000.00


4 Pagar BRC FP90 T7.0 7,0 mm 90 cm 240 cm Rp 319,211 0.216 Rp 750,000.00
5 Pagar BRC FP90 T8.0 8,0 mm 90 cm 240 cm Rp 395,133 0.216 Rp 750,000.00

6 Pagar BRC FP120 T6.0 6,0 mm 120 cm 240 cm Rp 297,180 0.288 Rp 750,000.00
7 Pagar BRC FP120 T7.0 7,0 mm 120 cm 240 cm Rp 378,807 0.288 Rp 750,000.00
8 Pagar BRC FP120 T8.0 8,0 mm 120 cm 240 cm Rp 472,956 0.288 Rp 750,000.00

9 Pagar BRC FP 150 T6.0 6,0 mm 150 cm 240 cm Rp 342,352 0.360 Rp 750,000.00
10 Pagar BRC FP 150 T7.0 7,0 mm 150 cm 240 cm Rp 440,464 0.360 Rp 750,000.00
11 Pagar BRC FP 150 T8.0 8,0 mm 150 cm 240 cm Rp 499,400 0.360 Rp 750,000.00

12 Pagar BRC FP175 T6.0 6,0 mm 175 cm 240 cm Rp 377,095 0.420 Rp 750,000.00
13 Pagar BRC FP175 T7.0 7,0 mm 175 cm 240 cm Rp 487,380 0.420 Rp 750,000.00
14 Pagar BRC FP175 T8.0 8,0 mm 175 cm 240 cm Rp 614,570 0.420 Rp 750,000.00

15 Pagar BRC FP190 T6.0 6,0 mm 190 cm 240 cm Rp 394,805 0.456 Rp 750,000.00
16 Pagar BRC FP190 T7.0 7,0 mm 190 cm 240 cm Rp 511,369 0.456 Rp 750,000.00
17 Pagar BRC FP190 T8.0 8,0 mm 190 cm 240 cm Rp 645,965 0.456 Rp 750,000.00

18 Pagar BRC FP240 T7.0 7,0 mm 240 cm 240 cm Rp 584,302 0.576 Rp 750,000.00
19 Pagar BRC FP240 T8.0 8,0 mm 240 cm 240 cm Rp 741,277 0.576 Rp 750,000.00
PANEL PAGAR HOT DIP/BRC
20 Pagar BRC FP60 T6.0 6,0 mm 60 cm 240 cm Rp 316,204 0.144 Rp 750,000.00
21 Pagar BRC FP60 T7.0 7,0 mm 60 cm 240 cm Rp 404,378 0.144 Rp 750,000.00

22 Pagar BRC FP90 T6.0 6,0 mm 90 cm 240 cm Rp 337,513 0.216 Rp 750,000.00


23 Pagar BRC FP90 T7.0 7,0 mm 90 cm 240 cm Rp 433,921 0.216 Rp 750,000.00
24 Pagar BRC FP90 T8.0 8,0 mm 90 cm 240 cm Rp 544,929 0.216 Rp 750,000.00

25 Pagar BRC FP120 T6.0 6,0 mm 120 cm 240 cm Rp 401,707 0.288 Rp 750,000.00
26 Pagar BRC FP120 T7.0 7,0 mm 120 cm 240 cm Rp 521,059 0.288 Rp 750,000.00
27 Pagar BRC FP120 T8.0 8,0 mm 120 cm 240 cm Rp 658,718 0.288 Rp 750,000.00

28 Pagar BRC FP 150 T6.0 6,0 mm 150 cm 240 cm Rp 467,756 0.360 Rp 750,000.00
29 Pagar BRC FP 150 T7.0 7,0 mm 150 cm 240 cm Rp 611,209 0.360 Rp 750,000.00
30 Pagar BRC FP 150 T8.0 8,0 mm 150 cm 240 cm Rp 776,447 0.360 Rp 750,000.00

31 Pagar BRC FP175 T6.0 6,0 mm 175 cm 240 cm Rp 511,666 0.420 Rp 750,000.00
32 Pagar BRC FP175 T7.0 7,0 mm 175 cm 240 cm Rp 670,415 0.420 Rp 750,000.00
33 Pagar BRC FP175 T8.0 8,0 mm 175 cm 240 cm Rp 853,498 0.420 Rp 750,000.00

34 Pagar BRC FP190 T6.0 6,0 mm 190 cm 240 cm Rp 537,159 0.456 Rp 750,000.00
34 Pagar BRC FP190 T7.0 7,0 mm 190 cm 240 cm Rp 704,946 0.456 Rp 750,000.00
36 Pagar BRC FP190 T8.0 8,0 mm 190 cm 240 cm Rp 898,689 0.456 Rp 750,000.00

37 Pagar BRC FP240 T7.0 7,0 mm 240 cm 240 cm Rp 809,929 0.576 Rp 750,000.00
38 Pagar BRC FP240 T8.0 8,0 mm 240 cm 240 cm Rp 1,035,885 0.576 Rp 750,000.00

B. TIANG ELEKTROPLATING /BRC


NO TYPE TINGGI TIANG (M') DIAMETER PANEL Harga Per Batang
EP (Galvanis Biasa)
1 P85 EP dia.1,5" 0.85 0.0381 0.01905 Rp 150,000.00 0.0010 Rp 750,000.00
1 P85 EP dia.2,0" 0.85 0.0381 0.01905 Rp 165,000.00 0.0010 Rp 750,000.00
-
2 P120 EP dia.1.5" 1.2 0.0381 0.01905 Rp 157,500.00 0.0014 Rp 750,000.00
2 P120 EP dia.2.0" 1.2 0.0508 0.0254 Rp 174,000.00 0.0024 Rp 750,000.00
-
3 P150 EP dia.1,5" 1.5 0.0381 0.01905 Rp 168,500.00 0.0017 Rp 750,000.00
3 P150 EP dia.2.0" 1.5 0.0508 0.0254 Rp 184,000.00 0.0030 Rp 750,000.00
-
4 P200 EP dia.1,5" 2 0.0381 0.01905 Rp 184,000.00 0.0023 Rp 750,000.00
4 P200 EP dia.2,0" 2 0.0381 0.01905 Rp 202,000.00 0.0023 Rp 750,000.00
-
5 P225 EP dia.1,5" 2.25 0.0381 0.01905 Rp 191,500.00 0.0026 Rp 750,000.00
5 P225 EP dia.2,0" 2.25 0.0381 0.01905 Rp 223,000.00 0.0026 Rp 750,000.00
-
6 P240 EP dia.1.5" 2.4 0.0508 0.0254 Rp 200,500.00 0.0049 Rp 750,000.00
6 P240 EP dia.2.0" 2.4 0.0508 0.0254 Rp 231,000.00 0.0049 Rp 750,000.00
-
7 P300 EP dia.1.5" 3 0.0381 0.01905 Rp 223,000.00 0.0034 Rp 750,000.00
7 P300 EP dia.2.0" 3 0.0381 0.01905 Rp 236,000.00 0.0034 Rp 750,000.00

HD (Galvanis HotDip)
1 P85 HD dia.1,5" 0.85 0.0381 0.01905 Rp 187,500.00 0.0010 Rp 750,000.00
1 P85 HD dia.2,0" 0.85 0.0381 0.01905 Rp 207,500.00 0.0010 Rp 750,000.00
-
2 P120 HD dia.1,5" 1.2 0.0381 0.01905 Rp 203,000.00 0.0014 Rp 750,000.00
2 P120 HD dia.2,0" 1.2 0.0381 0.01905 Rp 231,500.00 0.0014 Rp 750,000.00
-
3 P150 EP dia.1,5" 1.5 0.0381 0.01905 Rp 220,000.00 0.0017 Rp 750,000.00
3 P150 EP dia.2.0" 1.5 0.0508 0.0254 Rp 255,500.00 0.0030 Rp 750,000.00
-
4 P200 HD dia.1,5" 2 0.0381 0.01905 Rp 242,500.00 0.0023 Rp 750,000.00
4 P200 HD dia.2,0" 2 0.0381 0.01905 Rp 280,500.00 0.0023 Rp 750,000.00
-
5 P225 HD dia.1,5" 2.25 0.0381 0.01905 Rp 259,000.00 0.0026 Rp 750,000.00
5 P225 HD dia.2,0" 2.25 0.0381 0.01905 Rp 313,500.00 0.0026 Rp 750,000.00
-
6 P240 HD dia.1.5" 2.4 0.0381 0.01905 Rp 270,500.00 0.0027 Rp 750,000.00
6 P240 HD dia.2.0" 2.4 0.0508 0.0254 Rp 329,500.00 0.0049 Rp 750,000.00
-
7 P300 EP dia.1.5" 3 0.0381 0.01905 Rp 300,500.00 0.0034 Rp 750,000.00
z P300 EP dia.2.0" 3 0.0381 0.01905 Rp 358,000.00 0.0034 Rp 750,000.00
1" 2.54 1 "
1.5 3.81 1.5"
0.0381
2 5.08 2 "
0.0508
Logistik Surabaya

HARGA
Ongkos Kirim port to door
+transport dan pikul

Rp 108,000.00 Rp 347,848.00 8 1/4 6" 0.222 KG/M' 2.442


Rp 108,000.00 Rp 408,677.00 9 1/4 6" 0.222 KG/M' 2.442

Rp 162,000 Rp 415,275.00 8 1/4 6" 0.222 KG/M' 2.442


Rp 162,000 Rp 481,211.00 10 1/4 6" 0.222 KG/M' 2.442
Rp 162,000 Rp 557,133.00 12 1/4 6" 0.222 KG/M' 2.442

Rp 216,000 Rp 513,180.00 7 1/2 12" 0.888 KG/M' 9.768


Rp 216,000 Rp 594,807.00 9 1/2 12" 0.888 KG/M' 9.768
Rp 216,000 Rp 688,956.00 11 1/2 12" 0.888 KG/M' 9.768

Rp 270,000 Rp 612,352.00 2.00 5/8 16" 1.578 KG/M' 17.358


Rp 270,000 Rp 710,464.00 4.00 5/8 16" 1.578 KG/M' 17.358
Rp 270,000 Rp 769,400.00 6.00 5/8 16" 1.578 KG/M' 17.358

Rp 315,000 Rp 692,095.00 2.00 3/4 19" 2.226 KG/M' 24.486


Rp 315,000 Rp 802,380.00 4.00 18" 2 KG/M' 22.000
Rp 315,000 Rp 929,570.00 6.00 18" 2 KG/M' 22.000

Rp 342,000 Rp 736,805.00 2.00


Rp 342,000 Rp 853,369.00 4.00
Rp 342,000 Rp 987,965.00 6.00

Rp 432,000 Rp 1,016,302.00
Rp 432,000 Rp 1,173,277.00
Rp 108,000.00 Rp 424,204.00 8 1/4 6" 0.222 KG/M' 2.442
Rp 108,000.00 Rp 512,378.00 9 1/4 6" 0.222 KG/M' 2.442

Rp 162,000 Rp 499,513.00 8 1/4 6" 0.222 KG/M' 2.442


Rp 162,000 Rp 595,921.00 10 1/4 6" 0.222 KG/M' 2.442
Rp 162,000 Rp 706,929.00 12 1/4 6" 0.222 KG/M' 2.442

Rp 216,000 Rp 617,707.00 7 1/2 12" 0.888 KG/M' 9.768


Rp 216,000 Rp 737,059.00 9 1/2 12" 0.888 KG/M' 9.768
Rp 216,000 Rp 874,718.00 11 1/2 12" 0.888 KG/M' 9.768

Rp 270,000 Rp 737,756.00 2.00 5/8 16" 1.578 KG/M' 17.358


Rp 270,000 Rp 881,209.00 4.00 5/8 16" 1.578 KG/M' 17.358
Rp 270,000 Rp 1,046,447.00 6.00 5/8 16" 1.578 KG/M' 17.358

Rp 315,000 Rp 826,666.00 2.00 3/4 19" 2.226 KG/M' 24.486


Rp 315,000 Rp 985,415.00 4.00 18" 2 KG/M' 22.000
Rp 315,000 Rp 1,168,498.00 6.00 18" 2 KG/M' 22.000

Rp 342,000 Rp 879,159.00 2.00


Rp 342,000 Rp 1,046,946.00 4.00
Rp 342,000 Rp 1,240,689.00 6.00

Rp 432,000 Rp 1,241,929.00
Rp 432,000 Rp 1,467,885.00

Rp 726.44 Rp 150,726.44
Rp 726.44 Rp 165,726.44

Rp 1,025.56 Rp 158,525.56
Rp 1,823.22 Rp 175,823.22 7/8 22" 2.984 KG/M' 32.824 11.00

Rp 1,281.95 Rp 169,781.95
Rp 2,279.03 Rp 186,279.03 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 1,709.27 Rp 185,709.27
Rp 1,709.27 Rp 203,709.27

Rp 1,922.93 Rp 193,422.93
Rp 1,922.93 Rp 224,922.93

Rp 3,646.44 Rp 204,146.44 7/8 22" 2.984 KG/M' 32.824 11.00


Rp 3,646.44 Rp 234,646.44 7/8 22" 2.984 KG/M' 32.824 11.00

Rp 2,563.91 Rp 225,563.91
Rp 2,563.91 Rp 238,563.91

Rp 726.44 Rp 188,226.44
Rp 726.44 Rp 208,226.44

Rp 1,025.56 Rp 204,025.56
Rp 1,025.56 Rp 232,525.56

Rp 1,281.95 Rp 221,281.95
Rp 2,279.03 Rp 257,779.03 7/8 22" 2.984 KG/M' 32.824 11.00

Rp 1,709.27 Rp 244,209.27
Rp 1,709.27 Rp 282,209.27

Rp 1,922.93 Rp 260,922.93
Rp 1,922.93 Rp 315,422.93

Rp 2,051.12 Rp 272,551.12
Rp 3,646.44 Rp 333,146.44 7/8 22" 2.984 KG/M' 32.824 11

Rp 2,563.91 Rp 303,063.91
Rp 2,563.91 Rp 360,563.91
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983

11.00 24,000.00 9,828.01 9,828.01


11.00 24,000.00 9,828.01 9,828.01
11.00 24,000.00 9,828.01 9,828.01

11.00 89,000.00 9,111.38 9,111.38


11.00 89,000.00 9,111.38 9,111.38
11.00 89,000.00 9,111.38 9,111.38

11.00 174,500.00 10,053.00 -


11.00 174,500.00 10,053.00 -
11.00 174,500.00 10,053.00 -

11.00 - 238,249.13
11.00 162,000.00 7,363.64 -
11.00 162,000.00 7,363.64 -

-
-
-

4,862.23
-
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983

11.00 24,000.00 9,828.01 9,828.01


11.00 24,000.00 9,828.01 9,828.01
11.00 24,000.00 9,828.01 9,828.01

11.00 89,000.00 9,111.38 9,111.38


11.00 89,000.00 9,111.38 9,111.38
11.00 89,000.00 9,111.38 9,111.38

11.00 174,500.00 10,053.00 -


11.00 174,500.00 10,053.00 -
11.00 174,500.00 10,053.00 -

11.00 - 353,621.15
11.00 162,000.00 7,363.64 -
11.00 162,000.00 7,363.64 -

-
-
50,517.31

-
-

23.93

-
-
-

0
PERHITUNGAN BESI BETON

TOKO SUMBER TOKO


NO JENIS BESI ISTILAH DEPO DEWATA DEPO BANGUNAN TOKO ISTANA
KALIURANG
SURYA MAS HARGA PER KG
BARU
1 BAJA BULAT 1/4 Rp - Rp 35,000 Rp 60,000 Rp 35,000 Rp 37,000 Rp 13,677.31
1 BAJA BULAT 1/4 Rp 65,000 Rp 58,000 Rp 80,000 Rp 65,000 Rp 62,000 Rp 15,189.87
3/8 Rp 92,000 Rp 120,000 Rp 85,000 Rp 96,000 Rp 14,476.20
1/2 Rp 135,000 Rp 130,000 Rp 160,000 Rp 125,000 Rp 139,000 Rp 14,107.29

9/16

5/8 Rp 245,000 Rp 200,000 Rp 220,000 Rp 251,000 Rp 13,192.76

3/4

7/8

2 BATANG ULIR Rp 95,000 Rp 15,422.08


Rp - Rp 155,000 Rp 165,000 Rp 9,745.70
Rp 247,000 Rp 230,000 Rp 239,000 Rp 265,000 Rp 253,000 Rp 14,382.28

average = Rp

HARGA RATA-RATA PER KG Rp 13,774.19


1/4 6" 0.222 KG/M' 2.442 11.00 27,833.33 11,397.76

5/16 8" 0.395 KG/M' 4.345 11.00 55,000.00 12,658.23


27,833 3/8 10" 0.617 KG/M' 6.787 11.00 65,500.00 9,650.80
55,000 1/2 12" 0.888 KG/M' 9.768 11.00 114,833.33 11,756.07
65,500 9/16 14" 1.208 KG/M' 13.288 11.00 -
114,833 5/8 16" 1.578 KG/M' 17.358 11.00 229,000.00 13,192.76
18" 2 KG/M' 22.000 11.00 -
3/4 19" 2.226 KG/M' 24.486 11.00 -

229,000
9.00
-

95,000
320,000
308,500
DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN 2022
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3


1 2 3

FINISHING
1 Amplas lbr
2 Cat besi kg
3 Cat dasar kg
4 Cat emco kg
5 Cat menie besi kg
6 Cat menie kayu kg
7 Cat tembok Decolith kg
8 Cat tembok Dulux kg
9 Cat tembok Emco kg
10 Cat tembok Paragon kg
11 Cat tembok Toyopaint kg
12 Cat tembok Vinilex kg
13 Cat tembok Vinippaint kg
14 Dempul ltr
15 Kuas bh
16 Mild zak
17 Minyak cat ltr
18 Plamir kayu kg
19 Plamir tembok kg
20 Politur ultra ltr
21 Politur vernis ltr
22 Thiner A Bonanza ltr
23 Thiner B Spesial ltr

PENUTUP ATAP
24 Alang-alang panjang 2,4 meter lbr
25 Alluminium foil m2
26 Asbes Bubungan lbr
27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr
28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr
29 Asbes Rata 2 m x 1 m x 4 mm lbr
28 Atap metal Toratora 1 x 4 Extra m2
29 Atap metal Toratora 1 x 4 Premium m2
30 Atap metal Toratora 2 x 4 Extra m2
31 Atap metal Toratora 2 x 4 Premium m2
32 Atap metal Toratora 3 x 4 Extra m2
33 Atap metal Toratora 3 x 4 Premium m2
34 Atap metal Toratora 4 x 4 Extra m2
35 Atap metal Toratora 4 x 4 Premium m2
36 Bentala paras bh
37 Bentala tanah liat bh
38 Besi profil WF kg
39 Besi strip kg
40 Bubungan Biasa bj
41 Bubungan Karang Pilang (glazur) isi 3,5/m bj
42 Bubungan Karang Pilang isi 3,5/m bj
43 Bubungan Ngalayur isi 3,5/m bj
44 Bubungan Plentong bj
45 Bubungan Utama isi 3,5/m bj
46 Genteng Kanmuri (glazur) isi 14/m2 bj
47 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj
48 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj
49 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj
50 Genteng Morando Abadi isi 18/m2 bj
51 Genteng Morando Jatiwangi isi 18/m2 bj
52 Genteng Morando Ngalayur isi 20/m2 bj
53 Genteng Plentong bj
54 Genteng plentong dicat bj
55 Genteng Plentong Jatiwangi isi 24/m2 bj
56 Ijuk kg
57 Ikut celedu paras bh
58 Ikut celedu tanah liat bh
59 Murda paras bh

Harga Barang dan Upah Hal. 13


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
60 Murda tanah liat bh
61 Seng BJLS 0,20 gelombang lbr
62 Seng BJLS 0,25 gelombang lbr
63 Seng BJLS 0,28 gelombang lbr
64 Seng BJLS 0,32 gelombang lbr
65 Seng Plat 3" x 6" BJLS 28 lbr
66 Sirap Jati bh
67 Tali Ijuk kg
68 Tali pengikat alang-alang ikat

PENGGANTUNG
69 Engsel kupu-kupu ps
70 Engsel nylon ps
71 Espagnoleth set
72 Grendel biasa bh
73 Grendel hararo bh
74 Kaca 3 mm bening m2
75 Kaca 5 mm bening m2
76 Kaca 6 mm bening m2
77 Kaca 8 mm bening m2
78 Kaca 10 mm bening m2
79 Kaca 12 mm bening m2
80 Kaca Es/Kapur 3 mm m2
81 Kaca Es/Kapur 5 mm m2
82 Kaca nako daun
83 Kaca nako teralis bening m2
84 Kaca ryben 3 mm m2
85 Kaca ryben 5 mm m2
86 Kait angin biasa bh
87 Kunci pintu TOP bh
88 Kunci pintu Union bh
89 Kunci pintu Vanesa bh
90 Kunci pintu Yale bh
91 Kunci pintu YURI bh
92 Kunci slot bh
93 Kunci tanam 2 slag bh

KAYU DAN PLAFOND


94 Bambu besar btg
95 Bambu sedang btg
96 Bambu kecil btg
97 Celling teak (0,62 x 2,40) m2 lbr
98 Eternit lbr
99 Formika lbr
100 Gedeg kulit kelas I m2
101 Gypsum Old lbr
102 Hard board MDF lbr
103 Kalsiboard 4,5 mm lbr
104 Kayu bekesting m3
105 Kayu bingkirai m3
106 Kayu bingkirai papan m3
107 Kayu dolken (pekerjaan sementara) btg
108 Kayu jati m3
109 Kayu jati papan m3
110 Kayu kamper balok m3
111 Kayu kamper usuk/reng m3
112 Kayu kamper papan m3
113 Kayu kruing balok m3
114 Kayu kruing usuk/reng m3
115 Kayu kruing papan m3
116 Kayu meranti balok m3
117 Kayu meranti usuk/reng m3
118 Kayu meranti papan m3
119 Kayu merbau m3
120 Kayu merbau papan m3
121 Kayu profil m1
122 Kayu seseh balok m3
123 Kayu seseh dolken m3
124 Lem Aibond kg
125 Lem Kayu ltr
126 List Gypsum standar m'

Harga Barang dan Upah Hal. 14


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
127 Minyak bekisting ltr
128 Multiplek 12 mm lbr
129 Multiplek 18 mm lbr
130 Multiplek 6 mm lbr
131 Multiplek 9 mm lbr
132 Plywood 12 mm lbr
133 Plywood 3 mm lbr
134 Plywood 4 mm lbr
135 Plywood 6 mm lbr
136 Plywood 9 mm lbr
137 Plywood aluminium lbr
138 Teak wood (0,9x2,00) m2 lbr
139 Teak wood (1,20x2,40) m2 lbr

KERAMIK
IKAD
140 Ikad (Keramik) Kw. I 10 x 20 cm m2
141 Ikad (Keramik) Kw. I 20 x 20 cm m2
142 Ikad (Keramik) Kw. I 20 x 30 cm m2
143 Ikad (Keramik) Kw. I 30 x 30 cm m2
144 Ikad (Keramik) Kw. I 40 x 40 cm m2
145 Ikad (Keramik) Kw. II 10 x 20 cm m2
146 Ikad (Keramik) Kw. II 20 x 20 cm m2
147 Ikad (Keramik) Kw. II 20 x 30 cm m2
148 Ikad (Keramik) Kw. II 30 x 30 cm m2
149 Ikad (Keramik) Kw. II 40 x 40 cm m2

INESA
150 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2
151 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
152 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2
153 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2
154 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2
155 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2
156 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2
157 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
158 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2
159 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2
160 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2

ESSENZA
161 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2
162 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2
163 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
164 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2
165 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
166 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2
167 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
168 Keramik Kelas I Domus m2
169 Keramik Kelas I Granity Imperiali m2
170 Keramik Kelas I Lavagna m2
171 Keramik Kelas I Mountain Peak m2

GARUDA
172 Keramik 20 x 20 kelas I Emboss Dasar Muda m2
173 Keramik 20 x 20 kelas I Emboss Dasar Tua m2
174 Keramik 20 x 20 kelas I Tesia m2
175 Keramik 20 x 20 kelas II Emboss Dasar Muda m2
176 Keramik 20 x 20 kelas II Emboss Dasar Tua m2
177 Keramik 20 x 20 kelas II Tesia m2
178 Keramik 20 x 25 kelas I Motif Dasar Medium m2
179 Keramik 20 x 25 kelas I Motif Dasar Muda m2
180 Keramik 20 x 25 kelas I Nuri Dark m2
181 Keramik 20 x 25 kelas I Polos m2
182 Keramik 30 x 30 kelas I Granity m2
183 Keramik 30 x 30 kelas I Motif Embose m2
184 Keramik 30 x 30 kelas II Granity m2
185 Keramik 30 x 30 kelas II Motif Embose m2
186 Keramik 40 x 40 kelas I Motif Dasar Muda m2
187 Keramik 40 x 40 kelas I Motif Dasar Muda m2

Harga Barang dan Upah Hal. 15


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
188 Keramik 40 x 40 kelas I Motif Embose m2
189 Keramik 40 x 40 kelas I Motif Granity Tua m2
190 Keramik 40 x 40 kelas I Motif Medium Color m2
191 Keramik 40 x 40 kelas I Motif Spesial Color m2
192 Keramik 50 x 50 kelas I m2

ASIA
193 Keramik 10 x 20 kelas I warna muda m2
194 Keramik 20 x 20 kelas I warna muda m2
195 Keramik 20 x 20 kelas I warna tua m2
196 Keramik 20 x 25 kelas I warna tua m2
197 Keramik 20 x 30 kelas I warna muda m2
198 Keramik 30 x 30 kelas I warna muda m2
199 Keramik 30 x 30 kelas I warna tua m2
200 Keramik 40 x 40 kelas I warna muda m2
201 Keramik 10 x 20 kelas II m2
202 Keramik 20 x 20 kelas II m2
203 Keramik 20 x 30 kelas II m2
204 Keramik 30 x 30 kelas II m2
205 Keramik 40 x 40 kelas II m2

MULIA
206 Keramik 10 x 20 cm kelas I m2
207 Keramik 20 x 20 cm kelas I m2
208 Keramik 20 x 30 cm kelas I m2
209 Keramik 30 x 30 cm kelas I m2
210 Keramik 40 x 40 cm kelas I m2
211 Keramik 10 x 20 cm kelas II m2
212 Keramik 20 x 20 cm kelas II m2
213 Keramik 20 x 30 cm kelas II m2
214 Keramik 30 x 30 cm kelas II m2
215 Keramik 40 x 40 cm kelas II m2

SANITAIR
201 Bak mandi fibre glass 70x70x66 cm bh
202 Bak mandi keramik bh
203 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
204 Floor drain plastik bh
205 Floor drain stainless bh
206 Kloset duduk INA bh
207 Kloset duduk Amerika Standar bh
208 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh
209 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh
210 Kloset duduk " TOTO Type AVANTE CW 823 J bh
211 Kloset duduk " TOTO Type CW 660J bh
212 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
213 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh
214 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh
215 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh
216 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
217 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
218 Kloset jongkok " TOTO Type CE 6 COMPLIT bh
219 Kloset jongkok " TOTO Type CE 7 COMPLIT bh
220 Kloset porselin jongkok Kia (standar) bh
221 Kloset porselin jongkok Ina (standar) bh
222 Kran biasa bh
223 Kran SunEi bh
224 Kran TOTO T 205 LCSC bh
225 Kran TOTO T 205 MC bh
226 Kran TOTO T 23 B13 bh
227 Kran TOTO T 23 B13V7N bh
228 Kran TOTO T 26 - 13 bh
229 Kran TOTO TX 109 LH bh
230 Penyekat Urinoir " TOTO " Type A 100 " bh
231 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh
232 Soap holder " TOTO " Type S 6 N " bh
233 Seal tape bh
234 Urinoir " TOTO U 57 M bh
235 Urinoir " TOTO U 57 M BODI bh
236 Urinoir " TOTO UW 447 JT 1 " bh
237 Urinoir " TOTO UW 447 JT 1 BODI bh

Harga Barang dan Upah Hal. 16


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
238 Urinoir " TOTO UW 447 JT 1,M " bh
239 Urinoir " TOTO UW 447 JT 1,M "BODI bh
240 Wastagel KIA Standard bh
241 Wastagel KIA Warna bh
242 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh
243 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh

PAKU
244 Paku 10 cm kg
245 Paku kalsiboard kg
246 Paku list SQ kg
247 Paku pancing 60 x 230 kg
248 Paku reng/usuk SQ kg
249 Paku seng kg
250 Paku seng import bj
251 Paku skrup 1/2" kg
252 Paku skrup 2" kg
253 Paku skrup 3.5" kg
254 Paku sumbat 1/2" kg

PASIR, BATU, KERIKIL, BATA DAN PARAS


255 Bata gosok ex Tulikup bj
256 Bata pasang klas I bj
257 Batako kelas I bj
258 Batu kali m3
259 Batu karang m3
260 Batu lahar Singaraja m3
261 Batu pecah 5-7 cm (manual) m3
262 Batu pipih Singaraja m3
263 Glass block bj
264 Kerawang bh
265 Koral Beton m3
266 Limestone m3
267 Paras Batik bh
268 Paras Buahan bh
269 Paras Karang Bukit bh
270 Paras Kerobokan bh
271 Paras Malem bh
272 Paras Putih Bukit bh
273 Paras Silakarang tebal bh
274 Paras Silakarang tipis bh
275 Paras untuk pondasi bh
276 Pasir beton m3
277 Pasir pasang m3
278 Pasir urug m3
279 Sirtu m3
280 Tanah urug m3

PIPA
281 Pipa Galvanis 1/2" m1
282 Pipa Galvanis 3/4" m1
283 Pipa Galvanis 1 1/4" m1
284 Pipa Galvanis 1 1/2" m1
285 Pipa Galvanis 1" m1
286 Pipa Galvanis 1,5 BSA m1
287 Pipa Galvanis 2" m1
288 Pipa Galvanis 3" m1
289 Pipa Maspion AW 1 ljr
290 Pipa Maspion AW 1/2 ljr
291 Pipa Maspion AW 10 ljr
292 Pipa Maspion AW 1-1/2 ljr
293 Pipa Maspion AW 1-1/4 ljr
294 Pipa Maspion AW 12 ljr
295 Pipa Maspion AW 14 ljr
296 Pipa Maspion AW 16 ljr
297 Pipa Maspion AW 2 ljr
298 Pipa Maspion AW 2-1/2 ljr
299 Pipa Maspion AW 3 ljr
300 Pipa Maspion AW 3/4 ljr
301 Pipa Maspion AW 4 ljr
302 Pipa Maspion AW 5 ljr

Harga Barang dan Upah Hal. 17


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
303 Pipa Maspion AW 6 ljr
304 Pipa Maspion AW 8 ljr
305 Pipa Maspion C 1 ljr
306 Pipa Maspion C 1-1/2 ljr
307 Pipa Maspion C 1-1/4 ljr
308 Pipa Maspion C 2 ljr
309 Pipa Maspion C 2-1/2 ljr
310 Pipa Maspion C 3 ljr
311 Pipa Maspion C 3/4 ljr
312 Pipa Maspion C 4 ljr
313 Pipa Maspion C 5/8 ljr
314 Pipa Maspion D 10 ljr
315 Pipa Maspion D 1-1/2 ljr
316 Pipa Maspion D 1-1/4 ljr
317 Pipa Maspion D 12 ljr
318 Pipa Maspion D 14 ljr
319 Pipa Maspion D 16 ljr
320 Pipa Maspion D 2 ljr
321 Pipa Maspion D 2-1/2 ljr
322 Pipa Maspion D 3 ljr
323 Pipa Maspion D 4 ljr
324 Pipa Maspion D 5 ljr
325 Pipa Maspion D 6 ljr
326 Pipa Maspion D 8 ljr

SEMEN
327 Semen Bosowa 50 kg zak
328 Semen Gresik 40 kg zak
329 Semen Gresik 50 kg zak
330 Semen Tiga Roga 50 kg zak
331 Semen Tonasa 50 kg zak
332 Semen warna/semen grouting kg

BESI BETON DAN PAGAR


333 Besi beton kg
334 Kawat berduri roll
335 Kawat beton RRT kg
336 Pagar BRC asli T.120 diameter 6mm m'
337 Pagar BRC asli T.150 diameter 6mm m'
338 Pagar BRC asli T.175 diameter 7mm m'
339 Pagar BRC asli T.190 diameter 7mm m'
340 Pagar BRC asli T.90 diameter 6mm m'
341 Pagar HotDip Galvanized T.120 diameter 6mm m'
342 Pagar HotDip Galvanized T.150 diameter 7mm m'
343 Pagar HotDip Galvanized T.175 diameter 7mm m'
344 Pagar HotDip Galvanized T.190 diameter 7mm m'
345 Pagar HotDip Galvanized T.90 diameter 6mm m'
346 Tiang BRC asli T. 120 diameter 1 1/2" bh
347 Tiang BRC asli T. 150 diameter 2" bh
348 Tiang BRC asli T. 175 diameter 2" bh
349 Tiang BRC asli T. 190 diameter 2" bh
350 Tiang BRC asli T. 90 diameter 1 1/2" bh
351 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh
352 Tiang HotDip Galvanized T. 150 diameter 2" bh
353 Tiang HotDip Galvanized T. 175 diameter 2" bh
354 Tiang HotDip Galvanized T. 190 diameter 2" bh
355 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh

BAHAN LISTRIK
356 Saklar (Broco) bh
357 Stop Kontak bh
358 Fitting bh
359 Steker bh
360 Coaxial cable 5C - 75 ohm commscof m1
361 Kabel NYM 3 x 2.5 mm ex. Supreme m1
362 Kabel NYM 4 mm m1
363 Kabel telephone m1
364 Lampu pijar 10 Watt (Philip) bh
365 Lampu pijar 15 Watt (Philip) bh
366 Lampu pijar 25 Watt (Philip) bh
367 Lampu TL 10 Watt (10 Watt) bh

Harga Barang dan Upah Hal. 18


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
368 Lampu TL 20 Watt (10 Watt) bh
369 Lampu TL 25 Watt (10 Watt) bh
370 Pipa clipsal 20 mm bt
371 Pipa flexible clipsal 20 mm m1
372 Sock clipsal 20 mm bj
373 Tee dos clipsal 20 mm bh
374 Klem clipsal 20 mm bj
375 Inbow dos plastik clipsal E 157 P bj

BUIS BETON
376 Buis beton 10 x 75 bh
377 Buis beton 15 x 75 bh
378 Buis beton 20 x 75 bh
379 Buis beton 25 x 75 bh
380 Buis beton 30 x 75 bh
381 Buis beton 50 x 75 bh

PAVING
382 Paving 10 x 20 cm tebal 6 cm K225 m2
383 Paving 10 x 20 cm tebal 6 cm K300 m2
384 Paving 10 x 20 cm tebal 6 cm standard m2
385 Paving 10 x 20 cm tebal 8 cm K225 m2
386 Paving 10 x 20 cm tebal 8 cm K300 m2
387 Paving 10 x 20 cm tebal 8 cm standard m2
388 Paving Tiga Berlian tebal 6 cm K225 m2
389 Paving Tiga Berlian tebal 8 cm K225 m2
390 Kanstein Bulat 15x20x50 cm K225 m1
391 Kanstein Jumbo 15x30x50 cm K225 m1
392 Kanstein Super 17x25x60 cm K225 m1
393 Grass Block m2
394 Koral sikat zak

LAIN-LAIN
395 Dugul batu hitam 50 x 50 x 200 unit
396 Dugul batu hitam 60 x 70 x 250 unit
397 Dugul batu hitam 70 x 70 x 250 unit
398 Padmasari batu hitam 50 x 50 x 200 unit
399 Padmasari batu hitam 70 x 70 x 250 unit
400 Padmasari batu hitam 65 x 75 x 225 unit

Denpasar, April 2010


Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. I Dewa Made Apramana, MM


Pembina Tk. I
NIP. 195904211987111002

Harga Barang dan Upah Hal. 19


AN UPAH

HARGA 4 HARGA 5 RATA-RATA


4

Harga Barang dan Upah Hal. 20


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 21


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 22


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 23


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 24


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 25


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 26


DAFTAR HARGA SATUAN BAHAN DAN UPAH
DAFTAR HARGA ALAT
TAHUN ANGGARAN 2022
PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4

1 Asphal Mixing Flant


Spesifikasi 60 T 500kg
Merk AZP-800 OSAKA OSP 500
Tahun Pembelian 2010
Harga Pembelian 9,135,000,000.00
Kondisi Baik Baik
Harga Sewa 9.815.141,08/Jam' 9.350.000/Jam

2 Aspal Finisher
Spesifikasi 10 Ton 135 HP
Merk Marini Nigata NFB6C
Tahun Pembelian 2008
Harga Pembelian 950,000,000.00
Kondisi Baik Baik
Harga Sewa 544.082,36/ Jam 315.000/Jam

3 Asphal Sprayer
Spesifikasi 850 L
Merk Yanmar
Tahun Pembelian 2012
Harga Pembelian 324,600,000.00
Kondisi Baik
Harga Sewa 127.806,25/ Jam

4 Bulldozer 100-150 HP
Spesifikasi 155 HP
Merk
Tahun Pembelian
Harga Pembelian 2,055,000,000.00
Kondisi Baik
Harga Sewa 858.170,47/ Jam

5 Compressor 4000-6500 L/M


Spesifikasi 5000 CPM
Merk
Tahun Pembelian
Harga Pembelian 325,600,000.00
Kondisi Baik
Harga Sewa 247.246,25/ jam

6 Concrete Mixer 0.3-0.6 m3


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian 13,881,000.00
Kondisi Baik
Harga Sewa 99.246,54/ jam

7 Crane 10-15 Ton


Spesifikasi 15 T
Merk
Tahun Pembelian
Harga Pembelian 1,488,000,000.00
Kondisi Baik
Harga Sewa 690.696,79/jam

8 Dump Truk 3-4 m3


Spesifikasi 3.5 T 3.5 TON
Merk Mitshubisi
Tahun Pembelian 2014
Harga Pembelian 350,000,000
Kondisi Baik Baik
Harga Sewa 345.585,60/ jam 275.000/ Jam

9 Dump Truk
Spesifikasi 10 T 10 T
Merk Nissan CWA 260
Tahun Pembelian 2011
Harga Pembelian 500,000,000.00
Kondisi Baik
Harga Sewa 587.829,43/ jam 525.000/ Jam

Harga Barang dan Upah Hal. 27


PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4
10 Excavator 80-140 HP
Spesifikasi 0.9 m3 132HP
Merk Hitachi HITACHI ZX 200
Tahun Pembelian 2011
Harga Pembelian 1,250,000,000.00
Kondisi Baik Baik
Harga Sewa 578.268,82/ jam 455.000/ Jam

11 Flat Bed Truck 3-4 M3


Spesifikasi 10 T 3.5 TON
Merk COLT DIESEL
Tahun Pembelian 2014
Harga Pembelian 475,200,000
Kondisi Baik Baik
Harga Sewa 582.225,65/ jam 370.000/ Jam

12 Generator Set
Spesifikasi 135 kva
Merk cummins
Tahun Pembelian
Harga Pembelian 324,000,000.00
Kondisi BAIK
Harga Sewa 542,910.67/ jam

13 Motor Grader >100 HP


Spesifikasi 125 HP 135 HP
Merk KOMATSU
Tahun Pembelian 2012
Harga Pembelian 1,350,000,000.00
Kondisi Baik Baik
Harga Sewa 652.569,47/ jam 555.000/ Jam

14 Track Loader 75-100 HP 0.8 m3


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian 800,000,000.00
Kondisi Baik
Harga Sewa 377.817,09/jam

15 Wheel Loader 1.0-1.6 m3


Spesifikasi 1.5 m3
Merk HITACHI 140 ZW
Tahun Pembelian
Harga Pembelian 770,000,000.00
Kondisi Baik Baik
Harga Sewa 431.228,33/ jam 485.000/ Jam

16 Three Wheel Loader 6-8 T


Spesifikasi 8T
Merk
Tahun Pembelian
Harga Pembelian 750,000,000.00
Kondisi Baik
Harga Sewa 350.410,60/ jam

17 Tandem Roller 6-8 T


Spesifikasi 8T 8T
Merk SAKAI SW 750
Tahun Pembelian 2,011
Harga Pembelian 700,000,000.00
Kondisi Baik Baik
Harga Sewa 383.001,21/ jam 455.000/ Jam

18 Tire Roller 8-10 T


Spesifikasi 9T
Merk SAKAI TS 205
Tahun Pembelian 2015
Harga Pembelian 1,000,000,000.00
Kondisi Baik Baik
Harga Sewa 493.616,37/jam 510.000/ Jam

19 Vibrator Roller 5-8 T


Spesifikasi 7T
Merk AMMAN ASC-100
Tahun Pembelian 2012
Harga Pembelian 750,000,000.00
Kondisi Baik Baik
Harga Sewa 394.299,15/ jam 315.000/ Jam

Harga Barang dan Upah Hal. 28


PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4

Harga Barang dan Upah Hal. 29


PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4
20 Concrete Vibrator
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

21 Stone Chrusher
Spesifikasi 50 T
Merk
Tahun Pembelian
Harga Pembelian 1,500,000,000
Kondisi Baik
Harga Sewa 898.952,59/ jam

22 Water Pump 70-100 mm


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian 5,000,000
Kondisi Baik
Harga Sewa 50.331,01/ jam

23 Water Tanker 3000-4500 l


Spesifikasi 4000 liter MITSHUBISI
Merk 2007
Tahun Pembelian
Harga Pembelian 550,000,000.00
Kondisi Baik Baik
Harga Sewa 390.777,38 / jam 375.000/ Jam

24 Pedestrian Roller
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

25 Tamper
Spesifikasi MISAKA
Merk 1,995
Tahun Pembelian
Harga Pembelian
Kondisi Baik
Harga Sewa 105.000 / Jam

26 Jack hammer
Spesifikasi
Merk HM 960 CS
Tahun Pembelian 2002
Harga Pembelian
Kondisi Baik
Harga Sewa 75.000/ Jam

27 Fulvi Mixer
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

28 Concrete Pump
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

29 Trailer 20 TON
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi

Harga Barang dan Upah Hal. 30


PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4
Harga Sewa

Harga Barang dan Upah Hal. 31


PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4

30 Pile Drive + Hammer


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

31 Crane On Track 35 TON


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

32 Welding Set
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

33 Bore Pile Machine


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

34 Asphalt Liquid Mixer


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

35 Trailer 15 Ton
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

36 Rock Drill Breaker


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

37 Cold Milling
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

38 Cold Recycler
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

39 Hot Recycler
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi

Harga Barang dan Upah Hal. 32


PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4
Harga Sewa

40 Aggregat ( Chip ) Spreader


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

Harga Barang dan Upah Hal. 33


PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4
41 Aspalt Distribution
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

42 Split Form Paver


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

43 Concrete Pan Mixer


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

44 Concrete Breaker
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

45 Asphalt Tanker
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

46 Cement Tanker
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

47 Concrete Mixer (350)


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

48 Vibrating Ramer
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

49 Truk Mixer
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

Harga Barang dan Upah Hal. 34


PT. SINAR SAMA PT. SARI WAGOM INDAH
NO JENIS ALAT KET
SEJATI
1 2 3 3 4

50 Bore Pile Machine DIA 60


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

51 Crane On Track 75-100


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

52 Blending Equipment
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

53 Asphalt Liquid Mixer ( KAP 20000 )


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

Fakfak, 31 Mei 2022


PANITIA PENYUSUNAN STANDARD HARGA SATUAN TAHUN 2022

Mengetahui,
Plt.Kepala Dinas PU, Penataan Ruang, Perumahan Rakyat
dan Kawasan Permukiman
Kabupaten Fakfak ,
Ketua,

TEGUH SUGUHARTO, ST
NIP. 19701114 199712 1 001 LIZA NEIRASARI, ST
NIP. 19751016 200111 2 001

Harga Barang dan Upah Hal. 35


PEMERINTAH KABUPATEN FAKFAK
DINAS PU, PENATAAN RUANG, PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
Jl. Achmad Yani No. 08 Fakfak, Telp. (0956) 22320 - 22709

DAFTAR HARGA SATUAN UPAH


TAHUN 2022
###
HARGA ###
NO NAMA BARANG SPESIFIKASI SATUAN
(Rp.) ###
1 2 3 4 5 ###
1 Mandor Hari 180,947.48###
2 Kepala Tukang Hari 175,068.32###
3 Tukang Politur Hari 168,535.92###
4 Tukang Batu Hari 162,003.52###
5 Tukang kayu Hari 168,535.92###
6 Tukang Besi Hari 168,535.92###
7 Tukang cat Hari 168,535.92###
8 Tukang gali/buruh/ pekerja Hari 130,648.00###
9 Tukang Listrik Hari 168,535.92###
10 Tukang Pipa/ Tukang Ledeng Hari 168,535.92###
11 Tukang Aspal Hari 168,535.92###
12 Tukang masak Aspal/pekerja Hari 130,648.00###
13 Pekerja Hari 130,648.00###
14 Tukang Ukir Hari 168,535.92###
15 Operator Hari 168,535.92###
16 Pembantu Operator Hari 130,648.00###
17 Mekanik Hari 168,535.92###
18 Pembantu Mekanik Hari 130,648.00###
19 Pasang Atap Alang-Alang Hari 168,535.92###
20 Pasang Bata Gosok Dua Muka M2 359,074.00###
21 Pasang Bata Gosok Satu Muka M2 192,836.00###
22 Pasang Batu Paras Diukir M2 383,674.00###
23 Pasang Patu Paras Siap Diukir M2 332,476.00###
24 Tukang Bongkar Begesting Hari 162,003.52###

Catatan :
Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).
UMP PROV. PAPUA BARAT 2021 3,200,000.00
SEKTOR PERTAMBANGAN MINYAK DAN GAS BUMI 5,000,000.00
SEKTOR PERTAMBANGAN KECUALI
SEKTOR KEHUTANAN, PERKEBUNAN, DAN GALIAN C 3,137,900.00
PERIKANAN 3,134,600.00
SEKTOR JASA KONSTRUKSI 3,266,200.00
Undang -undang no. 13 tahun 2003 tentang "ketenagakerjaan"
Jika dalam 1 hari bekerja selama 8 jam (5 hari kerja/ senin s/d jumat) maka dalam 1 bulan bekerja selama 21 hari
Jika dalam 1 hari bekerja selama 7 jam (6 hari kerja/ senin s/d sabtu) maka dalam 1 bulan bekerja selama 25 hari

Fakfak, 31 Mei 2022


PANITIA PENYUSUNAN STANDARD HARGA SATUAN TAHUN 2022
Mengetahui,
Plt.Kepala Dinas PU, Penataan Ruang, Perumahan Rakyat
dan Kawasan Permukiman
Kabupaten Fakfak ,
Ketua,

TEGUH SUGIHARTO, ST
NIP. 19701114 199712 1 001 LIZA NEIRASARI, ST
NIP. 19751016 200111 2 001
PEMERINTAH KABUPATEN FAKFAK
DINAS PU, PENATAAN RUANG, PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
Jl. Achmad Yani No. 08 Fakfak, Telp. (0956) 22320 - 22709

DAFTAR HARGA SATUAN BAHAN DAN UPAH


TAHUN ANGGARAN 2022
A. Harga Satuan Bahan `

NO NAMA BARANG SATUAN


NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR

1 2 3 4 5 7 8 9 10 11 12 13 14
1.075 1.1 1.15 1.1 1.1 1.1 1.15 1.175
FINISHING
1 Amplas lbr 10,000.00 13,031.20 14,008.54 14,334.32 14,985.88 14,334.32 14,334.32 14,334.32 14,985.88 15,311.66
2 Amplas mtr 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
3 Amplas kain lbr 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
4 Kawat has m' 40,000.00 47,614.00 51,185.05 52,375.40 54,756.10 52,375.40 52,375.40 52,375.40 54,756.10 55,946.45
5 Kawat has Plastik lbr 80,000.00 93,724.40 100,753.73 103,096.84 107,783.06 103,096.84 103,096.84 103,096.84 107,783.06 110,126.17
6 Cat besi (Hamerton) Kaleng 1 kg kg 85,000.00 100,991.80 108,566.19 111,090.98 116,140.57 111,090.98 111,090.98 111,090.98 116,140.57 118,665.37
7 Cat besi (Avian) Kaleng 1 kg kg 95,000.00 112,519.40 120,958.36 123,771.34 129,397.31 123,771.34 123,771.34 123,771.34 129,397.31 132,210.30
8 Cat Besi (polibest) kaleng 1 kg kg 85,000.00 100,991.80 108,566.19 111,090.98 116,140.57 111,090.98 111,090.98 111,090.98 116,140.57 118,665.37
9 Cat Meni Besi/dasar (Polibest) Kaleng 0,8 kg kg 62,500.00 75,054.70 80,683.80 82,560.17 86,312.91 82,560.17 82,560.17 82,560.17 86,312.91 88,189.27
10 Cat Meni Besi/dasar (Yoko) Kaleng 0,8 kg kg 93,750.00 111,078.45 119,409.33 122,186.30 127,740.22 122,186.30 122,186.30 122,186.30 127,740.22 130,517.18
11 Cat kayu+Besi/dasar (polibest) kaleng 0.8 kg kg 87,500.00 103,873.70 111,664.23 114,261.07 119,454.76 114,261.07 114,261.07 114,261.07 119,454.76 122,051.60
12 Cat kayu+Besi/dasar (Yoko) kaleng 0.8 kg kg 81,250.00 96,668.95 103,919.12 106,335.85 111,169.29 106,335.85 106,335.85 106,335.85 111,169.29 113,586.02
13 Cat Kayu Yoko kg 75,000.00 89,464.20 96,174.02 98,410.62 102,883.83 98,410.62 98,410.62 98,410.62 102,883.83 105,120.44
14 Cat menie besi (Glotex) Kaleng 1 kg kg - - - - - - - - - -
15 Cat menie besi (Yoko) Kaleng 1 kg kg 75,000.00 89,464.20 96,174.02 98,410.62 102,883.83 98,410.62 98,410.62 98,410.62 102,883.83 105,120.44
16 Cat menie besi (Delmas) Kaleng 1 kg kg - - - - - - - - - -
17 Cat menie besi (Avian) Kaleng 1 kg kg 95,000.00 112,519.40 120,958.36 123,771.34 129,397.31 123,771.34 123,771.34 123,771.34 129,397.31 132,210.30
18 Cat menie kayu (polibest) 0,8 kg kg 68,750.00 82,259.45 88,428.91 90,485.40 94,598.37 90,485.40 90,485.40 90,485.40 94,598.37 96,654.85
19 Cat menie kayu (Avian) 1kg kg 95,000.00 112,519.40 120,958.36 123,771.34 129,397.31 123,771.34 123,771.34 123,771.34 129,397.31 132,210.30
20 Cat tembok Decolith kg - - - - - - - - - -
21 Cat tembok (Nippon) Exterior / Warna kg 220,000.00 256,614.40 275,860.48 282,275.84 295,106.56 282,275.84 282,275.84 282,275.84 295,106.56 301,521.92
22 Cat tembok (Nippon) Interior / Warna kg 234,000.00 272,753.04 293,209.52 300,028.34 313,666.00 300,028.34 300,028.34 300,028.34 313,666.00 320,484.82
23 Cat tembok (Nippon) Exterior / Putih kg 220,000.00 256,614.40 275,860.48 282,275.84 295,106.56 282,275.84 282,275.84 282,275.84 295,106.56 301,521.92
24 Cat tembok (Nippon) Interior / Putih kg 145,000.00 170,157.40 182,919.21 187,173.14 195,681.01 187,173.14 187,173.14 187,173.14 195,681.01 199,934.95
25 Cat tembok Paragon 5 Kg kg 31,000.00 36,337.00 39,062.28 39,970.70 41,787.55 39,970.70 39,970.70 39,970.70 41,787.55 42,695.98
26 Cat tembok (aries) 5 kg kg 19,800.00 23,426.09 25,183.04 25,768.70 26,940.00 25,768.70 25,768.70 25,768.70 26,940.00 27,525.65
27 Cat tembok Toyopaint kg - - - - - - - - - -
28 Cat tembok (vitex) Kaleng 5 kg kg 15,800.00 18,815.05 20,226.18 20,696.55 21,637.31 20,696.55 20,696.55 20,696.55 21,637.31 22,107.68
29 Cat tembok (vitex) Kaleng 4.5 kg kg 18,888.89 22,442.62 24,125.82 24,686.88 25,809.02 24,686.88 24,686.88 24,686.88 25,809.02 26,370.08
30 Cat monilex klg 95,000.00 112,519.40 120,958.36 123,771.34 129,397.31 123,771.34 123,771.34 123,771.34 129,397.31 132,210.30
31 Dempul kayu (polibest) 0,8 Kg kg 68,750.00 82,259.45 88,428.91 90,485.40 94,598.37 90,485.40 90,485.40 90,485.40 94,598.37 96,654.85
32 Dempul kayu (Pedang) 0.8 kg kg 43,750.00 53,440.45 57,448.48 58,784.50 61,456.52 58,784.50 58,784.50 58,784.50 61,456.52 62,792.53
33 Dempul kayu (Impra) 1 kg kg 95,000.00 112,519.40 120,958.36 123,771.34 129,397.31 123,771.34 123,771.34 123,771.34 129,397.31 132,210.30
34 Kuas Besar 5 inch bh 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
35 Kuas Besar 4 inch bh 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
36 Kuas Sedang 3 inch bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
37 Kuas roll 7" bh 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
38 Kuas roll 10" bh 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
39 Kuas roll 4" bh 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
40 Kuas Kecil 2 inch bh 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
41 Mild zak 33,000.00 39,544.68 42,510.53 43,499.15 45,476.38 43,499.15 43,499.15 43,499.15 45,476.38 46,465.00
42 Minyak cat/Thiner A Kaleng 0,8 liter ltr 60,000.00 70,669.20 75,969.39 77,736.12 81,269.58 77,736.12 77,736.12 77,736.12 81,269.58 83,036.31
43 Plamir kayu 1kg kg 55,000.00 66,409.00 71,389.68 73,049.90 76,370.35 73,049.90 73,049.90 73,049.90 76,370.35 78,030.58
44 Plamir tembok 5 kg merk B0y0 kg 17,000.00 20,198.36 21,713.24 22,218.20 23,228.11 22,218.20 22,218.20 22,218.20 23,228.11 23,733.07
45 Plamir tembok 5 kg merk lion kg 26,000.00 30,573.20 32,866.19 33,630.52 35,159.18 33,630.52 33,630.52 33,630.52 35,159.18 35,923.51
46 Plamir tembok 5 kg merk Paragon kg 31,000.00 36,337.00 39,062.28 39,970.70 41,787.55 39,970.70 39,970.70 39,970.70 41,787.55 42,695.98
47 Plamir tembok 5 kg kg 15,000.00 17,892.84 19,234.80 19,682.12 20,576.77 19,682.12 19,682.12 19,682.12 20,576.77 21,024.09
48 Politur (Boyo) kaleng 1 liter ltr 95,000.00 112,519.40 120,958.36 123,771.34 129,397.31 123,771.34 123,771.34 123,771.34 129,397.31 132,210.30
49 Politur (Joly) kaleng 1 liter ltr 80,000.00 95,228.00 102,370.10 104,750.80 109,512.20 104,750.80 104,750.80 104,750.80 109,512.20 111,892.90
50 Politur (vernis) kaleng 1 liter kg 95,000.00 112,519.40 120,958.36 123,771.34 129,397.31 123,771.34 123,771.34 123,771.34 129,397.31 132,210.30
51 Politur (india) kaleng 1 liter ltr - - - - - - - - -
52 Thiner A kaleng 1/2 liter Ltr 60,000.00 72,172.80 77,585.76 79,390.08 82,998.72 79,390.08 79,390.08 79,390.08 82,998.72 84,803.04
53 Thiner A Avian kaleng 1 liter ltr 60,000.00 72,172.80 77,585.76 79,390.08 82,998.72 79,390.08 79,390.08 79,390.08 82,998.72 84,803.04
54 Thiner A kaleng 1 liter Ltr 60,000.00 72,172.80 77,585.76 79,390.08 82,998.72 79,390.08 79,390.08 79,390.08 82,998.72 84,803.04
55 Thiner B Avian kaleng 1 liter ltr 60,000.00 72,172.80 77,585.76 79,390.08 82,998.72 79,390.08 79,390.08 79,390.08 82,998.72 84,803.04
56 Thiner B Super kaleng 1 liter Ltr 60,000.00 72,172.80 77,585.76 79,390.08 82,998.72 79,390.08 79,390.08 79,390.08 82,998.72 84,803.04

Harga Satauan Bahan dan Upah Hal. 37


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
57 Thiner Super 5 kg kg 44,800.00 52,245.09 56,163.47 57,469.60 60,081.85 57,469.60 57,469.60 57,469.60 60,081.85 61,387.98
58 Thiner A Spesial 5 kg kg 43,000.00 50,170.12 53,932.88 55,187.13 57,695.64 55,187.13 55,187.13 55,187.13 57,695.64 58,949.89
59 Impra 1 Liter ltr 105,000.00 124,047.00 133,350.53 136,451.70 142,654.05 136,451.70 136,451.70 136,451.70 142,654.05 145,755.23
60 impra clear / sanding 1 l Ltr 105,000.00 124,047.00 133,350.53 136,451.70 142,654.05 136,451.70 136,451.70 136,451.70 142,654.05 145,755.23
61 impra wood stain 1 l Ltr 103,000.00 121,741.48 130,872.09 133,915.63 140,002.70 133,915.63 133,915.63 133,915.63 140,002.70 143,046.24
- - - - - - - - -
BAHAN BAKAR MINYAK - - - - - - - - -
1 Premium PBBKB 100% Ltr - - - - - - - - - -
2 Pertalite Ltr 11,400.00 16,148.66 17,359.81 17,763.53 18,570.96 17,763.53 17,763.53 17,763.53 18,570.96 18,974.68
3 Minyak Tanah Ltr 12,000.00 16,840.32 18,103.34 18,524.35 19,366.37 18,524.35 18,524.35 18,524.35 19,366.37 19,787.38
4 Minyak Solar B-0 ( 1 KL ) PBBKB 17 % (1,275%) Ltr - - - - - - - - -
5 Minyak Solar B-0 ( 1 KL ) PBBKB 90 % (6,75%) Ltr - - - - - - - - -
6 Minyak Solar B-0 ( 1 KL ) PBBKB 100% (7,5%) Ltr 11,450.00 16,206.30 17,421.77 17,826.93 18,637.25 17,826.93 17,826.93 17,826.93 18,637.25 19,042.40
7 Minyak Diesel Ltr - - - - - - - - -
8 Minyak Bakar Ltr - - - - - - - - -
9 Gemuk /Stempel 20 kg kg - - - - - - - - - -
10 Gemuk /Stempel 16 kg kg 54,062.50 65,328.29 70,227.91 71,861.12 75,127.53 71,861.12 71,861.12 71,861.12 75,127.53 76,760.74
- - - - - - - - -
PENUTUP ATAP - - - - - - - - -
1 Alang-alang Lbr - 3,007.20
2 Alluminium foil m2 47,028.00 57,219.20 61,510.64 62,941.12 65,802.08 62,941.12 62,941.12 62,941.12 65,802.08 67,232.56
3 Asbes Bubungan lbr - - - - - - - - -
4 Asbes Gelombang 1,80 m x 1.05 m x 3.5 mm lbr 54,490.45 67,826.41 72,913.39 74,609.05 78,000.37 74,609.05 74,609.05 74,609.05 78,000.37 79,696.03
5 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr 76,866.40 93,620.51 100,642.05 102,982.56 107,663.59 102,982.56 102,982.56 102,982.56 107,663.59 110,004.10
6 Asbes Nok 1mx2mx4mm lbr 48,640.00 61,082.25 65,663.41 67,190.47 70,244.58 67,190.47 67,190.47 67,190.47 70,244.58 71,771.64
7 Besi profil WF kg 19,000.00 24,909.64 26,777.86 27,400.60 28,646.09 27,400.60 27,400.60 27,400.60 28,646.09 29,268.83
8 Besi strip 1kg kg 8,712.00 13,050.05 14,028.80 14,355.05 15,007.55 14,355.05 14,355.05 14,355.05 15,007.55 15,333.80
9 Bubungan Biasa bj 25,000.00 - - - - - - - - -
10 Bubungan Plentong bj - - - - - - - - - -
11 Genteng plentong dicat bj - - - - - - - - - -
12 Genteng Plentong bj 35,000.00 43,353.80 46,605.34 47,689.18 49,856.87 47,689.18 47,689.18 47,689.18 49,856.87 50,940.72
13 Ijuk kg - - - - - - - - - -
14 Tali Ijuk Kg - - - - - - - - - -
15 Formite/Penjaga Jarak Bekisting/Spacer Bh - - - - - - - - - -
16 Seng BJLS 0,20 gelombang lbr 96,000.00 115,676.96 124,352.73 127,244.66 133,028.50 127,244.66 127,244.66 127,244.66 133,028.50 135,920.43
17 Seng BJLS 0.20 gelombang gajah berlian lbr 103,000.00 123,746.28 133,027.25 136,120.91 142,308.22 136,120.91 136,120.91 136,120.91 142,308.22 145,401.88
18 Seng BJLS 0,25 gelombang lbr 85,000.00 102,996.60 110,721.35 113,296.26 118,446.09 113,296.26 113,296.26 113,296.26 118,446.09 121,021.01
19 Seng BJLS 0,28 gelombang lbr - - - - - - - - - -
20 Seng BJLS 0,30 gelombang lbr 119,000.00 142,190.44 152,854.72 156,409.48 163,519.01 156,409.48 156,409.48 156,409.48 163,519.01 167,073.77
21 Seng Plat BJLS 30 lebar 28 cm lbr 35,000.00 45,358.60 48,760.50 49,894.46 52,162.39 49,894.46 49,894.46 49,894.46 52,162.39 53,296.36
22 Seng Plat BJLS 30 lebar 30 cm m' 45,000.00 56,886.20 61,152.67 62,574.82 65,419.13 62,574.82 62,574.82 62,574.82 65,419.13 66,841.29
23 Seng Plat BJLS 30 lebar 38 cm m' 45,000.00 56,886.20 61,152.67 62,574.82 65,419.13 62,574.82 62,574.82 62,574.82 65,419.13 66,841.29
24 Seng Plat BJLS 30 lebar 40 cm m' 50,000.00 62,650.00 67,348.75 68,915.00 72,047.50 68,915.00 68,915.00 68,915.00 72,047.50 73,613.75
25 Seng Plat BJLS 30 lebar 44 cm m' 50,000.00 62,650.00 67,348.75 68,915.00 72,047.50 68,915.00 68,915.00 68,915.00 72,047.50 73,613.75
26 Seng Plat BJLS 20 lebar 30 cm m' 35,000.00 45,358.60 48,760.50 49,894.46 52,162.39 49,894.46 49,894.46 49,894.46 52,162.39 53,296.36
27 Seng Plat BJLS 20 lebar 28 cm m' 30,000.00 39,594.80 42,564.41 43,554.28 45,534.02 43,554.28 43,554.28 43,554.28 45,534.02 46,523.89
28 Seng Plat BJLS 20 lebar 40 cm m' 45,000.00 56,886.20 61,152.67 62,574.82 65,419.13 62,574.82 62,574.82 62,574.82 65,419.13 66,841.29
29 Seng Plat BJLS 30 pintu lbr 87,000.00 105,302.12 113,199.78 115,832.33 121,097.44 115,832.33 115,832.33 115,832.33 121,097.44 123,729.99
30 Seng Plat BJLS 20 pintu m' 79,000.00 96,080.04 103,286.04 105,688.04 110,492.05 105,688.04 105,688.04 105,688.04 110,492.05 112,894.05
31 Seng Zincalum ( Spandek) 0.25 x 6 m lbr 243,000.00 285,132.68 306,517.63 313,645.95 327,902.58 313,645.95 313,645.95 313,645.95 327,902.58 335,030.90
32 Seng Zincalum ( Spandek ) 0.30 x 6 m lbr 480,000.00 558,336.80 600,212.06 614,170.48 642,087.32 614,170.48 614,170.48 614,170.48 642,087.32 656,045.74
33 Seng Zincalum (Spandek) 0.40 x 6 m lbr - - - - - - - - - -
34 Seng plastik gelombang besar tebal lbr 95,000.00 114,524.20 123,113.52 125,976.62 131,702.83 125,976.62 125,976.62 125,976.62 131,702.83 134,565.94
35 Seng plastik gelombang kecil tebal lbr 80,000.00 97,232.80 104,525.26 106,956.08 111,817.72 106,956.08 106,956.08 106,956.08 111,817.72 114,248.54
36 Seng plastik gelombang besar tipis lbr 75,000.00 91,469.00 98,329.18 100,615.90 105,189.35 100,615.90 100,615.90 100,615.90 105,189.35 107,476.08
37 Seng Fiber gelombang besar tebal lbr 95,000.00 114,524.20 123,113.52 125,976.62 131,702.83 125,976.62 125,976.62 125,976.62 131,702.83 134,565.94
38 Sirap Jati bh - - - - - - - - - -
39 AT roof Bjls 30, 0,8x0,8 lbr - - - - - - - - - -
40 Rainbouw roof Bjls 30, 0,3x1,2 lbr - - - - - - - - -
41 Bubungan rainbouw roof Bjls 30, 1,2 m' Bh - - - - - - - - -
42 Multiroof BJ 300 lbr - - - - - - - - - -
43 Bubungan multiroof Bh 73,000.00 87,158.68 93,695.58 95,874.55 100,232.48 95,874.55 95,874.55 95,874.55 100,232.48 102,411.45
44 Igi roof 0,2 uk. 0,8x0,8 m' lbr 35,000.00 - - - - - - - -
45 Sakura roof BJ 30 lbr 43,000.00 52,575.88 56,519.07 57,833.47 60,462.26 57,833.47 57,833.47 57,833.47 60,462.26 61,776.66
-
PENGGANTUNG -
1 Engsel jendela biasa ps 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
2 Engsel jendela biasa Merk King ps 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
3 Engsel jendela biasa merk king 3' ps 40,000.00 47,614.00 51,185.05 52,375.40 54,756.10 52,375.40 52,375.40 52,375.40 54,756.10 55,946.45
4 Engsel jendela merek King 4" ps 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
5 Engsel kupu-kupu jendela biasa ps 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52

Harga Satauan Bahan dan Upah Hal. 38


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
6 Engsel kupu-kupu jendela biasa 3" ps 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
7 Engsel Jendela Bagus Kuningan ps 55,000.00 64,905.40 69,773.31 71,395.94 74,641.21 71,395.94 71,395.94 71,395.94 74,641.21 76,263.85
8 Engsel jendela bagus kuningan modem 4' ps 75,000.00 87,960.60 94,557.65 96,756.66 101,154.69 96,756.66 96,756.66 96,756.66 101,154.69 103,353.71
9 Engsel jendela bagus kuningan 4' ps 75,000.00 87,960.60 94,557.65 96,756.66 101,154.69 96,756.66 96,756.66 96,756.66 101,154.69 103,353.71
10 Engsel kupu-kupu pintu biasa ps 55,000.00 64,905.40 69,773.31 71,395.94 74,641.21 71,395.94 71,395.94 71,395.94 74,641.21 76,263.85
11 Engsel kupu-kupu pintu biasa 4" ps 55,000.00 64,905.40 69,773.31 71,395.94 74,641.21 71,395.94 71,395.94 71,395.94 74,641.21 76,263.85
12 Engsel kupu-kupu pintu biasa 4cmx3cmx3mm merk jezz ps 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
13 Engsel kupu-kupu pintu biasa AFC 4cmx3cmx3mm merk king ps 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
14 Engsel kupu-kupu pintu biasa 4cmx3cmx3mm merk viper ps - - - - - - - - - -
15 Engsel nylon ps - - - - - - - - - -
16 Espagnoleth set - - - - - - - - -
17 Grendel kecil biasa bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
18 Grendel kecil bagus bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
19 Grendel kecil spring knife brabus/ses bh 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
20 Grendel kecil biasa 3" bh 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
21 Grendel kecil bagus 2" bh 20,000.00 24,558.80 26,400.71 27,014.68 28,242.62 27,014.68 27,014.68 27,014.68 28,242.62 28,856.59
22 Grendel kecil spring knife bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
23 Grendel besar 12" bh 65,000.00 76,433.00 82,165.48 84,076.30 87,897.95 84,076.30 84,076.30 84,076.30 87,897.95 89,808.78
24 Grendel besar bh 40,000.00 47,614.00 51,185.05 52,375.40 54,756.10 52,375.40 52,375.40 52,375.40 54,756.10 55,946.45
25 Grendel hararo bh - - - - - - - - -
26 Kaca 3 mm bening lbr 320,000.00 370,386.80 398,165.81 407,425.48 425,944.82 407,425.48 407,425.48 407,425.48 425,944.82 435,204.49
27 Kaca 3 mm bening 153x122 m2 m2 104,468.02 142,479.35 153,165.30 156,727.29 163,851.25 156,727.29 156,727.29 156,727.29 163,851.25 167,413.24
28 Kaca 5 mm bening 132 x 183 lbr 227,686.70 284,520.92 305,859.99 312,973.02 327,199.06 312,973.02 312,973.02 312,973.02 327,199.06 334,312.09
29 Kaca 5 mm bening 200 x 100 m2 137,500.00 180,557.30 194,099.10 198,613.03 207,640.90 198,613.03 198,613.03 198,613.03 207,640.90 212,154.83
30 Kaca 5 mm bening 153x122 m2 m2 147,326.69 191,885.12 206,276.50 211,073.63 220,667.88 211,073.63 211,073.63 211,073.63 220,667.88 225,465.01
31 Kaca 6 mm bening 153x122 m2 m2 - - - - - - - - - -
32 Kaca 8 mm bening 153x122 m2 m2 419,000.00 505,059.24 542,938.68 555,565.16 580,818.13 555,565.16 555,565.16 555,565.16 580,818.13 593,444.61
33 Kaca 10 mm bening m2 - - - - - - - - - -
34 Kaca 12 mm bening m2 - - - - - - - - - -
35 Kaca Es/Kapur 3 mm m2 - - - - - - - - - -
36 Kaca Es/Kapur 5 mm m2 - -
37 Kaca nako bening bh 30,000.00 37,590.00 40,409.25 41,349.00 43,228.50 41,349.00 41,349.00 41,349.00 43,228.50 44,168.25
38 Kaca nako rayben bh 30,000.00 37,590.00 40,409.25 41,349.00 43,228.50 41,349.00 41,349.00 41,349.00 43,228.50 44,168.25
39 Kaca ryben 3 mm 153x122 cm m2 95,360.55 131,980.63 141,879.17 145,178.69 151,777.72 145,178.69 145,178.69 145,178.69 151,777.72 155,077.24
40 Kaca ryben 5 mm 153x122 cm m2 153,755.49 199,295.98 214,243.18 219,225.58 229,190.38 219,225.58 219,225.58 219,225.58 229,190.38 234,172.78
41 Kaca Ryben 5 mm 183 x 132 cm m2 140,751.78 184,305.82 198,128.76 202,736.40 211,951.70 202,736.40 202,736.40 202,736.40 211,951.70 216,559.34
42 Kaca ryben 5 mm 200x100 cm m2 - - - - - - - - - -
43 Cermin 3 mm 153x122 cm m2 198,221.37 250,554.46 269,346.05 275,609.91 288,137.63 275,609.91 275,609.91 275,609.91 288,137.63 294,401.49
44 Cermin 5 mm 183 x 122 m2 193,048.46 244,591.35 262,935.70 269,050.48 281,280.05 269,050.48 269,050.48 269,050.48 281,280.05 287,394.83
45 Kait angin biasa ps 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
46 Kait angin bagus bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
47 Kunci pintu Delmanao bh 160,000.00 185,945.20 199,891.09 204,539.72 213,836.98 204,539.72 204,539.72 204,539.72 213,836.98 218,485.61
48 Kunci pintu Zeis bh 395,000.00 456,843.80 491,107.09 502,528.18 525,370.37 502,528.18 502,528.18 502,528.18 525,370.37 536,791.47
49 Kunci pintu TOP bh 75,000.00 87,960.60 94,557.65 96,756.66 101,154.69 96,756.66 96,756.66 96,756.66 101,154.69 103,353.71
50 Kunci pintu Union bh - -
51 Kunci pintu Cap Kuda bodi kecil bh 175,000.00 203,236.60 218,479.35 223,560.26 233,722.09 223,560.26 223,560.26 223,560.26 233,722.09 238,803.01
52 Kunci pintu Cap Kuda bodi besar bh 195,000.00 226,291.80 243,263.69 248,920.98 260,235.57 248,920.98 248,920.98 248,920.98 260,235.57 265,892.87
53 Kunci pintu Royal bh - - - - - - - - - -
54 Kunci pintu Globe K bh 135,000.00 157,126.20 168,910.67 172,838.82 180,695.13 172,838.82 172,838.82 172,838.82 180,695.13 184,623.29
55 Kunci pintu Yale bh 175,000.00 203,236.60 218,479.35 223,560.26 233,722.09 223,560.26 223,560.26 223,560.26 233,722.09 238,803.01
56 Kunci pintu vanessa bh 145,000.00 168,653.80 181,302.84 185,519.18 193,951.87 185,519.18 185,519.18 185,519.18 193,951.87 198,168.22
57 Kunci pintu Kodai bh 250,000.00 289,693.60 311,420.62 318,662.96 333,147.64 318,662.96 318,662.96 318,662.96 333,147.64 340,389.98
58 Kunci pintu Sapphire bh 175,000.00 203,236.60 218,479.35 223,560.26 233,722.09 223,560.26 223,560.26 223,560.26 233,722.09 238,803.01
59 Kunci slot kecil HPP bh 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
60 Kunci slot sedang HPP bh 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
61 Kunci slot besar HPP bh 65,000.00 76,433.00 82,165.48 84,076.30 87,897.95 84,076.30 84,076.30 84,076.30 87,897.95 89,808.78
62 Kunci slot kecil bh 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
63 Kunci slot kecil ATS bh 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
64 Kunci slot sedang bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
65 Kunci slot sedang ATS bh 39,000.00 46,461.24 49,945.83 51,107.36 53,430.43 51,107.36 51,107.36 51,107.36 53,430.43 54,591.96
66 Kunci slot besar bh 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
67 Kunci Silinder bh 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
68 Kunci tanam 2 slag Biasa bh 150,000.00 174,417.60 187,498.92 191,859.36 200,580.24 191,859.36 191,859.36 191,859.36 200,580.24 204,940.68
69 Kunci tanam 2 slag Bagus bh 200,000.00 232,055.60 249,459.77 255,261.16 266,863.94 255,261.16 255,261.16 255,261.16 266,863.94 272,665.33
70 Kunci tanam 2 slag bagus merk Azzuro bh 250,000.00 289,693.60 311,420.62 318,662.96 333,147.64 318,662.96 318,662.96 318,662.96 333,147.64 340,389.98
71 Kunci tanam 2 slag bagus merk Giardano bh - - - - - - - - -
- - - - - - - - -
KAYU DAN PLAFOND - - - - - - - - -
1 Bambu besar Ukuran 4 m btg 20,000.00 26,062.40 28,017.08 28,668.64 29,971.76 28,668.64 28,668.64 28,668.64 29,971.76 30,623.32
2 Bambu sedang Ukuran 4 m btg 15,000.00 20,298.60 21,821.00 22,328.46 23,343.39 22,328.46 22,328.46 22,328.46 23,343.39 23,850.86

Harga Satauan Bahan dan Upah Hal. 39


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR

1 2 3 4 5 7 8 9 10 11 12 13 14
3 Bambu kecil Ukuran 4 m btg 12,000.00 16,840.32 18,103.34 18,524.35 19,366.37 18,524.35 18,524.35 18,524.35 19,366.37 19,787.38
4 Celling teak (0,62 x 2,40) m2 lbr - - - - - - - - -
5 Eternit lbr 96,100.00 116,794.64 125,554.23 128,474.10 134,313.83 128,474.10 128,474.10 128,474.10 134,313.83 137,233.70
6 Formika lbr 191,556.89 226,833.52 243,846.03 249,516.87 260,858.54 249,516.87 249,516.87 249,516.87 260,858.54 266,529.38
7 Melamine Lbr 150,000.00 178,928.40 192,348.03 196,821.24 205,767.66 196,821.24 196,821.24 196,821.24 205,767.66 210,240.87
8 Gedeg kulit kelas I m2 - - - - - - - - - -
9 Gypsum Old lbr 100,000.00 121,290.40 130,387.18 133,419.44 139,483.96 133,419.44 133,419.44 133,419.44 139,483.96 142,516.22
10 Hard board MDF lbr - - - - - - - - -
11 Kalsiboard 4,5 mm lbr 130,000.00 155,873.20 167,563.69 171,460.52 179,254.18 171,460.52 171,460.52 171,460.52 179,254.18 183,151.01
12 Kayu bekesting / kayu putih m3 2,500,000.00 3,032,260.00 3,259,679.50 3,335,486.00 3,487,099.00 3,335,486.00 3,335,486.00 3,335,486.00 3,487,099.00 3,562,905.50
13 Kayu Besi 10 x 10, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,498,896.50 4,603,522.00 4,812,773.00 4,603,522.00 4,603,522.00 4,603,522.00 4,812,773.00 4,917,398.50
14 Kayu Besi 5 x 10, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,498,896.50 4,603,522.00 4,812,773.00 4,603,522.00 4,603,522.00 4,603,522.00 4,812,773.00 4,917,398.50
15 Kayu Besi 5 x 5, panjang 4 m' m3 - - - - - - - - - -
16 Kayu Besi 2.5 x 20, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,498,896.50 4,603,522.00 4,812,773.00 4,603,522.00 4,603,522.00 4,603,522.00 4,812,773.00 4,917,398.50
17 Kayu Besi 10 x 10, panjang 3 m' m3 3,500,000.00 4,185,020.00 4,498,896.50 4,603,522.00 4,812,773.00 4,603,522.00 4,603,522.00 4,603,522.00 4,812,773.00 4,917,398.50
18 Kayu Besi 6x 12, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,498,896.50 4,603,522.00 4,812,773.00 4,603,522.00 4,603,522.00 4,603,522.00 4,812,773.00 4,917,398.50
19 Reng Kayu Besi 2 x 3 m3 - - - - - - - - - -
20 Kayu Besi 4x 25, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,498,896.50 4,603,522.00 4,812,773.00 4,603,522.00 4,603,522.00 4,603,522.00 4,812,773.00 4,917,398.50
21 Papan Kayu besi 2,5 x 25, panjang 4 m' m3 3,700,000.00 4,415,572.00 4,746,739.90 4,857,129.20 5,077,907.80 4,857,129.20 4,857,129.20 4,857,129.20 5,077,907.80 5,188,297.10
22 Papan Cor/Papan Kayu Putih m3 2,300,000.00 2,801,708.00 3,011,836.10 3,081,878.80 3,221,964.20 3,081,878.80 3,081,878.80 3,081,878.80 3,221,964.20 3,292,006.90
23 Kayu Matoa 10 x10, panjang 4 m' m3 - - - - - - - - - -
24 Kayu Matoa 5 x 10, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,259,679.50 3,335,486.00 3,487,099.00 3,335,486.00 3,335,486.00 3,335,486.00 3,487,099.00 3,562,905.50
25 Kayu Matoa 5 x 5, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,259,679.50 3,335,486.00 3,487,099.00 3,335,486.00 3,335,486.00 3,335,486.00 3,487,099.00 3,562,905.50
26 Kayu Matoa m3 2,500,000.00 3,032,260.00 3,259,679.50 3,335,486.00 3,487,099.00 3,335,486.00 3,335,486.00 3,335,486.00 3,487,099.00 3,562,905.50
27 Kayu Merbau m3 - - - - - - - - - -
28 Papan Kayu Matoa 2,5 x 25, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,259,679.50 3,335,486.00 3,487,099.00 3,335,486.00 3,335,486.00 3,335,486.00 3,487,099.00 3,562,905.50
29 Papan Kayu Matoa 2,5 x 20, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,259,679.50 3,335,486.00 3,487,099.00 3,335,486.00 3,335,486.00 3,335,486.00 3,487,099.00 3,562,905.50
30 Papan Kayu Matoa 3 x 25, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,259,679.50 3,335,486.00 3,487,099.00 3,335,486.00 3,335,486.00 3,335,486.00 3,487,099.00 3,562,905.50
31 Kayu bingkirai m3 - - - - - - - - - -
32 Kayu bingkirai papan m3 - - - - - - - - - -
33 Kayu dolken (pekerjaan sementara) btg 22,000.00 33,379.92 35,883.41 36,717.91 38,386.91 36,717.91 36,717.91 36,717.91 38,386.91 39,221.41
34 Kayu jati m3 - - - - - - - - - -
35 Kayu jati papan m3 - - - - - - - - - -
36 Kayu kamper balok m3 - - - - - - - - - -
37 Kayu kamper usuk/reng m3 - - - - - - - - - -
38 Kayu kamper papan m3 - - - - - - - - - -
39 Kayu kruing balok m3 - - - - - - - - - -
40 Kayu kruing usuk/reng m3 - - - - - - - - - -
41 Kayu kruing papan m3 - - - - - - - - - -
42 Kayu meranti balok m3 - - - - - - - - - -
43 Kayu meranti usuk/reng m3 - - - - - - - - - -
44 Kayu meranti papan m3 - -
45 Kayu merbau papan m3 - - - - - - - - - -
46 Kayu profil m1 - - - - - - - - - -
47 Kayu seseh balok m3 - - - - - - - - - -
48 Kayu seseh dolken m3 - - - - - - - - - -
49 Lem Aibond 450 gr kg - - - - - - - - - -
50 Lem Aibond 700 gr kg - - - - - - - - - -
51 Lem Kayu (fox) kg 95,000.00 111,015.80 119,341.99 122,117.38 127,668.17 122,117.38 122,117.38 122,117.38 127,668.17 130,443.57
52 Lem Kayu (fox) besar klg 95,000.00 111,015.80 119,341.99 122,117.38 127,668.17 122,117.38 122,117.38 122,117.38 127,668.17 130,443.57
53 Lem Kayu (Fox) 0.6 klg 65,000.00 76,433.00 82,165.48 84,076.30 87,897.95 84,076.30 84,076.30 84,076.30 87,897.95 89,808.78
54 Lem Kayu (Fox) klg 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
55 Lem Kayu (Fox) Rajawali kg 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
56 List Gypsum standar m' - - - - - - - - - -
57 Minyak bekisting ltr 15,000.00 18,795.00 20,204.63 20,674.50 21,614.25 20,674.50 20,674.50 20,674.50 21,614.25 22,084.13
58 Tripleks 2.7 mm lbr 60,000.00 74,177.60 79,740.92 81,595.36 85,304.24 81,595.36 81,595.36 81,595.36 85,304.24 87,158.68
59 Tripleks 3 mm Lbr 90,000.00 108,760.40 116,917.43 119,636.44 125,074.46 119,636.44 119,636.44 119,636.44 125,074.46 127,793.47
60 Tripleks 3 mm semi meranti Lbr 86,000.00 104,149.36 111,960.56 114,564.30 119,771.76 114,564.30 114,564.30 114,564.30 119,771.76 122,375.50
61 Tripleks 3.6 mm lbr 75,000.00 - - - - - - - - -
62 Plywood 3 mm Lbr - - - - - - - - - -
63 Tripleks 4 mm Lbr 105,000.00 126,051.80 135,505.69 138,656.98 144,959.57 138,656.98 138,656.98 138,656.98 144,959.57 148,110.87
64 Tripleks 4 mm semi meranti Lbr 90,000.00 108,760.40 116,917.43 119,636.44 125,074.46 119,636.44 119,636.44 119,636.44 125,074.46 127,793.47
65 Plywood 4 mm lbr - - - - - - - - -
66 Tripleks 5 mm lbr 150,000.00 177,926.00 191,270.45 195,718.60 204,614.90 195,718.60 195,718.60 195,718.60 204,614.90 209,063.05
67 Multiplek 6 mm lbr 125,000.00 149,107.00 160,290.03 164,017.70 171,473.05 164,017.70 164,017.70 164,017.70 171,473.05 175,200.73
68 Plywood 6 mm lbr - - - - - - - - - -
69 Multiplek 9 mm lbr 195,000.00 229,800.20 247,035.22 252,780.22 264,270.23 252,780.22 252,780.22 252,780.22 264,270.23 270,015.24
70 Plywood 9 mm lbr 165,000.00 195,217.40 209,858.71 214,739.14 224,500.01 214,739.14 214,739.14 214,739.14 224,500.01 229,380.45
71 Multiplek 12 mm lbr 200,000.00 235,564.00 253,231.30 259,120.40 270,898.60 259,120.40 259,120.40 259,120.40 270,898.60 276,787.70
72 Plywood 12 mm lbr 200,000.00 235,564.00 253,231.30 259,120.40 270,898.60 259,120.40 259,120.40 259,120.40 270,898.60 276,787.70

Harga Satauan Bahan dan Upah Hal. 40


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
73 Multiplek 18 mm lbr 325,000.00 379,659.00 408,133.43 417,624.90 436,607.85 417,624.90 417,624.90 417,624.90 436,607.85 446,099.33
74 Plywood aluminium lbr 130,000.00 154,870.80 166,486.11 170,357.88 178,101.42 170,357.88 170,357.88 170,357.88 178,101.42 181,973.19
75 Teak wood (0,9x2,20) m2 lbr 130,000.00 154,870.80 166,486.11 170,357.88 178,101.42 170,357.88 170,357.88 170,357.88 178,101.42 181,973.19
76 Teak wood (1,20x2,40) m2 lbr - - - - - - - - - -
- - - - - - - - -
KERAMIK - - - - - - - - -
IKAD - - - - - - - - -
1 Ikad (Keramik) Kw. I 10 x 20 cm m2 - - - - - - - - - -
2 Ikad (Keramik) Kw. I 20 x 20 cm m2 - - - - - - - - - -
3 Ikad (Keramik) Kw. I 20 x 30 cm m2 - - - - - - - - -
4 Ikad (Keramik) Kw. I 30 x 30 cm m2 - - - - - - - - - -
5 Ikad (Keramik) Kw. I 40 x 40 cm m2 90,000.00 111,767.60 120,150.17 122,944.36 128,532.74 122,944.36 122,944.36 122,944.36 128,532.74 131,326.93
6 Ikad (Keramik) Kw. II 10 x 20 cm m2 - - - - - - - - - -
7 Ikad (Keramik) Kw. II 20 x 20 cm m2 95,000.00 117,531.40 126,346.26 129,284.54 135,161.11 129,284.54 129,284.54 129,284.54 135,161.11 138,099.40
8 Ikad (Keramik) Kw. II 20 x 30 cm m2 - - - - - - - - - -
9 Ikad (Keramik) Kw. II 30 x 30 cm m2 - - - - - - - - - -
10 Ikad (Keramik) Kw. II 40 x 40 cm m2 80,000.00 100,240.00 107,758.00 110,264.00 115,276.00 110,264.00 110,264.00 110,264.00 115,276.00 117,782.00
-
ELEYSIUM - - - - - - - - -
1 Ikad (Keramik) Kw. I 20 x 20 cm m2 - - - - - - - - - -
2 Ikad (Keramik) Kw. I 20 x 30 cm m2 - - - - - - - - - -
3 Ikad (Keramik) Kw. I 30 x 30 cm m2 - - - - - - - - - -
4 Ikad (Keramik) Kw. I 40 x 40 cm m2 - - - - - - - - - -
- - - - - - - - -
INESA - - - - - - - - -
1 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2 - - - - - - - - -
2 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 - - - - - - - - -
3 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2 - - - - - - - - -
4 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2 - - - - - - - - -
5 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2 - - - - - - - - -
6 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2 - - - - - - - - - -
7 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2 - - - - - - - - - -
8 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 - - - - - - - - - -
9 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2 - - - - - - - - - -
10 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2 - - - - - - - - - -
11 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2 - - - - - - - - - -

ESSENZA
1 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2 -
2 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2 -
3 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 -
4 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 -
5 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 -
6 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 - - - - - - - - - -
7 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 - - - - - - - - - -
8 Keramik Kelas I Domus m2 -
9 Keramik Kelas I Granity Imperiali m2 -
10 Keramik Kelas I Lavagna m2 -
11 Keramik Kelas I Mountain Peak m2 -

GARUDA - - - - - - - -
1 Keramik 20 x 20 kelas I Emboss Dasar Muda m2 - - - - - - - - -
2 Keramik 20 x 20 kelas I Emboss Dasar Tua m2 - - - - - - - - -
3 Keramik 20 x 20 kelas I Tesia m2 - - - - - - - - -
4 Keramik 20 x 20 kelas II Emboss Dasar Muda m2 - - - - - - - - -
5 Keramik 20 x 20 kelas II Emboss Dasar Tua m2 - - - - - - - - -
6 Keramik 20 x 20 kelas II Tesia m2 - - - - - - - - -
7 Keramik 20 x 25 kelas I Motif Dasar Medium m2 - - - - - - - - -
8 Keramik 20 x 25 kelas I Motif Dasar Muda m2 - - - - - - - - -
9 Keramik 20 x 25 kelas I Nuri Dark m2 - - - - - - - - -
10 Keramik 20 x 25 kelas I Polos m2 - - - - - - - - -
11 Keramik 30 x 30 kelas I Granity m2 - - - - - - - - -
12 Keramik 30 x 30 kelas I Motif Embose m2 - - - - - - - - -
13 Keramik 30 x 30 kelas II Granity m2 - - - - - - - - -
14 Keramik 30 x 30 kelas II Motif Embose m2 - - - - - - - - -
15 Keramik 40 x 40 kelas I Motif Dasar Muda m2 - - - - - - - - -
16 Keramik 40 x 40 kelas I Motif Dasar Muda m2 - - - - - - - - - -
17 Keramik 40 x 40 kelas I Motif Embose m2 - - - - - - - - - -

Harga Satauan Bahan dan Upah Hal. 41


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
18 Keramik 40 x 40 kelas I Motif Granity Tua m2 - - - - - - - - - -
19 Keramik 40 x 40 kelas I Motif Medium Color m2 - - - - - - - - - -
20 Keramik 40 x 40 kelas I Motif Spesial Color m2 - - - - - - - - - -
21 Keramik 50 x 50 kelas I m2 - - - - - - - - - -
22 Granito 60 x 60 polos m2 - - - - - - - - - -
22 Granito 60 x 60 warna m2 - - - - - - - - - -
-
ASIA - - - - - - - - -
1 Keramik 10 x 10 kelas I warna muda m2 - - - - - - - - - -
2 Keramik 10 x 20 kelas I warna muda m2 - - - - - - - - - -
3 Keramik 20 x 20 kelas I warna muda m2 70,000.00 88,712.40 95,365.83 97,583.64 102,019.26 97,583.64 97,583.64 97,583.64 102,019.26 104,237.07
4 Keramik 20 x 20 kelas I warna tua m2 80,000.00 100,240.00 107,758.00 110,264.00 115,276.00 110,264.00 110,264.00 110,264.00 115,276.00 117,782.00
5 Keramik 20 x 25 kelas I warna tua m2 90,000.00 111,767.60 120,150.17 122,944.36 128,532.74 122,944.36 122,944.36 122,944.36 128,532.74 131,326.93
6 Keramik 20 x 30 kelas I warna muda m2 - - - - - - - - - -
7 Keramik 30 x 30 kelas I warna muda m2 66,000.00 84,101.36 90,408.96 92,511.50 96,716.56 92,511.50 92,511.50 92,511.50 96,716.56 98,819.10
8 Keramik 30 x 30 kelas I warna tua m2 66,000.00 84,101.36
9 Keramik 40 x 40 kelas I warna muda m2 90,000.00 111,767.60 120,150.17 122,944.36 128,532.74 122,944.36 122,944.36 122,944.36 128,532.74 131,326.93
10 Keramik 40 x 40 warna platinum m2 80,000.00 100,240.00 107,758.00 110,264.00 115,276.00 110,264.00 110,264.00 110,264.00 115,276.00 117,782.00
11 Keramik 10 x 20 kelas II m2 80,000.00 100,240.00 107,758.00 110,264.00 115,276.00 110,264.00 110,264.00 110,264.00 115,276.00 117,782.00
12 Keramik 20 x 20 kelas II m2 - - - - - - - - - -
13 Keramik 20 x 30 kelas II m2 - - - - - - - - - -
14 Keramik 30 x 30 kelas II m2 - - - - - - - - - -
15 Keramik 40 x 40 kelas II m2 - - - - - - - - - -
- - - - - - - - -
MULIA - - - - - - - - -
1 Keramik 10 x 20 cm kelas I m2 - - - - - - - - - -
2 Keramik 20 x 20 cm kelas I m2 75,000.00 94,476.20 101,561.92 103,923.82 108,647.63 103,923.82 103,923.82 103,923.82 108,647.63 111,009.54
3 Keramik 20 x 30 cm kelas I m2 - - - - - - - - - -
4 Keramik 30 x 30 cm kelas I m2 - - - - - - - - - -
5 Keramik 40 x 40 cm kelas I m2 90,000.00 111,767.60 120,150.17 122,944.36 128,532.74 122,944.36 122,944.36 122,944.36 128,532.74 131,326.93
6 Keramik 10 x 20 cm kelas II m2 - - - - - - - - - -
7 Keramik 20 x 20 cm kelas II m2 - - - - - - - - - -
8 Keramik 20 x 30 cm kelas II m2 - - - - - - - - - -
9 Keramik 30 x 30 cm kelas II m2 - - - - - - - - - -
10 Keramik 40 x 40 cm kelas II m2 - - - - - - - - - -
- - - - - - - - -
PICASSO - - - - - - - - -
1 Ikad Keramik KW 1 20 x 20 cm m2 - - - - - - - - - -
2 Ikad Keramik KW 1 20 x 25 cm m2 - - - - - - - - - -
3 Ikad Keramik KW 1 30 x 30 cm m2 - - - - - - - - - -
4 Ikad Keramik KW 1 40 x 40 cm m2 - - - - - - - - - -
- - - - - - - - -
SANITAIR - - - - - - - - -
1 Bak mandi fibre glass 70x70x66 cm biasa bh 345,000.00 477,894.20 513,736.27 525,683.62 549,578.33 525,683.62 525,683.62 525,683.62 549,578.33 561,525.69
2 Bak mandi fibre glass 70x70x66 cm sudut bh 480,000.00 633,516.80 681,030.56 696,868.48 728,544.32 696,868.48 696,868.48 696,868.48 728,544.32 744,382.24
3 Bak mandi keramik 50x50 bh - - - - - - - - -
4 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh - - - - - - - - -
5 Floor drain plastik bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
6 Floor drain stainless bh 75,000.00 87,960.60 94,557.65 96,756.66 101,154.69 96,756.66 96,756.66 96,756.66 101,154.69 103,353.71
7 Floor drain plastik onda bh 39,000.00 46,461.24 49,945.83 51,107.36 53,430.43 51,107.36 51,107.36 51,107.36 53,430.43 54,591.96
8 Kloset duduk DATA komplit bh - - - - - - - - - -
9 Kloset duduk INA Komplit bh 2,800,000.00 3,307,920.00 3,556,014.00 3,638,712.00 3,804,108.00 3,638,712.00 3,638,712.00 3,638,712.00 3,804,108.00 3,886,806.00
10 Kloset duduk INA standard bh 1,200,000.00 1,463,504.00 1,573,266.80 1,609,854.40 1,683,029.60 1,609,854.40 1,609,854.40 1,609,854.40 1,683,029.60 1,719,617.20
11 Kloset duduk Amerika Standar bh 2,850,000.00 3,365,558.00 3,617,974.85 3,702,113.80 3,870,391.70 3,702,113.80 3,702,113.80 3,702,113.80 3,870,391.70 3,954,530.65
12 Kloset duduk " TOTO Type CW 421J WITH ECO WASHER bh 4,000,000.00 4,691,232.00 5,043,074.40 5,160,355.20 5,394,916.80 5,160,355.20 5,160,355.20 5,160,355.20 5,394,916.80 5,512,197.60
16 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh - - - - - - - - - -
18 Kloset duduk LOLO warna COMPLIT bh 450,000.00 598,934.00 643,854.05 658,827.40 688,774.10 658,827.40 658,827.40 658,827.40 688,774.10 703,747.45
17 Kloset jongkok " TOTO Type CE 9 Complete Push valve FSD bh 3,588,000.00 4,216,294.88 4,532,517.00 4,637,924.37 4,848,739.11 4,637,924.37 4,637,924.37 4,637,924.37 4,848,739.11 4,954,146.48
18 Kloset jongkok " TOTO bh - - - - - - - - - -
19 Kloset porselin jongkok Kia (standar) bh - - - - - - - - - -
20 Kloset porselin jongkok VITO (standar) bh 230,000.00 345,326.80 371,226.31 379,859.48 397,125.82 379,859.48 379,859.48 379,859.48 397,125.82 405,758.99
21 Kloset porselin jongkok Ina (standar) bh 345,000.00 477,894.20 513,736.27 525,683.62 549,578.33 525,683.62 525,683.62 525,683.62 549,578.33 561,525.69
22 Kloset porselin jongkok America (standar) bh -
23 Kloset porselin jongkok DUTY bh 270,000.00 391,437.20 420,794.99 430,580.92 450,152.78 430,580.92 430,580.92 430,580.92 450,152.78 459,938.71
24 Kloset porselin jongkok DATA bh - - - - - - - - - -
25 Kloset porselin jongkok ROSI bh - -
26 Kloset porselin jongkok CHELSEA bh 240,000.00 356,854.40 407,094.69 392,539.84 410,382.56 392,539.84 392,539.84 392,539.84 410,382.56 419,303.92
27 Kran air 3/4 biasa dari besi bh 70,000.00 82,196.80 88,361.56 90,416.48 94,526.32 90,416.48 90,416.48 90,416.48 94,526.32 96,581.24
28 Kran air 3/4 biasa dari plastik bh 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99

Harga Satauan Bahan dan Upah Hal. 42


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
29 Kran air 1/2 biasa dari besi bh 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
30 Kran SunEi bh - - - - - - - - -
31 Kran TOTO T 205 LCSC bh - - - - - - - - - -
32 Kran TOTO T 205 MC bh - - - - - - - - - -
33 Kran TOTO T 23 B13 bh - - - - - - - - - -
34 Kran TOTO T 23 B13V7N bh - - - - - - - - - -
35 Kran TOTO T 26 - 13 bh - - - - - - - - - -
36 Kran TOTO TX 109 LH bh - - - - - - - - - -
37 Kran washtafel bh 185,000.00 214,764.20 230,871.52 236,240.62 246,978.83 236,240.62 236,240.62 236,240.62 246,978.83 252,347.94
38 Kran cuci piring bh 175,000.00 203,236.60 218,479.35 223,560.26 233,722.09 223,560.26 223,560.26 223,560.26 233,722.09 238,803.01
39 Penyekat Urinoir " TOTO " Type A 100 " bh - - - - - - - - - -
40 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 295,000.00 341,567.80 367,185.39 375,724.58 392,802.97 375,724.58 375,724.58 375,724.58 392,802.97 401,342.17
41 Shower Spray biasa bh 200,000.00 232,055.60 249,459.77 255,261.16 266,863.94 255,261.16 255,261.16 255,261.16 266,863.94 272,665.33
42 Shower Spray TOTO 12 bh - - - - - - - - - -
43 Shower Spray TOTO bh - - - - - - - - - -
44 Soap holder " TOTO " Type S 6 N " bh - - - - - - - - - -
45 Seal tape Besar bh 15,000.00 18,795.00 20,204.63 20,674.50 21,614.25 20,674.50 20,674.50 20,674.50 21,614.25 22,084.13
46 Seal tape kecil bh 6,000.00 8,420.16 9,051.67 9,262.18 9,683.18 9,262.18 9,262.18 9,262.18 9,683.18 9,893.69
47 Urinoir " TOTO U 57 original bh 2,783,772.00 3,289,213.01 3,535,903.99 3,618,134.31 3,782,594.96 3,618,134.31 3,618,134.31 3,618,134.31 3,782,594.96 3,864,825.29
48 Urinoir " TOTO U 104 bh 3,462,500.00 4,071,623.50 4,376,995.26 4,478,785.85 4,682,367.03 4,478,785.85 4,478,785.85 4,478,785.85 4,682,367.03 4,784,157.61
49 Wastagel KIA Standard bh 725,000.00 915,943.00 984,638.73 1,007,537.30 1,053,334.45 1,007,537.30 1,007,537.30 1,007,537.30 1,053,334.45 1,076,233.03
50 Wastagel INA bh 900,000.00 1,117,676.00 1,201,501.70 1,229,443.60 1,285,327.40 1,229,443.60 1,229,443.60 1,229,443.60 1,285,327.40 1,313,269.30
51 Wastafel Komplit LW240CJ body only bh - - - - - - - - - -
52 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh - - - - - - - - -
53 Washtafel LOLO bh - - - - - - - - - -
54 Wastafel KIA Standar 2 (Lubang) bh - - - - - - - - - -
55 Washtafel cuci tangan kecil (Standard) bh 650,000.00 784,378.00 843,206.35 862,815.80 902,034.70 862,815.80 862,815.80 862,815.80 902,034.70 921,644.15
56 Washtafel cuci tangan besar (Standard) bh 900,000.00 1,072,568.00 1,153,010.60 1,179,824.80 1,233,453.20 1,179,824.80 1,179,824.80 1,179,824.80 1,233,453.20 1,260,267.40
57 Washtafel cuci piring 2 lubang bh 750,000.00 899,654.00 967,128.05 989,619.40 1,034,602.10 989,619.40 989,619.40 989,619.40 1,034,602.10 1,057,093.45
58 Washtafel cuci piring 1 lubang bh 450,000.00 553,826.00 595,362.95 609,208.60 636,899.90 609,208.60 609,208.60 609,208.60 636,899.90 650,745.55
59 Bak cuci piring single besar bh 325,000.00 409,731.00 440,460.83 450,704.10 471,190.65 450,704.10 450,704.10 450,704.10 471,190.65 481,433.93
60 Bak cuci piring double besar bh 600,000.00 726,740.00 781,245.50 799,414.00 835,751.00 799,414.00 799,414.00 799,414.00 835,751.00 853,919.50
61 Bak cuci piring single kecil bh 300,000.00 380,912.00 409,480.40 419,003.20 438,048.80 419,003.20 419,003.20 419,003.20 438,048.80 447,571.60
- - - - - - - - -
PAKU - - - - - - - - -
1 Paku 3 kg 43,000.00 51,072.28 54,902.70 56,179.51 58,733.12 56,179.51 56,179.51 56,179.51 58,733.12 60,009.93
2 Paku 4 kg 43,000.00 51,072.28 54,902.70 56,179.51 58,733.12 56,179.51 56,179.51 56,179.51 58,733.12 60,009.93
3 Paku 5 biasa kg 32,000.00 38,391.92 41,271.31 42,231.11 44,150.71 42,231.11 42,231.11 42,231.11 44,150.71 45,110.51
4 Paku 5 putih kg 40,000.00 47,614.00 51,185.05 52,375.40 54,756.10 52,375.40 52,375.40 52,375.40 54,756.10 55,946.45
5 Paku 7 biasa kg 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
6 Paku 7 putih kg 37,000.00 44,155.72 47,467.40 48,571.29 50,779.08 48,571.29 48,571.29 48,571.29 50,779.08 51,882.97
7 Paku 8 putih kg 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
8 Paku 9 putih kg 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
9 Paku 10 biasa kg 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
10 Paku 10 putih kg 37,000.00 44,155.72 47,467.40 48,571.29 50,779.08 48,571.29 48,571.29 48,571.29 50,779.08 51,882.97
11 Paku 12 biasa kg 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
12 Paku 12 putih kg 37,000.00 44,155.72 47,467.40 48,571.29 50,779.08 48,571.29 48,571.29 48,571.29 50,779.08 51,882.97
13 Paku 14 biasa kg - - - - - - - - - -
14 Paku 15 biasa kg 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
15 Paku 15 putih kg 40,000.00 47,614.00 51,185.05 52,375.40 54,756.10 52,375.40 52,375.40 52,375.40 54,756.10 55,946.45
16 Paku kalsiboard kg 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
17 Paku list SQ kg - - - - - - - - -
18 Paku Atap Asbes /ulir 7 cm / 3 inch kg 43,800.00 51,994.49 55,894.07 57,193.94 59,793.66 57,193.94 57,193.94 57,193.94 59,793.66 61,093.52
19 Paku reng/usuk SQ kg - - - - - - - - -
20 Paku seng 1Kg kg 48,000.00 56,836.08 61,098.79 62,519.69 65,361.49 62,519.69 62,519.69 62,519.69 65,361.49 66,782.39
21 Paku seng import bj - - - - - - - - - -
22 Paku skrup 1/2" kg 12,000.00 15,336.72 16,486.97 16,870.39 17,637.23 16,870.39 16,870.39 16,870.39 17,637.23 18,020.65
23 Paku skrup 2" bh 5,000.00 7,267.40 7,812.46 7,994.14 8,357.51 7,994.14 7,994.14 7,994.14 8,357.51 8,539.20
24 Paku skrup 7 cm kg - - - - - - - - - -
25 Paku skrup 1" kg 20,000.00 24,558.80 26,400.71 27,014.68 28,242.62 27,014.68 27,014.68 27,014.68 28,242.62 28,856.59
26 Paku beton kg 75,000.00 87,960.60 94,557.65 96,756.66 101,154.69 96,756.66 96,756.66 96,756.66 101,154.69 103,353.71
27 Paku tripleks kg 43,000.00 51,072.28- 54,902.70
- 56,179.51
- 58,733.12
- 56,179.51
- 56,179.51
- 56,179.51
- 58,733.12
- 60,009.93
-
PASIR, BATU, KERIKIL, BATA DAN PARAS - - - - - - - - -
1 Bata gosok ex Tobacco bj - - - - - - - - - -
2 Bata Merah 5 x 11 x 22 cm bj - - - - - - - - - -
3 Bata Ringan/ Bataco 7 x 20 x 60 bj 14,000.00 22,608.68 24,304.33 24,869.54 25,999.98 24,869.54 24,869.54 24,869.54 25,999.98 26,565.19
4 Bata Ringan/ Bataco 8 x 20 x 60 bj - - - - - - - - - -
5 Bata Ringan/ Bataco 10 x 20 x 60 bj 19,000.00 28,372.48 30,500.41 31,209.72 32,628.35 31,209.72 31,209.72 31,209.72 32,628.35 33,337.66
6 Batu tela bj 15,000.00 22,052.80 23,706.76 24,258.08 25,360.72 24,258.08 24,258.08 24,258.08 25,360.72 25,912.04

Harga Satauan Bahan dan Upah Hal. 43


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
7 Batu gunung/ belah m3 300,000.00 496,188.00 533,402.10 545,806.80 570,616.20 545,806.80 545,806.80 545,806.80 570,616.20 583,020.90
8 Batu karang m3 - - - - - - - - - -
9 Batu lahar Singaraja m3 - - - - - - - - - -
10 Batu Pecah 2-3 m3 900,000.00 1,187,844.00 1,276,932.30 1,306,628.40 1,366,020.60 1,306,628.40 1,306,628.40 1,306,628.40 1,366,020.60 1,395,716.70
11 Batu Pecah 0.5-1/ciping m3 950,000.00 1,245,482.00 1,338,893.15 1,370,030.20 1,432,304.30 1,370,030.20 1,370,030.20 1,370,030.20 1,432,304.30 1,463,441.35
12 Batu Pecah 10-19 m3 950,000.00 1,245,482.00 1,338,893.15 1,370,030.20 1,432,304.30 1,370,030.20 1,370,030.20 1,370,030.20 1,432,304.30 1,463,441.35
13 Batu pipih Singaraja m3 - - - - - - - - -
14 Glass block 20cmx20cm m2 390,000.00 452,583.60 486,527.37 497,841.96 520,471.14 497,841.96 497,841.96 497,841.96 520,471.14 531,785.73
15 Glass block 30cmx30cm m2 - - - - - - - - - -
16 Roster Keramik 30cmx30cm bh 90,000.00 106,755.60 114,762.27 117,431.16 122,768.94 117,431.16 117,431.16 117,431.16 122,768.94 125,437.83
18 Limestone m3 - - - - - - - - -
19 Paras Batik bh - - - - - - - - -
20 Paras Buahan bh - - - - - - - - -
21 Paras Karang Bukit bh - - - - - - - - - -
22 Paras Kerobokan Tebal 5 bh - - - - - - - - - -
23 Paras Malem bh - - - - - - - - - -
24 Paras Putih Bukit bh - - - - - - - - - -
25 Paras Silakarang tebal bh - - - - - - - - - -
26 Paras Silakarang tipis bh - - - - - - - - - -
27 Paras untuk pondasi bh - - - - - - - - - -
28 Pasir halus m3 700,000.00 957,292.00 1,029,088.90 1,053,021.20 1,100,885.80 1,053,021.20 1,053,021.20 1,053,021.20 1,100,885.80 1,124,818.10
29 Pasir kasar m3 650,000.00 899,654.00 967,128.05 989,619.40 1,034,602.10 989,619.40 989,619.40 989,619.40 1,034,602.10 1,057,093.45
30 Pasir Lokal m3 - - - - - - - - -
31 Sirtu m3 175,000.00 352,093.00 378,499.98 387,302.30 404,906.95 387,302.30 387,302.30 387,302.30 404,906.95 413,709.28
32 Tanah urug m3 150,000.00 283,178.00 304,416.35 311,495.80 325,654.70 311,495.80 311,495.80 311,495.80 325,654.70 332,734.15
33 Filler/abu batu m3 1,085,000.00 1,601,584.60 1,721,703.45 1,761,743.06 1,841,822.29 1,761,743.06 1,761,743.06 1,761,743.06 1,841,822.29 1,881,861.91
34 Aspal drum 3,500,000.00 4,120,866.40 4,429,931.38 4,532,953.04 4,738,996.36 4,532,953.04 4,532,953.04 4,532,953.04 4,738,996.36 4,842,018.02
- - - - - - - - -
PIPA - - - - - - - - -
1 Pipa Galvanis 1/2" Medium A (tebal) m1 43,000.00 50,738.15 54,543.51 55,811.96 58,348.87 55,811.96 55,811.96 55,811.96 58,348.87 59,617.32
2 Pipa Galvanis 1/2" Medium B (tipis) m1 35,000.00 41,516.07 44,629.77 45,667.67 47,743.48 45,667.67 45,667.67 45,667.67 47,743.48 48,781.38
3 Pipa Galvanis 1/2' medium B (sedang) m1 23,333.33 28,067.20 30,172.24 30,873.92 32,277.28 30,873.92 30,873.92 30,873.92 32,277.28 32,978.96
4 Pipa Galvanis 3/4" Medium A (tebal) m1 55,833.33 65,531.90 70,446.79 72,085.09 75,361.69 72,085.09 72,085.09 72,085.09 75,361.69 76,999.98
5 Pipa Galvanis 3/4" Medium A sedang m1 42,500.00 50,161.77 53,923.90 55,177.94 57,686.03 55,177.94 55,177.94 55,177.94 57,686.03 58,940.08
6 Pipa Galvanis 3/4" Medium B m1 47,500.00 55,925.57 60,119.98 61,518.12 64,314.40 61,518.12 61,518.12 61,518.12 64,314.40 65,712.54
7 Pipa Galvanis 1 1/4" m1 97,500.00 113,563.57 122,080.83 124,919.92 130,598.10 124,919.92 124,919.92 124,919.92 130,598.10 133,437.19
8 Pipa Galvanis 1 1/2" m1 114,166.67 132,776.23 142,734.45 146,053.86 152,692.67 146,053.86 146,053.86 146,053.86 152,692.67 156,012.07
9 Pipa Galvanis 1 1/2 " M.B m1 585,000.00 675,534.07 726,199.12 743,087.47 776,864.18 743,087.47 743,087.47 743,087.47 776,864.18 793,752.53
10 Pipa Galvanis 1" m1 54,166.67 63,610.63 68,381.43 69,971.70 73,152.23 69,971.70 69,971.70 69,971.70 73,152.23 74,742.49
11 Pipa Galvanis 1" MA m1 80,000.00 93,390.27 100,394.54 102,729.29 107,398.81 102,729.29 102,729.29 102,729.29 107,398.81 109,733.56
12 Pipa Galvanis 1" MB m1 64,166.67 75,138.23 80,773.60 82,652.06 86,408.97 82,652.06 82,652.06 82,652.06 86,408.97 88,287.42
13 Pipa Galvanis 1,5 BSA m1 - - - - - - - - - -
14 Pipa Galvanis 2" m1 104,166.67 121,248.63 130,342.28 133,373.50 139,435.93 133,373.50 133,373.50 133,373.50 139,435.93 142,467.14
15 Pipa Galvanis 2" MA m1 154,166.67 178,886.63 192,303.13 196,775.30 205,719.63 196,775.30 196,775.30 196,775.30 205,719.63 210,191.79
16 Pipa Galvanis 2" MB m1 124,500.00 144,688.09 155,539.69 159,156.90 166,391.30 159,156.90 159,156.90 159,156.90 166,391.30 170,008.50
17 Pipa Galvanis 3" m1 191,666.67 222,115.13 238,773.77 244,326.65 255,432.40 244,326.65 244,326.65 244,326.65 255,432.40 260,985.28
18 Pipa Galvanis 3" MA m1 249,166.67 288,398.83 310,028.75 317,238.72 331,658.66 317,238.72 317,238.72 317,238.72 331,658.66 338,868.63
19 Pipa Galvanis 3" MB m1 214,166.67 248,052.23 266,656.15 272,857.46 285,260.07 272,857.46 272,857.46 272,857.46 285,260.07 291,461.37
20 Pipa Maspion AW 1 m1 20,000.00 24,809.40 26,670.11 27,290.34 28,530.81 27,290.34 27,290.34 27,290.34 28,530.81 29,151.05
21 Pipa Winlon AW 1 m1 20,000.00 24,809.40 26,670.11 27,290.34 28,530.81 27,290.34 27,290.34 27,290.34 28,530.81 29,151.05
22 Pipa Maspion AW 1/2 m1 10,000.00 13,281.80 14,277.94 14,609.98 15,274.07 14,609.98 14,609.98 14,609.98 15,274.07 15,606.12
23 Pipa Winlon AW 1/2 m1 11,250.00 14,722.75 15,826.96 16,195.03 16,931.16 16,195.03 16,195.03 16,195.03 16,931.16 17,299.23
24 Pipa Maspion AW 10 m1 - - - - - - - - - -
25 Pipa Maspion AW 1-1/2 m1 25,000.00 30,573.20 32,866.19 33,630.52 35,159.18 33,630.52 33,630.52 33,630.52 35,159.18 35,923.51
26 Pipa Winlon AW 1-1/2 m1 25,000.00 30,573.20 32,866.19 33,630.52 35,159.18 33,630.52 33,630.52 33,630.52 35,159.18 35,923.51
27 Pipa Maspion D 1-1/2 m1 22,500.00 27,691.30 29,768.15 30,460.43 31,845.00 30,460.43 30,460.43 30,460.43 31,845.00 32,537.28
28 Pipa Winlon D 1-1/2 m1 22,500.00 27,691.30 29,768.15 30,460.43 31,845.00 30,460.43 30,460.43 30,460.43 31,845.00 32,537.28
29 Pipa Maspion AW 1-1/4 m1 23,750.00 29,132.25 31,317.17 32,045.48 33,502.09 32,045.48 32,045.48 32,045.48 33,502.09 34,230.39
30 Pipa Winlon AW 1-1/4 m1 23,750.00 29,132.25 31,317.17 32,045.48 33,502.09 32,045.48 32,045.48 32,045.48 33,502.09 34,230.39
31 Pipa Maspion AW 12 m1 - - - - - - - - - -
32 Pipa Maspion AW 14 m1 - - - - - - - - - -
33 Pipa Maspion AW 16 m1 - - - - - - - - - -
34 Pipa Maspion AW 2 m1 37,000.00 44,406.32 47,736.79 48,846.95 51,067.27 48,846.95 48,846.95 48,846.95 51,067.27 52,177.43
35 Pipa Winlon AW 2 m1 32,500.00 39,218.90 42,160.32 43,140.79 45,101.74 43,140.79 43,140.79 43,140.79 45,101.74 46,082.21
36 Pipa Maspion D 2 m1 26,250.00 32,014.15 34,415.21 35,215.57 36,816.27 35,215.57 35,215.57 35,215.57 36,816.27 37,616.63
37 Pipa Winlon D 2 m1 26,250.00 32,014.15 34,415.21 35,215.57 36,816.27 35,215.57 35,215.57 35,215.57 36,816.27 37,616.63
38 Pipa Maspion AW 2-1/2 m1 43,750.00 52,187.45 56,101.51 57,406.20 60,015.57 57,406.20 57,406.20 57,406.20 60,015.57 61,320.25
39 Pipa Maspion D 2-1/2 m1 31,250.00 37,777.95 40,611.30 41,555.75 43,444.64 41,555.75 41,555.75 41,555.75 43,444.64 44,389.09
40 Pipa Winlon D 2-1/2 m1 31,250.00 37,777.95 40,611.30 41,555.75 43,444.64 41,555.75 41,555.75 41,555.75 43,444.64 44,389.09
41 Pipa Maspion AW 3 m1 56,250.00 66,596.95 71,591.72 73,256.65 76,586.49 73,256.65 73,256.65 73,256.65 76,586.49 78,251.42

Harga Satauan Bahan dan Upah Hal. 44


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
42 Pipa Winlon AW 3 m1 56,250.00 66,596.95 71,591.72 73,256.65 76,586.49 73,256.65 73,256.65 73,256.65 76,586.49 78,251.42
43 Pipa Maspion AW 3/4 m1 18,750.00 23,368.45 25,121.08 25,705.30 26,873.72 25,705.30 25,705.30 25,705.30 26,873.72 27,457.93
44 Pipa Winlon AW 3/4 m1 18,750.00 23,368.45 25,121.08 25,705.30 26,873.72 25,705.30 25,705.30 25,705.30 26,873.72 27,457.93
45 Pipa Maspion AW 4 m1 97,500.00 114,148.30 122,709.42 125,563.13 131,270.55 125,563.13 125,563.13 125,563.13 131,270.55 134,124.25
46 Pipa Winlon AW 4 m1 97,500.00 114,148.30 122,709.42 125,563.13 131,270.55 125,563.13 125,563.13 125,563.13 131,270.55 134,124.25
47 Pipa Maspion D 4" m1 58,750.00 69,478.85 74,689.76 76,426.74 79,900.68 76,426.74 76,426.74 76,426.74 79,900.68 81,637.65
48 Pipa Winlon D 4" m1 58,750.00 69,478.85 74,689.76 76,426.74 79,900.68 76,426.74 76,426.74 76,426.74 79,900.68 81,637.65
49 Pipa Maspion AW 5 m1 - - - - - - - - - -
50 Pipa Maspion AW 6 m1 243,750.00 282,739.45 303,944.91 311,013.40 325,150.37 311,013.40 311,013.40 311,013.40 325,150.37 332,218.85
51 Pipa Maspion AW 8 m1 - - - - - - - - - -
52 Pipa Maspion C 1 m1 10,000.00 13,281.80 14,277.94 14,609.98 15,274.07 14,609.98 14,609.98 14,609.98 15,274.07 15,606.12
53 Pipa Maspion C 1-1/2 m1 13,750.00 17,604.65 18,925.00 19,365.12 20,245.35 19,365.12 19,365.12 19,365.12 20,245.35 20,685.46
54 Pipa Maspion C 1-1/4 m1 12,500.00 16,163.70 17,375.98 17,780.07 18,588.26 17,780.07 17,780.07 17,780.07 18,588.26 18,992.35
55 Pipa Maspion C 2 m1 15,000.00 19,045.60 20,474.02 20,950.16 21,902.44 20,950.16 20,950.16 20,950.16 21,902.44 22,378.58
56 Pipa Maspion C 2-1/2 m1 20,000.00 24,809.40 26,670.11 27,290.34 28,530.81 27,290.34 27,290.34 27,290.34 28,530.81 29,151.05
57 Pipa Maspion C 3 m1 28,750.00 34,896.05 37,513.25 38,385.66 40,130.46 38,385.66 38,385.66 38,385.66 40,130.46 41,002.86
58 Pipa Maspion C 3/4 m1 8,750.00 11,840.85 12,728.91 13,024.94 13,616.98 13,024.94 13,024.94 13,024.94 13,616.98 13,913.00
59 Pipa Maspion C 4 m1 28,750.00 34,896.05 37,513.25 38,385.66 40,130.46 38,385.66 38,385.66 38,385.66 40,130.46 41,002.86
60 Pipa Maspion C 5/8 m1 3,750.00 6,077.05 6,532.83 6,684.76 6,988.61 6,684.76 6,684.76 6,684.76 6,988.61 7,140.53
61 Pipa Maspion D 10 m1 - - - - - - - - - -
62 Pipa Maspion D 1-1/2 m1 22,500.00 27,691.30 29,768.15 30,460.43 31,845.00 30,460.43 30,460.43 30,460.43 31,845.00 32,537.28
63 Pipa Winlon D 1-1/2 m1 22,500.00 27,691.30 29,768.15 30,460.43 31,845.00 30,460.43 30,460.43 30,460.43 31,845.00 32,537.28
64 Pipa Winlon D 1-1/4 m1 21,250.00 26,250.35 28,219.13 28,875.39 30,187.90 28,875.39 28,875.39 28,875.39 30,187.90 30,844.16
65 Pipa Maspion D 1-1/4 m1 21,250.00 26,250.35 28,219.13 28,875.39 30,187.90 28,875.39 28,875.39 28,875.39 30,187.90 30,844.16
66 Pipa Maspion D 12 m1 - -
67 Pipa Maspion D 14 m1 - - - - - - - - - -
68 Pipa Maspion D 16 m1 - - - - - - - - - -
69 Pipa Maspion D 2 m1 26,250.00 32,014.15 34,415.21 35,215.57 36,816.27 35,215.57 35,215.57 35,215.57 36,816.27 37,616.63
70 Pipa Maspion D 2-1/2 m1 31,250.00 37,777.95 40,611.30 41,555.75 43,444.64 41,555.75 41,555.75 41,555.75 43,444.64 44,389.09
71 Pipa Maspion D 3 m1 35,000.00 42,100.80 45,258.36 46,310.88 48,415.92 46,310.88 46,310.88 46,310.88 48,415.92 49,468.44
72 Pipa Maspion D 4 m1 58,750.00 69,478.85 74,689.76 76,426.74 79,900.68 76,426.74 76,426.74 76,426.74 79,900.68 81,637.65
73 Pipa Maspion D 5 m1 - - - - - - - - - -
74 Pipa Maspion D 6 m1 - - - - - - - - - -
75 Pipa Maspion D 8 m1 - - - - - - - - - -
76 Elbo 1/2" PVC bh 10,000.00 13,031.20 14,008.54 14,334.32 14,985.88 14,334.32 14,334.32 14,334.32 14,985.88 15,311.66
77 Elbo 3/4" PVC bh 14,000.00 17,642.24 18,965.41 19,406.46 20,288.58 19,406.46 19,406.46 19,406.46 20,288.58 20,729.63
78 Elbo PVC 4" bh 83,000.00 97,182.68 104,471.38 106,900.95 111,760.08 106,900.95 106,900.95 106,900.95 111,760.08 114,189.65
79 Elbo PVC 3" bh 40,000.00 47,614.00 51,185.05 52,375.40 54,756.10 52,375.40 52,375.40 52,375.40 54,756.10 55,946.45
80 Elbo PVC 2,5" bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
81 Selang hipres 1" m1 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
82 Selang hipres 2" m1 75,000.00 87,960.60 94,557.65 96,756.66 101,154.69 96,756.66 96,756.66 96,756.66 101,154.69 103,353.71
83 Selang hipres 1,5" m1 42,000.00 49,919.52 53,663.48 54,911.47 57,407.45 54,911.47 54,911.47 54,911.47 57,407.45 58,655.44
84 Selang hipres 0,5" m1 10,000.00 13,031.20 14,008.54 14,334.32 14,985.88 14,334.32 14,334.32 14,334.32 14,985.88 15,311.66
85 Selang spiral 2" m1 100,000.00 116,779.60 125,538.07 128,457.56 134,296.54 128,457.56 128,457.56 128,457.56 134,296.54 137,216.03
- - - - - - - - -
SEMEN - - - - - - - - -
1 Semen Gresik 40 kg kg - - - - - - - - - -
2 Semen Tiga Roga 40 kg kg - - - - - - - - - -
3 Semen Tonasa 40 kg kg 1,900.00 3,543.48 3,809.25 3,897.83 4,075.01 3,897.83 3,897.83 3,897.83 4,075.01 4,163.59
4 Semen Bosowa 40 kg kg - - - - - - - - - -
5 Semen Conch 40 kg Kg 1,875.00 3,514.67 3,778.26 3,866.13 4,041.86 3,866.13 3,866.13 3,866.13 4,041.86 4,129.73
6 Semen warna/semen grouting kg 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
7 Semen putih kg 15,000.00 18,795.00 20,204.63 20,674.50 21,614.25 20,674.50 20,674.50 20,674.50 21,614.25 22,084.13
- - - - - - - - -
BESI BETON DAN PAGAR - - - - - - - - -
1 Besi beton kg 13,774.19 16,657.98 17,907.33 18,323.78 19,156.67 18,323.78 18,323.78 18,323.78 19,156.67 19,573.12
2 Besi beton Kg - - - - - - - -
3 Besi Beton Ulir - - - - - - - - -
Besi Beton Ulir 16 mm btg 285,000.00 - - - - - - - - -
Besi Beton Ulir 12 mm btg 165,000.00 - - - - - - - - -
Besi Beton Ulir 10 mm btg 95,000.00 - - - - - - - - -
4 Besi Beton - - - - - - - - -
Diameter 5.5 mm btg 32,000.00 - - - - - - - - -
Diameter 6 mm btg 60,000.00 - - - - - - - - -
Diameter 8 mm btg 80,000.00 - - - - - - - - -
Diameter 9 mm btg - - - - - - - - - -
Diameter 10 mm btg 120,000.00 - - - - - - - - -
Diameter 12 mm btg 160,000.00 - - - - - - - - -
Diameter 16 mm btg 251,000.00 - - - - - - - - -
5 Besi Siku 4x4 btg 297,000.00 345,376.92 371,280.19 379,914.61 397,183.46 379,914.61 379,914.61 379,914.61 397,183.46 405,817.88
6 Besi Siku 5 X 5 btg 465,000.00 539,040.60 579,468.65 592,944.66 619,896.69 592,944.66 592,944.66 592,944.66 619,896.69 633,372.71

Harga Satauan Bahan dan Upah Hal. 45


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
7 Besi Siku Lubang btg 110,000.00 129,810.80 139,546.61 142,791.88 149,282.42 142,791.88 142,791.88 142,791.88 149,282.42 152,527.69
8 Besi UN 60 btg 415,000.00 481,402.60 517,507.80 529,542.86 553,612.99 529,542.86 529,542.86 529,542.86 553,612.99 565,648.06
9 Besi UN 80 btg 575,000.00 665,844.20 715,782.52 732,428.62 765,720.83 732,428.62 732,428.62 732,428.62 765,720.83 782,366.94
10 Besi Holous 20 x 40 btg 170,000.00 198,976.40 213,899.63 218,874.04 228,822.86 218,874.04 218,874.04 218,874.04 228,822.86 233,797.27
11 Besi Holous 40 x 40 btg 245,000.00 285,433.40 306,840.91 313,976.74 328,248.41 313,976.74 313,976.74 313,976.74 328,248.41 335,384.25
12 Kawat Bronjong ukuran 2 mm kg 100,000.00 118,283.20 127,154.44 130,111.52 136,025.68 130,111.52 130,111.52 130,111.52 136,025.68 138,982.76
13 Kawat Bronjong ukuran 2,7 mm / 2x1x0.5 m kg 30,133.33 37,743.70 40,574.48 41,518.07 43,405.26 41,518.07 41,518.07 41,518.07 43,405.26 44,348.85
14 Kawat Bronjong ukuran 3 mm / 2x1x1 m kg 39,050.00 48,022.48 51,624.16 52,824.73 55,225.85 52,824.73 52,824.73 52,824.73 55,225.85 56,426.41
15 Kawat Bronjong ukuran 3,4 mm kg - - - - - - - - -
16 Kawat Bronjong ukuran 4 mm m 5,000.00 8,771.00 9,428.83 9,648.10 10,086.65 9,648.10 9,648.10 9,648.10 10,086.65 10,305.93
17 Kawat berduri roll 425,000.00 506,963.80 544,986.09 557,660.18 583,008.37 557,660.18 557,660.18 557,660.18 583,008.37 595,682.47
18 Kawat beton RRT 1 Kg kg 25,000.00 31,826.20 34,213.17 35,008.82 36,600.13 35,008.82 35,008.82 35,008.82 36,600.13 37,395.79
19 Kawat ram m' 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
20 Kawat nyamuk m' 46,000.00 54,530.56 58,620.35 59,983.62 62,710.14 59,983.62 59,983.62 59,983.62 62,710.14 64,073.41
21 Kawat ayakan m' 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
22 Kawat Las RB Dos 190,000.00 222,031.60 238,683.97 244,234.76 255,336.34 244,234.76 244,234.76 244,234.76 255,336.34 260,887.13
23 Kawat Las 1kg kg 80,000.00 95,228.00 102,370.10 104,750.80 109,512.20 104,750.80 104,750.80 104,750.80 109,512.20 111,892.90
24 Kawat Ikat kg 30,000.00 37,590.00 40,409.25 41,349.00 43,228.50 41,349.00 41,349.00 41,349.00 43,228.50 44,168.25
25 Kawat Harmonika besar mtr 125,000.00 147,102.20 158,134.87 161,812.42 169,167.53 161,812.42 161,812.42 161,812.42 169,167.53 172,845.09
26 Kawat Harmonika sedang mtr 80,000.00 95,228.00 102,370.10 104,750.80 109,512.20 104,750.80 104,750.80 104,750.80 109,512.20 111,892.90
26 Pagar BRC FP60 T6.0 (ELEKTROPLATING GALVANIS ) Panil 347,848.00 426,880.59 458,896.64 469,568.65 490,912.68 469,568.65 469,568.65 469,568.65 490,912.68 501,584.70
27 Pagar BRC FP60 T7.0 Panil 408,677.00 497,001.83 534,276.97 546,702.02 571,552.11 546,702.02 546,702.02 546,702.02 571,552.11 583,977.15
28 Pagar BRC FP90 T6.0 Panil 415,275.00 504,607.74 542,453.32 555,068.52 580,298.90 555,068.52 555,068.52 555,068.52 580,298.90 592,914.10
29 Pagar BRC FP90 T6.7 Panil 637,800.00 761,125.66 818,210.09 837,238.23 875,294.51 837,238.23 837,238.23 837,238.23 875,294.51 894,322.65
30 Pagar BRC FP90 T8.0 Panil 557,133.00 668,135.97 718,246.17 734,949.57 768,356.37 734,949.57 734,949.57 734,949.57 768,356.37 785,059.77
31 Pagar BRC FP120 T6.0 Panil 513,180.00 617,468.71 663,778.86 679,215.58 710,089.02 679,215.58 679,215.58 679,215.58 710,089.02 725,525.73
32 Pagar BRC FP120 T7.0 Panil 594,807.00 711,565.05 764,932.43 782,721.56 818,299.81 782,721.56 782,721.56 782,721.56 818,299.81 836,088.93
33 Pagar BRC FP120 T8.0 Panil 688,956.00 820,096.25 881,603.47 902,105.88 943,110.69 902,105.88 902,105.88 902,105.88 943,110.69 963,613.10
34 Pagar BRC FP 150 T6.0 Panil 612,352.00 731,790.22 786,674.49 804,969.25 841,558.76 804,969.25 804,969.25 804,969.25 841,558.76 859,853.51
35 Pagar BRC FP 150 T7.0 Panil 710,464.00 844,889.81 908,256.55 929,378.80 971,623.29 929,378.80 929,378.80 929,378.80 971,623.29 992,745.53
36 Pagar BRC FP 150 T8.0 Panil 769,400.00 912,828.88 981,291.04 1,004,111.77 1,049,753.21 1,004,111.77 1,004,111.77 1,004,111.77 1,049,753.21 1,072,573.93
37 Pagar BRC FP175 T6.0 Panil 692,095.00 823,714.77 885,493.37 906,086.24 947,271.98 906,086.24 906,086.24 906,086.24 947,271.98 967,864.85
38 Pagar BRC FP175 T7.0 Panil 802,380.00 950,846.90 1,022,160.42 1,045,931.59 1,093,473.94 1,045,931.59 1,045,931.59 1,045,931.59 1,093,473.94 1,117,245.11
39 Pagar BRC FP175 T8.0 Panil 929,570.00 1,097,466.45 1,179,776.43 1,207,213.09 1,262,086.41 1,207,213.09 1,207,213.09 1,207,213.09 1,262,086.41 1,289,523.07
40 Pagar BRC FP190 T6.0 Panil 736,805.00 875,254.67 940,898.77 962,780.13 1,006,542.86 962,780.13 962,780.13 962,780.13 1,006,542.86 1,028,424.23
41 Pagar BRC FP190 T7.0 Panil 853,369.00 1,009,624.98 1,085,346.86 1,110,587.48 1,161,068.73 1,110,587.48 1,110,587.48 1,110,587.48 1,161,068.73 1,186,309.35
42 Pagar BRC FP190 T8.0 Panil 987,965.00 1,164,781.87 1,252,140.51 1,281,260.05 1,339,499.15 1,281,260.05 1,281,260.05 1,281,260.05 1,339,499.15 1,368,618.69
43 Pagar BRC FP240 T7.0 Panil 1,016,302.00 1,197,447.63 1,287,256.20 1,317,192.39 1,377,064.77 1,317,192.39 1,317,192.39 1,317,192.39 1,377,064.77 1,407,000.96
44 Pagar BRC FP240 T8.0 Panil 1,173,277.00 1,378,402.13 1,481,782.29 1,516,242.34 1,585,162.45 1,516,242.34 1,516,242.34 1,516,242.34 1,585,162.45 1,619,622.50
45 Pagar BRC FP60 T6.0 ( HOT DIP GALVANIS ) Panil 424,204.00 514,900.74 553,518.29 566,390.81 592,135.85 566,390.81 566,390.81 566,390.81 592,135.85 605,008.37
56 Pagar BRC FP60 T7.0 Panil 512,378.00 616,544.20 662,785.01 678,198.62 709,025.83 678,198.62 678,198.62 678,198.62 709,025.83 724,439.43
47 Pagar BRC FP90 T6.0 Panil 499,513.00 601,713.94 646,842.48 661,885.33 691,971.03 661,885.33 661,885.33 661,885.33 691,971.03 707,013.88
48 Pagar BRC FP90 T7.0 Panil 595,921.00 712,849.23 766,312.92 784,134.15 819,776.61 784,134.15 784,134.15 784,134.15 819,776.61 837,597.84
49 Pagar BRC FP90 T8.0 Panil 706,929.00 840,814.81 903,875.92 924,896.29 966,937.03 924,896.29 924,896.29 924,896.29 966,937.03 987,957.40
50 Pagar BRC FP120 T6.0 Panil 617,707.00 737,963.25 793,310.50 811,759.58 848,657.74 811,759.58 811,759.58 811,759.58 848,657.74 867,106.82
51 Pagar BRC FP120 T7.0 Panil 737,059.00 875,547.47 941,213.53 963,102.21 1,006,879.59 963,102.21 963,102.21 963,102.21 1,006,879.59 1,028,768.27
52 Pagar BRC FP120 T8.0 Panil 874,718.00 1,034,235.26 1,111,802.90 1,137,658.78 1,189,370.54 1,137,658.78 1,137,658.78 1,137,658.78 1,189,370.54 1,215,226.42
53 Pagar BRC FP 150 T6.0 Panil 737,756.00 876,350.94 942,077.26 963,986.03 1,007,803.58 963,986.03 963,986.03 963,986.03 1,007,803.58 1,029,712.35
54 Pagar BRC FP 150 T7.0 Panil 881,209.00 1,041,717.82 1,119,846.66 1,145,889.60 1,197,975.49 1,145,889.60 1,145,889.60 1,145,889.60 1,197,975.49 1,224,018.44
55 Pagar BRC FP 150 T8.0 Panil 1,046,447.00 1,232,197.58 1,324,612.40 1,355,417.33 1,417,027.21 1,355,417.33 1,355,417.33 1,355,417.33 1,417,027.21 1,447,832.15
56 Pagar BRC FP175 T6.0 Panil 879,159.00 1,039,354.66 1,117,306.26 1,143,290.13 1,195,257.86 1,143,290.13 1,143,290.13 1,143,290.13 1,195,257.86 1,221,241.73
57 Pagar BRC FP175 T7.0 Panil 985,415.00 1,161,842.33 1,248,980.50 1,278,026.56 1,336,118.68 1,278,026.56 1,278,026.56 1,278,026.56 1,336,118.68 1,365,164.74
58 Pagar BRC FP175 T8.0 Panil 1,168,498.00 1,372,893.09 1,475,860.07 1,510,182.40 1,578,827.05 1,510,182.40 1,510,182.40 1,510,182.40 1,578,827.05 1,613,149.38
59 Pagar BRC FP190 T6.0 Panil 879,159.00 1,039,354.66 1,117,306.26 1,143,290.13 1,195,257.86 1,143,290.13 1,143,290.13 1,143,290.13 1,195,257.86 1,221,241.73
60 Pagar BRC FP190 T7.0 Panil 1,046,946.00 1,232,772.80 1,325,230.76 1,356,050.08 1,417,688.72 1,356,050.08 1,356,050.08 1,356,050.08 1,417,688.72 1,448,508.05
61 Pagar BRC FP190 T8.0 Panil 1,240,689.00 1,456,111.98 1,565,320.38 1,601,723.18 1,674,528.78 1,601,723.18 1,601,723.18 1,601,723.18 1,674,528.78 1,710,931.58
61 Pagar BRC FP240 T7.0 Panil 1,241,929.00 1,457,541.41 1,566,857.01 1,603,295.55 1,676,172.62 1,603,295.55 1,603,295.55 1,603,295.55 1,676,172.62 1,712,611.15
63 Pagar BRC FP240 T8.0 Panil 1,467,885.00 1,718,014.45 1,846,865.53 1,889,815.89 1,975,716.61 1,889,815.89 1,889,815.89 1,889,815.89 1,975,716.61 2,018,666.97
64 P85 EP dia.1,5" ( TIANG ELECTROPLATING ) bh 150,726.44 176,758.61 190,015.51 194,434.47 203,272.40 194,434.47 194,434.47 194,434.47 203,272.40 207,691.37
65 P85 EP dia.2,0" bh 165,726.44 194,050.01 208,603.76 213,455.01 223,157.51 213,455.01 213,455.01 213,455.01 223,157.51 228,008.76
66 P120 EP dia.1.5" bh 158,525.56 185,749.13 199,680.31 204,324.04 213,611.50 204,324.04 204,324.04 204,324.04 213,611.50 218,255.22
67 P120 EP dia.2.0" bh 175,823.22 205,689.18 221,115.87 226,258.10 236,542.55 226,258.10 226,258.10 226,258.10 236,542.55 241,684.78
68 P150 EP dia.1,5" bh 169,781.95 198,725.04 213,629.42 218,597.55 228,533.80 218,597.55 218,597.55 218,597.55 228,533.80 233,501.93
69 P150 EP dia.2.0" bh 186,279.03 217,742.21 234,072.88 239,516.43 250,403.54 239,516.43 239,516.43 239,516.43 250,403.54 255,847.10
70 P200 EP dia.1,5" bh 185,709.27 217,085.42 233,366.83 238,793.96 249,648.23 238,793.96 238,793.96 238,793.96 249,648.23 255,075.37
71 P200 EP dia.2,0" bh 203,709.27 237,835.10 255,672.73 261,618.61 273,510.36 261,618.61 261,618.61 261,618.61 273,510.36 279,456.24
72 P225 EP dia.1,5" bh 193,422.93 225,977.42 242,925.72 248,575.16 259,874.03 248,575.16 248,575.16 248,575.16 259,874.03 265,523.46
73 P225 EP dia.2,0" bh 224,922.93 262,289.36 281,961.06 288,518.29 301,632.76 288,518.29 288,518.29 288,518.29 301,632.76 308,189.99
74 P240 EP dia.1.5" bh 204,146.44 238,339.06 256,214.48 262,172.96 274,089.91 262,172.96 262,172.96 262,172.96 274,089.91 280,048.39
75 P240 EP dia.2.0" bh 234,646.44 273,498.24 294,010.60 300,848.06 314,522.97 300,848.06 300,848.06 300,848.06 314,522.97 321,360.43

Harga Satauan Bahan dan Upah Hal. 46


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
76 P300 EP dia.1.5" bh 225,563.91 263,028.25 282,755.37 289,331.07 302,482.49 289,331.07 289,331.07 289,331.07 302,482.49 309,058.19
77 P300 EP dia.2.0" bh 238,563.91 278,014.13 298,865.19 305,815.54 319,716.25 305,815.54 305,815.54 305,815.54 319,716.25 326,666.60
78 P85 HD dia.1,5" ( TIANG HOT DIP ) bh 188,226.44 219,987.11 236,486.14 241,985.82 252,985.18 241,985.82 241,985.82 241,985.82 252,985.18 258,484.86
79 P85 HD dia.2,0" bh 208,226.44 243,042.31 261,270.48 267,346.54 279,498.66 267,346.54 267,346.54 267,346.54 279,498.66 285,574.72
80 P120 HD dia.1.5" bh 204,025.56 238,199.71 256,064.69 262,019.68 273,929.66 262,019.68 262,019.68 262,019.68 273,929.66 279,884.66
81 P120 HD dia.2.0" bh 232,525.56 271,053.37 291,382.37 298,158.70 311,711.37 298,158.70 298,158.70 298,158.70 311,711.37 318,487.71
82 P150 HD dia.1,5" bh 221,281.95 258,092.18 277,449.10 283,901.40 296,806.01 283,901.40 283,901.40 283,901.40 296,806.01 303,258.32
83 P150 HD dia.2.0" bh 257,779.03 300,164.55 322,676.89 330,181.01 345,189.23 330,181.01 330,181.01 330,181.01 345,189.23 352,693.35
84 P200 HD dia.1,5" bh 244,209.27 284,521.88 305,861.02 312,974.07 327,200.16 312,974.07 312,974.07 312,974.07 327,200.16 334,313.21
85 P200 HD dia.2,0" bh 282,209.27 328,326.76 352,951.27 361,159.43 377,575.77 361,159.43 361,159.43 361,159.43 377,575.77 385,783.94
86 P225 HD dia.1,5" bh 260,922.93 303,788.72 326,572.87 334,167.59 349,357.02 334,167.59 334,167.59 334,167.59 349,357.02 356,951.74
87 P225 HD dia.2,0" bh 315,422.93 366,614.14 394,110.20 403,275.55 421,606.26 403,275.55 403,275.55 403,275.55 421,606.26 430,771.61
88 P240 HD dia.1.5" bh 272,551.12 317,193.23 340,982.73 348,912.56 364,772.22 348,912.56 348,912.56 348,912.56 364,772.22 372,702.05
89 P240 HD dia.2.0" bh 333,146.44 387,045.10 416,073.48 425,749.60 445,101.86 425,749.60 425,749.60 425,749.60 445,101.86 454,777.99
90 P300 HD dia.1.5" bh 303,063.91 352,367.15 378,794.68 387,603.86 405,222.22 387,603.86 387,603.86 387,603.86 405,222.22 414,031.40
91 P300 HD dia.2.0" bh 360,563.91 418,650.85 450,049.66 460,515.93 481,448.48 460,515.93 460,515.93 460,515.93 481,448.48 491,914.75
- - - - - - - - -
BAHAN LISTRIK - - - - - - - - -
1 Saklar (Broco) double bh 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
2 Saklar (Broco) engkle bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
3 Saklar (Oni) double bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
4 Saklar (Oni) engkle bh 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
5 Saklar tunggal philip bh 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
6 Saklar ganda philip bh 50,000.00 59,141.60 63,577.22 65,055.76 68,012.84 65,055.76 65,055.76 65,055.76 68,012.84 69,491.38
7 Stop kontak philip bh 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
8 Stop Kontak (Oni) bh 27,000.00 32,628.12 35,075.23 35,890.93 37,522.34 35,890.93 35,890.93 35,890.93 37,522.34 38,338.04
9 Stop Kontak (Oni) 2 lubang bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
10 Stop Kontak (Vticon) 2 lubang bh 30,000.00 36,086.40 38,792.88 39,695.04 41,499.36 39,695.04 39,695.04 39,695.04 41,499.36 42,401.52
11 Stop Kontak (Oni) 3 lubang bh 35,000.00 41,850.20 44,988.97 46,035.22 48,127.73 46,035.22 46,035.22 46,035.22 48,127.73 49,173.99
12 Stop Kontak (Oni) 4 lubang bh 40,000.00 47,614.00 51,185.05 52,375.40 54,756.10 52,375.40 52,375.40 52,375.40 54,756.10 55,946.45
13 Fitting Biasa bh 20,000.00 24,558.80 26,400.71 27,014.68 28,242.62 27,014.68 27,014.68 27,014.68 28,242.62 28,856.59
14 Fitting keramik bh 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
15 Steker biasa bh 13,000.00 16,489.48 17,726.19 18,138.43 18,962.90 18,138.43 18,138.43 18,138.43 18,962.90 19,375.14
16 Steker Broco bh 25,000.00 30,322.60 32,596.80 33,354.86 34,870.99 33,354.86 33,354.86 33,354.86 34,870.99 35,629.06
17 Coaxial cable 5C - 75 ohm commscof m1 - - - - - - - - - -
18 Kabel NYM 3 x 2.5 mm ex. Supreme m1 29,000.00 34,933.64 37,553.66 38,427.00 40,173.69 38,427.00 38,427.00 38,427.00 40,173.69 41,047.03
19 Kabel NYM 3 x 1.5 mm ex. Eterna m1 22,000.00 26,864.32 28,879.14 29,550.75 30,893.97 29,550.75 29,550.75 29,550.75 30,893.97 31,565.58
20 Kabel NYM 4 mm m1 - - - - - - - - - -
21 Kabel NYA 4mm rol - - - - - - - - - -
22 Kabel telephone m1 - - - - - - - - -
23 Lampu 8 Watt (Philip) bh 60,000.00 70,669.20 75,969.39 77,736.12 81,269.58 77,736.12 77,736.12 77,736.12 81,269.58 83,036.31
24 Lampu 8 Watt (Philip) Tornado bh 56,000.00 66,058.16 71,012.52 72,663.98 75,966.88 72,663.98 72,663.98 72,663.98 75,966.88 77,618.34
25 Lampu 11 Watt (Philip) bh 45,000.00 53,377.80 57,381.14 58,715.58 61,384.47 58,715.58 58,715.58 58,715.58 61,384.47 62,718.92
26 Lampu 14 Watt (Philip) bh 48,000.00 56,836.08 61,098.79 62,519.69 65,361.49 62,519.69 62,519.69 62,519.69 65,361.49 66,782.39
27 Lampu 18 Watt (Philip) bh 55,000.00 64,905.40 69,773.31 71,395.94 74,641.21 71,395.94 71,395.94 71,395.94 74,641.21 76,263.85
28 Lampu 20 Watt (Philip) bh 91,000.00 106,404.76 114,385.12 117,045.24 122,365.47 117,045.24 117,045.24 117,045.24 122,365.47 125,025.59
29 Lampu 23 Watt (Philip) bh 65,000.00 76,433.00 82,165.48 84,076.30 87,897.95 84,076.30 84,076.30 84,076.30 87,897.95 89,808.78
30 Lampu 24 Watt (Philip) bh 70,000.00 82,196.80 88,361.56 90,416.48 94,526.32 90,416.48 90,416.48 90,416.48 94,526.32 96,581.24
31 Lampu 24 Watt (Philip) tornado bh 114,000.00 132,918.24 142,887.11 146,210.06 152,855.98 146,210.06 146,210.06 146,210.06 152,855.98 156,178.93
32 Lampu 15 Watt (Philip) tornado bh 66,000.00 77,585.76 83,404.69 85,344.34 89,223.62 85,344.34 85,344.34 85,344.34 89,223.62 91,163.27
33 Lampu downlight 3,5" bh 55,000.00 64,905.40 69,773.31 71,395.94 74,641.21 71,395.94 71,395.94 71,395.94 74,641.21 76,263.85
34 Lampu downlight 4" bh 70,000.00 82,196.80 88,361.56 90,416.48 94,526.32 90,416.48 90,416.48 90,416.48 94,526.32 96,581.24
35 Lampu downlight 5" bh 150,000.00 174,417.60 187,498.92 191,859.36 200,580.24 191,859.36 191,859.36 191,859.36 200,580.24 204,940.68
36 Isolasi unibelt bh 20,000.00 24,558.80 26,400.71 27,014.68 28,242.62 27,014.68 27,014.68 27,014.68 28,242.62 28,856.59
37 Pipa clipsal 20 mm bt 28,000.00 33,780.88 36,314.45 37,158.97 38,848.01 37,158.97 37,158.97 37,158.97 38,848.01 39,692.53
38 Pipa flexible clipsal 20 mm m1 - - - - - - - - - -
39 Sock clipsal 20 mm bj 3,000.00 4,961.88 5,334.02 5,458.07 5,706.16 5,458.07 5,458.07 5,458.07 5,706.16 5,830.21
40 Tee dos clipsal 20 mm bh 10,000.00 13,031.20 14,008.54 14,334.32 14,985.88 14,334.32 14,334.32 14,334.32 14,985.88 15,311.66
41 Klem clipsal 0,5 " bj 2,000.00 3,809.12 4,094.80 4,190.03 4,380.49 4,190.03 4,190.03 4,190.03 4,380.49 4,475.72
42 Inbow dos plastik clipsal E 157 P bj 6,000.00 8,420.16 9,051.67 9,262.18 9,683.18 9,262.18 9,262.18 9,262.18 9,683.18 9,893.69
- - - - - - - - -
PAVING - - - - - - - - -
1 Paving Poligon m2 175,000.00 254,860.20 273,974.72 280,346.22 293,089.23 280,346.22 280,346.22 280,346.22 293,089.23 299,460.74
2 Paving 10 x 20 cm tebal 6 cm K350 m2 -
3 Paving 10 x 20 cm tebal 8 cm K225 m2 -
4 Paving 10 x 20 cm tebal 8 cm K350 m2 -
5 Paving 10 x 20 cm tebal 8 cm K425 m2 -
6 Paving 20 x 20 cm tebal 6 cm K225 m2 -
7 Paving 20 x 20 cm tebal 6 cm K350 m2 -
8 Paving 20 x 20 cm tebal 8 cm K225 m2 -

Harga Satauan Bahan dan Upah Hal. 47


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA KRAMONGMONGGA MBAHAMDANDARA KARAS TELUK PATIPI ARGUNI FURWAGI BOMBERAY TOMAGE
DASAR
1 2 3 4 5 7 8 9 10 11 12 13 14
9 Paving 20 x 20 cm tebal 8 cm K350 m2 - - - - - - - - - -
10 Paving 20 x 20 cm tebal 8 cm K425 m2 -
11 Paving 20 x 20 cm tebal 10 cm K225 m2 -
12 Paving 20 x 20 cm tebal 10 cm K350 m2 -
13 Paving 20 x 20 cm tebal 10 cm K425 m2 -
14 Paving Tiga Berlian tebal 6 cm K225 m2 -
15 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) m1 - - - - - - - - - -
16 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m1 -
17 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) m1 -
18 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 - - - - - - - - - -
19 Koral Sikat Sak 12,000.00 16,840.32 18,103.34 18,524.35 19,366.37 18,524.35 18,524.35 18,524.35 19,366.37 19,787.38

LAIN-LAIN - - - - - - - -
1 Dugul batu hitam 50 x 50 x 200 unit -
2 Dugul batu hitam 60 x 70 x 250 unit -
3 Dugul batu hitam 70 x 70 x 250 unit -
4 Padmasari batu hitam 50 x 50 x 200 unit -
5 Padmasari batu hitam 70 x 70 x 250 unit -
6 Padmasari batu hitam 65 x 75 x 225 unit -
7 Karpet plastik m2 22,000.00 28,367.92 30,495.51 31,204.71 32,623.11 31,204.71 31,204.71 31,204.71 32,623.11 33,332.31
8 Talang PVC P= 4M', L=4" bentuk bulat buah 150,000.00 177,926.00 191,270.45 195,718.60 204,614.90 195,718.60 195,718.60 195,718.60 204,614.90 209,063.05
9 Talang PVC P= 4M', L=4" bentuk kotak buah 180,000.00 212,508.80 228,446.96 233,759.68 244,385.12 233,759.68 233,759.68 233,759.68 244,385.12 249,697.84
10 Talang PVC P= 4M', L=8" bentuk kotak buah 250,000.00 293,202.00 315,192.15 322,522.20 337,182.30 322,522.20 322,522.20 322,522.20 337,182.30 344,512.35
11 Talang PVC P= 4M', L=6" bentuk bulat buah 120,000.00 143,343.20 154,093.94 157,677.52 164,844.68 157,677.52 157,677.52 157,677.52 164,844.68 168,428.26
12 Talang PVC P= 4M', L=40" bentuk bulat buah - -
13 Talang PVC P= 4M', L=140 mm" bentuk kotak buah 170,000.00 200,981.20 216,054.79 221,079.32 231,128.38 221,079.32 221,079.32 221,079.32 231,128.38 236,152.91
14 Talang PVC P= 4M', L: 8' buah 150,000.00 177,926.00 191,270.45 195,718.60 204,614.90 195,718.60 195,718.60 195,718.60 204,614.90 209,063.05

Fakfak, 31 Mei 2022


PANITIA PENYUSUNAN STANDART HARGA SATUAN HARGA
TAHUN 2022

Mengetahui,
Plt. Kepala Dinas PU, Penataan Ruang,
Perumahan Rakyat
dan Kawasan Permukiman
Kabupaten Fakfak , Ketua,

TEGUH SUGIHARTO, ST LIZA NEIRASARI, ST


NIP. 19701114 199712 1 001 NIP. 19751016 200111 2 001

Harga Satauan Bahan dan Upah Hal. 48


PEMERINTAH KABUPATEN FAKFAK
DINAS PU, PENATAAN RUANG, PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
Jl. Achmad Yani No. 08 Fakfak, Telp. (0956) 22320 - 22709

DAFTAR HARGA SATUAN BAHAN DAN UPAH


TAHUN ANGGARAN 2022
A. Harga Satuan Bahan
NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR
TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
1.00 1.015 1.015 1.025 1.04 1.1 1.04 1.1 1.06
FINISHING
1 Amplas lbr 10,000.00 13,031.20 13,031.20 13,226.67 13,226.67 13,356.98 13,552.45 14,334.32 13,552.45 14,334.32 13,813.07
2 Amplas mtr 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
3 Amplas kain lbr 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
4 Kawat has m' 40,000.00 47,614.00 47,614.00 48,328.21 48,328.21 48,804.35 49,518.56 52,375.40 49,518.56 52,375.40 50,470.84
5 Kawat has Plastik lbr 80,000.00 93,724.40 93,724.40 95,130.27 95,130.27 96,067.51 97,473.38 103,096.84 97,473.38 103,096.84 99,347.86
6 Cat besi (Hamerton) Kaleng 1 kg kg 85,000.00 100,991.80 100,991.80 102,506.68 102,506.68 103,516.60 105,031.47 111,090.98 105,031.47 111,090.98 107,051.31
7 Cat besi (Avian) Kaleng 1 kg kg 95,000.00 112,519.40 112,519.40 114,207.19 114,207.19 115,332.39 117,020.18 123,771.34 117,020.18 123,771.34 119,270.56
8 Cat Besi (polibest) kaleng 1 kg kg 85,000.00 100,991.80 100,991.80 102,506.68 102,506.68 103,516.60 105,031.47 111,090.98 105,031.47 111,090.98 107,051.31
9 Cat Meni Besi/dasar (Polibest) Kaleng 0,8 kg kg 62,500.00 75,054.70 75,054.70 76,180.52 76,180.52 76,931.07 78,056.89 82,560.17 78,056.89 82,560.17 79,557.98
10 Cat Meni Besi/dasar (Yoko) Kaleng 0,8 kg kg 93,750.00 111,078.45 111,078.45 112,744.63 112,744.63 113,855.41 115,521.59 122,186.30 115,521.59 122,186.30 117,743.16
11 Cat kayu+Besi/dasar (polibest) kaleng 0.8 kg kg 87,500.00 103,873.70 103,873.70 105,431.81 105,431.81 106,470.54 108,028.65 114,261.07 108,028.65 114,261.07 110,106.12
12 Cat kayu+Besi/dasar (Yoko) kaleng 0.8 kg kg 81,250.00 96,668.95 96,668.95 98,118.98 98,118.98 99,085.67 100,535.71 106,335.85 100,535.71 106,335.85 102,469.09
13 Cat Kayu Yoko kg 75,000.00 89,464.20 89,464.20 90,806.16 90,806.16 91,700.81 93,042.77 98,410.62 93,042.77 98,410.62 94,832.05
14 Cat menie besi (Glotex) Kaleng 1 kg kg - - - - - - - - - -
15 Cat menie besi (Yoko) Kaleng 1 kg kg 75,000.00 89,464.20 89,464.20 90,806.16 90,806.16 91,700.81 93,042.77 98,410.62 93,042.77 98,410.62 94,832.05
16 Cat menie besi (Delmas) Kaleng 1 kg kg - - - - - - - - - -
17 Cat menie besi (Avian) Kaleng 1 kg kg 95,000.00 112,519.40 112,519.40 114,207.19 114,207.19 115,332.39 117,020.18 123,771.34 117,020.18 123,771.34 119,270.56
18 Cat menie kayu (polibest) 0,8 kg kg 68,750.00 82,259.45 82,259.45 83,493.34 83,493.34 84,315.94 85,549.83 90,485.40 85,549.83 90,485.40 87,195.02
19 Cat menie kayu (Avian) 1kg kg 95,000.00 112,519.40 112,519.40 114,207.19 114,207.19 115,332.39 117,020.18 123,771.34 117,020.18 123,771.34 119,270.56
20 Cat tembok Decolith kg - - - - - - - - - -
21 Cat tembok (Nippon) Exterior / Warna kg 220,000.00 256,614.40 256,614.40 260,463.62 260,463.62 263,029.76 266,878.98 282,275.84 266,878.98 282,275.84 272,011.26
22 Cat tembok (Nippon) Interior / Warna kg 234,000.00 272,753.04 272,753.04 276,844.34 276,844.34 279,571.87 283,663.16 300,028.34 283,663.16 300,028.34 289,118.22
23 Cat tembok (Nippon) Exterior / Putih kg 220,000.00 256,614.40 256,614.40 260,463.62 260,463.62 263,029.76 266,878.98 282,275.84 266,878.98 282,275.84 272,011.26
24 Cat tembok (Nippon) Interior / Putih kg 145,000.00 170,157.40 170,157.40 172,709.76 172,709.76 174,411.34 176,963.70 187,173.14 176,963.70 187,173.14 180,366.84
25 Cat tembok Paragon 5 Kg kg 31,000.00 36,337.00 36,337.00 36,882.06 36,882.06 37,245.43 37,790.48 39,970.70 37,790.48 39,970.70 38,517.22
26 Cat tembok (aries) 5 kg kg 19,800.00 23,426.09 23,426.09 23,777.48 23,777.48 24,011.74 24,363.13 25,768.70 24,363.13 25,768.70 24,831.65
27 Cat tembok Toyopaint kg - - - - - - - - - -
28 Cat tembok (vitex) Kaleng 5 kg kg 15,800.00 18,815.05 18,815.05 19,097.27 19,097.27 19,285.42 19,567.65 20,696.55 19,567.65 20,696.55 19,943.95
29 Cat tembok (vitex) Kaleng 4.5 kg kg 18,888.89 22,442.62 22,442.62 22,779.26 22,779.26 23,003.69 23,340.33 24,686.88 23,340.33 24,686.88 23,789.18
30 Cat monilex klg 95,000.00 112,519.40 112,519.40 114,207.19 114,207.19 115,332.39 117,020.18 123,771.34 117,020.18 123,771.34 119,270.56
31 Dempul kayu (polibest) 0,8 Kg kg 68,750.00 82,259.45 82,259.45 83,493.34 83,493.34 84,315.94 85,549.83 90,485.40 85,549.83 90,485.40 87,195.02
32 Dempul kayu (Pedang) 0.8 kg kg 43,750.00 53,440.45 53,440.45 54,242.06 54,242.06 54,776.46 55,578.07 58,784.50 55,578.07 58,784.50 56,646.88
33 Dempul kayu (Impra) 1 kg kg 95,000.00 112,519.40 112,519.40 114,207.19 114,207.19 115,332.39 117,020.18 123,771.34 117,020.18 123,771.34 119,270.56
34 Kuas Besar 5 inch bh 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
35 Kuas Besar 4 inch bh 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
36 Kuas Sedang 3 inch bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
37 Kuas roll 7" bh 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
38 Kuas roll 10" bh 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
39 Kuas roll 4" bh 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
40 Kuas Kecil 2 inch bh 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
41 Mild zak 33,000.00 39,544.68 39,544.68 40,137.85 40,137.85 40,533.30 41,126.47 43,499.15 41,126.47 43,499.15 41,917.36
42 Minyak cat/Thiner A Kaleng 0,8 liter ltr 60,000.00 70,669.20 70,669.20 71,729.24 71,729.24 72,435.93 73,495.97 77,736.12 73,495.97 77,736.12 74,909.35
43 Plamir kayu 1kg kg 55,000.00 66,409.00 66,409.00 67,405.14 67,405.14 68,069.23 69,065.36 73,049.90 69,065.36 73,049.90 70,393.54
44 Plamir tembok 5 kg merk B0y0 kg 17,000.00 20,198.36 20,198.36 20,501.34 20,501.34 20,703.32 21,006.29 22,218.20 21,006.29 22,218.20 21,410.26
45 Plamir tembok 5 kg merk lion kg 26,000.00 30,573.20 30,573.20 31,031.80 31,031.80 31,337.53 31,796.13 33,630.52 31,796.13 33,630.52 32,407.59
46 Plamir tembok 5 kg merk Paragon kg 31,000.00 36,337.00 36,337.00 36,882.06 36,882.06 37,245.43 37,790.48 39,970.70 37,790.48 39,970.70 38,517.22
47 Plamir tembok 5 kg kg 15,000.00 17,892.84 17,892.84 18,161.23 18,161.23 18,340.16 18,608.55 19,682.12 18,608.55 19,682.12 18,966.41
48 Politur (Boyo) kaleng 1 liter ltr 95,000.00 112,519.40 112,519.40 114,207.19 114,207.19 115,332.39 117,020.18 123,771.34 117,020.18 123,771.34 119,270.56
49 Politur (Joly) kaleng 1 liter ltr 80,000.00 95,228.00 95,228.00 96,656.42 96,656.42 97,608.70 99,037.12 104,750.80 99,037.12 104,750.80 100,941.68
50 Politur (vernis) kaleng 1 liter kg 95,000.00 112,519.40 112,519.40 114,207.19 114,207.19 115,332.39 117,020.18 123,771.34 117,020.18 123,771.34 119,270.56
51 Politur (india) kaleng 1 liter ltr - - - - - - - - -
52 Thiner A kaleng 1/2 liter Ltr 60,000.00 72,172.80 72,172.80 73,255.39 73,255.39 73,977.12 75,059.71 79,390.08 75,059.71 79,390.08 76,503.17
53 Thiner A Avian kaleng 1 liter ltr 60,000.00 72,172.80 72,172.80 73,255.39 73,255.39 73,977.12 75,059.71 79,390.08 75,059.71 79,390.08 76,503.17
54 Thiner A kaleng 1 liter Ltr 60,000.00 72,172.80 72,172.80 73,255.39 73,255.39 73,977.12 75,059.71 79,390.08 75,059.71 79,390.08 76,503.17
55 Thiner B Avian kaleng 1 liter ltr 60,000.00 72,172.80 72,172.80 73,255.39 73,255.39 73,977.12 75,059.71 79,390.08 75,059.71 79,390.08 76,503.17
56 Thiner B Super kaleng 1 liter Ltr 60,000.00 72,172.80 72,172.80 73,255.39 73,255.39 73,977.12 75,059.71 79,390.08 75,059.71 79,390.08 76,503.17

Harga Satauan Bahan dan Upah Hal. 49


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
57 Thiner Super 5 kg kg 44,800.00 52,245.09 52,245.09 53,028.76 53,028.76 53,551.22 54,334.89 57,469.60 54,334.89 57,469.60 55,379.79
58 Thiner A Spesial 5 kg kg 43,000.00 50,170.12 50,170.12 50,922.67 50,922.67 51,424.37 52,176.92 55,187.13 52,176.92 55,187.13 53,180.33
59 Impra 1 Liter ltr 105,000.00 124,047.00 124,047.00 125,907.71 125,907.71 127,148.18 129,008.88 136,451.70 129,008.88 136,451.70 131,489.82
60 impra clear / sanding 1 l Ltr 105,000.00 124,047.00 124,047.00 125,907.71 125,907.71 127,148.18 129,008.88 136,451.70 129,008.88 136,451.70 131,489.82
61 impra wood stain 1 l Ltr 103,000.00 121,741.48 121,741.48 123,567.60 123,567.60 124,785.02 126,611.14 133,915.63 126,611.14 133,915.63 129,045.97
- - - - - - - - -
BAHAN BAKAR MINYAK - - - - - - - - -
1 Premium PBBKB 100% Ltr - - - - - - - - - -
2 Pertalite Ltr 11,400.00 16,148.66 16,148.66 16,390.89 16,390.89 16,552.38 16,794.61 17,763.53 16,794.61 17,763.53 17,117.58
3 Minyak Tanah Ltr 12,000.00 16,840.32 16,840.32 17,092.92 17,092.92 17,261.33 17,513.93 18,524.35 17,513.93 18,524.35 17,850.74
4 Minyak Solar B-0 ( 1 KL ) PBBKB 17 % (1,275%) Ltr - - - - - - - - -
5 Minyak Solar B-0 ( 1 KL ) PBBKB 90 % (6,75%) Ltr - - - - - - - - -
6 Minyak Solar B-0 ( 1 KL ) PBBKB 100% (7,5%) Ltr 11,450.00 16,206.30 16,206.30 16,449.40 16,449.40 16,611.46 16,854.55 17,826.93 16,854.55 17,826.93 17,178.68
7 Minyak Diesel Ltr - - - - - - - - -
8 Minyak Bakar Ltr - - - - - - - - -
9 Gemuk /Stempel 20 kg kg - - - - - - - - - -
10 Gemuk /Stempel 16 kg kg 54,062.50 65,328.29 65,328.29 66,308.21 66,308.21 66,961.49 67,941.42 71,861.12 67,941.42 71,861.12 69,247.98
- - - - - - - - -
PENUTUP ATAP - - - - - - - - -
1 Alang-alang Lbr - 3,007.20 3,007.20 3,052.31 3,052.31 3,082.38 3,127.49 3,307.92 3,127.49 3,307.92 3,187.63
2 Alluminium foil m2 47,028.00 57,219.20 57,219.20 58,077.49 58,077.49 58,649.68 59,507.97 62,941.12 59,507.97 62,941.12 60,652.35
3 Asbes Bubungan lbr - - - - - - - - - -
4 Asbes Gelombang 1,80 m x 1.05 m x 3.5 mm lbr 54,490.45 67,826.41 67,826.41 68,843.81 68,843.81 69,522.07 70,539.47 74,609.05 70,539.47 74,609.05 71,896.00
5 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr 76,866.40 93,620.51 93,620.51 95,024.82 95,024.82 95,961.02 97,365.33 102,982.56 97,365.33 102,982.56 99,237.74
6 Asbes Nok 1mx2mx4mm lbr 48,640.00 61,082.25 61,082.25 61,998.48 61,998.48 62,609.30 63,525.54 67,190.47 63,525.54 67,190.47 64,747.18
7 Besi profil WF kg 19,000.00 24,909.64 24,909.64 25,283.28 25,283.28 25,532.38 25,906.03 27,400.60 25,906.03 27,400.60 26,404.22
8 Besi strip 1kg kg 8,712.00 13,050.05 13,050.05 13,245.80 13,245.80 13,376.30 13,572.05 14,355.05 13,572.05 14,355.05 13,833.05
9 Bubungan Biasa bj 25,000.00 - - - - - - - - -
10 Bubungan Plentong bj - - - - - - - - - - -
11 Genteng plentong dicat bj - - - - - - - - - - -
12 Genteng Plentong bj 35,000.00 43,353.80 43,353.80 44,004.11 44,004.11 44,437.65 45,087.95 47,689.18 45,087.95 47,689.18 45,955.03
13 Ijuk kg - - - - - - - - - -
14 Tali Ijuk Kg - - - - - - - - - -
15 Formite/Penjaga Jarak Bekisting/Spacer Bh - - - - - - - - - -
16 Seng BJLS 0,20 gelombang lbr 96,000.00 115,676.96 115,676.96 117,412.11 117,412.11 118,568.88 120,304.04 127,244.66 120,304.04 127,244.66 122,617.58
17 Seng BJLS 0.20 gelombang gajah berlian lbr 103,000.00 123,746.28 123,746.28 125,602.47 125,602.47 126,839.94 128,696.13 136,120.91 128,696.13 136,120.91 131,171.06
18 Seng BJLS 0,25 gelombang lbr 85,000.00 102,996.60 102,996.60 104,541.55 104,541.55 105,571.52 107,116.46 113,296.26 107,116.46 113,296.26 109,176.40
19 Seng BJLS 0,28 gelombang lbr - - - - - - - - - -
20 Seng BJLS 0,30 gelombang lbr 119,000.00 142,190.44 142,190.44 144,323.30 144,323.30 145,745.20 147,878.06 156,409.48 147,878.06 156,409.48 150,721.87
21 Seng Plat BJLS 30 lebar 28 cm lbr 35,000.00 45,358.60 45,358.60 46,038.98 46,038.98 46,492.57 47,172.94 49,894.46 47,172.94 49,894.46 48,080.12
22 Seng Plat BJLS 30 lebar 30 cm m' 45,000.00 56,886.20 56,886.20 57,739.49 57,739.49 58,308.36 59,161.65 62,574.82 59,161.65 62,574.82 60,299.37
23 Seng Plat BJLS 30 lebar 38 cm m' 45,000.00 56,886.20 56,886.20 57,739.49 57,739.49 58,308.36 59,161.65 62,574.82 59,161.65 62,574.82 60,299.37
24 Seng Plat BJLS 30 lebar 40 cm m' 50,000.00 62,650.00 62,650.00 63,589.75 63,589.75 64,216.25 65,156.00 68,915.00 65,156.00 68,915.00 66,409.00
25 Seng Plat BJLS 30 lebar 44 cm m' 50,000.00 62,650.00 62,650.00 63,589.75 63,589.75 64,216.25 65,156.00 68,915.00 65,156.00 68,915.00 66,409.00
26 Seng Plat BJLS 20 lebar 30 cm m' 35,000.00 45,358.60 45,358.60 46,038.98 46,038.98 46,492.57 47,172.94 49,894.46 47,172.94 49,894.46 48,080.12
27 Seng Plat BJLS 20 lebar 28 cm m' 30,000.00 39,594.80 39,594.80 40,188.72 40,188.72 40,584.67 41,178.59 43,554.28 41,178.59 43,554.28 41,970.49
28 Seng Plat BJLS 20 lebar 40 cm m' 45,000.00 56,886.20 56,886.20 57,739.49 57,739.49 58,308.36 59,161.65 62,574.82 59,161.65 62,574.82 60,299.37
29 Seng Plat BJLS 30 pintu lbr 87,000.00 105,302.12 105,302.12 106,881.65 106,881.65 107,934.67 109,514.20 115,832.33 109,514.20 115,832.33 111,620.25
30 Seng Plat BJLS 20 pintu m' 79,000.00 96,080.04 96,080.04 97,521.24 97,521.24 98,482.04 99,923.24 105,688.04 99,923.24 105,688.04 101,844.84
31 Seng Zincalum ( Spandek) 0.25 x 6 m lbr 243,000.00 285,132.68 285,132.68 289,409.67 289,409.67 292,261.00 296,537.99 313,645.95 296,537.99 313,645.95 302,240.64
32 Seng Zincalum ( Spandek ) 0.30 x 6 m lbr 480,000.00 558,336.80 558,336.80 566,711.85 566,711.85 572,295.22 580,670.27 614,170.48 580,670.27 614,170.48 591,837.01
33 Seng Zincalum (Spandek) 0.40 x 6 m lbr - - - - - - - - - -
34 Seng plastik gelombang besar tebal lbr 95,000.00 114,524.20 114,524.20 116,242.06 116,242.06 117,387.31 119,105.17 125,976.62 119,105.17 125,976.62 121,395.65
35 Seng plastik gelombang kecil tebal lbr 80,000.00 97,232.80 97,232.80 98,691.29 98,691.29 99,663.62 101,122.11 106,956.08 101,122.11 106,956.08 103,066.77
36 Seng plastik gelombang besar tipis lbr 75,000.00 91,469.00 91,469.00 92,841.04 92,841.04 93,755.73 95,127.76 100,615.90 95,127.76 100,615.90 96,957.14
37 Seng Fiber gelombang besar tebal lbr 95,000.00 114,524.20 114,524.20 116,242.06 116,242.06 117,387.31 119,105.17 125,976.62 119,105.17 125,976.62 121,395.65
38 Sirap Jati bh - - - - - - - - - - -
39 AT roof Bjls 30, 0,8x0,8 lbr - - - - - - - - - -
40 Rainbouw roof Bjls 30, 0,3x1,2 lbr - - - - - - - - - -
41 Bubungan rainbouw roof Bjls 30, 1,2 m' Bh - - - - - - - - - -
42 Multiroof BJ 300 lbr - - - - - - - - - -
43 Bubungan multiroof Bh 73,000.00 87,158.68 87,158.68 88,466.06 88,466.06 89,337.65 90,645.03 95,874.55 90,645.03 95,874.55 92,388.20
44 Igi roof 0,2 uk. 0,8x0,8 m' lbr 35,000.00 - - - - - - - -
45 Sakura roof BJ 30 lbr 43,000.00 52,575.88 52,575.88 53,364.52 53,364.52 53,890.28 54,678.92 57,833.47 54,678.92 57,833.47 55,730.43
-
PENGGANTUNG -
1 Engsel jendela biasa ps 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
2 Engsel jendela biasa Merk King ps 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
3 Engsel jendela biasa merk king 3' ps 40,000.00 47,614.00 47,614.00 48,328.21 48,328.21 48,804.35 49,518.56 52,375.40 49,518.56 52,375.40 50,470.84
4 Engsel jendela merek King 4" ps 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
5 Engsel kupu-kupu jendela biasa ps 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58

Harga Satauan Bahan dan Upah Hal. 50


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
6 Engsel kupu-kupu jendela biasa 3" ps 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
7 Engsel Jendela Bagus Kuningan ps 55,000.00 64,905.40 64,905.40 65,878.98 65,878.98 66,528.04 67,501.62 71,395.94 67,501.62 71,395.94 68,799.72
8 Engsel jendela bagus kuningan modem 4' ps 75,000.00 87,960.60 87,960.60 89,280.01 89,280.01 90,159.62 91,479.02 96,756.66 91,479.02 96,756.66 93,238.24
9 Engsel jendela bagus kuningan 4' ps 75,000.00 87,960.60 87,960.60 89,280.01 89,280.01 90,159.62 91,479.02 96,756.66 91,479.02 96,756.66 93,238.24
10 Engsel kupu-kupu pintu biasa ps 55,000.00 64,905.40 64,905.40 65,878.98 65,878.98 66,528.04 67,501.62 71,395.94 67,501.62 71,395.94 68,799.72
11 Engsel kupu-kupu pintu biasa 4" ps 55,000.00 64,905.40 64,905.40 65,878.98 65,878.98 66,528.04 67,501.62 71,395.94 67,501.62 71,395.94 68,799.72
12 Engsel kupu-kupu pintu biasa 4cmx3cmx3mm merk jezz ps 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
13 Engsel kupu-kupu pintu biasa AFC 4cmx3cmx3mm merk king ps 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
14 Engsel kupu-kupu pintu biasa 4cmx3cmx3mm merk viper ps - - - - - - - - - -
15 Engsel nylon ps - - - - - - - - - -
16 Espagnoleth set - - - - - - - - -
17 Grendel kecil biasa bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
18 Grendel kecil bagus bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
19 Grendel kecil spring knife brabus/ses bh 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
20 Grendel kecil biasa 3" bh 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
21 Grendel kecil bagus 2" bh 20,000.00 24,558.80 24,558.80 24,927.18 24,927.18 25,172.77 25,541.15 27,014.68 25,541.15 27,014.68 26,032.33
22 Grendel kecil spring knife bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
23 Grendel besar 12" bh 65,000.00 76,433.00 76,433.00 77,579.50 77,579.50 78,343.83 79,490.32 84,076.30 79,490.32 84,076.30 81,018.98
24 Grendel besar bh 40,000.00 47,614.00 47,614.00 48,328.21 48,328.21 48,804.35 49,518.56 52,375.40 49,518.56 52,375.40 50,470.84
25 Grendel hararo bh - - - - - - - - - -
26 Kaca 3 mm bening lbr 320,000.00 370,386.80 370,386.80 375,942.60 375,942.60 379,646.47 385,202.27 407,425.48 385,202.27 407,425.48 392,610.01
27 Kaca 3 mm bening 153x122 m2 m2 104,468.02 142,479.35 142,479.35 144,616.54 144,616.54 146,041.33 148,178.52 156,727.29 148,178.52 156,727.29 151,028.11
28 Kaca 5 mm bening 132 x 183 lbr 227,686.70 284,520.92 284,520.92 288,788.74 288,788.74 291,633.95 295,901.76 312,973.02 295,901.76 312,973.02 301,592.18
29 Kaca 5 mm bening 200 x 100 m2 137,500.00 180,557.30 180,557.30 183,265.66 183,265.66 185,071.23 187,779.59 198,613.03 187,779.59 198,613.03 191,390.74
30 Kaca 5 mm bening 153x122 m2 m2 147,326.69 191,885.12 191,885.12 194,763.39 194,763.39 196,682.24 199,560.52 211,073.63 199,560.52 211,073.63 203,398.22
31 Kaca 6 mm bening 153x122 m2 m2 - - - - - - - - - -
32 Kaca 8 mm bening 153x122 m2 m2 419,000.00 505,059.24 505,059.24 512,635.13 512,635.13 517,685.72 525,261.61 555,565.16 525,261.61 555,565.16 535,362.79
33 Kaca 10 mm bening m2 - - - - - - - - - -
34 Kaca 12 mm bening m2 - - - - - - - - - -
35 Kaca Es/Kapur 3 mm m2 - - - - - - - - - - -
36 Kaca Es/Kapur 5 mm m2 - -
37 Kaca nako bening bh 30,000.00 37,590.00 37,590.00 38,153.85 38,153.85 38,529.75 39,093.60 41,349.00 39,093.60 41,349.00 39,845.40
38 Kaca nako rayben bh 30,000.00 37,590.00 37,590.00 38,153.85 38,153.85 38,529.75 39,093.60 41,349.00 39,093.60 41,349.00 39,845.40
39 Kaca ryben 3 mm 153x122 cm m2 95,360.55 131,980.63 131,980.63 133,960.34 133,960.34 135,280.14 137,259.85 145,178.69 137,259.85 145,178.69 139,899.46
40 Kaca ryben 5 mm 153x122 cm m2 153,755.49 199,295.98 199,295.98 202,285.42 202,285.42 204,278.38 207,267.82 219,225.58 207,267.82 219,225.58 211,253.74
41 Kaca Ryben 5 mm 183 x 132 cm m2 140,751.78 184,305.82 184,305.82 187,070.41 187,070.41 188,913.47 191,678.05 202,736.40 191,678.05 202,736.40 195,364.17
42 Kaca ryben 5 mm 200x100 cm m2 - - - - - - - - - -
43 Cermin 3 mm 153x122 cm m2 198,221.37 250,554.46 250,554.46 254,312.78 254,312.78 256,818.32 260,576.64 275,609.91 260,576.64 275,609.91 265,587.73
44 Cermin 5 mm 183 x 122 m2 193,048.46 244,591.35 244,591.35 248,260.22 248,260.22 250,706.13 254,375.00 269,050.48 254,375.00 269,050.48 259,266.83
45 Kait angin biasa ps 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
46 Kait angin bagus bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
47 Kunci pintu Delmanao bh 160,000.00 185,945.20 185,945.20 188,734.38 188,734.38 190,593.83 193,383.01 204,539.72 193,383.01 204,539.72 197,101.91
48 Kunci pintu Zeis bh 395,000.00 456,843.80 456,843.80 463,696.46 463,696.46 468,264.90 475,117.55 502,528.18 475,117.55 502,528.18 484,254.43
49 Kunci pintu TOP bh 75,000.00 87,960.60 87,960.60 89,280.01 89,280.01 90,159.62 91,479.02 96,756.66 91,479.02 96,756.66 93,238.24
50 Kunci pintu Union bh - -
51 Kunci pintu Cap Kuda bodi kecil bh 175,000.00 203,236.60 203,236.60 206,285.15 206,285.15 208,317.52 211,366.06 223,560.26 211,366.06 223,560.26 215,430.80
52 Kunci pintu Cap Kuda bodi besar bh 195,000.00 226,291.80 226,291.80 229,686.18 229,686.18 231,949.10 235,343.47 248,920.98 235,343.47 248,920.98 239,869.31
53 Kunci pintu Royal bh - - - - - - - - - -
54 Kunci pintu Globe K bh 135,000.00 157,126.20 157,126.20 159,483.09 159,483.09 161,054.36 163,411.25 172,838.82 163,411.25 172,838.82 166,553.77
55 Kunci pintu Yale bh 175,000.00 203,236.60 203,236.60 206,285.15 206,285.15 208,317.52 211,366.06 223,560.26 211,366.06 223,560.26 215,430.80
56 Kunci pintu vanessa bh 145,000.00 168,653.80 168,653.80 171,183.61 171,183.61 172,870.15 175,399.95 185,519.18 175,399.95 185,519.18 178,773.03
57 Kunci pintu Kodai bh 250,000.00 289,693.60 289,693.60 294,039.00 294,039.00 296,935.94 301,281.34 318,662.96 301,281.34 318,662.96 307,075.22
58 Kunci pintu Sapphire bh 175,000.00 203,236.60 203,236.60 206,285.15 206,285.15 208,317.52 211,366.06 223,560.26 211,366.06 223,560.26 215,430.80
59 Kunci slot kecil HPP bh 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
60 Kunci slot sedang HPP bh 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
61 Kunci slot besar HPP bh 65,000.00 76,433.00 76,433.00 77,579.50 77,579.50 78,343.83 79,490.32 84,076.30 79,490.32 84,076.30 81,018.98
62 Kunci slot kecil bh 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
63 Kunci slot kecil ATS bh 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
64 Kunci slot sedang bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
65 Kunci slot sedang ATS bh 39,000.00 46,461.24 46,461.24 47,158.16 47,158.16 47,622.77 48,319.69 51,107.36 48,319.69 51,107.36 49,248.91
66 Kunci slot besar bh 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
67 Kunci Silinder bh 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
68 Kunci tanam 2 slag Biasa bh 150,000.00 174,417.60 174,417.60 177,033.86 177,033.86 178,778.04 181,394.30 191,859.36 181,394.30 191,859.36 184,882.66
69 Kunci tanam 2 slag Bagus bh 200,000.00 232,055.60 232,055.60 235,536.43 235,536.43 237,856.99 241,337.82 255,261.16 241,337.82 255,261.16 245,978.94
70 Kunci tanam 2 slag bagus merk Azzuro bh 250,000.00 289,693.60 289,693.60 294,039.00 294,039.00 296,935.94 301,281.34 318,662.96 301,281.34 318,662.96 307,075.22
71 Kunci tanam 2 slag bagus merk Giardano bh - - - - - - - - - -
- - - - - - - - -
KAYU DAN PLAFOND - - - - - - - - -
1 Bambu besar Ukuran 4 m btg 20,000.00 26,062.40 26,062.40 26,453.34 26,453.34 26,713.96 27,104.90 28,668.64 27,104.90 28,668.64 27,626.14
2 Bambu sedang Ukuran 4 m btg 15,000.00 20,298.60 20,298.60 20,603.08 20,603.08 20,806.07 21,110.54 22,328.46 21,110.54 22,328.46 21,516.52

Harga Satauan Bahan dan Upah Hal. 51


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR
TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
3 Bambu kecil Ukuran 4 m btg 12,000.00 16,840.32 16,840.32 17,092.92 17,092.92 17,261.33 17,513.93 18,524.35 17,513.93 18,524.35 17,850.74
4 Celling teak (0,62 x 2,40) m2 lbr - - - - - - - - - -
5 Eternit lbr 96,100.00 116,794.64 116,794.64 118,546.56 118,546.56 119,714.50 121,466.42 128,474.10 121,466.42 128,474.10 123,802.31
6 Formika lbr 191,556.89 226,833.52 226,833.52 230,236.02 230,236.02 232,504.35 235,906.86 249,516.87 235,906.86 249,516.87 240,443.53
7 Melamine Lbr 150,000.00 178,928.40 178,928.40 181,612.33 181,612.33 183,401.61 186,085.54 196,821.24 186,085.54 196,821.24 189,664.10
8 Gedeg kulit kelas I m2 - - - - - - - - - - -
9 Gypsum Old lbr 100,000.00 121,290.40 121,290.40 1,503.60 123,109.76 124,322.66 126,142.02 133,419.44 126,142.02 133,419.44 128,567.82
10 Hard board MDF lbr - - - - - - - - - -
11 Kalsiboard 4,5 mm lbr 130,000.00 155,873.20 155,873.20 158,211.30 158,211.30 159,770.03 162,108.13 171,460.52 162,108.13 171,460.52 165,225.59
12 Kayu bekesting / kayu putih m3 2,500,000.00 3,032,260.00 3,032,260.00 3,077,743.90 3,077,743.90 3,108,066.50 3,153,550.40 3,335,486.00 3,153,550.40 3,335,486.00 3,214,195.60
13 Kayu Besi 10 x 10, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,185,020.00 4,247,795.30 4,247,795.30 4,289,645.50 4,352,420.80 4,603,522.00 4,352,420.80 4,603,522.00 4,436,121.20
14 Kayu Besi 5 x 10, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,185,020.00 4,247,795.30 4,247,795.30 4,289,645.50 4,352,420.80 4,603,522.00 4,352,420.80 4,603,522.00 4,436,121.20
15 Kayu Besi 5 x 5, panjang 4 m' m3 - - - - - - - - - -
16 Kayu Besi 2.5 x 20, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,185,020.00 4,247,795.30 4,247,795.30 4,289,645.50 4,352,420.80 4,603,522.00 4,352,420.80 4,603,522.00 4,436,121.20
17 Kayu Besi 10 x 10, panjang 3 m' m3 3,500,000.00 4,185,020.00 4,185,020.00 4,247,795.30 4,247,795.30 4,289,645.50 4,352,420.80 4,603,522.00 4,352,420.80 4,603,522.00 4,436,121.20
18 Kayu Besi 6x 12, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,185,020.00 4,247,795.30 4,247,795.30 4,289,645.50 4,352,420.80 4,603,522.00 4,352,420.80 4,603,522.00 4,436,121.20
19 Reng Kayu Besi 2 x 3 m3 - - - - - - - - - -
20 Kayu Besi 4x 25, panjang 4 m' m3 3,500,000.00 4,185,020.00 4,185,020.00 4,247,795.30 4,247,795.30 4,289,645.50 4,352,420.80 4,603,522.00 4,352,420.80 4,603,522.00 4,436,121.20
21 Papan Kayu besi 2,5 x 25, panjang 4 m' m3 3,700,000.00 4,415,572.00 4,415,572.00 4,481,805.58 4,481,805.58 4,525,961.30 4,592,194.88 4,857,129.20 4,592,194.88 4,857,129.20 4,680,506.32
22 Papan Cor/Papan Kayu Putih m3 2,300,000.00 2,801,708.00 2,801,708.00 2,843,733.62 2,843,733.62 2,871,750.70 2,913,776.32 3,081,878.80 2,913,776.32 3,081,878.80 2,969,810.48
23 Kayu Matoa 10 x10, panjang 4 m' m3 - - - - - - - - - -
24 Kayu Matoa 5 x 10, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,032,260.00 3,077,743.90 3,077,743.90 3,108,066.50 3,153,550.40 3,335,486.00 3,153,550.40 3,335,486.00 3,214,195.60
25 Kayu Matoa 5 x 5, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,032,260.00 3,077,743.90 3,077,743.90 3,108,066.50 3,153,550.40 3,335,486.00 3,153,550.40 3,335,486.00 3,214,195.60
26 Kayu Matoa m3 2,500,000.00 3,032,260.00 3,032,260.00 3,077,743.90 3,077,743.90 3,108,066.50 3,153,550.40 3,335,486.00 3,153,550.40 3,335,486.00 3,214,195.60
27 Kayu Merbau m3 - - - - - - - - - -
28 Papan Kayu Matoa 2,5 x 25, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,032,260.00 3,077,743.90 3,077,743.90 3,108,066.50 3,153,550.40 3,335,486.00 3,153,550.40 3,335,486.00 3,214,195.60
29 Papan Kayu Matoa 2,5 x 20, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,032,260.00 3,077,743.90 3,077,743.90 3,108,066.50 3,153,550.40 3,335,486.00 3,153,550.40 3,335,486.00 3,214,195.60
30 Papan Kayu Matoa 3 x 25, panjang 4 m' m3 2,500,000.00 3,032,260.00 3,032,260.00 3,077,743.90 3,077,743.90 3,108,066.50 3,153,550.40 3,335,486.00 3,153,550.40 3,335,486.00 3,214,195.60
31 Kayu bingkirai m3 - - - - - - - - - -
32 Kayu bingkirai papan m3 - - - - - - - - - -
33 Kayu dolken (pekerjaan sementara) btg 22,000.00 33,379.92 33,379.92 33,880.62 33,880.62 34,214.42 34,715.12 36,717.91 34,715.12 36,717.91 35,382.72
34 Kayu jati m3 - - - - - - - - - -
35 Kayu jati papan m3 - - - - - - - - - -
36 Kayu kamper balok m3 - - - - - - - - - -
37 Kayu kamper usuk/reng m3 - - - - - - - - - -
38 Kayu kamper papan m3 - - - - - - - - - -
39 Kayu kruing balok m3 - - - - - - - - - -
40 Kayu kruing usuk/reng m3 - - - - - - - - - -
41 Kayu kruing papan m3 - - - - - - - - - -
42 Kayu meranti balok m3 - - - - - - - - - -
43 Kayu meranti usuk/reng m3 - - - - - - - - - -
44 Kayu meranti papan m3 - -
45 Kayu merbau papan m3 - - - - - - - - - - -
46 Kayu profil m1 - - - - - - - - - -
47 Kayu seseh balok m3 - - - - - - - - - -
48 Kayu seseh dolken m3 - - - - - - - - - -
49 Lem Aibond 450 gr kg - - - - - - - - - -
50 Lem Aibond 700 gr kg - - - - - - - - - -
51 Lem Kayu (fox) kg 95,000.00 111,015.80 111,015.80 112,681.04 112,681.04 113,791.20 115,456.43 122,117.38 115,456.43 122,117.38 117,676.75
52 Lem Kayu (fox) besar klg 95,000.00 111,015.80 111,015.80 112,681.04 112,681.04 113,791.20 115,456.43 122,117.38 115,456.43 122,117.38 117,676.75
53 Lem Kayu (Fox) 0.6 klg 65,000.00 76,433.00 76,433.00 77,579.50 77,579.50 78,343.83 79,490.32 84,076.30 79,490.32 84,076.30 81,018.98
54 Lem Kayu (Fox) klg 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
55 Lem Kayu (Fox) Rajawali kg 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
56 List Gypsum standar m' - - - - - - - - - -
57 Minyak bekisting ltr 15,000.00 18,795.00 18,795.00 19,076.93 19,076.93 19,264.88 19,546.80 20,674.50 19,546.80 20,674.50 19,922.70
58 Tripleks 2.7 mm lbr 60,000.00 74,177.60 74,177.60 75,290.26 75,290.26 76,032.04 77,144.70 81,595.36 77,144.70 81,595.36 78,628.26
59 Tripleks 3 mm Lbr 90,000.00 108,760.40 108,760.40 110,391.81 110,391.81 111,479.41 113,110.82 119,636.44 113,110.82 119,636.44 115,286.02
60 Tripleks 3 mm semi meranti Lbr 86,000.00 104,149.36 104,149.36 105,711.60 105,711.60 106,753.09 108,315.33 114,564.30 108,315.33 114,564.30 110,398.32
61 Tripleks 3.6 mm lbr 75,000.00 - - - - - - - - -
62 Plywood 3 mm Lbr - - - - - - - - - -
63 Tripleks 4 mm Lbr 105,000.00 126,051.80 126,051.80 127,942.58 127,942.58 129,203.10 131,093.87 138,656.98 131,093.87 138,656.98 133,614.91
64 Tripleks 4 mm semi meranti Lbr 90,000.00 108,760.40 108,760.40 110,391.81 110,391.81 111,479.41 113,110.82 119,636.44 113,110.82 119,636.44 115,286.02
65 Plywood 4 mm lbr - - - - - - - - - -
66 Tripleks 5 mm lbr 150,000.00 177,926.00 177,926.00 180,594.89 180,594.89 182,374.15 185,043.04 195,718.60 185,043.04 195,718.60 188,601.56
67 Multiplek 6 mm lbr 125,000.00 149,107.00 149,107.00 151,343.61 151,343.61 152,834.68 155,071.28 164,017.70 155,071.28 164,017.70 158,053.42
68 Plywood 6 mm lbr - - - - - - - - - - -
69 Multiplek 9 mm lbr 195,000.00 229,800.20 229,800.20 233,247.20 233,247.20 235,545.21 238,992.21 252,780.22 238,992.21 252,780.22 243,588.21
70 Plywood 9 mm lbr 165,000.00 195,217.40 195,217.40 198,145.66 198,145.66 200,097.84 203,026.10 214,739.14 203,026.10 214,739.14 206,930.44
71 Multiplek 12 mm lbr 200,000.00 235,564.00 235,564.00 239,097.46 239,097.46 241,453.10 244,986.56 259,120.40 244,986.56 259,120.40 249,697.84
72 Plywood 12 mm lbr 200,000.00 235,564.00 235,564.00 239,097.46 239,097.46 241,453.10 244,986.56 259,120.40 244,986.56 259,120.40 249,697.84

Harga Satauan Bahan dan Upah Hal. 52


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR
TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
73 Multiplek 18 mm lbr 325,000.00 379,659.00 379,659.00 385,353.89 385,353.89 389,150.48 394,845.36 417,624.90 394,845.36 417,624.90 402,438.54
74 Plywood aluminium lbr 130,000.00 154,870.80 154,870.80 1,503.60 1,503.60 1,503.60 151,362.40 1,503.60 161,065.63 170,357.88 164,163.05
75 Teak wood (0,9x2,20) m2 lbr 130,000.00 154,870.80 154,870.80 157,193.86 157,193.86 158,742.57 161,065.63 170,357.88 161,065.63 170,357.88 164,163.05
76 Teak wood (1,20x2,40) m2 lbr - - - - - - - - - -
- - - - - - - - -
KERAMIK - - - - - - - - -
IKAD - - - - - - - - -
1 Ikad (Keramik) Kw. I 10 x 20 cm m2 - - - - - - - - - - -
2 Ikad (Keramik) Kw. I 20 x 20 cm m2 - - - - - - - - - -
3 Ikad (Keramik) Kw. I 20 x 30 cm m2 - - - - - - - - -
4 Ikad (Keramik) Kw. I 30 x 30 cm m2 - - - - - - - - - -
5 Ikad (Keramik) Kw. I 40 x 40 cm m2 90,000.00 111,767.60 111,767.60 113,444.11 113,444.11 114,561.79 116,238.30 122,944.36 116,238.30 122,944.36 118,473.66
6 Ikad (Keramik) Kw. II 10 x 20 cm m2 - - - - - - - - - - -
7 Ikad (Keramik) Kw. II 20 x 20 cm m2 95,000.00 117,531.40 117,531.40 119,294.37 119,294.37 120,469.69 122,232.66 129,284.54 122,232.66 129,284.54 124,583.28
8 Ikad (Keramik) Kw. II 20 x 30 cm m2 - - - - - - - - - -
9 Ikad (Keramik) Kw. II 30 x 30 cm m2 - - - - - - - - - -
10 Ikad (Keramik) Kw. II 40 x 40 cm m2 80,000.00 100,240.00 100,240.00 101,743.60 101,743.60 102,746.00 104,249.60 110,264.00 104,249.60 110,264.00 106,254.40
-
ELEYSIUM - - - - - - - - -
1 Ikad (Keramik) Kw. I 20 x 20 cm m2 - - - - - - - - - -
2 Ikad (Keramik) Kw. I 20 x 30 cm m2 - - - - - - - - - - -
3 Ikad (Keramik) Kw. I 30 x 30 cm m2 - - - - - - - - - -
4 Ikad (Keramik) Kw. I 40 x 40 cm m2 - - - - - - - - - -
- - - - - - - - -
INESA - - - - - - - - -
1 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2 - - - - - - - - - -
2 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 - - - - - - - - -
3 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2 - - - - - - - - -
4 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2 - - - - - - - - -
5 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2 - - - - - - - - -
6 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2 - - - - - - - - - -
7 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2 - - - - - - - - - -
8 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 - - - - - - - - - -
9 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2 - - - - - - - - - -
10 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2 - - - - - - - - - -
11 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2 - - - - - - - - - -

ESSENZA
1 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2 - Err:522
2 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2 - Err:522
3 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 - Err:522
4 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 - Err:522
5 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 - Err:522
6 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 - - - - - - - - - -
7 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 - - - - - - - - - -
8 Keramik Kelas I Domus m2 - Err:522
9 Keramik Kelas I Granity Imperiali m2 - Err:522
10 Keramik Kelas I Lavagna m2 - Err:522
11 Keramik Kelas I Mountain Peak m2 - Err:522

GARUDA - - - - - - - -
1 Keramik 20 x 20 kelas I Emboss Dasar Muda m2 - - - - - - - - -
2 Keramik 20 x 20 kelas I Emboss Dasar Tua m2 - - - - - - - - -
3 Keramik 20 x 20 kelas I Tesia m2 - - - - - - - - -
4 Keramik 20 x 20 kelas II Emboss Dasar Muda m2 - - - - - - - - -
5 Keramik 20 x 20 kelas II Emboss Dasar Tua m2 - - - - - - - - -
6 Keramik 20 x 20 kelas II Tesia m2 - - - - - - - - -
7 Keramik 20 x 25 kelas I Motif Dasar Medium m2 - - - - - - - - -
8 Keramik 20 x 25 kelas I Motif Dasar Muda m2 - - - - - - - - -
9 Keramik 20 x 25 kelas I Nuri Dark m2 - - - - - - - - -
10 Keramik 20 x 25 kelas I Polos m2 - - - - - - - - -
11 Keramik 30 x 30 kelas I Granity m2 - - - - - - - - -
12 Keramik 30 x 30 kelas I Motif Embose m2 - - - - - - - - -
13 Keramik 30 x 30 kelas II Granity m2 - - - - - - - - -
14 Keramik 30 x 30 kelas II Motif Embose m2 - - - - - - - - -
15 Keramik 40 x 40 kelas I Motif Dasar Muda m2 - - - - - - - - -
16 Keramik 40 x 40 kelas I Motif Dasar Muda m2 - - - - - - - - - -
17 Keramik 40 x 40 kelas I Motif Embose m2 - - - - - - - - - -

Harga Satauan Bahan dan Upah Hal. 53


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
18 Keramik 40 x 40 kelas I Motif Granity Tua m2 - - - - - - - - - -
19 Keramik 40 x 40 kelas I Motif Medium Color m2 - - - - - - - - - -
20 Keramik 40 x 40 kelas I Motif Spesial Color m2 - - - - - - - - - -
21 Keramik 50 x 50 kelas I m2 - - - - - - - - - -
22 Granito 60 x 60 polos m2 - - - - - - - - - -
22 Granito 60 x 60 warna m2 - - - - - - - - - -
-
ASIA - - - - - - - - -
1 Keramik 10 x 10 kelas I warna muda m2 - - - - - - - - - - -
2 Keramik 10 x 20 kelas I warna muda m2 - - - - - - - - - -
3 Keramik 20 x 20 kelas I warna muda m2 70,000.00 88,712.40 88,712.40 90,043.09 90,043.09 90,930.21 92,260.90 97,583.64 92,260.90 97,583.64 94,035.14
4 Keramik 20 x 20 kelas I warna tua m2 80,000.00 100,240.00 100,240.00 101,743.60 101,743.60 102,746.00 104,249.60 110,264.00 104,249.60 110,264.00 106,254.40
5 Keramik 20 x 25 kelas I warna tua m2 90,000.00 111,767.60 111,767.60 113,444.11 113,444.11 114,561.79 116,238.30 122,944.36 116,238.30 122,944.36 118,473.66
6 Keramik 20 x 30 kelas I warna muda m2 - - - - - - - - - -
7 Keramik 30 x 30 kelas I warna muda m2 66,000.00 84,101.36 84,101.36 85,362.88 85,362.88 86,203.89 87,465.41 92,511.50 87,465.41 92,511.50 89,147.44
8 Keramik 30 x 30 kelas I warna tua m2 66,000.00 84,101.36 84,101.36 85,362.88 85,362.88 86,203.89
9 Keramik 40 x 40 kelas I warna muda m2 90,000.00 111,767.60 111,767.60 113,444.11 113,444.11 114,561.79 116,238.30 122,944.36 116,238.30 122,944.36 118,473.66
10 Keramik 40 x 40 warna platinum m2 80,000.00 100,240.00 100,240.00 101,743.60 101,743.60 102,746.00 104,249.60 110,264.00 104,249.60 110,264.00 106,254.40
11 Keramik 10 x 20 kelas II m2 80,000.00 100,240.00 100,240.00 101,743.60 101,743.60 102,746.00 104,249.60 110,264.00 104,249.60 110,264.00 106,254.40
12 Keramik 20 x 20 kelas II m2 - - - - - - - - - -
13 Keramik 20 x 30 kelas II m2 - - - - - - - - - -
14 Keramik 30 x 30 kelas II m2 - - - - - - - - - -
15 Keramik 40 x 40 kelas II m2 - - - - - - - - - -
- - - - - - - - -
MULIA - - - - - - - - -
1 Keramik 10 x 20 cm kelas I m2 - - - - - - - - - - -
2 Keramik 20 x 20 cm kelas I m2 75,000.00 94,476.20 94,476.20 95,893.34 95,893.34 96,838.11 98,255.25 103,923.82 98,255.25 103,923.82 100,144.77
3 Keramik 20 x 30 cm kelas I m2 - - - - - - - - - -
4 Keramik 30 x 30 cm kelas I m2 - - - - - - - - - -
5 Keramik 40 x 40 cm kelas I m2 90,000.00 111,767.60 111,767.60 113,444.11 113,444.11 114,561.79 116,238.30 122,944.36 116,238.30 122,944.36 118,473.66
6 Keramik 10 x 20 cm kelas II m2 - - - - - - - - - - -
7 Keramik 20 x 20 cm kelas II m2 - - - - - - - - - -
8 Keramik 20 x 30 cm kelas II m2 - - - - - - - - - - -
9 Keramik 30 x 30 cm kelas II m2 - - - - - - - - - - -
10 Keramik 40 x 40 cm kelas II m2 - - - - - - - - - -
- - - - - - - - -
PICASSO - - - - - - - - -
1 Ikad Keramik KW 1 20 x 20 cm m2 - - - - - - - - - -
2 Ikad Keramik KW 1 20 x 25 cm m2 - - - - - - - - - -
3 Ikad Keramik KW 1 30 x 30 cm m2 - - - - - - - - - -
4 Ikad Keramik KW 1 40 x 40 cm m2 - - - - - - - - - -
- - - - - - - - -
SANITAIR - - - - - - - - -
1 Bak mandi fibre glass 70x70x66 cm biasa bh 345,000.00 477,894.20 477,894.20 485,062.61 485,062.61 489,841.56 497,009.97 525,683.62 497,009.97 525,683.62 506,567.85
2 Bak mandi fibre glass 70x70x66 cm sudut bh 480,000.00 633,516.80 633,516.80 643,019.55 643,019.55 649,354.72 658,857.47 696,868.48 658,857.47 696,868.48 671,527.81
3 Bak mandi keramik 50x50 bh - - - - - - - - - -
4 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh - - - - - - - - - -
5 Floor drain plastik bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
6 Floor drain stainless bh 75,000.00 87,960.60 87,960.60 89,280.01 89,280.01 90,159.62 91,479.02 96,756.66 91,479.02 96,756.66 93,238.24
7 Floor drain plastik onda bh 39,000.00 46,461.24 46,461.24 47,158.16 47,158.16 47,622.77 48,319.69 51,107.36 48,319.69 51,107.36 49,248.91
8 Kloset duduk DATA komplit bh - - - - - - - - - -
9 Kloset duduk INA Komplit bh 2,800,000.00 3,307,920.00 3,307,920.00 3,357,538.80 3,357,538.80 3,390,618.00 3,440,236.80 3,638,712.00 3,440,236.80 3,638,712.00 3,506,395.20
10 Kloset duduk INA standard bh 1,200,000.00 1,463,504.00 1,463,504.00 1,485,456.56 1,485,456.56 1,500,091.60 1,522,044.16 1,609,854.40 1,522,044.16 1,609,854.40 1,551,314.24
11 Kloset duduk Amerika Standar bh 2,850,000.00 3,365,558.00 3,365,558.00 3,416,041.37 3,416,041.37 3,449,696.95 3,500,180.32 3,702,113.80 3,500,180.32 3,702,113.80 3,567,491.48
12 Kloset duduk " TOTO Type CW 421J WITH ECO WASHER bh 4,000,000.00 4,691,232.00 4,691,232.00 4,761,600.48 4,761,600.48 4,808,512.80 4,878,881.28 5,160,355.20 4,878,881.28 5,160,355.20 4,972,705.92
16 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh - - - - - - - - - -
18 Kloset duduk LOLO warna COMPLIT bh 450,000.00 598,934.00 598,934.00 607,918.01 607,918.01 613,907.35 622,891.36 658,827.40 622,891.36 658,827.40 634,870.04
17 Kloset jongkok " TOTO Type CE 9 Complete Push valve FSD bh 3,588,000.00 4,216,294.88 4,216,294.88 4,279,539.30 4,279,539.30 4,321,702.25 4,384,946.68 4,637,924.37 4,384,946.68 4,637,924.37 4,469,272.57
18 Kloset jongkok " TOTO bh - - - - - - - - - -
19 Kloset porselin jongkok Kia (standar) bh - - - - - - - - - -
20 Kloset porselin jongkok VITO (standar) bh 230,000.00 345,326.80 345,326.80 350,506.70 350,506.70 353,959.97 359,139.87 379,859.48 359,139.87 379,859.48 366,046.41
21 Kloset porselin jongkok Ina (standar) bh 345,000.00 477,894.20 477,894.20 485,062.61 485,062.61 489,841.56 497,009.97 525,683.62 497,009.97 525,683.62 506,567.85
22 Kloset porselin jongkok America (standar) bh -
23 Kloset porselin jongkok DUTY bh 270,000.00 391,437.20 391,437.20 397,308.76 397,308.76 401,223.13 407,094.69 430,580.92 407,094.69 430,580.92 414,923.43
24 Kloset porselin jongkok DATA bh - - - - - - - - - - -
25 Kloset porselin jongkok ROSI bh - -
26 Kloset porselin jongkok CHELSEA bh 240,000.00 356,854.40 356,854.40 362,207.22 362,207.22 365,775.76 371,128.58 392,539.84 371,128.58 392,539.84 401,223.13
27 Kran air 3/4 biasa dari besi bh 70,000.00 82,196.80 82,196.80 83,429.75 83,429.75 84,251.72 85,484.67 90,416.48 85,484.67 90,416.48 87,128.61
28 Kran air 3/4 biasa dari plastik bh 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21

Harga Satauan Bahan dan Upah Hal. 54


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
29 Kran air 1/2 biasa dari besi bh 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
30 Kran SunEi bh - - - - - - - - - -
31 Kran TOTO T 205 LCSC bh - - - - - - - - - -
32 Kran TOTO T 205 MC bh - - - - - - - - - -
33 Kran TOTO T 23 B13 bh - - - - - - - - - - -
34 Kran TOTO T 23 B13V7N bh - - - - - - - - - - -
35 Kran TOTO T 26 - 13 bh - - - - - - - - - - -
36 Kran TOTO TX 109 LH bh - - - - - - - - - - -
37 Kran washtafel bh 185,000.00 214,764.20 214,764.20 217,985.66 217,985.66 220,133.31 223,354.77 236,240.62 223,354.77 236,240.62 227,650.05
38 Kran cuci piring bh 175,000.00 203,236.60 203,236.60 206,285.15 206,285.15 208,317.52 211,366.06 223,560.26 211,366.06 223,560.26 215,430.80
39 Penyekat Urinoir " TOTO " Type A 100 " bh - - - - - - - - - -
40 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 295,000.00 341,567.80 341,567.80 346,691.32 346,691.32 350,107.00 355,230.51 375,724.58 355,230.51 375,724.58 362,061.87
41 Shower Spray biasa bh 200,000.00 232,055.60 232,055.60 235,536.43 235,536.43 237,856.99 241,337.82 255,261.16 241,337.82 255,261.16 245,978.94
42 Shower Spray TOTO 12 bh - - - - - - - - - - -
43 Shower Spray TOTO bh - - - - - - - - - -
44 Soap holder " TOTO " Type S 6 N " bh - - - - - - - - - -
45 Seal tape Besar bh 15,000.00 18,795.00 18,795.00 19,076.93 19,076.93 19,264.88 19,546.80 20,674.50 19,546.80 20,674.50 19,922.70
46 Seal tape kecil bh 6,000.00 8,420.16 8,420.16 8,546.46 8,546.46 8,630.66 8,756.97 9,262.18 8,756.97 9,262.18 8,925.37
47 Urinoir " TOTO U 57 original bh 2,783,772.00 3,289,213.01 3,289,213.01 3,338,551.21 3,338,551.21 3,371,443.34 3,420,781.53 3,618,134.31 3,420,781.53 3,618,134.31 3,486,565.79
48 Urinoir " TOTO U 104 bh 3,462,500.00 4,071,623.50 4,071,623.50 4,132,697.85 4,132,697.85 4,173,414.09 4,234,488.44 4,478,785.85 4,234,488.44 4,478,785.85 4,315,920.91
49 Wastagel KIA Standard bh 725,000.00 915,943.00 915,943.00 929,682.15 929,682.15 938,841.58 952,580.72 1,007,537.30 952,580.72 1,007,537.30 970,899.58
50 Wastagel INA bh 900,000.00 1,117,676.00 1,117,676.00 1,134,441.14 1,134,441.14 1,145,617.90 1,162,383.04 1,229,443.60 1,162,383.04 1,229,443.60 1,184,736.56
51 Wastafel Komplit LW240CJ body only bh - - - - - - - - - -
52 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh - - - - - - - - - -
53 Washtafel LOLO bh - - - - - - - - - -
54 Wastafel KIA Standar 2 (Lubang) bh - - - - - - - - - -
55 Washtafel cuci tangan kecil (Standard) bh 650,000.00 784,378.00 784,378.00 796,143.67 796,143.67 803,987.45 815,753.12 862,815.80 815,753.12 862,815.80 831,440.68
56 Washtafel cuci tangan besar (Standard) bh 900,000.00 1,072,568.00 1,072,568.00 1,088,656.52 1,088,656.52 1,099,382.20 1,115,470.72 1,179,824.80 1,115,470.72 1,179,824.80 1,136,922.08
57 Washtafel cuci piring 2 lubang bh 750,000.00 899,654.00 899,654.00 913,148.81 913,148.81 922,145.35 935,640.16 989,619.40 935,640.16 989,619.40 953,633.24
58 Washtafel cuci piring 1 lubang bh 450,000.00 553,826.00 553,826.00 562,133.39 562,133.39 567,671.65 575,979.04 609,208.60 575,979.04 609,208.60 587,055.56
59 Bak cuci piring single besar bh 325,000.00 409,731.00 409,731.00 415,876.97 415,876.97 419,974.28 426,120.24 450,704.10 426,120.24 450,704.10 434,314.86
60 Bak cuci piring double besar bh 600,000.00 726,740.00 726,740.00 737,641.10 737,641.10 744,908.50 755,809.60 799,414.00 755,809.60 799,414.00 770,344.40
61 Bak cuci piring single kecil bh 300,000.00 380,912.00 380,912.00 386,625.68 386,625.68 390,434.80 396,148.48 419,003.20 396,148.48 419,003.20 403,766.72
- - - - - - - - -
PAKU - - - - - - - - -
1 Paku 3 kg 43,000.00 51,072.28 51,072.28 51,838.36 51,838.36 52,349.09 53,115.17 56,179.51 53,115.17 56,179.51 54,136.62
2 Paku 4 kg 43,000.00 51,072.28 51,072.28 51,838.36 51,838.36 52,349.09 53,115.17 56,179.51 53,115.17 56,179.51 54,136.62
3 Paku 5 biasa kg 32,000.00 38,391.92 38,391.92 38,967.80 38,967.80 39,351.72 39,927.60 42,231.11 39,927.60 42,231.11 40,695.44
4 Paku 5 putih kg 40,000.00 47,614.00 47,614.00 48,328.21 48,328.21 48,804.35 49,518.56 52,375.40 49,518.56 52,375.40 50,470.84
5 Paku 7 biasa kg 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
6 Paku 7 putih kg 37,000.00 44,155.72 44,155.72 44,818.06 44,818.06 45,259.61 45,921.95 48,571.29 45,921.95 48,571.29 46,805.06
7 Paku 8 putih kg 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
8 Paku 9 putih kg 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
9 Paku 10 biasa kg 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
10 Paku 10 putih kg 37,000.00 44,155.72 44,155.72 44,818.06 44,818.06 45,259.61 45,921.95 48,571.29 45,921.95 48,571.29 46,805.06
11 Paku 12 biasa kg 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
12 Paku 12 putih kg 37,000.00 44,155.72 44,155.72 44,818.06 44,818.06 45,259.61 45,921.95 48,571.29 45,921.95 48,571.29 46,805.06
13 Paku 14 biasa kg - - - - - - - - - - -
14 Paku 15 biasa kg 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
15 Paku 15 putih kg 40,000.00 47,614.00 47,614.00 48,328.21 48,328.21 48,804.35 49,518.56 52,375.40 49,518.56 52,375.40 50,470.84
16 Paku kalsiboard kg 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
17 Paku list SQ kg - - - - - - - - -
18 Paku Atap Asbes /ulir 7 cm / 3 inch kg 43,800.00 51,994.49 51,994.49 52,774.41 52,774.41 53,294.35 54,074.27 57,193.94 54,074.27 57,193.94 55,114.16
19 Paku reng/usuk SQ kg - - - - - - - - -
20 Paku seng 1Kg kg 48,000.00 56,836.08 56,836.08 57,688.62 57,688.62 58,256.98 59,109.52 62,519.69 59,109.52 62,519.69 60,246.24
21 Paku seng import bj - - - - - - - - - -
22 Paku skrup 1/2" kg 12,000.00 15,336.72 15,336.72 15,566.77 15,566.77 15,720.14 15,950.19 16,870.39 15,950.19 16,870.39 16,256.92
23 Paku skrup 2" bh 5,000.00 7,267.40 7,267.40 7,376.41 7,376.41 7,449.09 7,558.10 7,994.14 7,558.10 7,994.14 7,703.44
24 Paku skrup 7 cm kg - - - - - - - - - -
25 Paku skrup 1" kg 20,000.00 24,558.80 24,558.80 24,927.18 24,927.18 25,172.77 25,541.15 27,014.68 25,541.15 27,014.68 26,032.33
26 Paku beton kg 75,000.00 87,960.60 87,960.60 89,280.01 89,280.01 90,159.62 91,479.02 96,756.66 91,479.02 96,756.66 93,238.24
27 Paku tripleks kg 43,000.00 51,072.28- 51,072.28 51,838.36
- 51,838.36
- 52,349.09
- 53,115.17
- 56,179.51
- 53,115.17
- 56,179.51
- 54,136.62
-
PASIR, BATU, KERIKIL, BATA DAN PARAS - - - - - - - - -
1 Bata gosok ex Tobacco bj - - - - - - - - - - -
2 Bata Merah 5 x 11 x 22 cm bj - - - - - - - - - - -
3 Bata Ringan/ Bataco 7 x 20 x 60 bj 14,000.00 22,608.68 22,608.68 22,947.81 22,947.81 23,173.89 23,513.02 24,869.54 23,513.02 24,869.54 23,965.20
4 Bata Ringan/ Bataco 8 x 20 x 60 bj - - - - - - - - - -
5 Bata Ringan/ Bataco 10 x 20 x 60 bj 19,000.00 28,372.48 28,372.48 28,798.06 28,798.06 29,081.79 29,507.38 31,209.72 29,507.38 31,209.72 30,074.82
6 Batu tela bj 15,000.00 22,052.80 22,052.80 22,383.59 22,383.59 22,604.12 22,934.91 24,258.08 22,934.91 24,258.08 23,375.97

Harga Satauan Bahan dan Upah Hal. 55


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
7 Batu gunung/ belah m3 300,000.00 496,188.00 496,188.00 503,630.82 503,630.82 508,592.70 516,035.52 545,806.80 516,035.52 545,806.80 525,959.28
8 Batu karang m3 - - - - - - - - - - -
9 Batu lahar Singaraja m3 - - - - - - - - - - -
10 Batu Pecah 2-3 m3 900,000.00 1,187,844.00 1,187,844.00 1,205,661.66 1,205,661.66 1,217,540.10 1,235,357.76 1,306,628.40 1,235,357.76 1,306,628.40 1,259,114.64
11 Batu Pecah 0.5-1/ciping m3 950,000.00 1,245,482.00 1,245,482.00 1,264,164.23 1,264,164.23 1,276,619.05 1,295,301.28 1,370,030.20 1,295,301.28 1,370,030.20 1,320,210.92
12 Batu Pecah 10-19 m3 950,000.00 1,245,482.00 1,245,482.00 1,264,164.23 1,264,164.23 1,276,619.05 1,295,301.28 1,370,030.20 1,295,301.28 1,370,030.20 1,320,210.92
13 Batu pipih Singaraja m3 - - - - - - - - -
14 Glass block 20cmx20cm m2 390,000.00 452,583.60 452,583.60 459,372.35 459,372.35 463,898.19 470,686.94 497,841.96 470,686.94 497,841.96 479,738.62
15 Glass block 30cmx30cm m2 - - - - - - - - - -
16 Roster Keramik 30cmx30cm bh 90,000.00 106,755.60 106,755.60 108,356.93 108,356.93 109,424.49 111,025.82 117,431.16 111,025.82 117,431.16 113,160.94
18 Limestone m3 - - - - - - - - - -
19 Paras Batik bh - - - - - - - - - -
20 Paras Buahan bh - - - - - - - - - -
21 Paras Karang Bukit bh - - - - - - - - - - -
22 Paras Kerobokan Tebal 5 bh - - - - - - - - - - -
23 Paras Malem bh - - - - - - - - - - -
24 Paras Putih Bukit bh - - - - - - - - - - -
25 Paras Silakarang tebal bh - - - - - - - - - - -
26 Paras Silakarang tipis bh - - - - - - - - - - -
27 Paras untuk pondasi bh - - - - - - - - - - -
28 Pasir halus m3 700,000.00 957,292.00 957,292.00 971,651.38 971,651.38 981,224.30 995,583.68 1,053,021.20 995,583.68 1,053,021.20 1,014,729.52
29 Pasir kasar m3 650,000.00 899,654.00 899,654.00 913,148.81 913,148.81 922,145.35 935,640.16 989,619.40 935,640.16 989,619.40 953,633.24
30 Pasir Lokal m3 - - - - - - - - - -
31 Sirtu m3 175,000.00 352,093.00 352,093.00 357,374.40 357,374.40 360,895.33 366,176.72 387,302.30 366,176.72 387,302.30 373,218.58
32 Tanah urug m3 150,000.00 283,178.00 283,178.00 287,425.67 287,425.67 290,257.45 294,505.12 311,495.80 294,505.12 311,495.80 300,168.68
33 Filler/abu batu m3 1,085,000.00 1,601,584.60 1,601,584.60 1,625,608.37 1,625,608.37 1,641,624.22 1,665,647.98 1,761,743.06 1,665,647.98 1,761,743.06 1,697,679.68
34 Aspal drum 3,500,000.00 4,120,866.40 4,120,866.40 4,182,679.40 4,182,679.40 4,223,888.06 4,285,701.06 4,532,953.04 4,285,701.06 4,532,953.04 4,368,118.38
- - - - - - - - -
PIPA - - - - - - - - -
1 Pipa Galvanis 1/2" Medium A (tebal) m1 43,000.00 50,738.15 50,738.15 51,499.22 51,499.22 52,006.60 52,767.67 55,811.96 52,767.67 55,811.96 53,782.44
2 Pipa Galvanis 1/2" Medium B (tipis) m1 35,000.00 41,516.07 41,516.07 42,138.81 42,138.81 42,553.97 43,176.71 45,667.67 43,176.71 45,667.67 44,007.03
3 Pipa Galvanis 1/2' medium B (sedang) m1 23,333.33 28,067.20 28,067.20 28,488.21 28,488.21 28,768.88 29,189.89 30,873.92 29,189.89 30,873.92 29,751.23
4 Pipa Galvanis 3/4" Medium A (tebal) m1 55,833.33 65,531.90 65,531.90 66,514.88 66,514.88 67,170.20 68,153.18 72,085.09 68,153.18 72,085.09 69,463.81
5 Pipa Galvanis 3/4" Medium A sedang m1 42,500.00 50,161.77 50,161.77 50,914.19 50,914.19 51,415.81 52,168.24 55,177.94 52,168.24 55,177.94 53,171.47
6 Pipa Galvanis 3/4" Medium B m1 47,500.00 55,925.57 55,925.57 56,764.45 56,764.45 57,323.71 58,162.59 61,518.12 58,162.59 61,518.12 59,281.10
7 Pipa Galvanis 1 1/4" m1 97,500.00 113,563.57 113,563.57 115,267.02 115,267.02 116,402.66 118,106.11 124,919.92 118,106.11 124,919.92 120,377.38
8 Pipa Galvanis 1 1/2" m1 114,166.67 132,776.23 132,776.23 134,767.88 134,767.88 136,095.64 138,087.28 146,053.86 138,087.28 146,053.86 140,742.81
9 Pipa Galvanis 1 1/2 " M.B m1 585,000.00 675,534.07 675,534.07 685,667.08 685,667.08 692,422.42 702,555.43 743,087.47 702,555.43 743,087.47 716,066.11
10 Pipa Galvanis 1" m1 54,166.67 63,610.63 63,610.63 64,564.79 64,564.79 65,200.90 66,155.06 69,971.70 66,155.06 69,971.70 67,427.27
11 Pipa Galvanis 1" MA m1 80,000.00 93,390.27 93,390.27 94,791.12 94,791.12 95,725.02 97,125.88 102,729.29 97,125.88 102,729.29 98,993.68
12 Pipa Galvanis 1" MB m1 64,166.67 75,138.23 75,138.23 76,265.31 76,265.31 77,016.69 78,143.76 82,652.06 78,143.76 82,652.06 79,646.53
13 Pipa Galvanis 1,5 BSA m1 - - - - - - - - - -
14 Pipa Galvanis 2" m1 104,166.67 121,248.63 121,248.63 123,067.36 123,067.36 124,279.85 126,098.58 133,373.50 126,098.58 133,373.50 128,523.55
15 Pipa Galvanis 2" MA m1 154,166.67 178,886.63 178,886.63 181,569.93 181,569.93 183,358.80 186,042.10 196,775.30 186,042.10 196,775.30 189,619.83
16 Pipa Galvanis 2" MB m1 124,500.00 144,688.09 144,688.09 146,858.41 146,858.41 148,305.29 150,475.61 159,156.90 150,475.61 159,156.90 153,369.37
17 Pipa Galvanis 3" m1 191,666.67 222,115.13 222,115.13 225,446.86 225,446.86 227,668.01 230,999.74 244,326.65 230,999.74 244,326.65 235,442.04
18 Pipa Galvanis 3" MA m1 249,166.67 288,398.83 288,398.83 292,724.82 292,724.82 295,608.80 299,934.79 317,238.72 299,934.79 317,238.72 305,702.76
19 Pipa Galvanis 3" MB m1 214,166.67 248,052.23 248,052.23 251,773.02 251,773.02 254,253.54 257,974.32 272,857.46 257,974.32 272,857.46 262,935.37
20 Pipa Maspion AW 1 m1 20,000.00 24,809.40 24,809.40 25,181.54 25,181.54 25,429.64 25,801.78 27,290.34 25,801.78 27,290.34 26,297.96
21 Pipa Winlon AW 1 m1 20,000.00 24,809.40 24,809.40 25,181.54 25,181.54 25,429.64 25,801.78 27,290.34 25,801.78 27,290.34 26,297.96
22 Pipa Maspion AW 1/2 m1 10,000.00 13,281.80 13,281.80 13,481.03 13,481.03 13,613.85 13,813.07 14,609.98 13,813.07 14,609.98 14,078.71
23 Pipa Winlon AW 1/2 m1 11,250.00 14,722.75 14,722.75 14,943.59 14,943.59 15,090.82 15,311.66 16,195.03 15,311.66 16,195.03 15,606.12
24 Pipa Maspion AW 10 m1 - - - - - - - - - -
25 Pipa Maspion AW 1-1/2 m1 25,000.00 30,573.20 30,573.20 31,031.80 31,031.80 31,337.53 31,796.13 33,630.52 31,796.13 33,630.52 32,407.59
26 Pipa Winlon AW 1-1/2 m1 25,000.00 30,573.20 30,573.20 31,031.80 31,031.80 31,337.53 31,796.13 33,630.52 31,796.13 33,630.52 32,407.59
27 Pipa Maspion D 1-1/2 m1 22,500.00 27,691.30 27,691.30 28,106.67 28,106.67 28,383.58 28,798.95 30,460.43 28,798.95 30,460.43 29,352.78
28 Pipa Winlon D 1-1/2 m1 22,500.00 27,691.30 27,691.30 28,106.67 28,106.67 28,383.58 28,798.95 30,460.43 28,798.95 30,460.43 29,352.78
29 Pipa Maspion AW 1-1/4 m1 23,750.00 29,132.25 29,132.25 29,569.23 29,569.23 29,860.56 30,297.54 32,045.48 30,297.54 32,045.48 30,880.19
30 Pipa Winlon AW 1-1/4 m1 23,750.00 29,132.25 29,132.25 29,569.23 29,569.23 29,860.56 30,297.54 32,045.48 30,297.54 32,045.48 30,880.19
31 Pipa Maspion AW 12 m1 - - - - - - - - - -
32 Pipa Maspion AW 14 m1 - - - - - - - - - - -
33 Pipa Maspion AW 16 m1 - - - - - - - - - - -
34 Pipa Maspion AW 2 m1 37,000.00 44,406.32 44,406.32 45,072.41 45,072.41 45,516.48 46,182.57 48,846.95 46,182.57 48,846.95 47,070.70
35 Pipa Winlon AW 2 m1 32,500.00 39,218.90 39,218.90 39,807.18 39,807.18 40,199.37 40,787.66 43,140.79 40,787.66 43,140.79 41,572.03
36 Pipa Maspion D 2 m1 26,250.00 32,014.15 32,014.15 32,494.36 32,494.36 32,814.50 33,294.72 35,215.57 33,294.72 35,215.57 33,935.00
37 Pipa Winlon D 2 m1 26,250.00 32,014.15 32,014.15 32,494.36 32,494.36 32,814.50 33,294.72 35,215.57 33,294.72 35,215.57 33,935.00
38 Pipa Maspion AW 2-1/2 m1 43,750.00 52,187.45 52,187.45 52,970.26 52,970.26 53,492.14 54,274.95 57,406.20 54,274.95 57,406.20 55,318.70
39 Pipa Maspion D 2-1/2 m1 31,250.00 37,777.95 37,777.95 38,344.62 38,344.62 38,722.40 39,289.07 41,555.75 39,289.07 41,555.75 40,044.63
40 Pipa Winlon D 2-1/2 m1 31,250.00 37,777.95 37,777.95 38,344.62 38,344.62 38,722.40 39,289.07 41,555.75 39,289.07 41,555.75 40,044.63
41 Pipa Maspion AW 3 m1 56,250.00 66,596.95 66,596.95 67,595.90 67,595.90 68,261.87 69,260.83 73,256.65 69,260.83 73,256.65 70,592.77

Harga Satauan Bahan dan Upah Hal. 56


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR
TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
42 Pipa Winlon AW 3 m1 56,250.00 66,596.95 66,596.95 67,595.90 67,595.90 68,261.87 69,260.83 73,256.65 69,260.83 73,256.65 70,592.77
43 Pipa Maspion AW 3/4 m1 18,750.00 23,368.45 23,368.45 23,718.98 23,718.98 23,952.66 24,303.19 25,705.30 24,303.19 25,705.30 24,770.56
44 Pipa Winlon AW 3/4 m1 18,750.00 23,368.45 23,368.45 23,718.98 23,718.98 23,952.66 24,303.19 25,705.30 24,303.19 25,705.30 24,770.56
45 Pipa Maspion AW 4 m1 97,500.00 114,148.30 114,148.30 115,860.52 115,860.52 117,002.01 118,714.23 125,563.13 118,714.23 125,563.13 120,997.20
46 Pipa Winlon AW 4 m1 97,500.00 114,148.30 114,148.30 115,860.52 115,860.52 117,002.01 118,714.23 125,563.13 118,714.23 125,563.13 120,997.20
47 Pipa Maspion D 4" m1 58,750.00 69,478.85 69,478.85 70,521.03 70,521.03 71,215.82 72,258.00 76,426.74 72,258.00 76,426.74 73,647.58
48 Pipa Winlon D 4" m1 58,750.00 69,478.85 69,478.85 70,521.03 70,521.03 71,215.82 72,258.00 76,426.74 72,258.00 76,426.74 73,647.58
49 Pipa Maspion AW 5 m1 - - - - - - - - - -
50 Pipa Maspion AW 6 m1 243,750.00 282,739.45 282,739.45 286,980.54 286,980.54 289,807.94 294,049.03 311,013.40 294,049.03 311,013.40 299,703.82
51 Pipa Maspion AW 8 m1 - - - - - - - - - -
52 Pipa Maspion C 1 m1 10,000.00 13,281.80 13,281.80 13,481.03 13,481.03 13,613.85 13,813.07 14,609.98 13,813.07 14,609.98 14,078.71
53 Pipa Maspion C 1-1/2 m1 13,750.00 17,604.65 17,604.65 17,868.72 17,868.72 18,044.77 18,308.84 19,365.12 18,308.84 19,365.12 18,660.93
54 Pipa Maspion C 1-1/4 m1 12,500.00 16,163.70 16,163.70 16,406.16 16,406.16 16,567.79 16,810.25 17,780.07 16,810.25 17,780.07 17,133.52
55 Pipa Maspion C 2 m1 15,000.00 19,045.60 19,045.60 19,331.28 19,331.28 19,521.74 19,807.42 20,950.16 19,807.42 20,950.16 20,188.34
56 Pipa Maspion C 2-1/2 m1 20,000.00 24,809.40 24,809.40 25,181.54 25,181.54 25,429.64 25,801.78 27,290.34 25,801.78 27,290.34 26,297.96
57 Pipa Maspion C 3 m1 28,750.00 34,896.05 34,896.05 35,419.49 35,419.49 35,768.45 36,291.89 38,385.66 36,291.89 38,385.66 36,989.81
58 Pipa Maspion C 3/4 m1 8,750.00 11,840.85 11,840.85 12,018.46 12,018.46 12,136.87 12,314.48 13,024.94 12,314.48 13,024.94 12,551.30
59 Pipa Maspion C 4 m1 28,750.00 34,896.05 34,896.05 35,419.49 35,419.49 35,768.45 36,291.89 38,385.66 36,291.89 38,385.66 36,989.81
60 Pipa Maspion C 5/8 m1 3,750.00 6,077.05 6,077.05 6,168.21 6,168.21 6,228.98 6,320.13 6,684.76 6,320.13 6,684.76 6,441.67
61 Pipa Maspion D 10 m1 - - - - - - - - - -
62 Pipa Maspion D 1-1/2 m1 22,500.00 27,691.30 27,691.30 28,106.67 28,106.67 28,383.58 28,798.95 30,460.43 28,798.95 30,460.43 29,352.78
63 Pipa Winlon D 1-1/2 m1 22,500.00 27,691.30 27,691.30 28,106.67 28,106.67 28,383.58 28,798.95 30,460.43 28,798.95 30,460.43 29,352.78
64 Pipa Winlon D 1-1/4 m1 21,250.00 26,250.35 26,250.35 26,644.11 26,644.11 26,906.61 27,300.36 28,875.39 27,300.36 28,875.39 27,825.37
65 Pipa Maspion D 1-1/4 m1 21,250.00 26,250.35 26,250.35 26,644.11 26,644.11 26,906.61 27,300.36 28,875.39 27,300.36 28,875.39 27,825.37
66 Pipa Maspion D 12 m1 - - -
67 Pipa Maspion D 14 m1 - - - - - - - - - - -
68 Pipa Maspion D 16 m1 - - - - - - - - - - -
69 Pipa Maspion D 2 m1 26,250.00 32,014.15 32,014.15 32,494.36 32,494.36 32,814.50 33,294.72 35,215.57 33,294.72 35,215.57 33,935.00
70 Pipa Maspion D 2-1/2 m1 31,250.00 37,777.95 37,777.95 38,344.62 38,344.62 38,722.40 39,289.07 41,555.75 39,289.07 41,555.75 40,044.63
71 Pipa Maspion D 3 m1 35,000.00 42,100.80 42,100.80 42,732.31 42,732.31 43,153.32 43,784.83 46,310.88 43,784.83 46,310.88 44,626.85
72 Pipa Maspion D 4 m1 58,750.00 69,478.85 69,478.85 70,521.03 70,521.03 71,215.82 72,258.00 76,426.74 72,258.00 76,426.74 73,647.58
73 Pipa Maspion D 5 m1 - - - - - - - - - - -
74 Pipa Maspion D 6 m1 - - - - - - - - - - -
75 Pipa Maspion D 8 m1 - - - - - - - - - - -
76 Elbo 1/2" PVC bh 10,000.00 13,031.20 13,031.20 13,226.67 13,226.67 13,356.98 13,552.45 14,334.32 13,552.45 14,334.32 13,813.07
77 Elbo 3/4" PVC bh 14,000.00 17,642.24 17,642.24 17,906.87 17,906.87 18,083.30 18,347.93 19,406.46 18,347.93 19,406.46 18,700.77
78 Elbo PVC 4" bh 83,000.00 97,182.68 97,182.68 98,640.42 98,640.42 99,612.25 101,069.99 106,900.95 101,069.99 106,900.95 103,013.64
79 Elbo PVC 3" bh 40,000.00 47,614.00 47,614.00 48,328.21 48,328.21 48,804.35 49,518.56 52,375.40 49,518.56 52,375.40 50,470.84
80 Elbo PVC 2,5" bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
81 Selang hipres 1" m1 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
82 Selang hipres 2" m1 75,000.00 87,960.60 87,960.60 89,280.01 89,280.01 90,159.62 91,479.02 96,756.66 91,479.02 96,756.66 93,238.24
83 Selang hipres 1,5" m1 42,000.00 49,919.52 49,919.52 50,668.31 50,668.31 51,167.51 51,916.30 54,911.47 51,916.30 54,911.47 52,914.69
84 Selang hipres 0,5" m1 10,000.00 13,031.20 13,031.20 13,226.67 13,226.67 13,356.98 13,552.45 14,334.32 13,552.45 14,334.32 13,813.07
85 Selang spiral 2" m1 100,000.00 116,779.60 116,779.60 118,531.29 118,531.29 119,699.09 121,450.78 128,457.56 121,450.78 128,457.56 123,786.38
- - - - - - - - -
SEMEN - - - - - - - - -
1 Semen Gresik 40 kg kg - - - - - - - - -
2 Semen Tiga Roga 40 kg kg - - - - - - - - - -
3 Semen Tonasa 40 kg kg 1,900.00 3,543.48 3,543.48 3,596.64 3,596.64 3,632.07 3,685.22 3,897.83 3,685.22 3,897.83 3,756.09
4 Semen Bosowa 40 kg kg - - - - - - - - - - -
5 Semen Conch 40 kg Kg 1,875.00 3,514.67 3,514.67 3,567.38 3,567.38 3,602.53 3,655.25 3,866.13 3,655.25 3,866.13 3,725.54
6 Semen warna/semen grouting kg 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
7 Semen putih kg 15,000.00 18,795.00 18,795.00 19,076.93 19,076.93 19,264.88 19,546.80 20,674.50 19,546.80 20,674.50 19,922.70
- - - - - - - - -
BESI BETON DAN PAGAR - - - - - - - - -
1 Besi beton kg 13,774.19 16,657.98 16,657.98 16,907.85 16,907.85 17,074.43 17,324.30 18,323.78 17,324.30 18,323.78 17,657.46
2 Besi beton Kg - - - - - - - -
3 Besi Beton Ulir - - - - - - - - -
Besi Beton Ulir 16 mm btg 285,000.00 - - - - - - - - -
Besi Beton Ulir 12 mm btg 165,000.00 - - - - - - - - -
Besi Beton Ulir 10 mm btg 95,000.00 - - - - - - - - -
4 Besi Beton - - - - - - - - -
Diameter 5.5 mm btg 32,000.00 - - - - - - - - -
Diameter 6 mm btg 60,000.00 - - - - - - - - -
Diameter 8 mm btg 80,000.00 - - - - - - - - -
Diameter 9 mm btg - - - - - - - - - -
Diameter 10 mm btg 120,000.00 - - - - - - - - -
Diameter 12 mm btg 160,000.00 - - - - - - - - -
Diameter 16 mm btg 251,000.00 - - - - - - - - -
5 Besi Siku 4x4 btg 297,000.00 345,376.92 345,376.92 350,557.57 350,557.57 354,011.34 359,192.00 379,914.61 359,192.00 379,914.61 366,099.54
6 Besi Siku 5 X 5 btg 465,000.00 539,040.60 539,040.60 547,126.21 547,126.21 552,516.62 560,602.22 592,944.66 560,602.22 592,944.66 571,383.04

Harga Satauan Bahan dan Upah Hal. 57


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR
TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
7 Besi Siku Lubang btg 110,000.00 129,810.80 129,810.80 131,757.96 131,757.96 133,056.07 135,003.23 142,791.88 135,003.23 142,791.88 137,599.45
8 Besi UN 60 btg 415,000.00 481,402.60 481,402.60 488,623.64 488,623.64 493,437.67 500,658.70 529,542.86 500,658.70 529,542.86 510,286.76
9 Besi UN 80 btg 575,000.00 665,844.20 665,844.20 675,831.86 675,831.86 682,490.31 692,477.97 732,428.62 692,477.97 732,428.62 705,794.85
10 Besi Holous 20 x 40 btg 170,000.00 198,976.40 198,976.40 201,961.05 201,961.05 203,950.81 206,935.46 218,874.04 206,935.46 218,874.04 210,914.98
11 Besi Holous 40 x 40 btg 245,000.00 285,433.40 285,433.40 289,714.90 289,714.90 292,569.24 296,850.74 313,976.74 296,850.74 313,976.74 302,559.40
12 Kawat Bronjong ukuran 2 mm kg 100,000.00 118,283.20 118,283.20 120,057.45 120,057.45 121,240.28 123,014.53 130,111.52 123,014.53 130,111.52 125,380.19
13 Kawat Bronjong ukuran 2,7 mm / 2x1x0.5 m kg 30,133.33 37,743.70 37,743.70 38,309.86 38,309.86 38,687.29 39,253.45 41,518.07 39,253.45 41,518.07 40,008.32
14 Kawat Bronjong ukuran 3 mm / 2x1x1 m kg 39,050.00 48,022.48 48,022.48 48,742.82 48,742.82 49,223.04 49,943.38 52,824.73 49,943.38 52,824.73 50,903.83
15 Kawat Bronjong ukuran 3,4 mm kg - - - - - - - - - -
16 Kawat Bronjong ukuran 4 mm m 5,000.00 8,771.00 8,771.00 8,902.57 8,902.57 8,990.28 9,121.84 9,648.10 9,121.84 9,648.10 9,297.26
17 Kawat berduri roll 425,000.00 506,963.80 506,963.80 514,568.26 514,568.26 519,637.90 527,242.35 557,660.18 527,242.35 557,660.18 537,381.63
18 Kawat beton RRT 1 Kg kg 25,000.00 31,826.20 31,826.20 32,303.59 32,303.59 32,621.86 33,099.25 35,008.82 33,099.25 35,008.82 33,735.77
19 Kawat ram m' 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
20 Kawat nyamuk m' 46,000.00 54,530.56 54,530.56 55,348.52 55,348.52 55,893.82 56,711.78 59,983.62 56,711.78 59,983.62 57,802.39
21 Kawat ayakan m' 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
22 Kawat Las RB Dos 190,000.00 222,031.60 222,031.60 225,362.07 225,362.07 227,582.39 230,912.86 244,234.76 230,912.86 244,234.76 235,353.50
23 Kawat Las 1kg kg 80,000.00 95,228.00 95,228.00 96,656.42 96,656.42 97,608.70 99,037.12 104,750.80 99,037.12 104,750.80 100,941.68
24 Kawat Ikat kg 30,000.00 37,590.00 37,590.00 38,153.85 38,153.85 38,529.75 39,093.60 41,349.00 39,093.60 41,349.00 39,845.40
25 Kawat Harmonika besar mtr 125,000.00 147,102.20 147,102.20 149,308.73 149,308.73 150,779.76 152,986.29 161,812.42 152,986.29 161,812.42 155,928.33
26 Kawat Harmonika sedang mtr 80,000.00 95,228.00 95,228.00 96,656.42 96,656.42 97,608.70 99,037.12 104,750.80 99,037.12 104,750.80 100,941.68
26 Pagar BRC FP60 T6.0 (ELEKTROPLATING GALVANIS ) Panil 347,848.00 426,880.59 426,880.59 433,283.80 433,283.80 437,552.61 443,955.82 469,568.65 443,955.82 469,568.65 452,493.43
27 Pagar BRC FP60 T7.0 Panil 408,677.00 497,001.83 497,001.83 504,456.86 504,456.86 509,426.88 516,881.91 546,702.02 516,881.91 546,702.02 526,821.94
28 Pagar BRC FP90 T6.0 Panil 415,275.00 504,607.74 504,607.74 512,176.86 512,176.86 517,222.94 524,792.05 555,068.52 524,792.05 555,068.52 534,884.21
29 Pagar BRC FP90 T6.7 Panil 637,800.00 761,125.66 761,125.66 772,542.55 772,542.55 780,153.80 791,570.69 837,238.23 791,570.69 837,238.23 806,793.20
30 Pagar BRC FP90 T8.0 Panil 557,133.00 668,135.97 668,135.97 678,158.01 678,158.01 684,839.37 694,861.41 734,949.57 694,861.41 734,949.57 708,224.13
31 Pagar BRC FP120 T6.0 Panil 513,180.00 617,468.71 617,468.71 626,730.74 626,730.74 632,905.43 642,167.46 679,215.58 642,167.46 679,215.58 654,516.83
32 Pagar BRC FP120 T7.0 Panil 594,807.00 711,565.05 711,565.05 722,238.53 722,238.53 729,354.18 740,027.65 782,721.56 740,027.65 782,721.56 754,258.95
33 Pagar BRC FP120 T8.0 Panil 688,956.00 820,096.25 820,096.25 832,397.70 832,397.70 840,598.66 852,900.10 902,105.88 852,900.10 902,105.88 869,302.03
34 Pagar BRC FP 150 T6.0 Panil 612,352.00 731,790.22 731,790.22 742,767.08 742,767.08 750,084.98 761,061.83 804,969.25 761,061.83 804,969.25 775,697.64
35 Pagar BRC FP 150 T7.0 Panil 710,464.00 844,889.81 844,889.81 857,563.16 857,563.16 866,012.06 878,685.41 929,378.80 878,685.41 929,378.80 895,583.20
36 Pagar BRC FP 150 T8.0 Panil 769,400.00 912,828.88 912,828.88 926,521.31 926,521.31 935,649.60 949,342.03 1,004,111.77 949,342.03 1,004,111.77 967,598.61
37 Pagar BRC FP175 T6.0 Panil 692,095.00 823,714.77 823,714.77 836,070.49 836,070.49 844,307.63 856,663.36 906,086.24 856,663.36 906,086.24 873,137.65
38 Pagar BRC FP175 T7.0 Panil 802,380.00 950,846.90 950,846.90 965,109.61 965,109.61 974,618.07 988,880.78 1,045,931.59 988,880.78 1,045,931.59 1,007,897.72
39 Pagar BRC FP175 T8.0 Panil 929,570.00 1,097,466.45 1,097,466.45 1,113,928.44 1,113,928.44 1,124,903.11 1,141,365.10 1,207,213.09 1,141,365.10 1,207,213.09 1,163,314.43
40 Pagar BRC FP190 T6.0 Panil 736,805.00 875,254.67 875,254.67 888,383.49 888,383.49 897,136.03 910,264.85 962,780.13 910,264.85 962,780.13 927,769.95
41 Pagar BRC FP190 T7.0 Panil 853,369.00 1,009,624.98 1,009,624.98 1,024,769.36 1,024,769.36 1,034,865.61 1,050,009.98 1,110,587.48 1,050,009.98 1,110,587.48 1,070,202.48
42 Pagar BRC FP190 T8.0 Panil 987,965.00 1,164,781.87 1,164,781.87 1,182,253.59 1,182,253.59 1,193,901.41 1,211,373.14 1,281,260.05 1,211,373.14 1,281,260.05 1,234,668.78
43 Pagar BRC FP240 T7.0 Panil 1,016,302.00 1,197,447.63 1,197,447.63 1,215,409.34 1,215,409.34 1,227,383.82 1,245,345.53 1,317,192.39 1,245,345.53 1,317,192.39 1,269,294.48
44 Pagar BRC FP240 T8.0 Panil 1,173,277.00 1,378,402.13 1,378,402.13 1,399,078.16 1,399,078.16 1,412,862.18 1,433,538.21 1,516,242.34 1,433,538.21 1,516,242.34 1,461,106.26
45 Pagar BRC FP60 T6.0 ( HOT DIP GALVANIS ) Panil 424,204.00 514,900.74 514,900.74 522,624.25 522,624.25 527,773.25 535,496.77 566,390.81 535,496.77 566,390.81 545,794.78
56 Pagar BRC FP60 T7.0 Panil 512,378.00 616,544.20 616,544.20 625,792.36 625,792.36 631,957.80 641,205.96 678,198.62 641,205.96 678,198.62 653,536.85
47 Pagar BRC FP90 T6.0 Panil 499,513.00 601,713.94 601,713.94 610,739.65 610,739.65 616,756.79 625,782.50 661,885.33 625,782.50 661,885.33 637,816.78
48 Pagar BRC FP90 T7.0 Panil 595,921.00 712,849.23 712,849.23 723,541.96 723,541.96 730,670.46 741,363.19 784,134.15 741,363.19 784,134.15 755,620.18
49 Pagar BRC FP90 T8.0 Panil 706,929.00 840,814.81 840,814.81 853,427.03 853,427.03 861,835.18 874,447.40 924,896.29 874,447.40 924,896.29 891,263.70
50 Pagar BRC FP120 T6.0 Panil 617,707.00 737,963.25 737,963.25 749,032.70 749,032.70 756,412.34 767,481.78 811,759.58 767,481.78 811,759.58 782,241.05
51 Pagar BRC FP120 T7.0 Panil 737,059.00 875,547.47 875,547.47 888,680.68 888,680.68 897,436.15 910,569.36 963,102.21 910,569.36 963,102.21 928,080.31
52 Pagar BRC FP120 T8.0 Panil 874,718.00 1,034,235.26 1,034,235.26 1,049,748.78 1,049,748.78 1,060,091.14 1,075,604.67 1,137,658.78 1,075,604.67 1,137,658.78 1,096,289.37
53 Pagar BRC FP 150 T6.0 Panil 737,756.00 876,350.94 876,350.94 889,496.20 889,496.20 898,259.71 911,404.98 963,986.03 911,404.98 963,986.03 928,932.00
54 Pagar BRC FP 150 T7.0 Panil 881,209.00 1,041,717.82 1,041,717.82 1,057,343.59 1,057,343.59 1,067,760.77 1,083,386.53 1,145,889.60 1,083,386.53 1,145,889.60 1,104,220.89
55 Pagar BRC FP 150 T8.0 Panil 1,046,447.00 1,232,197.58 1,232,197.58 1,250,680.54 1,250,680.54 1,263,002.52 1,281,485.48 1,355,417.33 1,281,485.48 1,355,417.33 1,306,129.43
56 Pagar BRC FP175 T6.0 Panil 879,159.00 1,039,354.66 1,039,354.66 1,054,944.98 1,054,944.98 1,065,338.53 1,080,928.85 1,143,290.13 1,080,928.85 1,143,290.13 1,101,715.94
57 Pagar BRC FP175 T7.0 Panil 985,415.00 1,161,842.33 1,161,842.33 1,179,269.96 1,179,269.96 1,190,888.39 1,208,316.02 1,278,026.56 1,208,316.02 1,278,026.56 1,231,552.87
58 Pagar BRC FP175 T8.0 Panil 1,168,498.00 1,372,893.09 1,372,893.09 1,393,486.48 1,393,486.48 1,407,215.42 1,427,808.81 1,510,182.40 1,427,808.81 1,510,182.40 1,455,266.67
59 Pagar BRC FP190 T6.0 Panil 879,159.00 1,039,354.66 1,039,354.66 1,054,944.98 1,054,944.98 1,065,338.53 1,080,928.85 1,143,290.13 1,080,928.85 1,143,290.13 1,101,715.94
60 Pagar BRC FP190 T7.0 Panil 1,046,946.00 1,232,772.80 1,232,772.80 1,251,264.40 1,251,264.40 1,263,592.12 1,282,083.72 1,356,050.08 1,282,083.72 1,356,050.08 1,306,739.17
61 Pagar BRC FP190 T8.0 Panil 1,240,689.00 1,456,111.98 1,456,111.98 1,477,953.66 1,477,953.66 1,492,514.78 1,514,356.46 1,601,723.18 1,514,356.46 1,601,723.18 1,543,478.70
61 Pagar BRC FP240 T7.0 Panil 1,241,929.00 1,457,541.41 1,457,541.41 1,479,404.53 1,479,404.53 1,493,979.94 1,515,843.06 1,603,295.55 1,515,843.06 1,603,295.55 1,544,993.89
63 Pagar BRC FP240 T8.0 Panil 1,467,885.00 1,718,014.45 1,718,014.45 1,743,784.66 1,743,784.66 1,760,964.81 1,786,735.02 1,889,815.89 1,786,735.02 1,889,815.89 1,821,095.31
64 P85 EP dia.1,5" ( TIANG ELECTROPLATING ) bh 150,726.44 176,758.61 176,758.61 179,409.99 179,409.99 181,177.58 183,828.96 194,434.47 183,828.96 194,434.47 187,364.13
65 P85 EP dia.2,0" bh 165,726.44 194,050.01 194,050.01 196,960.76 196,960.76 198,901.26 201,812.01 213,455.01 201,812.01 213,455.01 205,693.01
66 P120 EP dia.1.5" bh 158,525.56 185,749.13 185,749.13 188,535.36 188,535.36 190,392.86 193,179.09 204,324.04 193,179.09 204,324.04 196,894.08
67 P120 EP dia.2.0" bh 175,823.22 205,689.18 205,689.18 208,774.52 208,774.52 210,831.41 213,916.74 226,258.10 213,916.74 226,258.10 218,030.53
68 P150 EP dia.1,5" bh 169,781.95 198,725.04 198,725.04 201,705.92 201,705.92 203,693.17 206,674.05 218,597.55 206,674.05 218,597.55 210,648.55
69 P150 EP dia.2.0" bh 186,279.03 217,742.21 217,742.21 221,008.35 221,008.35 223,185.77 226,451.90 239,516.43 226,451.90 239,516.43 230,806.74
70 P200 EP dia.1,5" bh 185,709.27 217,085.42 217,085.42 220,341.70 220,341.70 222,512.55 225,768.84 238,793.96 225,768.84 238,793.96 230,110.54
71 P200 EP dia.2,0" bh 203,709.27 237,835.10 237,835.10 241,402.63 241,402.63 243,780.98 247,348.50 261,618.61 247,348.50 261,618.61 252,105.20
72 P225 EP dia.1,5" bh 193,422.93 225,977.42 225,977.42 229,367.08 229,367.08 231,626.85 235,016.51 248,575.16 235,016.51 248,575.16 239,536.06
73 P225 EP dia.2,0" bh 224,922.93 262,289.36 262,289.36 266,223.70 266,223.70 268,846.59 272,780.93 288,518.29 272,780.93 288,518.29 278,026.72
74 P240 EP dia.1.5" bh 204,146.44 238,339.06 238,339.06 241,914.14 241,914.14 244,297.53 247,872.62 262,172.96 247,872.62 262,172.96 252,639.40
75 P240 EP dia.2.0" bh 234,646.44 273,498.24 273,498.24 277,600.71 277,600.71 280,335.69 284,438.16 300,848.06 284,438.16 300,848.06 289,908.13

Harga Satauan Bahan dan Upah Hal. 58


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
76 P300 EP dia.1.5" bh 225,563.91 263,028.25 263,028.25 266,973.67 266,973.67 269,603.95 273,549.38 289,331.07 273,549.38 289,331.07 278,809.94
77 P300 EP dia.2.0" bh 238,563.91 278,014.13 278,014.13 282,184.34 282,184.34 284,964.48 289,134.69 305,815.54 289,134.69 305,815.54 294,694.98
78 P85 HD dia.1,5" ( TIANG HOT DIP ) bh 188,226.44 219,987.11 219,987.11 223,286.92 223,286.92 225,486.79 228,786.60 241,985.82 228,786.60 241,985.82 233,186.34
79 P85 HD dia.2,0" bh 208,226.44 243,042.31 243,042.31 246,687.95 246,687.95 249,118.37 252,764.00 267,346.54 252,764.00 267,346.54 257,624.85
80 P120 HD dia.1.5" bh 204,025.56 238,199.71 238,199.71 241,772.70 241,772.70 244,154.70 247,727.70 262,019.68 247,727.70 262,019.68 252,491.69
81 P120 HD dia.2.0" bh 232,525.56 271,053.37 271,053.37 275,119.17 275,119.17 277,829.70 281,895.50 298,158.70 281,895.50 298,158.70 287,316.57
82 P150 HD dia.1,5" bh 221,281.95 258,092.18 258,092.18 261,963.57 261,963.57 264,544.49 268,415.87 283,901.40 268,415.87 283,901.40 273,577.72
83 P150 HD dia.2.0" bh 257,779.03 300,164.55 300,164.55 304,667.02 304,667.02 307,668.67 312,171.13 330,181.01 312,171.13 330,181.01 318,174.43
84 P200 HD dia.1,5" bh 244,209.27 284,521.88 284,521.88 288,789.71 288,789.71 291,634.93 295,902.75 312,974.07 295,902.75 312,974.07 301,593.19
85 P200 HD dia.2,0" bh 282,209.27 328,326.76 328,326.76 333,251.66 333,251.66 336,534.93 341,459.83 361,159.43 341,459.83 361,159.43 348,026.36
86 P225 HD dia.1,5" bh 260,922.93 303,788.72 303,788.72 308,345.55 308,345.55 311,383.43 315,940.27 334,167.59 315,940.27 334,167.59 322,016.04
87 P225 HD dia.2,0" bh 315,422.93 366,614.14 366,614.14 372,113.35 372,113.35 375,779.49 381,278.70 403,275.55 381,278.70 403,275.55 388,610.98
88 P240 HD dia.1.5" bh 272,551.12 317,193.23 317,193.23 321,951.13 321,951.13 325,123.07 329,880.96 348,912.56 329,880.96 348,912.56 336,224.83
89 P240 HD dia.2.0" bh 333,146.44 387,045.10 387,045.10 392,850.77 392,850.77 396,721.22 402,526.90 425,749.60 402,526.90 425,749.60 410,267.80
90 P300 HD dia.1.5" bh 303,063.91 352,367.15 352,367.15 357,652.66 357,652.66 361,176.33 366,461.83 387,603.86 366,461.83 387,603.86 373,509.18
91 P300 HD dia.2.0" bh 360,563.91 418,650.85 418,650.85 424,930.61 424,930.61 429,117.12 435,396.88 460,515.93 435,396.88 460,515.93 443,769.90
- - - - - - - - -
BAHAN LISTRIK - - - - - - - - -
1 Saklar (Broco) double bh 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
2 Saklar (Broco) engkle bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
3 Saklar (Oni) double bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
4 Saklar (Oni) engkle bh 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
5 Saklar tunggal philip bh 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
6 Saklar ganda philip bh 50,000.00 59,141.60 59,141.60 60,028.72 60,028.72 60,620.14 61,507.26 65,055.76 61,507.26 65,055.76 62,690.10
7 Stop kontak philip bh 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
8 Stop Kontak (Oni) bh 27,000.00 32,628.12 32,628.12 33,117.54 33,117.54 33,443.82 33,933.24 35,890.93 33,933.24 35,890.93 34,585.81
9 Stop Kontak (Oni) 2 lubang bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
10 Stop Kontak (Vticon) 2 lubang bh 30,000.00 36,086.40 36,086.40 36,627.70 36,627.70 36,988.56 37,529.86 39,695.04 37,529.86 39,695.04 38,251.58
11 Stop Kontak (Oni) 3 lubang bh 35,000.00 41,850.20 41,850.20 42,477.95 42,477.95 42,896.46 43,524.21 46,035.22 43,524.21 46,035.22 44,361.21
12 Stop Kontak (Oni) 4 lubang bh 40,000.00 47,614.00 47,614.00 48,328.21 48,328.21 48,804.35 49,518.56 52,375.40 49,518.56 52,375.40 50,470.84
13 Fitting Biasa bh 20,000.00 24,558.80 24,558.80 24,927.18 24,927.18 25,172.77 25,541.15 27,014.68 25,541.15 27,014.68 26,032.33
14 Fitting keramik bh 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
15 Steker biasa bh 13,000.00 16,489.48 16,489.48 16,736.82 16,736.82 16,901.72 17,149.06 18,138.43 17,149.06 18,138.43 17,478.85
16 Steker Broco bh 25,000.00 30,322.60 30,322.60 30,777.44 30,777.44 31,080.67 31,535.50 33,354.86 31,535.50 33,354.86 32,141.96
17 Coaxial cable 5C - 75 ohm commscof m1 - - - - - - - - - -
18 Kabel NYM 3 x 2.5 mm ex. Supreme m1 29,000.00 34,933.64 34,933.64 35,457.64 35,457.64 35,806.98 36,330.99 38,427.00 36,330.99 38,427.00 37,029.66
19 Kabel NYM 3 x 1.5 mm ex. Eterna m1 22,000.00 26,864.32 26,864.32 27,267.28 27,267.28 27,535.93 27,938.89 29,550.75 27,938.89 29,550.75 28,476.18
20 Kabel NYM 4 mm m1 - - - - - - - - - -
21 Kabel NYA 4mm rol - - - - - - - - - -
22 Kabel telephone m1 - - - - - - - - - -
23 Lampu 8 Watt (Philip) bh 60,000.00 70,669.20 70,669.20 71,729.24 71,729.24 72,435.93 73,495.97 77,736.12 73,495.97 77,736.12 74,909.35
24 Lampu 8 Watt (Philip) Tornado bh 56,000.00 66,058.16 66,058.16 67,049.03 67,049.03 67,709.61 68,700.49 72,663.98 68,700.49 72,663.98 70,021.65
25 Lampu 11 Watt (Philip) bh 45,000.00 53,377.80 53,377.80 54,178.47 54,178.47 54,712.25 55,512.91 58,715.58 55,512.91 58,715.58 56,580.47
26 Lampu 14 Watt (Philip) bh 48,000.00 56,836.08 56,836.08 57,688.62 57,688.62 58,256.98 59,109.52 62,519.69 59,109.52 62,519.69 60,246.24
27 Lampu 18 Watt (Philip) bh 55,000.00 64,905.40 64,905.40 65,878.98 65,878.98 66,528.04 67,501.62 71,395.94 67,501.62 71,395.94 68,799.72
28 Lampu 20 Watt (Philip) bh 91,000.00 106,404.76 106,404.76 108,000.83 108,000.83 109,064.88 110,660.95 117,045.24 110,660.95 117,045.24 112,789.05
29 Lampu 23 Watt (Philip) bh 65,000.00 76,433.00 76,433.00 77,579.50 77,579.50 78,343.83 79,490.32 84,076.30 79,490.32 84,076.30 81,018.98
30 Lampu 24 Watt (Philip) bh 70,000.00 82,196.80 82,196.80 83,429.75 83,429.75 84,251.72 85,484.67 90,416.48 85,484.67 90,416.48 87,128.61
31 Lampu 24 Watt (Philip) tornado bh 114,000.00 132,918.24 132,918.24 134,912.01 134,912.01 136,241.20 138,234.97 146,210.06 138,234.97 146,210.06 140,893.33
32 Lampu 15 Watt (Philip) tornado bh 66,000.00 77,585.76 77,585.76 78,749.55 78,749.55 79,525.40 80,689.19 85,344.34 80,689.19 85,344.34 82,240.91
33 Lampu downlight 3,5" bh 55,000.00 64,905.40 64,905.40 65,878.98 65,878.98 66,528.04 67,501.62 71,395.94 67,501.62 71,395.94 68,799.72
34 Lampu downlight 4" bh 70,000.00 82,196.80 82,196.80 83,429.75 83,429.75 84,251.72 85,484.67 90,416.48 85,484.67 90,416.48 87,128.61
35 Lampu downlight 5" bh 150,000.00 174,417.60 174,417.60 177,033.86 177,033.86 178,778.04 181,394.30 191,859.36 181,394.30 191,859.36 184,882.66
36 Isolasi unibelt bh 20,000.00 24,558.80 24,558.80 24,927.18 24,927.18 25,172.77 25,541.15 27,014.68 25,541.15 27,014.68 26,032.33
37 Pipa clipsal 20 mm bt 28,000.00 33,780.88 33,780.88 34,287.59 34,287.59 34,625.40 35,132.12 37,158.97 35,132.12 37,158.97 35,807.73
38 Pipa flexible clipsal 20 mm m1 - - - - - - - - - -
39 Sock clipsal 20 mm bj 3,000.00 4,961.88 4,961.88 5,036.31 5,036.31 5,085.93 5,160.36 5,458.07 5,160.36 5,458.07 5,259.59
40 Tee dos clipsal 20 mm bh 10,000.00 13,031.20 13,031.20 13,226.67 13,226.67 13,356.98 13,552.45 14,334.32 13,552.45 14,334.32 13,813.07
41 Klem clipsal 0,5 " bj 2,000.00 3,809.12 3,809.12 3,866.26 3,866.26 3,904.35 3,961.48 4,190.03 3,961.48 4,190.03 4,037.67
42 Inbow dos plastik clipsal E 157 P bj 6,000.00 8,420.16 8,420.16 8,546.46 8,546.46 8,630.66 8,756.97 9,262.18 8,756.97 9,262.18 8,925.37
- - - - - - - - -
PAVING - - - - - - - - -
1 Paving Poligon m2 175,000.00 254,860.20 254,860.20 258,683.10 258,683.10 261,231.71 265,054.61 280,346.22 265,054.61 280,346.22 270,151.81
2 Paving 10 x 20 cm tebal 6 cm K350 m2 - Err:522
3 Paving 10 x 20 cm tebal 8 cm K225 m2 - Err:522
4 Paving 10 x 20 cm tebal 8 cm K350 m2 - Err:522
5 Paving 10 x 20 cm tebal 8 cm K425 m2 - Err:522
6 Paving 20 x 20 cm tebal 6 cm K225 m2 - Err:522
7 Paving 20 x 20 cm tebal 6 cm K350 m2 - Err:522
8 Paving 20 x 20 cm tebal 8 cm K225 m2 - Err:522

Harga Satauan Bahan dan Upah Hal. 59


NO NAMA BARANG SATUAN
NO NAMA BARANG SATUAN HARGA DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
MSK ANALISA FAKFAK FAKFAK TENGAH PARIWARI FAKFAK BARAT WARTUTIN FAKFAK TIMUR FAKFAK TIMUR KOKAS KAYUNI
DASAR TENGAH
1 2 3 4 5 6 7 8 9 10 11 12 13 6
9 Paving 20 x 20 cm tebal 8 cm K350 m2 - - - - - - - - -
10 Paving 20 x 20 cm tebal 8 cm K425 m2 - Err:522
11 Paving 20 x 20 cm tebal 10 cm K225 m2 - Err:522
12 Paving 20 x 20 cm tebal 10 cm K350 m2 - Err:522
13 Paving 20 x 20 cm tebal 10 cm K425 m2 - Err:522
14 Paving Tiga Berlian tebal 6 cm K225 m2 - Err:522
15 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) m1 - - - - - - - - - -
16 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m1 - Err:522
17 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) m1 - -
18 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 - - - - - - - - - -
19 Koral Sikat Sak 12,000.00 16,840.32 16,840.32 17,092.92 17,092.92 17,261.33 17,513.93 18,524.35 17,513.93 18,524.35 17,850.74

LAIN-LAIN - - - - - - - -
1 Dugul batu hitam 50 x 50 x 200 unit - Err:522
2 Dugul batu hitam 60 x 70 x 250 unit - Err:522
3 Dugul batu hitam 70 x 70 x 250 unit - Err:522
4 Padmasari batu hitam 50 x 50 x 200 unit - Err:522
5 Padmasari batu hitam 70 x 70 x 250 unit - Err:522
6 Padmasari batu hitam 65 x 75 x 225 unit - Err:522
7 Karpet plastik m2 22,000.00 28,367.92 28,367.92 28,793.44 28,793.44 29,077.12 29,502.64 31,204.71 29,502.64 31,204.71 30,070.00
8 Talang PVC P= 4M', L=4" bentuk bulat buah 150,000.00 177,926.00 177,926.00 180,594.89 180,594.89 182,374.15 185,043.04 195,718.60 185,043.04 195,718.60 188,601.56
9 Talang PVC P= 4M', L=4" bentuk kotak buah 180,000.00 212,508.80 212,508.80 215,696.43 215,696.43 217,821.52 221,009.15 233,759.68 221,009.15 233,759.68 225,259.33
10 Talang PVC P= 4M', L=8" bentuk kotak buah 250,000.00 293,202.00 293,202.00 297,600.03 297,600.03 300,532.05 304,930.08 322,522.20 304,930.08 322,522.20 310,794.12
11 Talang PVC P= 4M', L=6" bentuk bulat buah 120,000.00 143,343.20 143,343.20 145,493.35 145,493.35 146,926.78 149,076.93 157,677.52 149,076.93 157,677.52 151,943.79
12 Talang PVC P= 4M', L=40" bentuk bulat buah - -
13 Talang PVC P= 4M', L=140 mm" bentuk kotak buah 170,000.00 200,981.20 200,981.20 203,995.92 203,995.92 206,005.73 209,020.45 221,079.32 209,020.45 221,079.32 213,040.07
14 Talang PVC P= 4M', L: 8' buah 150,000.00 177,926.00 177,926.00 180,594.89 180,594.89 182,374.15 185,043.04 195,718.60 185,043.04 195,718.60 188,601.56

Fakfak, 31 Mei 2022


PANITIA PENYUSUNAN STANDART HARGA SATUAN HARGA
TAHUN 2022

Mengetahui,
Plt. Kepala Dinas PU, Penataan Ruang, Perumahan Rakyat
dan Kawasan Permukiman
Kabupaten Fakfak , Ketua,

TEGUH SUGIHARTO, ST LIZA NEIRASARI, ST


NIP. 19701114 199712 1 001 NIP. 19751016 200111 2 001

Harga Satauan Bahan dan Upah Hal. 60


DAFTAR ANALISA PEKERJAAN
TAHUN 2022
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2
METER
1.2500 btg Bambu Sedang 20,298.60 25,373.25
2.5000 kg Semen Portland 3,543.48 8,858.71
1.2000 lbr Seng gelombang 3" - 5" 142,190.44 170,628.53
0.0050 m3 Pasir Beton 899,654.00 4,498.27
0.0090 m3 Koral beton 1,187,844.00 10,690.60
0.0720 m3 Kayu Matoa Usuk 5/7 3,032,260.00 218,322.72
0.0600 kg Paku biasa 2" - 5" 38,391.92 2,303.52
0.4500 kg Meni Besi 112,519.40 50,633.73
0.2000 oh Tukang Kayu 168,535.92 33,707.18
0.4000 oh Pekerja 130,648.00 52,259.20
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0200 oh Mandor 180,947.48 3,618.95
Total : 93,086.70 491,309.32 584,396.02

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu putih 5/7 3,032,260.00 36,387.12
0.0200 kg Paku Biasa 2" - 5" 38,391.92 767.84
0.0070 m3 Kayu Papan putih 3/20 2,801,708.00 19,611.96
0.1000 oh Tukang Kayu 168,535.92 16,853.59
0.1000 oh Pekerja 130,648.00 13,064.80
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0050 oh Mandor 180,947.48 904.74
Total : 32,573.81 56,766.91 89,340.73

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu Ø 8 - 10/4m 33,379.92 41,724.90
0.1800 m3 Kayu Matoa 3,032,260.00 545,806.80
0.8500 kg Paku Biasa 2" - 5" 38,391.92 32,633.13
1.1000 kg Besi Strip 13,050.05 14,355.05
35.0000 kg Semen Portland 3,543.48 124,021.94
0.1500 m3 Pasir Pasang 899,654.00 134,948.10
0.1000 m3 Pasir Beton 899,654.00 89,965.40
0.1500 m3 Koral Beton 1,187,844.00 178,176.60
30.0000 bh Batu tela 22,052.80 661,584.00
0.2500 lbr Seng Plat 39,594.80 9,898.70
2.0000 bh Jendela Nako 37,590.00 75,180.00
0.0800 m2 Kaca Polos 142,479.35 11,398.35
0.1500 bh Kunci Tanam 174,417.60 26,162.64
0.0600 lbr Tripleks 4 mm 126,051.80 7,563.11
2.0000 oh Tukang Kayu 168,535.92 337,071.84
1.0000 oh Tukang Batu 162,003.52 162,003.52
2.0000 oh Pekerja 130,648.00 261,296.00
0.3000 oh Kepala Tukang 175,068.32 52,520.50
0.0500 oh Mandor 180,947.48 9,047.37
Total : 821,939.23 1,953,418.72 2,775,357.95

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang 20,298.60 34,507.62
0.2100 m3 Kayu Matoa 3,032,260.00 636,774.60
0.3000 kg Paku Biasa 2" - 5" 38,391.92 11,517.58
10.5000 kg Semen Portland 3,543.48 37,206.58
0.0300 m3 Pasir Beton 899,654.00 26,989.62
0.0500 m3 Koral Beton 1,187,844.00 59,392.20
1.5000 lbr Seng gelombang BJLS 20 115,676.96 173,515.44
2.0000 oh Tukang Kayu 168,535.92 337,071.84
1.0000 oh Pekerja 130,648.00 130,648.00
0.2000 oh Kepala Tukang 175,068.32 35,013.66
0.0500 oh Mandor 180,947.48 9,047.37
Total : 511,780.88 979,903.64 1,491,684.52

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang 20,298.60 60,895.80
0.2760 m3 Kayu Matoa 3,032,260.00 836,903.76
0.7000 kg Paku biasa 2" - 5" 38,391.92 26,874.34
1.5000 lbr Seng gelombang BJLS 20 115,676.96 173,515.44
1.5000 oh Tukang Kayu 168,535.92 252,803.88
1.0000 oh Pekerja 130,648.00 130,648.00
0.1500 oh Kepala Tukang 175,068.32 26,260.25
0.0500 oh Mandor 180,947.48 9,047.37
Total : 418,759.50 1,098,189.34 1,516,948.85
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja 130,648.00 13,064.80
0.0500 oh Mandor 180,947.48 9,047.37
Total : 22,112.17 22,112.17

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang 20,298.60 25,373.25
0.1860 m3 Kayu Matoa 3,032,260.00 564,000.36
0.3000 kg Paku Biasa 2" - 5" 38,391.92 11,517.58
18.0000 kg Semen Portland 3,543.48 63,782.71
0.0300 m3 Pasir Beton 899,654.00 26,989.62
0.0500 m3 Koral Beton 1,187,844.00 59,392.20
1.5000 lbr Seng gelombang BJLS 20 115,676.96 173,515.44
1.3500 lbr Triplex 4 mm 126,051.80 170,169.93
2.0000 oh Tukang Kayu 168,535.92 337,071.84
1.0000 oh Pekerja 130,648.00 130,648.00
0.2000 oh Kepala Tukang 175,068.32 35,013.66
0.0500 oh Mandor 180,947.48 9,047.37
Total : 511,780.88 1,094,741.09 1,606,521.97

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Matoa 3,032,260.00 109,161.36
0.0800 kg Paku Biasa 2" - 5" 38,391.92 3,071.35
1.0000 btg Matoa 5/5 30,322.60 30,322.60
0.3000 oh Tukang kayu 168,535.92 50,560.78
0.0015 oh Mandor 180,947.48 271.42
Total : 50,832.20 142,555.31 193,387.51

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu 20,298.60 20,298.60
0.2500 kg Tali Ijuk - -
0.0170 oh Tukang Kayu 168,535.92 2,865.11
0.0020 oh Pekerja 130,648.00 261.30
0.2500 oh Kepala Tukang 175,068.32 43,767.08
0.0130 oh Mandor 180,947.48 2,352.32
Total : 49,245.80 20,298.60 69,544.40

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu belah 496,188.00 74,428.20
0.0900 m3 Batu Pecah 5 - 7 1,245,482.00 112,093.38
0.0100 m3 Pasir Pasang 899,654.00 8,996.54
1.0000 oh Pekerja 130,648.00 130,648.00
0.0500 oh Mandor 180,947.48 9,047.37
Total : 139,695.37 195,518.12 335,213.49

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja 130,648.00 871,030.22
0.3330 oh Mandor 180,947.48 60,255.51
Total : 931,285.73 931,285.73

12 1 M3 BONGKARAN DINDING TEMBOK BATU TELA


6.6670 oh Pekerja 130,648.00 871,030.22
0.0330 oh Mandor 180,947.48 5,971.27
Total : 877,001.48 877,001.48

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
0.7500 oh Pekerja 130,648.00 97,986.00
0.0250 oh Mandor 180,947.48 4,523.69
Total : 102,509.69 102,509.69
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
0.9000 oh Pekerja 130,648.00 117,583.20
0.0450 oh Mandor 180,947.48 8,142.64
Total : 125,725.84 125,725.84

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja 130,648.00 137,180.40
0.0670 oh Mandor 180,947.48 12,123.48
Total : 149,303.88 149,303.88

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja 130,648.00 130,648.00
0.0320 oh Mandor 180,947.48 5,790.32
Total : 136,438.32 136,438.32

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja 130,648.00 195,972.00
0.0600 oh Mandor 180,947.48 10,856.85
Total : 206,828.85 206,828.85
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja 130,648.00 156,777.60
0.0450 oh Mandor 180,947.48 8,142.64
Total : 164,920.24 164,920.24

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja 130,648.00 6,532.40
0.0050 oh Mandor 180,947.48 904.74
Total : 7,437.14 7,437.14

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja 130,648.00 43,113.84
0.0100 oh Mandor 180,947.48 1,809.47
Total : 44,923.31 44,923.31

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja 130,648.00 65,324.00
0.0500 oh Mandor 180,947.48 9,047.37
Total : 74,371.37 74,371.37

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 899,654.00 1,079,584.80
0.3000 oh Pekerja 130,648.00 39,194.40
0.0100 oh Mandor 180,947.48 1,809.47
Total : 41,003.87 1,079,584.80 1,120,588.67

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk - -
0.1500 oh Pekerja 130,648.00 19,597.20
0.0150 oh Mandor 180,947.48 2,714.21
Total : 22,311.41 - 22,311.41

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu 352,093.00 422,511.60
0.2500 oh Pekerja 130,648.00 32,662.00
0.0250 oh Mandor 180,947.48 4,523.69
Total : 37,185.69 422,511.60 459,697.29

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug 283,178.00 339,813.60
0.5000 oh Pekerja 130,648.00 65,324.00
0.0500 oh Mandor 180,947.48 9,047.37
Total : 74,371.37 339,813.60 414,184.97
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone - -
0.2500 oh Pekerja 130,648.00 32,662.00
0.0250 oh Mandor 180,947.48 4,523.69
Total : 37,185.69 - 37,185.69

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU KALI CAMP. 1 PC : 3 PS
1.2000 m3 Batu Kali / Batu Bulat 15/20 496,188.00 595,425.60
202.0000 kg Semen Portland 3,543.48 715,783.77
0.4850 m3 Pasir Pasang 899,654.00 436,332.19
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
0.0750 oh Kepala Tukang 175,068.32 13,130.12
0.0750 oh Mandor 180,947.48 13,571.06
Total : 344,175.83 1,747,541.56 2,091,717.38

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 496,188.00 595,425.60
163.0000 kg Semen Portland 3,543.48 577,587.89
0.5200 m3 Pasir Pasang 899,654.00 467,820.08
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
0.0750 oh Kepala Tukang 175,068.32 13,130.12
0.0750 oh Mandor 180,947.48 13,571.06
Total : 344,175.83 1,640,833.57 1,985,009.40
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 496,188.00 595,425.60
136.0000 kg Semen Portland 3,543.48 481,913.82
0.5440 m3 Pasir Pasang 899,654.00 489,411.78
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
0.0750 oh Kepala Tukang 175,068.32 13,130.12
0.0750 oh Mandor 180,947.48 13,571.06
Total : 344,175.83 1,566,751.20 1,910,927.03

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 496,188.00 595,425.60
117.0000 kg Semen Portland 3,543.48 414,587.63
0.5610 m3 Pasir Pasang 899,654.00 504,705.89
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
0.0750 oh Kepala Tukang 175,068.32 13,130.12
0.0750 oh Mandor 180,947.48 13,571.06
Total : 344,175.83 1,514,719.12 1,858,894.95

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 496,188.00 595,425.60
91.0000 kg Semen Portland 3,543.48 322,457.04
0.5840 m3 Pasir Pasang 899,654.00 525,397.94
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
0.0750 oh Kepala Tukang 175,068.32 13,130.12
0.0750 oh Mandor 180,947.48 13,571.06
Total : 344,175.83 1,443,280.58 1,787,456.41

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20 496,188.00 238,170.24
194.0000 kg Semen Portland 3,543.48 687,435.90
0.3120 m3 Pasir Beton 899,654.00 280,692.05
0.4680 m3 Koral Beton 1,187,844.00 555,910.99
126.0000 kg Besi Beton 16,657.98 2,098,905.18
1.8000 kg Kawat Beton 31,826.20 57,287.16
3.4000 oh Pekerja 130,648.00 444,203.20
0.8500 oh Tukang Batu 162,003.52 137,702.99
0.0850 oh Kepala Tukang 175,068.32 14,880.81
0.1700 oh Mandor 180,947.48 30,761.07
Total : 627,548.07 3,918,401.51 4,545,949.58

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20 496,188.00 223,284.60
194.0000 kg Semen Portland 3,543.48 687,435.90
0.3120 m3 Pasir Beton 899,654.00 280,692.05
0.4680 m3 Koral Beton 1,187,844.00 555,910.99
2.4000 oh Pekerja 130,648.00 313,555.20
0.8000 oh Tukang Batu 162,003.52 129,602.82
0.0800 oh Kepala Tukang 175,068.32 14,005.47
0.1190 oh Mandor 180,947.48 21,532.75
Total : 478,696.23 1,747,323.54 2,226,019.77

8 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 496,188.00 595,425.60
0.4320 m3 Pasir Urug 899,654.00 388,650.53
0.7800 oh Pekerja 130,648.00 101,905.44
0.3900 oh Tukang Batu 162,003.52 63,181.37
0.0390 oh Kepala Tukang 175,068.32 6,827.66
0.0390 oh Mandor 180,947.48 7,056.95
Total : 178,971.43 984,076.13 1,163,047.56

IV PEKERJAAN DINDING (SNI 6897 : 2008)

1 1 M2 PASANGAN BATA RINGAN CAMP. 1 PC : 2 PS


83.3333 bh Bata Ringan 10 x 20 x 60 28,372.48 2,364,373.03
43.5000 kg Semen Portland 3,543.48 154,141.55
0.0800 m3 Pasir Pasang 899,654.00 71,972.32
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 2,590,486.90 2,710,206.20
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 3 PS


140.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 3,972,146.69
32.9500 kg Semen Portland 3,543.48 116,757.80
0.0910 m3 Pasir Pasang 899,654.00 81,868.51
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 4,170,773.00 4,290,492.30

3 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 4 PS


140.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 3,972,146.69
26.5500 kg Semen Portland 3,543.48 94,079.50
0.0930 m3 Pasir Pasang 899,654.00 83,667.82
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 4,149,894.01 4,269,613.31

4 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 5 PS


140.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 3,972,146.69
22.2000 kg Semen Portland 3,543.48 78,665.34
0.1020 m3 Pasir Pasang 899,654.00 91,764.71
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 4,142,576.74 4,262,296.04

5 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 6 PS


140.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 3,972,146.69
18.5000 kg Semen Portland 3,543.48 65,554.45
0.1220 m3 Pasir Pasang 899,654.00 109,757.79
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 4,147,458.93 4,267,178.23

6 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 2 PS


70.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 1,986,073.35
18.9500 kg Semen Portland 3,543.48 67,149.02
0.0380 m3 Pasir Pasang 899,654.00 34,186.85
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,859.65 2,087,409.22 2,147,268.87

7 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 3 PS


70.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 1,986,073.35
14.3700 kg Semen Portland 3,543.48 50,919.87
0.0400 m3 Pasir Pasang 899,654.00 35,986.16
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,859.65 2,072,979.37 2,132,839.02

8 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 4 PS


70.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 1,986,073.35
11.5000 kg Semen Portland 3,543.48 40,750.07
0.0430 m3 Pasir Pasang 899,654.00 38,685.12
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,859.65 2,065,508.53 2,125,368.18

9 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 5 PS


70.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 1,986,073.35
9.6800 kg Semen Portland 3,543.48 34,300.93
0.0450 m3 Pasir Pasang 899,654.00 40,484.43
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,859.65 2,060,858.70 2,120,718.35
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
10 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 6 PS
70.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 1,986,073.35
8.3200 kg Semen Portland 3,543.48 29,481.79
0.0490 m3 Pasir Pasang 899,654.00 44,083.05
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,859.65 2,059,638.18 2,119,497.83

11 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 8 PS


70.0000 bh Batu Tela 5 x 11 x 22 cm 28,372.48 1,986,073.35
6.5000 kg Semen Portland 3,543.48 23,032.65
0.0500 m3 Pasir Pasang 899,654.00 44,982.70
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,859.65 2,054,088.69 2,113,948.34

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


12.5000 bh Batako 28,372.48 354,655.95
7.5000 kg Semen Portland 3,543.48 26,576.13
0.0270 m3 Pasir Pasang 899,654.00 24,290.66
1.9500 kg Besi Beton 8 mm 16,657.98 32,483.06
0.3200 oh Pekerja 130,648.00 41,807.36
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 62,472.61 438,005.80 500,478.41

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako 28,372.48 354,655.95
7.5000 kg Semen Portland 3,543.48 26,576.13
0.0270 m3 Pasir Pasang 899,654.00 24,290.66
0.3200 oh Pekerja 130,648.00 41,807.36
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 62,472.61 405,522.74 467,995.35

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik 106,755.60 3,202,668.00
11.0000 kg Semen Portland 3,543.48 38,978.32
0.0350 m3 Pasir Pasang 899,654.00 31,487.89
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,859.65 3,273,134.21 3,332,993.86

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I - -
0.0140 m3 Kayu Matoa usuk/reng 3,032,260.00 42,451.64
0.0120 kg Paku Biasa 36,086.40 433.04
0.0030 m3 List Kayu 2/4 3,032,260.00 9,096.78
0.1000 oh Pekerja 130,648.00 13,064.80
0.0500 oh Tukang Kayu 168,535.92 8,426.80
0.0050 oh Kepala Tukang 175,068.32 875.34
0.0020 oh Mandor 180,947.48 361.89
Total : 22,728.83 51,981.46 74,710.29

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland 3,543.48 54,938.18
0.0160 m3 Pasir Pasang 899,654.00 14,394.46
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Total : 68,835.17 69,332.64 138,167.80
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland 3,543.48 36,228.58
0.0200 m3 Pasir Pasang 899,654.00 17,993.08
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Total : 68,835.17 54,221.66 123,056.83
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland 3,543.48 27,554.13
0.0230 m3 Pasir Pasang 899,654.00 20,692.04
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Total : 68,835.17 48,246.17 117,081.34

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland 3,543.48 22,111.34
0.0240 m3 Pasir Pasang 899,654.00 21,591.70
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Total : 68,835.17 43,703.04 112,538.20

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland 3,543.48 18,369.42
0.0260 m3 Pasir Pasang 899,654.00 23,391.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Total : 68,835.17 41,760.43 110,595.59

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland 3,543.48 15,648.03
0.0270 m3 Pasir Pasang 899,654.00 24,290.66
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Total : 68,835.17 39,938.68 108,773.85

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland 3,543.48 12,246.28
0.0290 m3 Pasir Pasang 899,654.00 26,089.97
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Total : 68,835.17 38,336.25 107,171.41

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland 3,543.48 48,304.77
0.0270 m3 Pasir Pasang 899,654.00 24,290.66
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0220 oh Mandor 180,947.48 3,980.84
Total : 92,142.11 72,595.43 164,737.55

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland 3,543.48 36,738.84
0.0310 m3 Pasir Pasang 899,654.00 27,889.27
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0220 oh Mandor 180,947.48 3,980.84
Total : 92,142.11 64,628.12 156,770.23

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


8.3200 kg Semen Portland 3,543.48 29,481.79
0.0320 m3 Pasir Pasang 899,654.00 28,788.93
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0220 oh Mandor 180,947.48 3,980.84
Total : 92,142.11 58,270.71 150,412.83
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland 3,543.48 24,492.56
0.0350 m3 Pasir Pasang 899,654.00 31,487.89
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0220 oh Mandor 180,947.48 3,980.84
Total : 92,142.11 55,980.45 148,122.57
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland 3,543.48 20,864.03
0.0360 m3 Pasir Pasang 899,654.00 32,387.54
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0220 oh Mandor 180,947.48 3,980.84
Total : 92,142.11 53,251.58 145,393.69

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland 3,543.48 1,771.74
0.0130 m3 Pasir Pasang 899,654.00 11,695.50
0.0800 oh Pekerja 130,648.00 10,451.84
0.4000 oh Tukang Batu 162,003.52 64,801.41
0.0400 oh Kepala Tukang 175,068.32 7,002.73
0.0040 oh Mandor 180,947.48 723.79
Total : 82,979.77 13,467.24 96,447.01

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 3,543.48 15,307.85
0.0060 m3 Pasir Pasang 899,654.00 5,397.92
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,859.65 20,705.77 80,565.42

15 1 M2 FINISHING SIAR PASANGAN DINDING BATU TELA (=20 M')


3.1080 kg Semen Portland 3,543.48 11,013.15
0.1500 oh Pekerja 130,648.00 19,597.20
0.0750 oh Tukang Batu 162,003.52 12,150.26
0.0080 oh Kepala Tukang 175,068.32 1,400.55
0.0080 oh Mandor 180,947.48 1,447.58
Total : 34,595.59 11,013.15 45,608.74

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK


EKSPOSE (= 8 M')
1.6000 kg Semen Portland 3,543.48 5,669.57
0.0700 oh Pekerja 130,648.00 9,145.36
0.0350 oh Tukang Batu 162,003.52 5,670.12
0.0040 oh Kepala Tukang 175,068.32 700.27
0.0040 oh Mandor 180,947.48 723.79
Total : 16,239.55 5,669.57 21,909.12

17 1 M2 FINISHING SIAR PASANGAN BATUKALI/BELAH ADUKAN


1PC : 2 PS
6.3400 kg Semen Portland 3,543.48 22,465.69
0.0120 m3 Pasir Pasang 899,654.00 10,795.85
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Total : 68,835.17 33,261.54 102,096.70

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 3,543.48 11,516.32
0.2000 oh Pekerja 130,648.00 26,129.60
0.1000 oh Tukang Labur/Cat 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0100 oh Mandor 180,947.48 1,809.47
Total : 46,543.35 11,516.32 58,059.67
VI PEKERJAAN KAYU (SNI 3434 : 2008)
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA
KAYU KELAS I (KAYU BESI)
1.1000 m3 Balok Kayu Besi 4,185,020.00 4,603,522.00
1.2500 Kg Paku 10 Cm 36,086.40 45,108.00
1.0000 Kg Lem Kayu 111,015.80 111,015.80
7.0000 oh Pekerja 130,648.00 914,536.00
21.0000 oh Tukang Kayu 168,535.92 3,539,254.32
2.1000 oh Kepala Tukang 175,068.32 367,643.47
0.3500 oh Mandor 180,947.48 63,331.62
Total : 4,884,765.41 4,759,645.80 9,644,411.21
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III (KAYU MATOA)
1.2000 m3 Balok Kayu Matoa 3,032,260.00 3,638,712.00
1.2500 Kg Paku 10 Cm 36,086.40 45,108.00
1.0000 Kg Lem Kayu 111,015.80 111,015.80
6.0000 oh Pekerja 130,648.00 783,888.00
18.0000 oh Tukang Kayu 168,535.92 3,033,646.56
1.8000 oh Kepala Tukang 175,068.32 315,122.98
0.3000 oh Mandor 180,947.48 54,284.24
Total : 4,186,941.78 3,794,835.80 7,981,777.58

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II (KAYU MATOA)
0.0400 m3 Papan Kayu Matoa 3,032,260.00 121,290.40
0.0500 Kg Paku 5-7 Cm 36,086.40 1,804.32
0.3500 oh Pekerja 130,648.00 45,726.80
1.0500 oh Tukang Kayu 168,535.92 176,962.72
0.1050 oh Kepala Tukang 175,068.32 18,382.17
0.0180 oh Mandor 180,947.48 3,257.05
Total : 244,328.74 123,094.72 367,423.46

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III (KAYU PUTIH)
0.0400 m3 Papan Kayu Putih 3,032,260.00 121,290.40
0.0500 Kg Paku 5-7 Cm 36,086.40 1,804.32
0.3500 oh Pekerja 130,648.00 45,726.80
1.0500 oh Tukang Kayu 168,535.92 176,962.72
0.1050 oh Kepala Tukang 175,068.32 18,382.17
0.0180 oh Mandor 180,947.48 3,257.05
Total : 244,328.74 123,094.72 367,423.46

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II (KAYU BESI)
0.0400 m3 Papan Kayu Besi 4,415,572.00 176,622.88
0.5000 Kg Lem Kayu 111,015.80 55,507.90
1.0000 oh Pekerja 130,648.00 130,648.00
3.0000 oh Tukang Kayu 168,535.92 505,607.76
0.3000 oh Kepala Tukang 175,068.32 52,520.50
0.0500 oh Mandor 180,947.48 9,047.37
Total : 697,823.63 232,130.78 929,954.41

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,


KAYU KELAS I/II (KAYU BESI)
0.0240 m3 Papan Kayu Besi 4,415,572.00 105,973.73
1.0000 m2 Kaca rayben 5 mm 199,295.98 199,295.98
0.3000 Kg Lem Kayu 111,015.80 33,304.74
0.8000 oh Pekerja 130,648.00 104,518.40
2.4000 oh Tukang Kayu 168,535.92 404,486.21
0.2400 oh Kepala Tukang 175,068.32 42,016.40
0.0400 oh Mandor 180,947.48 7,237.90
Total : 558,258.90 338,574.45 896,833.35

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II (KAYU BESI)
0.0640 m3 Papan Kayu Besi 4,415,572.00 282,596.61
0.5000 Kg Lem Kayu 111,015.80 55,507.90
1.0000 oh Pekerja 130,648.00 130,648.00
3.0000 oh Tukang Kayu 168,535.92 505,607.76
0.3000 oh Kepala Tukang 175,068.32 52,520.50
0.0500 oh Mandor 180,947.48 9,047.37
Total : 697,823.63 338,104.51 1,035,928.14

8 MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA


TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Matoa 3,032,260.00 75,806.50
0.0300 Kg Paku 1-2,5 Cm 38,391.92 1,151.76
0.5000 Kg Lem Kayu 111,015.80 55,507.90
1.0000 Lbr Taekwood 4 mm 154,870.80 154,870.80
1.0000 oh Pekerja 130,648.00 130,648.00
3.0000 oh Tukang Kayu 168,535.92 505,607.76
0.3000 oh Kepala Tukang 175,068.32 52,520.50
0.0500 oh Mandor 180,947.48 9,047.37
Total : 697,823.63 287,336.96 985,160.59
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

9 MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Besi 4,415,572.00 113,038.64
0.0300 Kg Paku 1-2,5 Cm 38,391.92 1,151.76
0.5000 Kg Lem Kayu 111,015.80 55,507.90
1.0000 Lbr Teakwood 4 mm 154,870.80 154,870.80
0.8000 oh Pekerja 130,648.00 104,518.40
2.4000 oh Tukang Kayu 168,535.92 404,486.21
0.2400 oh Kepala Tukang 175,068.32 42,016.40
0.0400 oh Mandor 180,947.48 7,237.90
Total : 558,258.90 324,569.10 882,828.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600 m3 Papan Kayu Besi 4,415,572.00 264,934.32
0.1500 Kg Paku 1-2,5 Cm 38,391.92 5,758.79
0.6700 oh Pekerja 130,648.00 87,534.16
2.0000 oh Tukang Kayu 168,535.92 337,071.84
0.2000 oh Kepala Tukang 175,068.32 35,013.66
0.3350 oh Mandor 180,947.48 60,617.41
Total : 520,237.07 270,693.11 790,930.18

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Besi 4,415,572.00 113,038.64
0.0300 Kg Paku 1-2,5 Cm 38,391.92 1,151.76
0.5000 Kg Lem Kayu 111,015.80 55,507.90
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 154,870.80 154,870.80
0.8000 oh Pekerja 130,648.00 104,518.40
2.4000 oh Tukang Kayu 168,535.92 404,486.21
0.2400 oh Kepala Tukang 175,068.32 42,016.40
0.0400 oh Mandor 180,947.48 7,237.90
Total : 558,258.90 324,569.10 882,828.00

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA


RANGKA EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Matoa 3,032,260.00 75,806.50
0.0300 Kg Paku 1-2,5 Cm 38,391.92 1,151.76
0.8000 Kg Lem Kayu 111,015.80 88,812.64
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 154,870.80 154,870.80
0.5000 Lbr Formika 226,833.52 113,416.76
0.8000 oh Pekerja 130,648.00 104,518.40
2.4000 oh Tukang Kayu 168,535.92 404,486.21
0.2400 oh Kepala Tukang 175,068.32 42,016.40
0.0400 oh Mandor 180,947.48 7,237.90
Total : 558,258.90 434,058.46 992,317.36

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Besi 4,185,020.00 4,603,522.00
15.0000 Kg Besi Strip Tebal 5 cm 13,050.05 195,750.68
5.6000 Kg Paku 12 Cm 36,086.40 202,083.84
4.0000 oh Pekerja 130,648.00 522,592.00
12.0000 oh Tukang Kayu 168,535.92 2,022,431.04
1.2000 oh Kepala Tukang 175,068.32 210,081.98
0.2000 oh Mandor 180,947.48 36,189.50
Total : 2,791,294.52 5,001,356.52 7,792,651.04

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000 m3 Balok Kayu Besi 4,185,020.00 5,022,024.00
15.0000 Kg Besi Strip Tebal 5 cm 13,050.05 195,750.68
5.6000 Kg Paku 12 Cm 36,086.40 202,083.84
6.7000 oh Pekerja 130,648.00 875,341.60
20.1000 oh Tukang Kayu 168,535.92 3,387,571.99
2.0100 oh Kepala Tukang 175,068.32 351,887.32
0.3350 oh Mandor 180,947.48 60,617.41
Total : 4,675,418.32 5,419,858.52 10,095,276.84

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


1.1000 m3 Balok Kayu Matoa 3,032,260.00 3,335,486.00
15.0000 Kg Besi Strip Tebal 5 cm 13,050.05 195,750.68
3.0000 Kg Paku 12 Cm 36,086.40 108,259.20
2.4000 oh Pekerja 130,648.00 313,555.20
7.2000 oh Tukang Kayu 168,535.92 1,213,458.62
0.7200 oh Kepala Tukang 175,068.32 126,049.19
0.1200 oh Mandor 180,947.48 21,713.70
Total : 1,674,776.71 3,639,495.88 5,314,272.59
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 3,032,260.00 42,451.64
0.0036 m3 Reng ( 2 x 3 ) Cm 3,032,260.00 10,916.14
0.2500 Kg Paku 5 Cm dan 10 Cm 36,086.40 9,021.60
0.1000 oh Pekerja 130,648.00 13,064.80
0.1000 oh Tukang Kayu 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0050 oh Mandor 180,947.48 904.74
Total : 32,573.81 62,389.38 94,963.19

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 3,032,260.00 42,451.64
0.0072 m3 Reng ( 2 x 3 ) Cm 3,032,260.00 21,832.27
0.2500 Kg Paku 5 Cm dan 10 Cm 36,086.40 9,021.60
0.1000 oh Pekerja 130,648.00 13,064.80
0.1000 oh Tukang Kayu 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0050 oh Mandor 180,947.48 904.74
Total : 32,573.81 73,305.51 105,879.32

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II


0.1650 m3 Balok Kayu Matoa 3,032,260.00 500,322.90
0.2000 Kg Paku 5 Cm dan 10 Cm 36,086.40 7,217.28
0.1200 oh Pekerja 130,648.00 15,677.76
0.1200 oh Tukang Kayu 168,535.92 20,224.31
0.0120 oh Kepala Tukang 175,068.32 2,100.82
0.0060 oh Mandor 180,947.48 1,085.68
Total : 39,088.58 507,540.18 546,628.76

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 3,032,260.00 46,696.80
0.2000 Kg Paku 7 Cm dan 10 Cm 36,086.40 7,217.28
0.1500 oh Pekerja 130,648.00 19,597.20
0.3000 oh Tukang Kayu 168,535.92 50,560.78
0.0300 oh Kepala Tukang 175,068.32 5,252.05
0.0750 oh Mandor 180,947.48 13,571.06
Total : 88,981.09 53,914.08 142,895.17

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 3,032,260.00 49,425.84
0.2500 Kg Paku 7 Cm dan 10 Cm 36,086.40 9,021.60
0.2000 oh Pekerja 130,648.00 26,129.60
0.3000 oh Tukang Kayu 168,535.92 50,560.78
0.0300 oh Kepala Tukang 175,068.32 5,252.05
0.0100 oh Mandor 180,947.48 1,809.47
Total : 83,751.90 58,447.44 142,199.34

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS


I/II
0.0108 m3 Papan Kayu Besi 4,415,572.00 47,688.18
0.1000 Kg Paku 5 Cm dan 7 Cm 36,086.40 3,608.64
0.1000 oh Pekerja 130,648.00 13,064.80
0.2000 oh Tukang Kayu 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0050 oh Mandor 180,947.48 904.74
Total : 51,178.09 51,296.82 102,474.91

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS


I/II
0.0110 m3 Papan Kayu Besi 4,415,572.00 48,571.29
0.0500 Kg Paku 5 Cm dan 7 Cm 36,086.40 1,804.32
0.1000 oh Pekerja 130,648.00 13,064.80
0.2000 oh Tukang Kayu 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0050 oh Mandor 180,947.48 904.74
Total : 51,178.09 50,375.61 101,553.70
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280 m3 Balok Kayu Matoa 3,032,260.00 84,903.28
0.1500 Kg Paku 5 Cm dan 7 Cm 36,086.40 5,412.96
0.1500 oh Pekerja 130,648.00 19,597.20
0.4500 oh Tukang Kayu 168,535.92 75,841.16
0.0450 oh Kepala Tukang 175,068.32 7,878.07
0.0080 oh Mandor 180,947.48 1,447.58
Total : 104,764.02 90,316.24 195,080.26

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Matoa 3,032,260.00 84,903.28
0.1500 Kg Paku 5 Cm dan 7 Cm 36,086.40 5,412.96
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 154,870.80 133,188.89
0.5600 Kg Lem Kayu 111,015.80 62,168.85
0.1500 oh Pekerja 130,648.00 19,597.20
0.4500 oh Tukang Kayu 168,535.92 75,841.16
0.0450 oh Kepala Tukang 175,068.32 7,878.07
0.0080 oh Mandor 180,947.48 1,447.58
Total : 104,764.02 285,673.98 390,437.99

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Matoa 3,032,260.00 84,903.28
0.1500 Kg Paku 5 Cm dan 7 Cm 36,086.40 5,412.96
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 108,760.40 93,533.94
0.5600 Kg Lem Kayu 111,015.80 62,168.85
0.2000 oh Pekerja 130,648.00 26,129.60
0.6000 oh Tukang Kayu 168,535.92 101,121.55
0.0600 oh Kepala Tukang 175,068.32 10,504.10
0.0100 oh Mandor 180,947.48 1,809.47
Total : 139,564.73 246,019.03 385,583.76

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Besi 4,415,572.00 30,909.00


0.1000 Kg Paku 5 Cm dan 10 Cm 36,086.40 3,608.64
0.1500 Kg Paku Skrup 10 cm - -
0.6000 oh Pekerja 130,648.00 78,388.80
1.8000 oh Tukang Kayu 168,535.92 303,364.66
0.1800 oh Kepala Tukang 175,068.32 31,512.30
0.0300 oh Mandor 180,947.48 5,428.42
Total : 418,694.18 34,517.64 453,211.82

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120


X 240) CM
0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 108,760.40 43,504.16
0.0500 Kg Paku 1 Cm dan 2.5 Cm 36,086.40 1,804.32
0.0250 oh Pekerja 130,648.00 3,266.20
0.0750 oh Tukang Kayu 168,535.92 12,640.19
0.0080 oh Kepala Tukang 175,068.32 1,400.55
0.0010 oh Mandor 180,947.48 180.95
Total : 17,487.89 45,308.48 62,796.37

VII PEKERJAAN BETON ( SNI 7394:2008)


1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
218.0000 kg Semen Portland 3,543.48 772,479.51
0.5200 m3 Pasir Beton 899,654.00 467,820.08
0.8700 m3 Koral Beton 1,187,844.00 1,033,424.28
1.6500 oh Pekerja 130,648.00 215,569.20
0.2500 oh Tukang Batu 162,003.52 40,500.88
0.0250 oh Kepala Tukang 175,068.32 4,376.71
0.0800 oh Mandor 180,947.48 14,475.80
Total : 274,922.59 2,273,723.87 2,548,646.46

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
232.0000 kg Semen Portland 3,543.48 822,088.29
0.5200 m3 Pasir Beton 899,654.00 467,820.08
0.7800 m3 Koral Beton 1,187,844.00 926,518.32
1.6500 oh Pekerja 130,648.00 215,569.20
0.2500 oh Tukang Batu 162,003.52 40,500.88
0.0250 oh Kepala Tukang 175,068.32 4,376.71
0.0800 oh Mandor 180,947.48 14,475.80
Total : 274,922.59 2,216,426.69 2,491,349.27
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland 3,543.48 992,175.52
0.4500 m3 Pasir Beton 899,654.00 404,844.30
0.9000 m3 Koral Beton 1,187,844.00 1,069,059.60
1.6500 oh Pekerja 130,648.00 215,569.20
0.2500 oh Tukang Batu 162,003.52 40,500.88
0.0250 oh Kepala Tukang 175,068.32 4,376.71
0.0800 oh Mandor 180,947.48 14,475.80
Total : 274,922.59 2,466,079.42 2,741,002.01

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir) 16,657.98 174,908.76
0.1500 kg Kawat Beton 31,826.20 4,773.93
0.0700 oh Pekerja 130,648.00 9,145.36
0.0700 oh Tukang Besi 168,535.92 11,797.51
0.0070 oh Kepala Tukang 175,068.32 1,225.48
0.0040 oh Mandor 180,947.48 723.79
Total : 22,892.14 179,682.69 202,574.84

5 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Bekisting 3,032,260.00 121,290.40
0.3000 kg Paku Biasa 5' - 10' 38,391.92 11,517.58
0.1000 ltr Minyak Bekisting 18,795.00 1,879.50
0.5200 oh Pekerja 130,648.00 67,936.96
0.2600 oh Tukang Kayu 168,535.92 43,819.34
0.0260 oh Kepala Tukang 175,068.32 4,551.78
0.0260 oh Mandor 180,947.48 4,704.63
Total : 121,012.71 134,687.48 255,700.19

6 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Bekisting 3,032,260.00 121,290.40
0.3000 kg Paku Biasa 5' - 10' 38,391.92 11,517.58
0.1000 ltr Minyak Bekisting 18,795.00 1,879.50
0.5200 oh Pekerja 130,648.00 67,936.96
0.2600 oh Tukang Kayu 168,535.92 43,819.34
0.0260 oh Kepala Tukang 175,068.32 4,551.78
0.0260 oh Mandor 180,947.48 4,704.63
Total : 121,012.71 134,687.48 255,700.19

7 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Bekisting 3,032,260.00 121,290.40
0.4000 kg Paku Biasa 5' - 12' 38,391.92 15,356.77
0.2000 ltr Minyak Bekisting 18,795.00 3,759.00
0.0150 m3 Kayu Usuk 4/6 3,032,260.00 45,483.90
0.3500 lbr Plywood 9 mm 229,800.20 80,430.07
2.0000 btg Dolken Kayu 8" - 10"/4 m 33,379.92 66,759.84
0.6600 oh Pekerja 130,648.00 86,227.68
0.3300 oh Tukang Kayu 168,535.92 55,616.85
0.0330 oh Kepala Tukang 175,068.32 5,777.25
0.0330 oh Mandor 180,947.48 5,971.27
Total : 153,593.06 333,079.98 486,673.03

8 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Bekisting 3,032,260.00 121,290.40
0.4000 kg Paku Biasa 5' - 12' 38,391.92 15,356.77
0.2000 ltr Minyak Bekisting 18,795.00 3,759.00
0.0180 m3 Kayu Usuk 4/6 3,032,260.00 54,580.68
0.3500 lbr Plywood 9 mm 229,800.20 80,430.07
2.0000 btg Dolken Kayu 8" - 10"/4m 33,379.92 66,759.84
0.6600 oh Pekerja 130,648.00 86,227.68
0.3300 oh Tukang Kayu 168,535.92 55,616.85
0.0330 oh Kepala Tukang 175,068.32 5,777.25
0.0330 oh Mandor 180,947.48 5,971.27
Total : 153,593.06 342,176.76 495,769.81

9 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Bekisting 3,032,260.00 121,290.40
0.4000 kg Paku Biasa 5' - 12' 38,391.92 15,356.77
0.2000 ltr Minyak Bekisting 18,795.00 3,759.00
0.0150 m3 Kayu Usuk 4/6 3,032,260.00 45,483.90
0.3500 lbr Plywood 9 mm 229,800.20 80,430.07
6.0000 btg Dolken Kayu 8" - 10"/4m 33,379.92 200,279.52
0.6600 oh Pekerja 130,648.00 86,227.68
0.3300 oh Tukang Kayu 168,535.92 55,616.85
0.0330 oh Kepala Tukang 175,068.32 5,777.25
0.0330 oh Mandor 180,947.48 5,971.27
Total : 153,593.06 466,599.66 620,192.71
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

10 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Bekisting 3,032,260.00 90,967.80
0.4000 Kg Paku Biasa 5' - 12' 38,391.92 15,356.77
0.2000 Ltr Minyak Bekisting 18,795.00 3,759.00
0.0200 M3 Kayu Usuk 4/6 3,032,260.00 60,645.20
0.3500 Lbr Plywood 9 mm 229,800.20 80,430.07
3.0000 Btng Dolken Kayu 8" - 10"/4m 33,379.92 100,139.76
4.0000 Bh Formite/penjaga jarak bekisting/spacer - -
0.6600 Oh Pekerja 130,648.00 86,227.68
0.3300 Oh Tukang Kayu 168,535.92 55,616.85
0.0330 Oh Kepala Tukang 175,068.32 5,777.25
0.0330 Oh Mandor 180,947.48 5,971.27
Total : 153,593.06 351,298.60 504,891.65

11 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Bekisting 3,032,260.00 90,967.80
0.4000 kg Paku Biasa 5' - 12' 38,391.92 15,356.77
0.1500 ltr Minyak Bekisting 18,795.00 2,819.25
0.0150 m3 Kayu Usuk 4/6 3,032,260.00 45,483.90
0.3500 lbr Plywood 9 mm 229,800.20 80,430.07
2.0000 btg Dolken Kayu 8" - 10"/4m 33,379.92 66,759.84
0.6600 oh Pekerja 130,648.00 86,227.68
0.3300 oh Tukang Kayu 168,535.92 55,616.85
0.0330 oh Kepala Tukang 175,068.32 5,777.25
0.0330 oh Mandor 180,947.48 5,971.27
Total : 153,593.06 301,817.63 455,410.68

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan Kayu putih) 3,032,260.00 80,051.66
0.6000 kg Paku Biasa 5' - 12' 38,391.92 23,035.15
0.5000 btg Dolken Kayu 8" - 10"/4m 33,379.92 16,689.96
0.1500 oh Pekerja 130,648.00 19,597.20
0.0500 oh Tukang Kayu 168,535.92 8,426.80
0.0050 oh Kepala Tukang 175,068.32 875.34
0.0080 oh Mandor 180,947.48 1,447.58
Total : 30,346.92 119,776.78 150,123.69

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Bekisting 3,032,260.00 606,452.00
1.5000 kg Paku Biasa 5' - 12' 38,391.92 57,587.88
0.4000 ltr Minyak Bekisting 18,795.00 7,518.00
157.0000 kg Besi Beton 16,657.98 2,615,302.48
2.2500 kg Kawat Beton 31,826.20 71,608.95
336.0000 kg Semen Portland 3,543.48 1,190,610.62
0.5400 m3 Pasir Beton 899,654.00 485,813.16
0.8100 m3 Koral Beton 1,187,844.00 962,153.64
5.3000 oh Pekerja 130,648.00 692,434.40
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.3000 oh Tukang Kayu 168,535.92 219,096.70
1.0500 oh Tukang Besi 168,535.92 176,962.72
0.2620 oh Kepala Tukang 175,068.32 45,867.90
0.2650 oh Mandor 180,947.48 47,951.08
Total : 1,226,863.76 5,997,046.74 7,223,910.50

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Bekisting 3,032,260.00 818,710.20
2.0000 kg Paku Biasa 5' - 12' 38,391.92 76,783.84
0.6000 ltr Minyak Bekisting 18,795.00 11,277.00
210.0000 kg Besi Beton 16,657.98 3,498,175.30
3.0000 kg Kawat Beton 31,826.20 95,478.60
336.0000 kg Semen Portland 3,543.48 1,190,610.62
0.5400 m3 Pasir Beton 899,654.00 485,813.16
0.8100 m3 Koral Beton 1,187,844.00 962,153.64
5.6500 oh Pekerja 130,648.00 738,161.20
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.5600 oh Tukang Kayu 168,535.92 262,916.04
1.4000 oh Tukang Besi 168,535.92 235,950.29
0.3230 oh Kepala Tukang 175,068.32 56,547.07
0.2830 oh Mandor 180,947.48 51,208.14
Total : 1,389,333.70 7,139,002.36 8,528,336.05
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
19
15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +
BEKISTING)
0.4000 m3 Kayu Bekisting 3,032,260.00 1,212,904.00
4.0000 kg Paku Biasa 5' - 12' 38,391.92 153,567.68
2.0000 ltr Minyak Bekisting 18,795.00 37,590.00
315.0000 kg Besi Beton 16,657.98 5,247,262.94
4.5000 kg Kawat Beton 31,826.20 143,217.90
336.0000 kg Semen Portland 3,543.48 1,190,610.62
0.5400 m3 Pasir Beton 899,654.00 485,813.16
0.8100 m3 Koral Beton 1,187,844.00 962,153.64
0.1500 m3 Kayu Kelas II balok 3,032,260.00 454,839.00
3.5000 lbr Plywood 9 mm 229,800.20 804,300.70
20.0000 btg Dolken Kayu 8" /4 m 33,379.92 667,598.40
7.0500 oh Pekerja 130,648.00 921,068.40
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.6500 oh Tukang Kayu 168,535.92 278,084.27
2.1000 oh Tukang Besi 168,535.92 353,925.43
0.4030 oh Kepala Tukang 175,068.32 70,552.53
0.3530 oh Mandor 180,947.48 63,874.46
Total : 1,732,056.06 11,359,858.05 13,091,914.11
19
16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +
BEKISTING)
0.3200 m3 Kayu Bekisting 3,032,260.00 970,323.20
3.2000 kg Paku Biasa 5' - 12' 38,391.92 122,854.14
1.6000 ltr Minyak Bekisting 18,795.00 30,072.00
210.0000 kg Besi Beton 16,657.98 3,498,175.30
3.0000 kg Kawat Beton 31,826.20 95,478.60
336.0000 kg Semen Portland 3,543.48 1,190,610.62
0.5400 m3 Pasir Beton 899,654.00 485,813.16
0.8100 m3 Koral Beton 1,187,844.00 962,153.64
0.1400 m3 Kayu Kelas II balok 3,032,260.00 424,516.40
2.8000 lbr Plywood 9 mm 229,800.20 643,440.56
16.0000 btg Dolken Kayu 8" /4 m 33,379.92 534,078.72
6.3500 oh Pekerja 130,648.00 829,614.80
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.6500 oh Tukang Kayu 168,535.92 278,084.27
1.4000 oh Tukang Besi 168,535.92 235,950.29
0.3330 oh Kepala Tukang 175,068.32 58,297.75
0.3180 oh Mandor 180,947.48 57,541.30
Total : 1,504,039.37 8,957,516.34 10,461,555.72
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Bekisting 3,032,260.00 970,323.20
3.2000 kg Paku Biasa 5' - 12' 38,391.92 122,854.14
1.6000 ltr Minyak Bekisting 18,795.00 30,072.00
157.5000 kg Besi Beton 16,657.98 2,623,631.47
2.2500 kg Kawat Beton 31,826.20 71,608.95
336.0000 kg Semen Portland 3,543.48 1,190,610.62
0.5400 m3 Pasir Beton 899,654.00 485,813.16
0.8100 m3 Koral Beton 1,187,844.00 962,153.64
0.1200 m3 Kayu Kelas II balok 3,032,260.00 363,871.20
2.8000 lbr Plywood 9 mm 229,800.20 643,440.56
32.0000 btg Dolken Kayu 8" /4 m 33,379.92 1,068,157.44
5.3000 oh Pekerja 130,648.00 692,434.40
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.3000 oh Tukang Kayu 168,535.92 219,096.70
1.0500 oh Tukang Besi 168,535.92 176,962.72
0.2650 oh Kepala Tukang 175,068.32 46,393.10
0.2650 oh Mandor 180,947.48 47,951.08
Total : 1,227,388.97 8,532,536.39 9,759,925.36
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
0.2400 m3 Kayu Bekisting 3,032,260.00 727,742.40
3.2000 kg Paku Biasa 5' - 12' 38,391.92 122,854.14
1.6000 ltr Minyak Bekisting 18,795.00 30,072.00
157.0000 kg Besi Beton 16,657.98 2,615,302.48
2.2500 kg Kawat Beton 31,826.20 71,608.95
336.0000 kg Semen Portland 3,543.48 1,190,610.62
0.5400 m3 Pasir Beton 899,654.00 485,813.16
0.8100 m3 Koral Beton 1,187,844.00 962,153.64
0.1600 m3 Kayu Kelas II balok 3,032,260.00 485,161.60
2.8000 lbr Plywood 9 mm 229,800.20 643,440.56
24.0000 btg Dolken Kayu 8" /4 m 33,379.92 801,118.08
5.3000 oh Pekerja 130,648.00 692,434.40
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.3000 oh Tukang Kayu 168,535.92 219,096.70
1.0500 oh Tukang Besi 168,535.92 176,962.72
0.2620 oh Kepala Tukang 175,068.32 45,867.90
0.2650 oh Mandor 180,947.48 47,951.08
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
Total : 1,226,863.76 8,135,877.64 9,362,741.40
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)
0.2500 m3 Kayu Bekisting 3,032,260.00 758,065.00
3.0000 kg Paku Biasa 5' - 12' 38,391.92 115,175.76
1.2000 ltr Minyak Bekisting 18,795.00 22,554.00
210.0000 kg Besi Beton 16,657.98 3,498,175.30
3.0000 kg Kawat Beton 31,826.20 95,478.60
336.0000 kg Semen Portland 3,543.48 1,190,610.62
0.5400 m3 Pasir Beton 899,654.00 485,813.16
0.8100 m3 Koral Beton 1,187,844.00 962,153.64
0.1050 m3 Kayu Kelas II balok 3,032,260.00 318,387.30
2.5000 lbr Plywood 9 mm 229,800.20 574,500.50
14.0000 btg Dolken Kayu 8" /4 m 33,379.92 467,318.88
5.6500 oh Pekerja 130,648.00 738,161.20
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.5600 oh Tukang Kayu 168,535.92 262,916.04
1.4000 oh Tukang Besi 168,535.92 235,950.29
0.3230 oh Kepala Tukang 175,068.32 56,547.07
0.2830 oh Mandor 180,947.48 51,208.14
Total : 1,389,333.70 8,488,232.76 9,877,566.45

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020 m3 Kayu Bekisting 3,032,260.00 6,064.52
0.0100 kg Paku Biasa 5' - 12' 38,391.92 383.92
3.0000 kg Besi Beton 16,657.98 49,973.93
0.0450 kg Kawat Beton 31,826.20 1,432.18
4.0000 kg Semen Portland 3,543.48 14,173.94
0.0060 m3 Pasir Beton 899,654.00 5,397.92
0.0090 m3 Koral Beton 1,187,844.00 10,690.60
0.1800 oh Pekerja 130,648.00 23,516.64
0.0200 oh Tukang Batu 162,003.52 3,240.07
0.0200 oh Tukang Kayu 168,535.92 3,370.72
0.0200 oh Tukang Besi 168,535.92 3,370.72
0.0060 oh Kepala Tukang 175,068.32 1,050.41
0.0090 oh Mandor 180,947.48 1,628.53
Total : 36,177.08 88,117.01 124,294.09
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15
CM)
0.0030 m3 Kayu Bekisting 3,032,260.00 9,096.78
0.0200 kg Paku Biasa 5' - 12' 38,391.92 767.84
3.6000 kg Besi Beton 16,657.98 59,968.72
0.0500 kg Kawat Beton 31,826.20 1,591.31
5.5000 kg Semen Portland 3,543.48 19,489.16
0.0090 m3 Pasir Beton 899,654.00 8,096.89
0.0150 m3 Koral Beton 1,187,844.00 17,817.66
0.2970 oh Pekerja 130,648.00 38,802.46
0.0330 oh Tukang Batu 162,003.52 5,346.12
0.0330 oh Tukang Kayu 168,535.92 5,561.69
0.0330 oh Tukang Besi 168,535.92 5,561.69
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Total : 59,736.84 116,828.36 176,565.19

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong - -
0.1500 oh Pekerja 130,648.00 19,597.20
0.0600 oh Tukang Kayu 168,535.92 10,112.16
0.0060 oh Kepala Tukang 175,068.32 1,050.41
0.0080 oh Mandor 180,947.48 1,447.58
Total : 32,207.34 - 32,207.34

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat - -
0.1500 oh Pekerja 130,648.00 19,597.20
0.0600 oh Tukang Kayu 168,535.92 10,112.16
0.0060 oh Kepala Tukang 175,068.32 1,050.41
0.0080 oh Mandor 180,947.48 1,447.58
Total : 32,207.34 - 32,207.34

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong 87,158.68
8.0000 kg Semen Portland 3,543.48 28,347.87
0.0320 m3 Pasir Pasang 899,654.00 28,788.93
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Kayu 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0020 oh Mandor 180,947.48 361.89
Total : 89,829.65 57,136.80 146,966.45
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 67,826.41 50,869.81
0.1200 kg Paku Pancing 60 x 230 51,994.49 6,239.34
0.1400 oh Pekerja 130,648.00 18,290.72
0.0700 oh Tukang Kayu 168,535.92 11,797.51
0.0070 oh Kepala Tukang Kayu 175,068.32 1,225.48
0.0070 oh Mandor 180,947.48 1,266.63
Total : 32,580.35 57,109.15 89,689.49

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


2.4000 lbr Bubungan Stel Gelombang 61,082.25 146,597.39
6.0000 Bh Paku Skrup 3,5" - -
0.0840 oh Pekerja 130,648.00 10,974.43
0.1250 oh Tukang Kayu 168,535.92 21,066.99
0.0130 oh Kepala Tukang 175,068.32 2,275.89
0.0040 oh Mandor 180,947.48 723.79
Total : 35,041.10 146,597.39 181,638.49
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap - -
0.2000 kg Paku Biasa 1/2" - 1" 38,391.92 7,678.38
0.1660 oh Pekerja 130,648.00 21,687.57
0.2500 oh Tukang Kayu 168,535.92 42,133.98
0.0250 oh Kepala Tukang 175,068.32 4,376.71
0.0080 oh Mandor 180,947.48 1,447.58
Total : 69,645.84 7,678.38 77,324.22

7 1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28 45,358.60 18,143.44
0.0600 kg Paku biasa 1/2" - 1" 51,072.28 3,064.34
0.0500 kg Paku biasa 2" - 5" 38,391.92 1,919.60
0.0040 m3 Kayu papan 3 cm 4,415,572.00 17,662.29
0.1250 oh Pekerja 130,648.00 16,331.00
0.2500 oh Tukang kayu 168,535.92 42,133.98
0.0250 oh Kepala Tukang 175,068.32 4,376.71
0.0080 oh Mandor 180,947.48 1,447.58
Total : 64,289.27 40,789.66 105,078.93

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang 3,007.20 19,546.80
0.5000 glg Tali pengikat - -
0.2000 oh Pekerja 130,648.00 26,129.60
0.0100 oh Mandor 180,947.48 1,809.47
Total : 27,939.07 19,546.80 47,485.87

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 32 142,190.44 99,533.31
0.0200 kg Paku Biasa 1/2" - 1" 56,836.08 1,136.72
0.1200 oh Pekerja 130,648.00 15,677.76
0.0600 oh Tukang Kayu 168,535.92 10,112.16
0.0060 oh Kepala Tukang 175,068.32 1,050.41
0.0060 oh Mandor 180,947.48 1,085.68
Total : 27,926.01 100,670.03 128,596.04

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil 57,219.20 60,080.16
0.1500 oh Pekerja 130,648.00 19,597.20
0.0500 oh Tukang Kayu 168,535.92 8,426.80
0.0050 oh Kepala Tukang 175,068.32 875.34
0.0080 oh Mandor 180,947.48 1,447.58
Total : 30,346.92 60,080.16 90,427.07

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28 45,358.60 13,607.58
0.0400 kg Paku biasa 1/2" - 1" 56,836.08 2,273.44
0.1500 oh Pekerja 130,648.00 19,597.20
0.0700 oh Tukang Kayu 168,535.92 11,797.51
0.0080 oh Kepala Tukang 175,068.32 1,400.55
0.0060 oh Mandor 180,947.48 1,085.68
Total : 33,880.95 15,881.02 49,761.97
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

12 1 M2 MEMASANG ATAP MULTIROOF


1.0200 lbr Multiroof - -
0.2000 kg Paku 51,072.28 10,214.46
0.2000 oh Pekerja 130,648.00 26,129.60
0.1000 oh Tukang Kayu 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0100 oh Mandor 180,947.48 1,809.47
Total : 46,543.35 10,214.46 56,757.81

13 1 M1 MEMASANG BUBUNGAN MULTIROOF


5.0000 bh Bubungan Multiroof 87,158.68 435,793.40
0.8000 kg Semen Portland 3,543.48 2,834.79
0.0320 m3 Pasir Pasang 899,654.00 28,788.93
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Kayu 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0020 oh Mandor 180,947.48 361.89
Total : 89,829.65 467,417.12 557,246.76

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ETERNIT, TEBAL 4 MM, 5 MM
DAN 6 MM
1.1000 lbr Eternit 116,794.64 128,474.10
0.0100 kg Paku Biasa 1/2" - 1" 51,072.28 510.72
0.0300 oh Pekerja 130,648.00 3,919.44
0.0700 oh Tukang Kayu 168,535.92 11,797.51
0.0070 oh Kepala Tukang 175,068.32 1,225.48
0.0040 oh Mandor 180,947.48 723.79
Total : 17,666.22 128,984.82 146,651.04

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/4MM


0.3750 lbr Tripleks 4 mm 126,051.80 47,269.43
0.0300 kg Paku Biasa 1/2" - 1" 51,072.28 1,532.17
0.1000 oh Pekerja 130,648.00 13,064.80
0.1000 oh Tukang Kayu 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0050 oh Mandor 180,947.48 904.74
Total : 32,573.81 48,801.59 81,375.41

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan 4,415,572.00 66,233.58
0.0100 kg Paku Biasa 1/2" - 1" 51,072.28 510.72
0.8000 oh Pekerja 130,648.00 104,518.40
0.8000 oh Tukang Kayu 168,535.92 134,828.74
0.0800 oh Kepala Tukang 175,068.32 14,005.47
0.0400 oh Mandor 180,947.48 7,237.90
Total : 260,590.50 66,744.30 327,334.80

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil - -
0.1000 kg Paku list SQ 51,072.28 5,107.23
0.0500 oh Pekerja 130,648.00 6,532.40
0.0500 oh Tukang Kayu 168,535.92 8,426.80
0.0050 oh Kepala Tukang 175,068.32 875.34
0.0030 oh Mandor 180,947.48 542.84
Total : 16,377.38 5,107.23 21,484.61
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Matoa Usuk 4/6 cm 3,032,260.00 36,387.12
0.0600 kg Paku Biasa 2" - 5" 38,391.92 2,303.52
1.1000 lbr Asbes 116,794.64 128,474.10
0.1800 oh Pekerja 130,648.00 23,516.64
0.3200 oh Tukang Kayu 168,535.92 53,931.49
0.0320 oh Kepala Tukang 175,068.32 5,602.19
0.0090 oh Mandor 180,947.48 1,628.53
Total : 84,678.85 167,164.73 251,843.58

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup 24,558.80 2,701.47
0.3640 lbr Gypsum Board (120x240x9) 100,000.00 36,400.00
0.1000 oh Pekerja 130,648.00 13,064.80
0.0500 oh Tukang Kayu 168,535.92 8,426.80
0.0050 oh Kepala Tukang 175,068.32 875.34
0.0050 oh Mandor 180,947.48 904.74
Total : 23,271.68 39,101.47 62,373.14

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup 24,558.80 2,701.47
0.3640 lbr Kalsiboard 4.5 mm 155,873.20 56,737.84
0.1000 oh Pekerja 130,648.00 13,064.80
0.0500 oh Tukang Kayu 168,535.92 8,426.80
0.0050 oh Kepala Tukang 175,068.32 875.34
0.0050 oh Mandor 180,947.48 904.74
Total : 23,271.68 59,439.31 82,710.99

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
1.0000 bh Kloset duduk/ monoblok 3,307,920.00 3,307,920.00
6% x harga kloset Perlengkapan 198,475.20
3.3000 oh Pekerja 130,648.00 431,138.40
1.1000 oh Tukang batu 162,003.52 178,203.87
0.0010 oh Kepala Tukang 175,068.32 175.07
0.1600 oh Mandor 180,947.48 28,951.60
Total : 638,468.94 3,506,395.20 4,144,864.14

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen 477,894.20 477,894.20
6.0000 kg Semen Portland 3,543.48 21,260.90
0.0100 m3 Pasir Pasang 899,654.00 8,996.54
1.0000 oh Pekerja 130,648.00 130,648.00
1.5000 oh Tukang batu 162,003.52 243,005.28
1.5000 oh Kepala Tukang 175,068.32 262,602.48
0.1600 oh Mandor 180,947.48 28,951.60
Total : 665,207.36 508,151.64 1,173,359.00

3 MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir 2,783,772.00 2,783,772.00
6% x harga Urin Perlengkapan 167,026.32
6.0000 kg Semen Portland 3,543.48 21,260.90
0.0100 m3 Pasir Pasang 899,654.00 8,996.54
1.0000 oh Pekerja 130,648.00 130,648.00
1.0000 oh Tukang batu 162,003.52 162,003.52
0.1000 oh Kepala Tukang 175,068.32 17,506.83
0.1000 oh Mandor 180,947.48 18,094.75
Total : 328,253.10 2,981,055.76 3,309,308.86

4 MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel 1,117,676.00 1,117,676.00
12% x harga wast Perlengkapan 134,121.12
6.0000 kg Semen Portland 3,543.48 21,260.90
0.0100 m3 Pasir Pasang 899,654.00 8,996.54
1.2000 oh Pekerja 130,648.00 156,777.60
1.4500 oh Tukang batu 162,003.52 234,905.10
0.1500 oh Kepala Tukang 175,068.32 26,260.25
0.1000 oh Mandor 180,947.48 18,094.75
Total : 436,037.70 1,282,054.56 1,718,092.26
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass 477,894.20 477,894.20
18% x harga wast Perlengkapan 86,020.96
1.8000 oh Pekerja 130,648.00 235,166.40
2.7000 oh Tukang batu 162,003.52 437,409.50
0.5400 oh Kepala Tukang 175,068.32 94,536.89
0.1100 oh Mandor 180,947.48 19,904.22
Total : 787,017.02 563,915.16 1,350,932.18

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


1.2000 m1 Pipa galvanis 63,610.63 76,332.76
35% x harga pipa Perlengkapan 22,263.72
0.0540 oh Pekerja 130,648.00 7,054.99
0.0900 oh Tukang Pipa 168,535.92 15,168.23
0.0090 oh Kepala Tukang 175,068.32 1,575.61
0.0270 oh Mandor 180,947.48 4,885.58
Total : 28,684.42 98,596.48 127,280.90

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


1.2000 M' Pipa galvanis 288,398.83 346,078.60
35% x harga pipa Perlengkapan 100,939.59
0.1080 Oh Pekerja 130,648.00 14,109.98
0.1800 Oh Tukang Pipa 168,535.92 30,336.47
0.0180 Oh Kepala Tukang 175,068.32 3,151.23
0.0054 Oh Mandor 180,947.48 977.12
Total : 48,574.80 447,018.19 495,592.99

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


1.2000 m1 Pipa PVC 30,573.20 36,687.84
35% x harga pipa Perlengkapan 10,700.62
0.0360 oh Pekerja 130,648.00 4,703.33
0.0600 oh Tukang Pipa 168,535.92 10,112.16
0.0060 oh Kepala Tukang 175,068.32 1,050.41
0.0018 oh Mandor 180,947.48 325.71
Total : 16,191.60 47,388.46 63,580.06

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


1.2000 m1 Pipa PVC 44,406.32 53,287.58
35% x harga pipa Perlengkapan 15,542.21
0.0540 oh Pekerja 130,648.00 7,054.99
0.0900 oh Tukang Pipa 168,535.92 15,168.23
0.0090 oh Kepala Tukang 175,068.32 1,575.61
0.0027 oh Mandor 180,947.48 488.56
Total : 24,287.40 68,829.80 93,117.19

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


1.2000 m1 Pipa PVC 114,148.30 136,977.96
35% x harga pipa Perlengkapan 39,951.91
0.0810 oh Pekerja 130,648.00 10,582.49
0.1350 oh Tukang Pipa 168,535.92 22,752.35
0.0135 oh Kepala Tukang 175,068.32 2,363.42
0.0041 oh Mandor 180,947.48 741.88
Total : 36,440.14 176,929.87 213,370.01
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air 82,196.80 82,196.80
0.0250 bh Seal tape 18,795.00 469.88
0.0100 oh Pekerja 130,648.00 1,306.48
0.1000 oh Tukang Pipa 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0050 oh Mandor 180,947.48 904.74
Total : 20,815.49 82,666.68 103,482.17

XI PEKERJAAN BESI DAN ALUMINIUM


(SNI 7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF 24,909.64 28,646.09
0.0060 oh Pekerja 130,648.00 783.89
0.0600 oh Tukang besi 168,535.92 10,112.16
0.0060 oh Kepala Tukang 175,068.32 1,050.41
0.0003 oh Mandor 180,947.48 54.28
Total : 12,000.74 28,646.09 40,646.82

2 1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako 37,590.00 41,349.00
10.0000 bh Paku biasa 1 cm - 2,5 cm 7,267.40 72,674.00
7.0000 m' Besi strip 13,050.05 91,350.32
0.2000 oh Pekerja 130,648.00 26,129.60
0.2000 oh Tukang besi 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0010 oh Mandor 180,947.48 180.95
Total : 63,519.10 205,373.32 268,892.41

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat 45,358.60 47,626.53
0.0150 kg Paku biasa 0,5" - 1" 56,836.08 852.54
0.0190 m3 Kayu papan matoa 3,032,260.00 57,612.94
0.1500 oh Pekerja 130,648.00 19,597.20
0.4000 oh Tukang besi 168,535.92 67,414.37
0.0250 oh Kepala Tukang 175,068.32 4,376.71
0.0013 oh Mandor 180,947.48 235.23
Total : 91,623.51 106,092.01 197,715.52

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa 174,417.60 174,417.60
0.0100 oh Pekerja 130,648.00 1,306.48
0.5000 oh Tukang besi 168,535.92 84,267.96
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0050 oh Mandor 180,947.48 904.74
Total : 88,229.86 174,417.60 262,647.46

2 1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu - -
0.0150 oh Pekerja 130,648.00 1,959.72
0.1500 oh Tukang besi 168,535.92 25,280.39
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0008 oh Mandor 180,947.48 144.76
Total : 30,010.89 - 30,010.89

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela 41,850.20 41,850.20
0.0100 oh Pekerja 130,648.00 1,306.48
0.1000 oh Tukang besi 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0005 oh Mandor 180,947.48 90.47
Total : 20,001.23 41,850.20 61,851.43

4 1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin 30,322.60 30,322.60
0.0150 oh Pekerja 130,648.00 1,959.72
0.1500 oh Tukang besi 168,535.92 25,280.39
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0008 oh Mandor 180,947.48 144.76
Total : 30,010.89 30,322.60 60,333.49

5 1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot 41,850.20 41,850.20
0.0200 oh Pekerja 130,648.00 2,612.96
0.2000 oh Tukang besi 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0010 oh Mandor 180,947.48 180.95
Total : 40,002.46 41,850.20 81,852.66
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6 1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 m2 Kaca 191,885.12 211,073.63
0.0150 oh Pekerja 130,648.00 1,959.72
0.1500 oh Tukang besi 168,535.92 25,280.39
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0008 oh Mandor 180,947.48 144.76
Total : 30,010.89 211,073.63 241,084.52

XIII PEK. PENUTUP LANTAI DAN DINDING


(SNI 7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.8700 bh Keramik 30 x 30 cm 7,645.58 90,753.01
10.0000 kg Semen Portland 3,543.48 35,434.84
0.0450 m3 Pasir Pasang 899,654.00 40,484.43
1.5000 kg Semen warna/semen grouting 41,850.20 62,775.30
0.7000 oh Pekerja 130,648.00 91,453.60
0.3500 oh Tukang batu 162,003.52 56,701.23
0.0350 oh Kepala Tukang 175,068.32 6,127.39
0.0350 oh Mandor 180,947.48 6,333.16
Total : 160,615.39 229,447.58 390,062.97

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm 3,779.05 100,144.77
10.4000 kg Semen Portland 3,543.48 36,852.23
0.0450 m3 Pasir Pasang 899,654.00 40,484.43
1.6200 kg Semen warna/semen grouting 41,850.20 67,797.32
0.7000 oh Pekerja 130,648.00 91,453.60
0.3500 oh Tukang batu 162,003.52 56,701.23
0.0350 oh Kepala Tukang 175,068.32 6,127.39
0.0350 oh Mandor 180,947.48 6,333.16
Total : 160,615.39 245,278.76 405,894.14

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm 7,645.58 25,459.78
1.1400 kg Semen Portland 3,543.48 4,039.57
0.0030 m3 Pasir Pasang 899,654.00 2,698.96
0.1000 kg Semen warna/semen grouting 41,850.20 4,185.02
0.0900 oh Pekerja 130,648.00 11,758.32
0.0900 oh Tukang batu 162,003.52 14,580.32
0.0090 oh Kepala Tukang 175,068.32 1,575.61
0.0050 oh Mandor 180,947.48 904.74
Total : 28,818.99 36,383.33 65,202.32
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
26.5000 bh Keramik 20 x 20 cm 3,779.05 100,144.77
9.3000 kg Semen Portland 3,543.48 32,954.40
0.0180 m3 Pasir Pasang 899,654.00 16,193.77
1.9400 kg Semen warna/semen grouting 41,850.20 81,189.39
0.9000 oh Pekerja 130,648.00 117,583.20
0.4500 oh Tukang batu 162,003.52 72,901.58
0.0450 oh Kepala Tukang 175,068.32 7,878.07
0.0450 oh Mandor 180,947.48 8,142.64
Total : 206,505.50 230,482.33 436,987.83

5 1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Matoa 3,032,260.00 9,096.78
0.0500 kg Paku sekrup 3,5' - -
0.1200 oh Pekerja 130,648.00 15,677.76
0.1200 oh Tukang kayu 168,535.92 20,224.31
0.0120 oh Kepala Tukang 175,068.32 2,100.82
0.0060 oh Mandor 180,947.48 1,085.68
Total : 39,088.58 9,096.78 48,185.36

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni 82,259.45 16,451.89
0.1500 kg Dempul 82,259.45 12,338.92
0.1700 kg Cat dasar 81,250.00 13,812.50
0.2600 kg Cat Penutup 2x 89,464.20 23,260.69
0.0700 oh Pekerja 130,648.00 9,145.36
0.0090 oh Tukang cat 168,535.92 1,516.82
0.0060 oh Kepala Tukang 175,068.32 1,050.41
0.0025 oh Mandor 180,947.48 452.37
Total : 12,164.96 65,864.00 78,028.96
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis 112,519.40 16,877.91
0.0500 kg Dempul 82,259.45 4,112.97
0.1000 lbr Amplas 13,031.20 1,303.12
0.0100 bh Kuas 41,850.20 418.50
0.1600 oh Pekerja 130,648.00 20,903.68
0.1600 oh Tukang cat 168,535.92 26,965.75
0.0160 oh Kepala Tukang 175,068.32 2,801.09
0.0025 oh Mandor 180,947.48 452.37
Total : 51,122.89 22,712.50 73,835.39
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir 17,892.84 1,789.28
0.1000 kg Cat dasar 36,337.00 3,633.70
0.2600 kg Cat Penutup 2x 256,614.40 66,719.74
0.0200 oh Pekerja 130,648.00 2,612.96
0.0630 oh Tukang cat 168,535.92 10,617.76
0.0063 oh Kepala Tukang 175,068.32 1,102.93
0.0025 oh Mandor 180,947.48 452.37
Total : 14,786.02 72,142.73 86,928.75

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar 36,337.00 4,360.44
0.1800 kg Cat Penutup 2x 256,614.40 46,190.59
0.0280 oh Pekerja 130,648.00 3,658.14
0.0420 oh Tukang cat 168,535.92 7,078.51
0.0042 oh Kepala Tukang 175,068.32 735.29
0.0025 oh Mandor 180,947.48 452.37
Total : 11,924.31 50,551.03 62,475.34

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi 112,519.40 11,251.94
0.0100 lbr Kuas 41,850.20 418.50
0.0200 oh Pekerja 130,648.00 2,612.96
0.2000 oh Tukang cat 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0100 oh Mandor 180,947.48 1,809.47
Total : 41,630.99 11,670.44 53,301.43

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi 112,519.40 33,755.82
0.0060 oh Pekerja 130,648.00 783.89
0.0600 oh Tukang cat 168,535.92 10,112.16
0.0120 oh Kepala Tukang 175,068.32 2,100.82
0.0060 oh Mandor 180,947.48 1,085.68
Total : 14,082.55 33,755.82 47,838.37

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur 95,228.00 49,709.02
2.0000 lbr Amplas 13,031.20 26,062.40
0.0600 oh Pekerja 130,648.00 7,838.88
0.0600 oh Tukang cat 168,535.92 10,112.16
0.0160 oh Kepala Tukang 175,068.32 2,801.09
0.0025 oh Mandor 180,947.48 452.37

Total : 21,204.50 75,771.42 96,975.91

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok - -
8.4000 kg Semen Portland 3,543.48 29,765.27
Upah Kerja ( Lumpsum) 359,074.00 359,074.00
Total : 359,074.00 29,765.27 388,839.27

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan - -
8.4000 kg Semen Portland 3,543.48 29,765.27
Upah Kerja ( Lumpsum) 192,836.00 192,836.00
Total : 192,836.00 29,765.27 222,601.27

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Bata Gosok - -
4.2000 kg Semen Portland 3,543.48 14,882.63
Upah Kerja ( Lumpsum) 192,836.00 192,836.00
Total : 192,836.00 14,882.63 207,718.63
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

4 1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras - -
4.2000 kg Semen Portland 3,543.48 14,882.63
Upah Kerja ( Lumpsum) 192,836.00 192,836.00
Total : 192,836.00 14,882.63 207,718.63

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok - -
4.4917 bh Batu paras - -
5.2500 kg Semen Portland 3,543.48 18,603.29
Upah Kerja ( Lumpsum) 192,836.00 192,836.00
Total : 192,836.00 18,603.29 211,439.29

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok - -
4.2000 kg Semen Portland 3,543.48 14,882.63
Upah Kerja ( Lumpsum) 383,674.00 383,674.00
Total : 383,674.00 14,882.63 398,556.63

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras - -
4.2000 kg Semen Portland 3,543.48 14,882.63
Upah Kerja ( Lumpsum) 383,674.00 383,674.00
Total : 383,674.00 14,882.63 398,556.63

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok - -
4.4917 bh Batu paras - -
5.2500 kg Semen 50 Kg 3,543.48 18,603.29
Upah Kerja ( Lumpsum) 383,674.00 383,674.00
Total : 383,674.00 18,603.29 402,277.29

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 6 cm K225 254,860.20 254,860.20
0.2500 oh Tukang Batu 162,003.52 40,500.88
0.0250 oh Kepala Tukang 175,068.32 4,376.71
0.5000 oh Pekerja 130,648.00 65,324.00
0.0250 oh Mandor 180,947.48 4,523.69
Total : 114,725.28 254,860.20 369,585.48
2 Paving 10 x 20 cm tebal 6 cm K350 - 114,725.28 - 114,725.28
4 Paving 10 x 20 cm tebal 8 cm K225 - 114,725.28 - 114,725.28
5 Paving 10 x 20 cm tebal 8 cm K350 - 114,725.28 - 114,725.28
5 Paving 10 x 20 cm tebal 8 cm K425 - 114,725.28 - 114,725.28
7 Paving 20 x 20 cm tebal 6 cm K225 - 114,725.28 - 114,725.28
8 Paving 20 x 20 cm tebal 6 cm K350 - 114,725.28 - 114,725.28
10 Paving 20 x 20 cm tebal 8 cm K225 - 114,725.28 - 114,725.28
11 Paving 20 x 20 cm tebal 8 cm K350 - 114,725.28 - 114,725.28
12 Paving 20 x 20 cm tebal 8 cm K425 - 114,725.28 - 114,725.28
14 Paving 20 x 20 cm tebal 10 cm K225 - 114,725.28 - 114,725.28
15 Paving 20 x 20 cm tebal 10 cm K350 - 114,725.28 - 114,725.28
16 Paving 20 x 20 cm tebal 10 cm K425 - 114,725.28 - 114,725.28
18 Paving Tiga Berlian tebal 6 cm K225 - 114,725.28 - 114,725.28

20 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block 452,583.60 452,583.60
0.0690 m3 Pasir Urug 899,654.00 62,076.13
0.5000 oh Tukang Batu 162,003.52 81,001.76
0.0500 oh Kepala Tukang 175,068.32 8,753.42
1.0000 oh Pekerja 130,648.00 130,648.00
0.0500 oh Mandor 180,947.48 9,047.37
Total : 229,450.55 514,659.73 744,110.28

21 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat 16,840.32 20,208.38
9.2800 zak Semen 3,543.48 32,883.53
0.2000 m3 Pasir pasang 899,654.00 179,930.80
0.2500 oh Tukang Batu 162,003.52 40,500.88
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.6250 oh Pekerja 130,648.00 81,655.00
0.0310 oh Mandor 180,947.48 5,609.37
Total : 129,515.94 233,022.72 362,538.65
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 - -
0.4500 zak Semen 50 Kg 3,543.48 1,594.57
0.0023 m3 Pasir Pasang 899,654.00 2,069.20
0.3500 oh Tukang Batu 162,003.52 56,701.23
0.0350 oh Kepala Tukang 175,068.32 6,127.39
0.9500 oh Pekerja 130,648.00 124,115.60
0.0950 oh Mandor 180,947.48 17,190.01
Total : 204,134.23 3,663.77 207,798.01
23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) - 204,134.23 212,814.33 416,948.57
24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) - 204,134.23 212,814.33 416,948.57

25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 100,991.80 28,681.67
0.0710 kg Thiner 72,172.80 5,124.27
0.0300 oh Tukang Cat 168,535.92 5,056.08
0.0030 oh Kep. Tukang 175,068.32 525.20
0.1500 oh Pekerja 130,648.00 19,597.20
0.0150 oh Mandor 180,947.48 2,714.21
Total : 27,892.69 33,805.94 61,698.63

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 34,933.64 279,469.12
3.0000 bt Pipa Clipsal 20 mm hitam 33,780.88 101,342.64
2.0000 bh Tee dos clipsal 20 mm hitam 13,031.20 26,062.40
15.0000 bj Klem clipsal 20 mm hitam 3,809.12 57,136.80
3.0000 bj Sock clipsal 20 mm hitam 4,961.88 14,885.64
1.0000 bj Inbow dos plastik clipsal E 157 P 8,420.16 8,420.16
1.0000 ttk Biaya pasang 50,000.00 50,000.00
Total : 50,000.00 487,316.76 537,316.76

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 34,933.64 349,336.40
3.0000 bt Pipa Clipsal 20 mm hitam 33,780.88 101,342.64
1.0000 bh Tee dos clipsal 20 mm hitam 13,031.20 13,031.20
15.0000 bj Klem clipsal 20 mm hitam 3,809.12 57,136.80
4.0000 bj Sock clipsal 20 mm hitam 4,961.88 19,847.52
1.0000 bj Inbow dos plastik clipsal E 157 P 8,420.16 8,420.16
1.0000 m1 Pipa flexible clipsal 20 mm hitam - -
1.0000 ttk Biaya pasang 50,000.00 50,000.00 50,000.00
Total : 50,000.00 599,114.72 649,114.72

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone - -
8.0000 bt Pipa Clipsal 20 mm putih 33,780.88 270,247.04
1.0000 bh Tee dos clipsal 20 mm putih 13,031.20 13,031.20
25.0000 bj Klem clipsal 20 mm putih 3,809.12 95,228.00
5.0000 bj Sock clipsal 20 mm putih 4,961.88 24,809.40
1.0000 bj Inbow dos plastik clipsal E 157 P 8,420.16 8,420.16
1.0000 ttk Biaya pasang 50,000.00 50,000.00
Total : 50,000.00 411,735.80 461,735.80

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof - -
6.0000 bt Pipa Clipsal 20 mm putih 33,780.88 202,685.28
2.0000 bh Tee dos clipsal 20 mm putih 13,031.20 26,062.40
20.0000 bj Klem clipsal 20 mm putih 3,809.12 76,182.40
6.0000 bj Sock clipsal 20 mm putih 4,961.88 29,771.28
1.0000 bj Inbow dos plastik clipsal E 157 P 8,420.16 8,420.16
1.0000 ttk Biaya pasang 50,000.00 50,000.00
Total : 50,000.00 343,121.52 393,121.52

ANALISA PASANGAN BATA RINGAN (PENDEKATAN)


1 1 M2 PASANGAN BATU RINGAN CAMP. 1 PC : 2 PS
8.0000 bh Bata ringan 60x20x10 cm 28,372.48 226,979.81
43.5000 kg Semen Portland 3,543.48 154,141.55
0.0800 m3 Pasir Pasang 899,654.00 71,972.32
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 453,093.68 572,812.98

2 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 3 PS


8.0000 bh Bata ringan 60x20x10 cm 28,372.48 226,979.81
32.9500 kg Semen Portland 3,543.48 116,757.80
0.0910 m3 Pasir Pasang 899,654.00 81,868.51
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 425,606.12 545,325.42

3 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 4 PS


8.0000 bh Bata ringan 60x20x10 cm 28,372.48 226,979.81
26.5500 kg Semen Portland 3,543.48 94,079.50
0.0930 m3 Pasir Pasang 899,654.00 83,667.82
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 404,727.13 524,446.43

4 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 5 PS


8.0000 bh Bata ringan 60x20x10 cm 28,372.48 226,979.81
22.2000 kg Semen Portland 3,543.48 78,665.34
0.1020 m3 Pasir Pasang 899,654.00 91,764.71
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 397,409.86 517,129.16

5 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 6 PS


8.0000 bh Bata ringan 60x20x10 cm 28,372.48 226,979.81
18.5000 kg Semen Portland 3,543.48 65,554.45
0.1220 m3 Pasir Pasang 899,654.00 109,757.79
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0300 oh Mandor 180,947.48 5,428.42
Total : 119,719.29 402,292.05 522,011.35
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2022

NO URAIAN PEKERJAAN HARG


1 2 3
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp.
2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK Rp.
3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN Rp.
4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT Rp.
5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU Rp.
6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN Rp.
7 1 M2 PEMBUATAN BEDENG BURUH Rp.
8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM Rp.
9 1 M2 PEMBUATAN STEGGER DARI BAMBU Rp.
10 1 M2 PEMBUATAN JALAN SEMENTARA Rp.
11 1 M3 BONGKARAN BETON BERTULANG Rp.
12 1 M3 BONGKARAN DINDING TEMBOK BATU TELA Rp.

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER Rp.
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER Rp.
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER Rp.
4 1 M3 GALIAN TANAH KERAS DALAM 1METER Rp.
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp.
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER Rp.
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER Rp.
8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER Rp.
9 1 M3 URUGAN KEMBALI Rp.
10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) Rp.
11 1 M3 URUGAN PASIR Rp.
12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM Rp.
13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan Rp.
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN Rp.
15 1 M3 URUGAN LIMESTONE PADAT Rp.

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU KALI CAMP. 1 PC : 3 PS Rp.
2 1 M3 BATU KALI CAMP. 1 PC : 4 PS Rp.
3 1 M3 BATU KALI CAMP. 1 PC : 5 PS Rp.
4 1 M3 BATU KALI CAMP. 1 PC : 6 PS Rp.
5 1 M3 BATU KALI CAMP. 1 PC : 8 PS Rp.
6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI Rp.
7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M Rp.
8 1 M3 PASANGAN BATU KOSONG Rp.
NO URAIAN PEKERJAAN HARG
1 2 3
IV PEKERJAAN DINDING (SNI 6897 : 2008)
1 1 M2 PASANGAN BATA RINGAN CAMP. 1 PC : 2 PS Rp.
2 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 3 PS Rp.
3 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 4 PS Rp.
4 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 5 PS Rp.
5 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 6 PS Rp.
6 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 2 PS Rp.
7 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 3 PS Rp.
8 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 4 PS Rp.
9 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 5 PS Rp.
10 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 6 PS Rp.
11 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 8 PS Rp.
12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) Rp.
13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI Rp.
14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM Rp.
15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU Rp.

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM Rp.
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM Rp.
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM Rp.
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM Rp.
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp.
6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM Rp.
7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM Rp.
8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM Rp.
9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp.
10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM Rp.
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM Rp.
12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM Rp.
13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM Rp.
14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS Rp.
15 1 M2 FINISHING SIAR PASANGAN DINDING BATU TELA (=20 M') Rp.
16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') Rp.
17 1 M2 FINISHING SIAR PASANGAN BATUKALI/BELAH ADUKAN 1PC : 2 PS Rp.
18 1 M2 PEKERJAAN ACIAN Rp.
NO URAIAN PEKERJAAN HARG
1 2 3
VI PEKERJAAN KAYU (SNI 3434 : 2008)
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I (KAYU BESI) Rp.
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III (KAYU MATOA) Rp.
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II (KAYU MATOA) Rp.
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III (KAYU PUTIH) Rp.
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II (KAYU BESI) Rp.
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II (KAYU BESI) Rp.
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II (KAYU BESI) Rp.
8 MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai
90 Cm) Rp.
9 MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II
Rp.
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II Rp.
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I Rp.
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II
Rp.
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M'
Rp.
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp.
15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp.
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II Rp.
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II Rp.
18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp.
19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III Rp.
20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III Rp.
21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II Rp.
22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II Rp.
23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III Rp.

MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II


24 Rp.
MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II
25 Rp.
26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I Rp.
27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM Rp.
NO URAIAN PEKERJAAN HARG
1 2 3
VII PEKERJAAN BETON ( SNI 7394:2008)
1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR Rp.
2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR Rp.
3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR Rp.
4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR Rp.
5 1 M2 PASANG BEKISTING UNTUK PONDASI Rp.
6 1 M2 PASANG BEKISTING UNTUK SLOOF Rp.
7 1 M2 PASANG BEKISTING UNTUK KOLOM Rp.
8 1 M2 PASANG BEKISTING UNTUK BALOK Rp.
9 1 M2 PASANG BEKISTING UNTUK LANTAI Rp.
10 1 M2 PASANG BEKISTING UNTUK DINDING Rp.
11 1 M2 PASANG BEKISTING UNTUK TANGGA Rp.
12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp.
13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) Rp.
14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) Rp.
15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) Rp.
16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING) Rp.
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING Rp.
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) Rp.
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING) Rp.
20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) Rp.
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) Rp.

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG Rp.
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT Rp.
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG Rp.
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM Rp.
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M Rp.
6 1 M2 PEKERJAAN ATAP SIRAP Rp.
7 1 M2 PEKERJAAN ATAP NOK SIRAP Rp.
8 1 M2 PASANG ATAP ALANG-ALANG 3 M1 Rp.
9 1 M2 PEKERJAAN ATAP SENG GELOMBANG Rp.
10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL Rp.
11 1 M1 PASANG NOK SENG GELOMBANG Rp.

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ETERNIT, TEBAL 4 MM, 5 MM DAN 6 MM Rp.
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/4MM Rp.
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING Rp.
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL Rp.
5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA Rp.
6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM Rp.
7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM Rp.
NO URAIAN PEKERJAAN HARG
1 2 3
X PEKERJAAN SANITASI ( SNI 2002 )
1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK Rp.
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN Rp.
3 MEMASANG 1 BUAH URINOIR Rp.
4 MEMASANG 1 BUAH WASHTAFEL KIA Rp.
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 Rp.
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp.
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp.
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5" Rp.
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp.
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4" Rp.
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp.

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)


1 1 KG PASANG RANGKA ATAP BAJA Rp.
2 1 M2 PASANG JENDELA NAKO Rp.
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 Rp.

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA Rp.
2 1 PS PASANG ENGSEL PINTU Rp.
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU Rp.
4 1 BH PASANG KAIT ANGIN Rp.
5 1 BH PASANG KUNCI SLOT Rp.
6 1 M2 PASANG KACA, TEBAL 3 - 5 MM Rp.

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM Rp.
2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp.
3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM Rp.
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM Rp.
5 1 M1 PASANG PLIN KAYU 2 X 10 CM Rp.

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, Rp.
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS Rp.
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, Rp.
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) Rp.
5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI Rp.
6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI Rp.
7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR Rp.
NO URAIAN PEKERJAAN HARG
1 2 3
XV PEKERJAAN TETEMPELAN STYLE BALI
1 1 M2 PASANGAN BATA GOSOK 2 MUKA Rp.
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Rp.
3 1 M2 PASANGAN BATA GOSOK 1 MUKA Rp.
4 1 M2 PASANGAN PARAS 1 MUKA Rp.
5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Rp.
6 1 M2 PASANGAN BATA GOSOK DIUKIR Rp.
7 1 M2 PASANGAN PARAS DIUKIR Rp.
8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp.

XVI PEKERJAAN LANDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp.
2 Paving 10 x 20 cm tebal 6 cm K350 Rp.
3 Paving 10 x 20 cm tebal 8 cm K225 Rp.
4 Paving 10 x 20 cm tebal 8 cm K350 Rp.
5 Paving 20 x 20 cm tebal 6 cm K225 Rp.
6 Paving 20 x 20 cm tebal 6 cm K350 Rp.
7 Paving 20 x 20 cm tebal 8 cm K225 Rp.
8 Paving 20 x 20 cm tebal 8 cm K350 Rp.
9 Paving 20 x 20 cm tebal 8 cm K425 Rp.
10 Paving 20 x 20 cm tebal 10 cm K225 Rp.
11 Paving 20 x 20 cm tebal 10 cm K350 Rp.
12 Paving 20 x 20 cm tebal 10 cm K425 Rp.
13 Paving Tiga Berlian tebal 6 cm K225 Rp.
14 1 M2 PASANGAN GRASS BLOCK Rp.
15 1 M2 PASANGAN KORAL SIKAT Rp.
16 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp.
17 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Rp.
18 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp.
19 1 M2 PENGECATAN KANSTEIN Rp.

XVII PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp.
2 1 TITIK INSTALASI AC Rp.
3 1 TITIK INSTALASI TELEPHONE Rp.
4 1 TITIK INSTALASI MATV Rp.

Fakfak, 16 Agustus 2012


Panitia Penyusunan Standard Harga Satuan
Tahun 2013
Ketua,
Sekretaris,

Ir. ARIEF HARTADI, MT


LIZA NEIRASARI, ST NIP. 19640121 199403 1 004
NIP. 19751016 200111 2 001

Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,

SAMAUN DAHLAN, S.Sos, MAP


NIP. 19681005 199108 1 002
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,

NO URAIAN PEKERJAAN
SAMAUN DAHLAN, S.Sos, MAP
HARG
NIP. 19681005 199108 1 002
1 2 3
HARGA
3

584,396.02
89,340.73
2,775,357.95
1,491,684.52
1,516,948.85
22,112.17
1,606,521.97
193,387.51
69,544.40
335,213.49
931,285.73
877,001.48

102,509.69
125,725.84
149,303.88
136,438.32
206,828.85
164,920.24
7,437.14
44,923.31
-
74,371.37
1,120,588.67
22,311.41
459,697.29
414,184.97
37,185.69

2,091,717.38
1,985,009.40
1,910,927.03
1,858,894.95
1,787,456.41
4,545,949.58
2,226,019.77
1,163,047.56
HARGA
3

2,710,206.20
4,290,492.30
4,269,613.31
4,262,296.04
4,267,178.23
2,147,268.87
2,132,839.02
2,125,368.18
2,120,718.35
2,119,497.83
2,113,948.34
500,478.41
467,995.35
3,332,993.86
74,710.29

138,167.80
123,056.83
117,081.34
112,538.20
110,595.59
108,773.85
107,171.41
164,737.55
156,770.23
150,412.83
148,122.57
145,393.69
96,447.01
80,565.42
45,608.74
21,909.12
102,096.70
58,059.67
HARGA
3

9,644,411.21
7,981,777.58
367,423.46
367,423.46
929,954.41
896,833.35
1,035,928.14

985,160.59

882,828.00
790,930.18
882,828.00

992,317.36

7,792,651.04
10,095,276.84
5,314,272.59
94,963.19
105,879.32
546,628.76
142,895.17
142,199.34
102,474.91
101,553.70
195,080.26

390,437.99

385,583.76
453,211.82
62,796.37
HARGA
3

2,548,646.46
2,491,349.27
2,741,002.01
202,574.84
255,700.19
255,700.19
486,673.03
495,769.81
620,192.71
504,891.65
455,410.68
150,123.69
7,223,910.50
8,528,336.05
13,091,914.11
10,461,555.72
9,759,925.36
9,362,741.40
9,877,566.45
124,294.09
176,565.19

32,207.34
32,207.34
146,966.45
89,689.49
181,638.49
77,324.22
105,078.93
47,485.87
128,596.04
90,427.07
49,761.97

146,651.04
81,375.41
327,334.80
21,484.61
251,843.58
62,373.14
82,710.99
HARGA
3

4,144,864.14
1,173,359.00
3,309,308.86
1,718,092.26
1,350,932.18
127,280.90
495,592.99
63,580.06
93,117.19
213,370.01
103,482.17

40,646.82
268,892.41
197,715.52

262,647.46
30,010.89
61,851.43
60,333.49
81,852.66
241,084.52

390,062.97
405,894.14
65,202.32
436,987.83
48,185.36

78,028.96

73,835.39
86,928.75

62,475.34
53,301.43
47,838.37
96,975.91
HARGA
3

388,839.27
222,601.27
207,718.63
207,718.63
211,439.29
398,556.63
398,556.63
402,277.29

369,585.48
114,725.28
114,725.28
114,725.28
114,725.28
114,725.28
114,725.28
114,725.28
114,725.28
114,725.28
114,725.28
114,725.28
114,725.28
744,110.28
362,538.65
207,798.01
416,948.57
416,948.57
61,698.63

537,316.76
649,114.72
461,735.80
393,121.52
R A B
PEMBANGUNAN RUMAH T.70
Lokasi : Kampung Homorkokma Distrik Kramamongga

Harga Satuan Jumlah Harga


No Uraian pekerjaan Sat Volume
(Rp) (Rp)
I. Pekerjaan Pendahuluan
1 Pengukuran/pas.bouwplak M' 49.00 89,340.73 4,377,695.62
2 Papan nama proyek Bh 1.00 1,000,000.00 1,000,000.00
3 Pembersihan lokasi M2 100.00 22,112.17 2,211,217.40
4 Barak Kerja M2 12.00 1,606,521.97 19,278,263.59
26,867,176.62
II. Pekerjaan Tanah
1 Galian tanah/batu pondasi M3 32.63 136,438.32 4,451,982.36
2 Urugan tanah kembali M3 10.88 45,479.44 494,664.71
3 Timbunan tanah bawah lantai M3 31.20 414,184.97 12,922,571.19
4 Urugan pasir bawah lantai t=7 cm M3 3.90 1,120,588.67 4,370,295.83
22,239,514.09
III. Pekerjaan Pasangan
1 Pas. Batu kosong M3 8.70 1,163,047.56 10,118,513.75
2 Pasang pondasi batu belah 1:4 M3 38.32 1,985,009.40 76,073,103.13
3 Sloef beton tanpa tulang 1:2:3, 20/25 M3 3.55 2,741,002.01 9,726,445.62
4 Pas. Dinding coor 1:4 M3 13.79 2,125,368.18 29,308,827.21
5 Plester dinding 1:4 M2 275.80 112,538.20 31,038,035.88
6 Coor lantai beton tumbuk 1:3:5, t=7 cm di- M3 7.80 2,548,646.46 19,879,442.38
plester 1:3 dan difloor -
7 Keramik lantai 30x30 M2 78.00 390,062.97 30,424,911.51
8 Coor bak air 75x50x50 Bh 1.00 1,350,932.18 1,350,932.18
9 Closet jongkok porcelen Bh 1.00 1,173,359.00 1,173,359.00
10 Coor beton tulang plat dapur M3 0.02 9,759,925.36 195,198.51
11 Septictank + rembesan Bh 1.00 9,469,302.09 9,469,302.09
218,758,071.25
IV. Pekerjaan Kayu
1 Tiang ky. Besi 10/10 M3 0.63 4,768,150.00 3,003,934.50
2 Mirplat ky. Besi 10/10 M3 0.70 4,768,150.00 3,337,705.00
3 Kosen pintu/jendela/regel ky. Besi 5/10 M3 0.90 9,644,411.21 8,679,970.09
4 Kuda -kuda + pengapit + skoor ky. Besi 5/10 M3 0.88 7,792,651.04 6,857,532.91
5 Gording ky. Matoa 5/10 M3 1.14 5,314,272.59 6,058,270.75
6 Plafond tripleks 4 mm + rangka M2 109.09 142,895.17 15,588,434.16
7 Jalusi datar papan kayu besi M2 5.94 790,930.18 4,698,125.26
8 Listplank papan ky. Besi 2,5/30 M1 105.60 102,474.91 10,821,350.01
9 Papan gewel kayu matoa M2 18.31 195,080.26 3,571,919.53
10 Pintu panil kayu besi M2 9.45 929,954.41 8,788,069.17
11 Pintu double tripleks kayu besi lapis seng plat M2 1.68 992,317.36 1,667,093.16
12 Jendela split M2 0.32 896,833.35 286,986.67
13 Jendela kaca mati (1,2x0,4) M2 0.48 896,833.35 430,480.01
14 Jendela kaca mati (1,9x0,4) M2 0.76 896,833.35 681,593.35
15 Jendela kaca jungkit (1,9x0,7) M2 2.66 896,833.35 2,385,576.72
16 Jendela nako 8 klips Zet 12.00 483,098.00 5,797,176.00
82,654,217.29
V. Pekerjaan Atap
1 Atap seng gelombang Bjls 0,30 M2 126.50 128,596.04 16,267,399.01
2 Bubungan seng plat Bjls 0,30 M' 16.00 49,761.97 796,191.50
17,063,590.51
VI. Pekerjaan Pengecatan
1 Cat kilap kayu M2 61.60 78,028.96 4,806,584.02
2 Sigmatex plafond baru 3x M2 109.09 86,928.75 9,483,057.35
3 Sigmatex dinding baru 3x M2 275.97 86,928.75 23,989,727.16
38,279,368.53
1 2 3 4 5 6
VII. Pekerjaan Instalasi
1 Pasang lampu TL 40 Watt Bh 6.00 594,152.84 3,564,917.04
2 Pasang lampu pijar 25 Watt Bh 3.00 590,694.56 1,772,083.68
3 Zekering kast 1 group otomatis Bh 1.00 553,806.24 553,806.24
4 Pasang saklar tunggal Bh 5.00 573,403.16 2,867,015.80
5 Pasang saklar ganda Bh 2.00 573,403.16 1,146,806.32
6 Pasang stop kontak Bh 6.00 569,944.88 3,419,669.28
7 Penyambungan listrik Ls 1.00 2,500,000.00 2,500,000.00
8 Instalasi air Ls 1.00 2,000,000.00 2,000,000.00
9 Dokumentasi (0%,50%,100%) Ls 1.00 1,000,000.00 1,000,000.00
18,824,298.36

REKAPITULASI

I Pekerjaan Pendahuluan ………………… Rp 26,867,176.62


II Pekerjaan Tanah ………………… Rp 22,239,514.09
III Pekerjaan Pasangan ………………… Rp 218,758,071.25
IV Pekerjaan Kayu ………………… Rp 82,654,217.29
V Pekerjaan Atap ………………… Rp 17,063,590.51
VI Pekerjaan Pengecatan ………………… Rp 38,279,368.53
VII Pekerjaan Instalasi ………………… Rp 18,824,298.36
Real Cost Rp 424,686,236.64
Di Bulatkan Rp 424,686,000.00
Harga Bangunan per M2 Kons. Rangka Kayu Besi Rp 6,066,942.86
R A B
PEMBANGUNAN RUMAH T.70
Lokasi : Kampung Homorkokma Distrik Kramamongga

Harga Satuan
No Uraian pekerjaan Sat Volume
(Rp)
I. Pekerjaan Pendahuluan
1 Pengukuran/pas.bouwplak M' 49.00 89,340.73
2 Papan nama proyek Bh 1.00 1,000,000.00
3 Pembersihan lokasi M2 100.00 22,112.17
4 Barak Kerja M2 12.00 1,606,521.97

II. Pekerjaan Tanah


1 Galian tanah/batu pondasi M3 32.63 136,438.32
2 Urugan tanah kembali M3 10.88 45,479.44
3 Timbunan tanah bawah lantai M3 31.20 414,184.97
4 Urugan pasir bawah lantai t=7 cm M3 3.90 1,120,588.67

III. Pekerjaan Pasangan


1 Pas. Batu kosong M3 8.70 1,163,047.56
2 Pasang pondasi batu belah 1:4 M3 38.32 1,985,009.40
3 Sloef beton tulang 1:2:3, 20/25 M3 3.55 8,528,336.05
4 Pas. Dinding coor 1:4 M3 13.79 2,125,368.18
5 Plester dinding 1:4 M2 275.80 112,538.20
6 Coor lantai beton tumbuk 1:3:5, t=7 cm di- M3 7.80 2,548,646.46
plester 1:3 dan difloor
7 Keramik lantai 30x30 M2 78.00 390,062.97
8 Coor bak air 75x50x50 Bh 1.00 1,350,932.18
9 Closet jongkok porcelen Bh 1.00 1,173,359.00
10 Coor beton tulang plat dapur M3 0.02 9,759,925.36
11 Septictank + rembesan Bh 1.00 9,469,302.09

IV. Pekerjaan Kayu


1 Kolom beton tulang 10/10 M3 0.63 13,091,914.11
2 Ringbalk beton tulang 10/10 M3 0.70 10,461,555.72
3 Kosen pintu/jendela/regel ky. Besi 5/10 M3 0.90 9,644,411.21
4 Kuda -kuda + pengapit + skoor ky. Besi 5/10 M3 0.88 7,792,651.04
5 Gording ky. Matoa 5/10 M3 1.14 5,314,272.59
6 Plafond tripleks 4 mm + rangka M2 109.09 142,895.17
7 Jalusi datar papan kayu besi M2 5.94 790,930.18
8 Listplank papan ky. Besi 2,5/30 M1 105.60 102,474.91
9 Papan gewel kayu matoa M2 18.31 195,080.26
10 Pintu panil kayu besi M2 9.45 929,954.41
11 Pintu double tripleks kayu besi lapis seng plat M2 1.68 992,317.36
12 Jendela split M2 0.32 896,833.35
13 Jendela kaca mati (1,2x0,4) M2 0.48 896,833.35
14 Jendela kaca mati (1,9x0,4) M2 0.76 896,833.35
15 Jendela kaca jungkit (1,9x0,7) M2 2.66 896,833.35
16 Jendela nako 8 klips Zet 12.00 483,098.00

V. Pekerjaan Atap
1 Atap seng gelombang Bjls 0,30 M2 126.50 128,596.04
2 Bubungan seng plat Bjls 0,30 M' 16.00 49,761.97

VI. Pekerjaan Pengecatan


1 Cat kilap kayu M2 61.60 78,028.96
2 Sigmatex plafond baru 3x M2 109.09 86,928.75
3 Sigmatex dinding baru 3x M2 275.97 86,928.75

1 2 3 4 5
VII. Pekerjaan Instalasi
1 Pasang lampu TL 40 Watt Bh 6.00 594,152.84
2 Pasang lampu pijar 25 Watt Bh 3.00 590,694.56
3 Zekering kast 1 group otomatis Bh 1.00 553,806.24
4 Pasang saklar tunggal Bh 5.00 573,403.16
5 Pasang saklar ganda Bh 2.00 573,403.16
6 Pasang stop kontak Bh 6.00 569,944.88
7 Penyambungan listrik Ls 1.00 2,500,000.00
8 Instalasi air Ls 1.00 2,000,000.00
9 Dokumentasi (0%,50%,100%) Ls 1.00 1,000,000.00

REKAPITULASI

I Pekerjaan Pendahuluan ………………… Rp


II Pekerjaan Tanah ………………… Rp
III Pekerjaan Pasangan ………………… Rp
IV Pekerjaan Kayu ………………… Rp
V Pekerjaan Atap ………………… Rp
VI Pekerjaan Pengecatan ………………… Rp
VII Pekerjaan Instalasi ………………… Rp
Real Cost Rp
Di Bulatkan Rp
Harga Bangunan per M2 Kons. Beton Bertulang Rp
ga

Jumlah Harga
(Rp)

4,377,695.62
1,000,000.00
2,211,217.40
19,278,263.59
26,867,176.62

4,451,982.36
494,664.71
12,922,571.19
4,370,295.83
22,239,514.09

10,118,513.75
76,073,103.13
30,262,800.49
29,308,827.21
31,038,035.88
19,879,442.38
-
30,424,911.51
1,350,932.18
1,173,359.00
195,198.51
9,469,302.09
239,294,426.12

8,247,905.89
7,323,089.00
8,679,970.09
6,857,532.91
6,058,270.75
15,588,434.16
4,698,125.26
10,821,350.01
3,571,919.53
8,788,069.17
1,667,093.16
286,986.67
430,480.01
681,593.35
2,385,576.72
5,797,176.00
91,883,572.68

16,267,399.01
796,191.50
17,063,590.51

4,806,584.02
9,483,057.35
23,989,727.16
38,279,368.53

3,564,917.04
1,772,083.68
553,806.24
2,867,015.80
1,146,806.32
3,419,669.28
2,500,000.00
2,000,000.00
1,000,000.00
18,824,298.36

26,867,176.62
22,239,514.09
239,294,426.12
91,883,572.68
17,063,590.51
38,279,368.53
18,824,298.36
454,451,946.90
454,451,000.00
6,492,157.14
44.04

275.80
37.6
6.8
4.42 275.80
6.15
5.7
2.15
3.15
5
70.97 4.435625
0.9
10.08
RAB
PEMBANGUNAN PASAR EKS KIOS LAMA THUMBURUNI
KONSTRUKSI BETON TULANG BERLANTAI
LOKASI : FAKFAK KOTA
Harga Satuan Jumlah Harga
No URAIAN KEGIATAN Sat Volume
(Rp) (Rp)
1 2 3 4 5 6
I. PEKERJAAN PENDAHULUAN
1 Dokumentasi 0%,50%,100% LS 1.00 1,000,000.00 1,000,000.00
2 Pasang bouwplank M' 128.00 89,340.73 11,435,613.06
3 Papan nama proyek Bh 1.00 1,000,000.00 1,000,000.00
4 Barak Kerja M2 12.00 1,606,521.97 19,278,263.59
32,713,876.65
II. PEKERJAAN TANAH
1 Galian pondasi berbatu M3 150.21 136,438.32 20,494,399.95
2 Urugan tanah kembali M3 50.07 45,479.44 2,277,155.55
3 Timbunan tanah bawah lantai M3 123.20 414,184.97 51,027,588.80
4 Urugan pasir M3 15.40 1,120,588.67 17,257,065.59
91,056,209.89
III. Pekerjaan Pasangan
1 Pasang pondasi batu belah 1:4 M3 98.80 1,985,009.40 196,118,928.42
2 Pasang talud batu belah 1:4 M3 24.00 1,985,009.40 47,640,225.53
3 Pasang batu saluran 1:4 M3 9.00 1,985,009.40 17,865,084.57
4 Cor lantai kerja t=10 cm M3 6.22 2,548,646.46 15,852,580.97
5 Pasang poer beton tulang 1:2:3 (1x1x0.4) M3 14.40 7,223,910.50 104,024,311.18
6 Sloof beton tulang 1:2:3, 20/30 (arah X) M3 4.44 8,528,336.05 37,865,812.08
7 Sloof beton tulang 1:2:3, 20/30 (arah Y) M3 5.33 8,528,336.05 45,456,031.17
8 Sloof beton tulang 1:2:3,15/20 (arah X) M3 1.03 8,528,336.05 8,784,186.14
9 Sloof beton tulang 1:2:3,15/20 (arah Y) M3 2.28 8,528,336.05 19,444,606.21
10 Kolom beton tulang 1:2:3, 30/30 ( X,Y) M3 28.84 13,091,914.11 377,570,802.89
11 Kolom beton tulang 1:2:3, 20/20 (Teras Lt 1) M3 3.60 13,091,914.11 47,130,890.79
12 Kolom beton tulang 1:2:3, 20/20 (Teras Lt 2) M3 1.70 13,091,914.11 22,256,253.98
13 Balok beton tulang 1:2:3, 25/35 (Arah X)LT 2 M3 4.63 10,461,555.72 48,437,002.97
14 Balok beton tulang 1:2:3, 25/35 (Arah Y)LT 2 M3 5.55 10,461,555.72 58,061,634.23
15 Balok beton tulang 1:2:3, 15/25 (Arah X)LT 2 M3 0.84 10,461,555.72 8,787,706.80
16 Balok beton tulang 1:2:3, 15/25 (Arah Y)LT 2 M3 2.05 10,461,555.72 21,446,189.22
17 Ringbalk plat atap beton tulang 1:2:3, 15/20 (Arah X) M3 0.44 10,461,555.72 4,603,084.52
18 Ringbalk plat atap beton tulang 1:2:3, 15/20 (Arah Y) M3 0.66 10,461,555.72 6,904,626.77
19 Cor lantai beton tulang 1:2:3, T=10CM (LT 2) M3 47.16 9,759,925.36 460,278,079.82
20 Kolom praktis beton tulang 1:2:3, 10/10 (LT 2) M3 1.60 13,091,914.11 20,947,062.57
21 Cor plat atap beton tulang 1:2:3, T=9 cm M3 8.03 9,759,925.36 78,372,200.61
22 Listplankbeton plat atap t=10 cm M3 2.40 9,759,925.36 23,423,820.86
23 Kuda -kuda beton tulang 10/10 M3 1.12 9,759,925.36 10,931,116.40
24 Talang beton T= 10CM ( depan dan belakang) M3 6.00 9,759,925.36 58,559,552.14
25 Canopi beton atap (depan + belakang) t= 10 cm M3 1.73 9,759,925.36 16,884,670.87
26 Canopi ventilasi depan t= 10 cm M3 2.10 9,759,925.36 20,495,843.25
27 Canopi jendela t 5 mm M3 0.79 9,759,925.36 7,710,341.03
28 Kolom pagar beton bertulang 15/15 M3 0.41 13,091,914.11 5,367,684.78
29 Sloofpagar beton bertulang 15/20 M3 0.55 8,528,336.05 4,690,584.83
30 Coor lantai tumbuk 1:3:6, t=7 cm M3 30.80 2,548,646.46 78,498,310.92
31 Keramik lantai 30/30 M2 778.00 390,062.97 303,468,989.12
32 Pasang kaca blok M2 10.00 3,332,993.86 33,329,938.61
33 Pas batu cetak 1:4 LT1 M3 35.57 2,125,368.18 75,599,346.19
34 Pas batu cetak 1:4 LT2 M3 38.46 2,125,368.18 81,741,660.24
35 Plester dinding 1:4 M2 2,000.64 112,538.20 225,148,426.77
36 Plester dinding 1:2 M2 225.64 123,056.83 27,766,542.09
37 Acian dinding M2 2,226.28 58,059.67 129,257,088.81
2,750,721,218.35
1 2 3 4 5 6
IV. Pekerjaan KAYU/ALUMINIUM/PAGAR
1 Kusen Kayu besi 5/10 M3 1.07 9,644,411.21 10,280,942.35
2 Kusen kayu besi 5/10 M3 0.42 9,644,411.21 4,050,652.71
3 Gording kayu matoa 5/10 M3 2.00 5,314,272.59 10,628,545.18
4 Kasau 5/5 M3 0.80 5,314,272.59 4,251,418.07
5 Reng 2/3 M3 0.67 5,314,272.59 3,560,562.63
6 Plafond tripleks 3 mm M2 840.00 142,895.17 120,031,943.30
7 Jendela kaca riben M2 46.30 896,833.35 41,523,384.20
8 Jendela panil kaca riben (1,2x0,7) M2 16.80 896,833.35 15,066,800.32
9 Pintu toko (lipat dan besi) M2 175.00 1,100,000.00 192,500,000.00
10 Pagar BRC t= 1,2 m' Panil 26.00 778,503.52 20,241,091.48
11 Tiang BRC Bh 27.00 1,039,354.66 28,062,575.88
450,197,916.12
V. Pekerjaan Atap
1 Atap multiroof M2 344.00 56,757.81 19,524,685.26
2 Bubungan multiroof M' 40.00 557,246.76 22,289,870.42
41,814,555.69
VI. Pekerjaan Pengecatan
1 Sigmatex dinding baru 3x M2 2,226.28 86,928.75 193,527,737.72
2 Cat plafond M2 840.00 78,028.96 65,544,327.58
259,072,065.30
VII Pekerjaan Instalasi
1 Penyambungan listrik 900 watt Pkt 20.00 1,000,000.00 20,000,000.00
2 Pipa air hujan 3" M' 139.20 213,370.01 29,701,105.28
3 Pasang lampu XL 8 Watt Ttk 80.00 594,152.84 47,532,227.20
4 Pas. Saklar ganda Ttk 40.00 573,403.16 22,936,126.40
5 Pas. Stop kontak Ttk 40.00 569,944.88 22,797,795.20
6 Pas. Sekring kast Group 20.00 553,806.24 11,076,124.80
154,043,378.88

REKAPITULASI
I PEKERJAAN PENDAHULUAN Rp. 32,713,876.65
II PEKERJAAN TANAH Rp. 91,056,209.89
III Pekerjaan Pasangan Rp. 2,750,721,218.35
IV Pekerjaan KAYU/ALUMINIUM/PAGAR Rp. 450,197,916.12
V Pekerjaan Atap Rp. 41,814,555.69
VI Pekerjaan Pengecatan Rp. 259,072,065.30
VII Pekerjaan Instalasi Rp. 154,043,378.88
JUMLAH Rp 3,779,619,220.87
DIBULATKAN Rp 3,779,619,000.00

Harga Bangunan per M2 Kons. Beton tulang berlantai Rp 6,135,745.13


TYPE 640 M2 Rp 6,135,000.00
PEMERINTAH KABUPATEN FAKFAK
DINAS PU, PENATAAN RUANG, PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
Jl. Achmad Yani No. 08 Fakfak, Telp. (0956) 22320 - 22709

HARGA SATUAN PER M2


PEMBANGUNAN BANGUNAN GEDUNG DAN RUMAH NEGARA
TAHUN ANGGARAN 2022 DI DISTRIK FAKFAK KABUPATEN FAKFAK

Untuk Tahun Anggaran 2022 Triwulan ke - I, Dinas Pekerjaan Umum menetapkan harga satuan
per meter persegi untuk pembangunan gedung dan rumah dinas sebagai berikut:

1 Bang. Gedung/Rumah Konstruksi Rangka Beton Bertulang Rp 6,492,157.14


2 Bang. Gedung/Rumah Konstruksi Rangka Beton Bertulang 6,135,000.00
Bertingkat
2 Bang. Gedung/Rumah Konstruksi Rangka Rp 6,066,942.86
Kayu Besi

Dengan dasar perhitungan =

I Harga material didapat dari beberapa toko material di Fakfak, ditambahkan dengan
biaya pikul, biaya transport, dan keuntungan/overhead ( 15% )
II Upah tenaga berdasarkan UMP Prop. Papua Barat Sektor Konstruksi = Rp.3.266.200,- per bulan.
dan hasil survey/wawancara bersama pekerja di lokasi proyek.
III Analisa harga satuan pekerjaan menggunakan analisa SNI, kecuali untuk yang tidak ada dalam
SNI masih mengacu pada BOW
IV Analisa/asumsi bangunan sebagai berikut
- Pondasi tinggi rata2 1,00 m s/d 1.50 m
- Timbunan menggunakan tanah+batu
- Galian tanah berbatu
- Rangka bangunan dengan kayu besi dan beton bertulang
- Lantai beton tumbuk

Fakfak, 31 Mei 2022


PANITIA PENYUSUNAN STANDARD HARGA SATUAN TAHUN 2021

Mengetahui,
Plt.Kepala Dinas PU, Penataan Ruang, Perumahan Rakyat
dan Kawasan Permukiman
Kabupaten Fakfak , Ketua,

TEGUH SUGIHARTO, ST
NIP. 19701114 199712 1 001

LIZA NEIRASARI, ST
NIP. 19751016 200111 2 001
DAFTAR ANALISA PEKERJAAN SWAKLOLA
TAHUN 2022
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2
METER
1.2500 btg Bambu Sedang 15,000.00 18,750.00
2.5000 kg Semen Portland - -
1.2000 lbr Seng gelombang 3" - 5" 96,000.00 115,200.00
0.0050 m3 Pasir Beton 700,000.00 3,500.00
0.0090 m3 Koral beton #REF! #REF!
0.0720 m3 Kayu Meranti Usuk 5/7 - -
0.0600 kg Paku biasa 2" - 5" - -
0.4500 kg Meni Besi 75,000.00 33,750.00
0.2000 oh Tukang Kayu 168,535.92 33,707.18
0.4000 oh Pekerja 130,648.00 52,259.20
Total : 85,966.38 #REF! #REF!

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7 - -
0.0200 kg Paku Biasa 2" - 5" - -
0.0070 m3 Kayu Papan Meranti 3/20 - -
0.1000 oh Tukang Kayu 168,535.92 16,853.59
0.1000 oh Pekerja 130,648.00 13,064.80
Total : 29,918.39 - 29,918.39

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu Ø 8 - 10/4m 22,000.00 27,500.00
0.1800 m3 Kayu Meranti - -
0.8500 kg Paku Biasa 2" - 5" - -
1.1000 kg Besi Strip 8,712.00 9,583.20
35.0000 kg Semen Portland - -
0.1500 m3 Pasir Pasang 650,000.00 97,500.00
0.1000 m3 Pasir Beton 700,000.00 70,000.00
0.1500 m3 Koral Beton #REF! #REF!
30.0000 bh Bata Merah - -
0.2500 lbr Seng Plat 35,000.00 8,750.00
2.0000 bh Jendela Nako 30,000.00 60,000.00
0.0800 m2 Kaca Polos 147,326.69 11,786.14
0.1500 bh Kunci Tanam 150,000.00 22,500.00
0.0600 lbr Plywood 4 mm 200,000.00 12,000.00
2.0000 oh Tukang Kayu 168,535.92 337,071.84
1.0000 oh Tukang Batu 162,003.52 162,003.52
2.0000 oh Pekerja 130,648.00 261,296.00
Total : 760,371.36 #REF! #REF!

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang 15,000.00 25,500.00
0.2100 m3 Kayu Meranti - -
0.3000 kg Paku Biasa 2" - 5" - -
10.5000 kg Semen Portland - -
0.0300 m3 Pasir Beton 700,000.00 21,000.00
0.0500 m3 Koral Beton #REF! #REF!
1.5000 lbr Seng gelombang BJLS 28 - -
2.0000 oh Tukang Kayu 168,535.92 337,071.84
1.0000 oh Pekerja 130,648.00 130,648.00
Total : 467,719.84 #REF! #REF!

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang 15,000.00 45,000.00
0.2760 m3 Kayu Meranti - -
0.7000 kg Paku biasa 2" - 5" - -
1.5000 lbr Seng gelombang BJLS 28 - -
1.5000 oh Tukang Kayu 168,535.92 252,803.88
1.0000 oh Pekerja 130,648.00 130,648.00
Total : 383,451.88 45,000.00 428,451.88

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja 130,648.00 13,064.80
Total : 13,064.80 13,064.80

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang 15,000.00 18,750.00
0.1860 m3 Kayu Meranti - -
0.3000 kg Paku Biasa 2" - 5" - -
18.0000 kg Semen Portland - -
0.0300 m3 Pasir Beton 700,000.00 21,000.00
0.0500 m3 Koral Beton #REF! #REF!
1.5000 lbr Seng gelombang BJLS 28 - -
1.3500 lbr Plywood 4 mm 200,000.00 270,000.00
2.0000 oh Tukang Kayu 168,535.92 337,071.84
1.0000 oh Pekerja 130,648.00 130,648.00
Total : 467,719.84 #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang - -
0.0800 kg Paku Biasa 2" - 5" - -
1.0000 btg Kaso 5/7 - -
0.3000 oh Tukang kayu 168,535.92 50,560.78
Total : 50,560.78 - 50,560.78

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu 12,000.00 12,000.00
0.2500 kg Tali Ijuk - -
0.0170 oh Tukang Kayu 168,535.92 2,865.11
0.0020 oh Pekerja 130,648.00 261.30
3,126.41 12,000.00 15,126.41

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20 300,000.00 45,000.00
0.0900 m3 Batu Pecah 5 - 7 #REF! #REF!
0.0100 m3 Pasir Pasang 650,000.00 6,500.00
1.0000 oh Pekerja 130,648.00 130,648.00
Total : 130,648.00 #REF! #REF!

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja 130,648.00 871,030.22
Total : 871,030.22 871,030.22

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja 130,648.00 871,030.22
Total : 871,030.22 871,030.22

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja 130,648.00 97,986.00
Total : 97,986.00 97,986.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
0.9000 oh Pekerja 130,648.00 117,583.20
Total : 117,583.20 117,583.20

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja 130,648.00 137,180.40
Total : 137,180.40 137,180.40

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja 130,648.00 130,648.00
Total : 130,648.00 130,648.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja 130,648.00 195,972.00
Total : 195,972.00 195,972.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja 130,648.00 156,777.60
Total : 156,777.60 156,777.60

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja 130,648.00 6,532.40
Total : 6,532.40 6,532.40

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja 130,648.00 43,113.84
Total : 43,113.84 43,113.84

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja 130,648.00 65,324.00
Total : 65,324.00 65,324.00

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug - -
0.3000 oh Pekerja 130,648.00 39,194.40
Total : 39,194.40 - 39,194.40

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk - -
0.1500 oh Pekerja 130,648.00 19,597.20
Total : 19,597.20 - 19,597.20

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu 175,000.00 210,000.00
0.2500 oh Pekerja 130,648.00 32,662.00
Total : 32,662.00 210,000.00 242,662.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN
1.2000 m3 Tanah Urug 150,000.00 180,000.00
0.5000 oh Pekerja 130,648.00 65,324.00
Total : 65,324.00 180,000.00 245,324.00

14 1 M3 URUGAN LIMESTONE PADAT


1.2000 m3 Limestone - -
0.2500 oh Pekerja 130,648.00 32,662.00
Total : 32,662.00 - 32,662.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 300,000.00 360,000.00
202.0000 kg Semen Portland - -
0.4850 m3 Pasir Pasang 650,000.00 315,250.00
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
Total : 317,474.64 675,250.00 992,724.64

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 300,000.00 360,000.00
163.0000 kg Semen Portland - -
0.5200 m3 Pasir Pasang 650,000.00 338,000.00
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
Total : 317,474.64 698,000.00 1,015,474.64

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 300,000.00 360,000.00
136.0000 kg Semen Portland - -
0.5440 m3 Pasir Pasang 650,000.00 353,600.00
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
Total : 317,474.64 713,600.00 1,031,074.64

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 300,000.00 360,000.00
117.0000 kg Semen Portland - -
0.5610 m3 Pasir Pasang 650,000.00 364,650.00
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
Total : 317,474.64 724,650.00 1,042,124.64

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 300,000.00 360,000.00
91.0000 kg Semen Portland - -
0.5840 m3 Pasir Pasang 650,000.00 379,600.00
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
Total : 317,474.64 739,600.00 1,057,074.64

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20 300,000.00 144,000.00
194.0000 kg Semen Portland - -
0.3120 m3 Pasir Beton 700,000.00 218,400.00
0.4680 m3 Koral Beton #REF! #REF!
126.0000 kg Besi Beton 13,774.19 1,735,547.71
1.8000 kg Kawat Beton 25,000.00 45,000.00
3.4000 oh Pekerja 130,648.00 444,203.20
0.8500 oh Tukang Batu 162,003.52 137,702.99
581,906.19 #REF! #REF!

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20 300,000.00 135,000.00
194.0000 kg Semen Portland - -
0.3120 m3 Pasir Beton 700,000.00 218,400.00
0.4680 m3 Koral Beton #REF! #REF!
2.4000 oh Pekerja 130,648.00 313,555.20
0.8000 oh Tukang Batu 162,003.52 129,602.82
Total : 443,158.02 #REF! #REF!

8 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 300,000.00 360,000.00
0.4320 m3 Pasir Urug 700,000.00 302,400.00
0.7800 oh Pekerja 130,648.00 101,905.44
0.3900 oh Tukang Batu 162,003.52 63,181.37
Total : 165,086.81 662,400.00 827,486.81
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

IV PEKERJAAN DINDING (SNI 6897 : 2008)

1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm - -
43.5000 kg Semen Portland - -
0.0800 m3 Pasir Pasang 650,000.00 52,000.00
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
110,789.50 52,000.00 162,789.50

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm - -
32.9500 kg Semen Portland - -
0.0910 m3 Pasir Pasang 650,000.00 59,150.00
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
110,789.50 59,150.00 169,939.50

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm - -
26.5500 kg Semen Portland - -
0.0930 m3 Pasir Pasang 650,000.00 60,450.00
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
110,789.50 60,450.00 171,239.50

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm - -
22.2000 kg Semen Portland - -
0.1020 m3 Pasir Pasang 650,000.00 66,300.00
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
110,789.50 66,300.00 177,089.50

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm - -
18.5000 kg Semen Portland - -
0.1220 m3 Pasir Pasang 650,000.00 79,300.00
0.6000 oh Pekerja 130,648.00 78,388.80
0.2000 oh Tukang Batu 162,003.52 32,400.70
110,789.50 79,300.00 190,089.50

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm - -
18.9500 kg Semen Portland - -
0.0380 m3 Pasir Pasang 650,000.00 24,700.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
55,394.75 24,700.00 80,094.75

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm - -
14.3700 kg Semen Portland - -
0.0400 m3 Pasir Pasang 650,000.00 26,000.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 55,394.75 26,000.00 81,394.75

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm - -
11.5000 kg Semen Portland - -
0.0430 m3 Pasir Pasang 650,000.00 27,950.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 55,394.75 27,950.00 83,344.75

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm - -
9.6800 kg Semen Portland - -
0.0450 m3 Pasir Pasang 650,000.00 29,250.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 55,394.75 29,250.00 84,644.75
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm - -
8.3200 kg Semen Portland - -
0.0490 m3 Pasir Pasang 650,000.00 31,850.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 55,394.75 31,850.00 87,244.75
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm - -
6.5000 kg Semen Portland - -
0.0500 m3 Pasir Pasang 650,000.00 32,500.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 55,394.75 32,500.00 87,894.75

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


12.5000 bh Batako 15,000.00 187,500.00
7.5000 kg Semen Portland - -
0.0270 m3 Pasir Pasang 650,000.00 17,550.00
1.9500 kg Besi Beton 8 mm 13,774.19 26,859.67
0.3200 oh Pekerja 130,648.00 41,807.36
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 58,007.71 231,909.67 289,917.38

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako 15,000.00 187,500.00
7.5000 kg Semen Portland - -
0.0270 m3 Pasir Pasang 650,000.00 17,550.00
0.3200 oh Pekerja 130,648.00 41,807.36
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 58,007.71 205,050.00 263,057.71

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik 90,000.00 2,700,000.00
11.0000 kg Semen Portland - -
0.0350 m3 Pasir Pasang 650,000.00 22,750.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 55,394.75 2,722,750.00 2,778,144.75

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I - -
0.0140 m3 Kayu kamper usuk/reng - -
0.0120 kg Paku Biasa - -
0.0030 m3 List Kayu 2/4 - -
0.1000 oh Pekerja 130,648.00 13,064.80
0.0500 oh Tukang Kayu 168,535.92 8,426.80
Total : 21,491.60 - 21,491.60

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland - -
0.0160 m3 Pasir Pasang 650,000.00 10,400.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
Total : 63,494.93 10,400.00 73,894.93
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland - -
0.0200 m3 Pasir Pasang 650,000.00 13,000.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
Total : 63,494.93 13,000.00 76,494.93

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland - -
0.0230 m3 Pasir Pasang 650,000.00 14,950.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
Total : 63,494.93 14,950.00 78,444.93

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland - -
0.0240 m3 Pasir Pasang 650,000.00 15,600.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
Total : 63,494.93 15,600.00 79,094.93

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland - -
0.0260 m3 Pasir Pasang 650,000.00 16,900.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
Total : 63,494.93 16,900.00 80,394.93

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland - -
0.0270 m3 Pasir Pasang 650,000.00 17,550.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
Total : 63,494.93 17,550.00 81,044.93
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland - -
0.0290 m3 Pasir Pasang 650,000.00 18,850.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
Total : 63,494.93 18,850.00 82,344.93

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland - -
0.0270 m3 Pasir Pasang 650,000.00 17,550.00
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
Total : 84,659.90 17,550.00 102,209.90

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland - -
0.0310 m3 Pasir Pasang 650,000.00 20,150.00
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
Total : 84,659.90 20,150.00 104,809.90

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


8.3200 kg Semen Portland - -
0.0320 m3 Pasir Pasang 650,000.00 20,800.00
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
Total : 84,659.90 20,800.00 105,459.90
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland - -
0.0350 m3 Pasir Pasang 650,000.00 22,750.00
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
Total : 84,659.90 22,750.00 107,409.90

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland - -
0.0360 m3 Pasir Pasang 650,000.00 23,400.00
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Batu 162,003.52 32,400.70
Total : 84,659.90 23,400.00 108,059.90

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland - -
0.0130 m3 Pasir Pasang 650,000.00 8,450.00
0.0800 oh Pekerja 130,648.00 10,451.84
0.4000 oh Tukang Batu 162,003.52 64,801.41
Total : 75,253.25 8,450.00 83,703.25

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland - -
0.0060 m3 Pasir Pasang 650,000.00 3,900.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 162,003.52 16,200.35
Total : 55,394.75 3,900.00 59,294.75

15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20


M')
3.1080 kg Semen Portland - -
0.1500 oh Pekerja 130,648.00 19,597.20
0.0750 oh Tukang Batu 162,003.52 12,150.26
Total : 31,747.46 - 31,747.46

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK


EKSPOSE (= 8 M')
1.6000 kg Semen Portland - -
0.0700 oh Pekerja 130,648.00 9,145.36
0.0350 oh Tukang Batu 162,003.52 5,670.12
Total : 14,815.48 - 14,815.48

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland - -
0.0120 m3 Pasir Pasang 650,000.00 7,800.00
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 162,003.52 24,300.53
Total : 63,494.93 7,800.00 71,294.93

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg - -
0.2000 oh Pekerja 130,648.00 26,129.60
0.1000 oh Tukang Labur/Cat 168,535.92 16,853.59
Total : 16,853.59 - 16,853.59
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
VI PEKERJAAN KAYU (SNI 3434 : 2008)

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I
1.1000 m3 Balok Kayu Kamper - -
1.2500 Kg Paku 10 Cm 32,000.00 40,000.00
1.0000 Kg Lem Kayu 95,000.00 95,000.00
7.0000 oh Pekerja 130,648.00 914,536.00
21.0000 oh Tukang Kayu 168,535.92 3,539,254.32
Total : 4,453,790.32 135,000.00 4,588,790.32

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing - -
1.2500 Kg Paku 10 Cm 32,000.00 40,000.00
1.0000 Kg Lem Kayu 95,000.00 95,000.00
6.0000 oh Pekerja 130,648.00 783,888.00
18.0000 oh Tukang Kayu 168,535.92 3,033,646.56
Total : 3,817,534.56 135,000.00 3,952,534.56

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper - -
0.0500 Kg Paku 5-7 Cm 32,000.00 1,600.00
0.3500 oh Pekerja 130,648.00 45,726.80
1.0500 oh Tukang Kayu 168,535.92 176,962.72
Total : 222,689.52 1,600.00 224,289.52

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing - -
0.0500 Kg Paku 5-7 Cm 32,000.00 1,600.00
0.3500 oh Pekerja 130,648.00 45,726.80
1.0500 oh Tukang Kayu 168,535.92 176,962.72
Total : 222,689.52 1,600.00 224,289.52

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper - -
0.5000 Kg Lem Kayu 95,000.00 47,500.00
1.0000 oh Pekerja 130,648.00 130,648.00
3.0000 oh Tukang Kayu 168,535.92 505,607.76
Total : 636,255.76 47,500.00 683,755.76

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,


KAYU KELAS I/II
0.0240 m3 Papan Kayu Kamper - -
0.3000 Kg Lem Kayu 95,000.00 28,500.00
0.8000 oh Pekerja 130,648.00 104,518.40
2.4000 oh Tukang Kayu 168,535.92 404,486.21
Total : 509,004.61 28,500.00 537,504.61

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper - -
0.5000 Kg Lem Kayu 95,000.00 47,500.00
1.0000 oh Pekerja 130,648.00 130,648.00
3.0000 oh Tukang Kayu 168,535.92 505,607.76
Total : 636,255.76 47,500.00 683,755.76

8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper - -
0.0300 Kg Paku 1-2,5 Cm 32,000.00 960.00
0.5000 Kg Lem Kayu 95,000.00 47,500.00
1.0000 Lbr Plywood 4 mm 200,000.00 200,000.00
1.0000 oh Pekerja 130,648.00 130,648.00
3.0000 oh Tukang Kayu 168,535.92 505,607.76
Total : 636,255.76 248,460.00 884,715.76

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper - -
0.0300 Kg Paku 1-2,5 Cm 32,000.00 960.00
0.5000 Kg Lem Kayu 95,000.00 47,500.00
1.0000 Lbr Plywood 4 mm 200,000.00 200,000.00
0.8000 oh Pekerja 130,648.00 104,518.40
2.4000 oh Tukang Kayu 168,535.92 404,486.21
Total : 509,004.61 248,460.00 757,464.61

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600 m3 Papan Kayu Kamper - -
0.1500 Kg Paku 1-2,5 Cm 32,000.00 4,800.00
0.6700 oh Pekerja 130,648.00 87,534.16
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
2.0000 oh Tukang Kayu 168,535.92 337,071.84
Total : 424,606.00 4,800.00 429,406.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper - -
0.0300 Kg Paku 1-2,5 Cm 32,000.00 960.00
0.5000 Kg Lem Kayu 95,000.00 47,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 130,000.00 130,000.00
0.8000 oh Pekerja 130,648.00 104,518.40
2.4000 oh Tukang Kayu 168,535.92 404,486.21
Total : 509,004.61 178,460.00 687,464.61

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA


RANGKA EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper - -
0.0300 Kg Paku 1-2,5 Cm 32,000.00 960.00
0.8000 Kg Lem Kayu 95,000.00 76,000.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 130,000.00 130,000.00
0.5000 Lbr Formika 191,556.89 95,778.44
0.8000 oh Pekerja 130,648.00 104,518.40
2.4000 oh Tukang Kayu 168,535.92 404,486.21
Total : 509,004.61 302,738.44 811,743.05

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Kamper - -
15.0000 Kg Besi Strip Tebal 5 cm 8,712.00 130,680.00
5.6000 Kg Paku 12 Cm 32,000.00 179,200.00
4.0000 oh Pekerja 130,648.00 522,592.00
12.0000 oh Tukang Kayu 168,535.92 2,022,431.04
Total : 2,545,023.04 309,880.00 2,854,903.04

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000 m3 Balok Kayu Kamper - -
15.0000 Kg Besi Strip Tebal 5 cm 8,712.00 130,680.00
5.6000 Kg Paku 12 Cm 32,000.00 179,200.00
6.7000 oh Pekerja 130,648.00 875,341.60
20.1000 oh Tukang Kayu 168,535.92 3,387,571.99
Total : 4,262,913.59 309,880.00 4,572,793.59

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

1.1000 m3 Balok Kayu Kamper - -


15.0000 Kg Besi Strip Tebal 5 cm 8,712.00 130,680.00
3.0000 Kg Paku 12 Cm 32,000.00 96,000.00
2.4000 oh Pekerja 130,648.00 313,555.20
7.2000 oh Tukang Kayu 168,535.92 1,213,458.62
Total : 1,527,013.82 226,680.00 1,753,693.82

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm - -
0.0036 m3 Reng ( 2 x 3 ) Cm - -
0.2500 Kg Paku 5 Cm dan 10 Cm 32,000.00 8,000.00
0.1000 oh Pekerja 130,648.00 13,064.80
0.1000 oh Tukang Kayu 168,535.92 16,853.59
Total : 29,918.39 8,000.00 37,918.39

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm - -
0.0072 m3 Reng ( 2 x 3 ) Cm - -
0.2500 Kg Paku 5 Cm dan 10 Cm 32,000.00 8,000.00
0.1000 oh Pekerja 130,648.00 13,064.80
0.1000 oh Tukang Kayu 168,535.92 16,853.59
Total : 29,918.39 8,000.00 37,918.39

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper - -


0.2000 Kg Paku 5 Cm dan 10 Cm 32,000.00 6,400.00
0.1200 oh Pekerja 130,648.00 15,677.76
0.1200 oh Tukang Kayu 168,535.92 20,224.31
Total : 35,902.07 6,400.00 42,302.07

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm - -
0.2000 Kg Paku 7 Cm dan 10 Cm 32,000.00 6,400.00
0.1500 oh Pekerja 130,648.00 19,597.20
0.3000 oh Tukang Kayu 168,535.92 50,560.78
Total : 70,157.98 6,400.00 76,557.98
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm - -
0.2500 Kg Paku 7 Cm dan 10 Cm 32,000.00 8,000.00
0.2000 oh Pekerja 130,648.00 26,129.60
0.3000 oh Tukang Kayu 168,535.92 50,560.78
Total : 76,690.38 8,000.00 84,690.38

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS


I/II
0.0108 m3 Papan Kayu Kamper - -
0.1000 Kg Paku 5 Cm dan 7 Cm 32,000.00 3,200.00
0.1000 oh Pekerja 130,648.00 13,064.80
0.2000 oh Tukang Kayu 168,535.92 33,707.18
Total : 46,771.98 3,200.00 49,971.98

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS


I/II
0.0110 m3 Papan Kayu Kamper - -
0.0500 Kg Paku 5 Cm dan 7 Cm 32,000.00 1,600.00
0.1000 oh Pekerja 130,648.00 13,064.80
0.2000 oh Tukang Kayu 168,535.92 33,707.18
Total : 46,771.98 1,600.00 48,371.98

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280 m3 Balok Kayu Kamper - -
0.1500 Kg Paku 5 Cm dan 7 Cm 32,000.00 4,800.00
0.1500 oh Pekerja 130,648.00 19,597.20
0.4500 oh Tukang Kayu 168,535.92 75,841.16
Total : 95,438.36 4,800.00 100,238.36

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper - -
0.1500 Kg Paku 5 Cm dan 7 Cm 32,000.00 4,800.00
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 130,000.00 111,800.00
0.5600 Kg Lem Kayu 95,000.00 53,200.00
0.1500 oh Pekerja 130,648.00 19,597.20
0.4500 oh Tukang Kayu 168,535.92 75,841.16
Total : 95,438.36 169,800.00 265,238.36

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper - -
0.1500 Kg Paku 5 Cm dan 7 Cm 32,000.00 4,800.00
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 200,000.00 172,000.00
0.5600 Kg Lem Kayu 95,000.00 53,200.00
0.2000 oh Pekerja 130,648.00 26,129.60
0.6000 oh Tukang Kayu 168,535.92 101,121.55
Total : 127,251.15 230,000.00 357,251.15

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper - -


0.1000 Kg Paku 5 Cm dan 10 Cm 32,000.00 3,200.00
0.1500 Kg Paku Skrup 10 cm 5,000.00 750.00
0.6000 oh Pekerja 130,648.00 78,388.80
1.8000 oh Tukang Kayu 168,535.92 303,364.66
Total : 381,753.46 3,950.00 385,703.46

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120


X 240) CM
0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 200,000.00 80,000.00
0.0500 Kg Paku 1 Cm dan 2.5 Cm 32,000.00 1,600.00
0.0250 oh Pekerja 130,648.00 3,266.20
0.0750 oh Tukang Kayu 168,535.92 12,640.19
Total : 15,906.39 81,600.00 97,506.39

VII PEKERJAAN BETON ( SNI 7394:2008)


1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
218.0000 kg Semen Portland - -
0.5200 m3 Pasir Beton 700,000.00 364,000.00
0.8700 m3 Koral Beton #REF! #REF!
1.6500 oh Pekerja 130,648.00 215,569.20
0.2500 oh Tukang Batu 162,003.52 40,500.88
256,070.08 #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
232.0000 kg Semen Portland - -
0.5200 m3 Pasir Beton 700,000.00 364,000.00
0.7800 m3 Koral Beton #REF! #REF!
1.6500 oh Pekerja 130,648.00 215,569.20
0.2500 oh Tukang Batu 162,003.52 40,500.88
Total : 256,070.08 #REF! #REF!

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland - -
0.4500 m3 Pasir Beton 700,000.00 315,000.00
0.9000 m3 Koral Beton #REF! #REF!
1.6500 oh Pekerja 130,648.00 215,569.20
0.2500 oh Tukang Batu 162,003.52 40,500.88
Total : 256,070.08 #REF! #REF!

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir) 13,774.19 144,628.98
0.1500 kg Kawat Beton 25,000.00 3,750.00
0.0700 oh Pekerja 130,648.00 9,145.36
0.0700 oh Tukang Besi 168,535.92 11,797.51
Total : 20,942.87 148,378.98 169,321.85

5 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III - -
0.3000 kg Paku Biasa 5' - 10' - -
0.1000 ltr Minyak Bekisting 15,000.00 1,500.00
0.5200 oh Pekerja 130,648.00 67,936.96
0.2600 oh Tukang Kayu 168,535.92 43,819.34
Total : 111,756.30 1,500.00 113,256.30

6 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III - -
0.3000 kg Paku Biasa 5' - 10' - -
0.1000 ltr Minyak Bekisting 15,000.00 1,500.00
0.5200 oh Pekerja 130,648.00 67,936.96
0.2600 oh Tukang Kayu 168,535.92 43,819.34
Total : 111,756.30 1,500.00 113,256.30

7 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III - -
0.4000 kg Paku Biasa 5' - 12' - -
0.2000 ltr Minyak Bekisting 15,000.00 3,000.00
0.0150 m3 Kayu Usuk 4/6 - -
0.3500 lbr Plywood 9 mm 325,000.00 113,750.00
2.0000 btg Dolken Kayu 8" - 10"/4 m 22,000.00 44,000.00
0.6600 oh Pekerja 130,648.00 86,227.68
0.3300 oh Tukang Kayu 168,535.92 55,616.85
Total : 141,844.53 160,750.00 302,594.53

8 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III - -
0.4000 kg Paku Biasa 5' - 12' - -
0.2000 ltr Minyak Bekisting 15,000.00 3,000.00
0.0180 m3 Kayu Usuk 4/6 - -
0.3500 lbr Plywood 9 mm 325,000.00 113,750.00
2.0000 btg Dolken Kayu 8" - 10"/4m 22,000.00 44,000.00
0.6600 oh Pekerja 130,648.00 86,227.68
0.3300 oh Tukang Kayu 168,535.92 55,616.85
Total : 141,844.53 160,750.00 302,594.53

9 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III - -
0.4000 kg Paku Biasa 5' - 12' - -
0.2000 ltr Minyak Bekisting 15,000.00 3,000.00
0.0150 m3 Kayu Usuk 4/6 - -
0.3500 lbr Plywood 9 mm 325,000.00 113,750.00
6.0000 btg Dolken Kayu 8" - 10"/4m 22,000.00 132,000.00
0.6600 oh Pekerja 130,648.00 86,227.68
0.3300 oh Tukang Kayu 168,535.92 55,616.85
Total : 141,844.53 248,750.00 390,594.53

10 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III - -
0.4000 Kg Paku Biasa 5' - 12' - -
0.2000 Ltr Minyak Bekisting 15,000.00 3,000.00
0.0200 M3 Kayu Usuk 4/6 - -
0.3500 Lbr Plywood 9 mm 325,000.00 113,750.00
3.0000 Btng Dolken Kayu 8" - 10"/4m 22,000.00 66,000.00
4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00 8,000.00
0.6600 Oh Pekerja 130,648.00 86,227.68
0.3300 Oh Tukang Kayu 168,535.92 55,616.85
141,844.53 190,750.00 332,594.53
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III - -
0.4000 kg Paku Biasa 5' - 12' - -
0.1500 ltr Minyak Bekisting 15,000.00 2,250.00
0.0150 m3 Kayu Usuk 4/6 - -
0.3500 lbr Plywood 9 mm 325,000.00 113,750.00
2.0000 btg Dolken Kayu 8" - 10"/4m 22,000.00 44,000.00
0.6600 oh Pekerja 130,648.00 86,227.68
0.3300 oh Tukang Kayu 168,535.92 55,616.85
Total : 141,844.53 160,000.00 301,844.53

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan) - -
0.6000 kg Paku Biasa 5' - 12' - -
0.5000 btg Dolken Kayu 8" - 10"/4m 22,000.00 11,000.00
0.1500 oh Pekerja 130,648.00 19,597.20
0.0500 oh Tukang Kayu 168,535.92 8,426.80
Total : 28,024.00 11,000.00 39,024.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III - -
1.5000 kg Paku Biasa 5' - 12' - -
0.4000 ltr Minyak Bekisting 15,000.00 6,000.00
157.0000 kg Besi Beton 13,774.19 2,162,547.54
2.2500 kg Kawat Beton 25,000.00 56,250.00
336.0000 kg Semen Portland - -
0.5400 m3 Pasir Beton 700,000.00 378,000.00
0.8100 m3 Koral Beton #REF! #REF!
5.3000 oh Pekerja 130,648.00 692,434.40
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.3000 oh Tukang Kayu 168,535.92 219,096.70
1.0500 oh Tukang Besi 168,535.92 176,962.72
Total : 1,133,044.78 #REF! #REF!

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III - -
2.0000 kg Paku Biasa 5' - 12' - -
0.6000 ltr Minyak Bekisting 15,000.00 9,000.00
210.0000 kg Besi Beton 13,774.19 2,892,579.52
3.0000 kg Kawat Beton 25,000.00 75,000.00
336.0000 kg Semen Portland - -
0.5400 m3 Pasir Beton 700,000.00 378,000.00
0.8100 m3 Koral Beton #REF! #REF!
5.6500 oh Pekerja 130,648.00 738,161.20
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.5600 oh Tukang Kayu 168,535.92 262,916.04
1.4000 oh Tukang Besi 168,535.92 235,950.29
Total : 1,281,578.49 #REF! #REF!

15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III - -
4.0000 kg Paku Biasa 5' - 12' - -
2.0000 ltr Minyak Bekisting 15,000.00 30,000.00
315.0000 kg Besi Beton 13,774.19 4,338,869.27
4.5000 kg Kawat Beton 25,000.00 112,500.00
336.0000 kg Semen Portland - -
0.5400 m3 Pasir Beton 700,000.00 378,000.00
0.8100 m3 Koral Beton #REF! #REF!
0.1500 m3 Kayu Kelas II balok - -
3.5000 lbr Plywood 9 mm 325,000.00 1,137,500.00
20.0000 btg Dolken Kayu 8" /4 m 22,000.00 440,000.00
7.0500 oh Pekerja 130,648.00 921,068.40
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.6500 oh Tukang Kayu 168,535.92 278,084.27
2.1000 oh Tukang Besi 168,535.92 353,925.43
Total : 1,597,629.07 #REF! #REF!

16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III - -
3.2000 kg Paku Biasa 5' - 12' - -
1.6000 ltr Minyak Bekisting 15,000.00 24,000.00
210.0000 kg Besi Beton 13,774.19 2,892,579.52
3.0000 kg Kawat Beton 25,000.00 75,000.00
336.0000 kg Semen Portland - -
0.5400 m3 Pasir Beton 700,000.00 378,000.00
0.8100 m3 Koral Beton #REF! #REF!
0.1400 m3 Kayu Kelas II balok - -
2.8000 lbr Plywood 9 mm 325,000.00 910,000.00
16.0000 btg Dolken Kayu 8" /4 m 22,000.00 352,000.00
6.3500 oh Pekerja 130,648.00 829,614.80
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.6500 oh Tukang Kayu 168,535.92 278,084.27
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
1.4000 oh Tukang Besi 168,535.92 235,950.29
Total : 1,388,200.32 #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III - -
3.2000 kg Paku Biasa 5' - 12' - -
1.6000 ltr Minyak Bekisting 15,000.00 24,000.00
157.5000 kg Besi Beton 13,774.19 2,169,434.64
2.2500 kg Kawat Beton 25,000.00 56,250.00
336.0000 kg Semen Portland - -
0.5400 m3 Pasir Beton 700,000.00 378,000.00
0.8100 m3 Koral Beton #REF! #REF!
0.1200 m3 Kayu Kelas II balok - -
2.8000 lbr Plywood 9 mm 325,000.00 910,000.00
32.0000 btg Dolken Kayu 8" /4 m 22,000.00 704,000.00
5.3000 oh Pekerja 130,648.00 692,434.40
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.3000 oh Tukang Kayu 168,535.92 219,096.70
1.0500 oh Tukang Besi 168,535.92 176,962.72
1,133,044.78 #REF! #REF!
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
0.2400 m3 Kayu Kelas III - -
3.2000 kg Paku Biasa 5' - 12' - -
1.6000 ltr Minyak Bekisting 15,000.00 24,000.00
157.0000 kg Besi Beton 13,774.19 2,162,547.54
2.2500 kg Kawat Beton 25,000.00 56,250.00
336.0000 kg Semen Portland - -
0.5400 m3 Pasir Beton 700,000.00 378,000.00
0.8100 m3 Koral Beton #REF! #REF!
0.1600 m3 Kayu Kelas II balok - -
2.8000 lbr Plywood 9 mm 325,000.00 910,000.00
24.0000 btg Dolken Kayu 8" /4 m 22,000.00 528,000.00
5.3000 oh Pekerja 130,648.00 692,434.40
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.3000 oh Tukang Kayu 168,535.92 219,096.70
1.0500 oh Tukang Besi 168,535.92 176,962.72
1,133,044.78 #REF! #REF!
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)
0.2500 m3 Kayu Kelas III - -
3.0000 kg Paku Biasa 5' - 12' - -
1.2000 ltr Minyak Bekisting 15,000.00 18,000.00
210.0000 kg Besi Beton 13,774.19 2,892,579.52
3.0000 kg Kawat Beton 25,000.00 75,000.00
336.0000 kg Semen Portland - -
0.5400 m3 Pasir Beton 700,000.00 378,000.00
0.8100 m3 Koral Beton #REF! #REF!
0.1050 m3 Kayu Kelas II balok - -
2.5000 lbr Plywood 9 mm 325,000.00 812,500.00
14.0000 btg Dolken Kayu 8" /4 m 22,000.00 308,000.00
5.6500 oh Pekerja 130,648.00 738,161.20
0.2750 oh Tukang Batu 162,003.52 44,550.97
1.5600 oh Tukang Kayu 168,535.92 262,916.04
1.4000 oh Tukang Besi 168,535.92 235,950.29
1,281,578.49 #REF! #REF!

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020 m3 Kayu Kelas III - -
0.0100 kg Paku Biasa 5' - 12' - -
3.0000 kg Besi Beton 13,774.19 41,322.56
0.0450 kg Kawat Beton 25,000.00 1,125.00
4.0000 kg Semen Portland - -
0.0060 m3 Pasir Beton 700,000.00 4,200.00
0.0090 m3 Koral Beton #REF! #REF!
0.1800 oh Pekerja 130,648.00 23,516.64
0.0200 oh Tukang Batu 162,003.52 3,240.07
0.0200 oh Tukang Kayu 168,535.92 3,370.72
0.0200 oh Tukang Besi 168,535.92 3,370.72
Total : 33,498.15 #REF! #REF!
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15
CM)
0.0030 m3 Kayu Kelas III - -
0.0200 kg Paku Biasa 5' - 12' - -
3.6000 kg Besi Beton 13,774.19 49,587.08
0.0500 kg Kawat Beton 25,000.00 1,250.00
5.5000 kg Semen Portland - -
0.0090 m3 Pasir Beton 700,000.00 6,300.00
0.0150 m3 Koral Beton #REF! #REF!
0.2970 oh Pekerja 130,648.00 38,802.46
0.0330 oh Tukang Batu 162,003.52 5,346.12
0.0330 oh Tukang Kayu 168,535.92 5,561.69
0.0330 oh Tukang Besi 168,535.92 5,561.69
Total : 55,271.94 #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong #REF! #REF!
0.1500 oh Pekerja 130,648.00 19,597.20
0.0600 oh Tukang Kayu 168,535.92 10,112.16
Total : 29,709.36 #REF! #REF!

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat #REF! #REF!
0.1500 oh Pekerja 130,648.00 19,597.20
0.0600 oh Tukang Kayu 168,535.92 10,112.16
Total : 29,709.36 #REF! #REF!

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong #REF! #REF!
8.0000 kg Semen Portland - -
0.0320 m3 Pasir Pasang 650,000.00 20,800.00
0.4000 oh Pekerja 130,648.00 52,259.20
0.2000 oh Tukang Kayu 168,535.92 33,707.18
Total : 85,966.38 #REF! #REF!
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 54,490.45 40,867.84
0.1200 kg Paku Pancing 60 x 230 43,800.00 5,256.00
0.1400 oh Pekerja 130,648.00 18,290.72
0.0700 oh Tukang Kayu 168,535.92 11,797.51
Total : 30,088.23 46,123.84 76,212.07

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


2.4000 lbr Bubungan Stel Gelombang - -
6.0000 kg Paku Skrup 3,5" - -
0.0840 oh Pekerja 130,648.00 10,974.43
0.1250 oh Tukang Kayu 168,535.92 21,066.99
Total : 32,041.42 - 32,041.42
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap - -
0.2000 kg Paku Biasa 1/2" - 1" 32,000.00 6,400.00
0.1660 oh Pekerja 130,648.00 21,687.57
0.2500 oh Tukang Kayu 168,535.92 42,133.98
Total : 63,821.55 6,400.00 70,221.55

7 1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28 35,000.00 14,000.00
0.0600 kg Paku biasa 1/2" - 1" 32,000.00 1,920.00
0.0500 kg Paku biasa 2" - 5" - -
0.0040 m3 Kayu papan 3 cm - -
0.1250 oh Pekerja 130,648.00 16,331.00
0.2500 oh Tukang kayu 168,535.92 42,133.98
Total : 58,464.98 15,920.00 74,384.98

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang - -
0.5000 glg Tali pengikat - -
0.2000 oh Pekerja 130,648.00 26,129.60
Total : 26,129.60 - 26,129.60

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 - -
0.0200 kg Paku Biasa 1/2" - 1" 32,000.00 640.00
0.1200 oh Pekerja 130,648.00 15,677.76
0.0600 oh Tukang Kayu 168,535.92 10,112.16
Total : 25,789.92 640.00 26,429.92

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil 47,028.00 49,379.40
0.1500 oh Pekerja 130,648.00 19,597.20
0.0500 oh Tukang Kayu 168,535.92 8,426.80
Total : 28,024.00 49,379.40 77,403.40

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28 35,000.00 10,500.00
0.0400 kg Paku biasa 1/2" - 1" 32,000.00 1,280.00
0.1500 oh Pekerja 130,648.00 19,597.20
0.0700 oh Tukang Kayu 168,535.92 11,797.51
Total : 31,394.71 11,780.00 43,174.71

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM,
5 MM DAN 6 MM
1.1000 lbr Asbes semen 96,100.00 105,710.00
0.0100 kg Paku Biasa 1/2" - 1" 32,000.00 320.00
0.0300 oh Pekerja 130,648.00 3,919.44
0.0700 oh Tukang Kayu 168,535.92 11,797.51
Total : 15,716.95 106,030.00 121,746.95
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS 200,000.00 75,000.00
0.0300 kg Paku Biasa 1/2" - 1" 32,000.00 960.00
0.1000 oh Pekerja 130,648.00 13,064.80
0.1000 oh Tukang Kayu 168,535.92 16,853.59
Total : 29,918.39 75,960.00 105,878.39

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan - -
0.0100 kg Paku Biasa 1/2" - 1" 32,000.00 320.00
0.8000 oh Pekerja 130,648.00 104,518.40
0.8000 oh Tukang Kayu 168,535.92 134,828.74
Total : 239,347.14 320.00 239,667.14

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil - -
0.1000 kg Paku list SQ 15,840.00 1,584.00
0.0500 oh Pekerja 130,648.00 6,532.40
0.0500 oh Tukang Kayu 168,535.92 8,426.80
Total : 14,959.20 1,584.00 16,543.20

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm - -
0.0600 kg Paku Biasa 2" - 5" 15,840.00 950.40
1.1000 lbr Asbes 96,100.00 105,710.00
0.1800 oh Pekerja 130,648.00 23,516.64
0.3200 oh Tukang Kayu 168,535.92 53,931.49
Total : 77,448.13 106,660.40 184,108.53

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup 12,000.00 1,320.00
0.3640 lbr Gypsum Board (120x240x9) 100,000.00 36,400.00
0.1000 oh Pekerja 130,648.00 13,064.80
0.0500 oh Tukang Kayu 168,535.92 8,426.80
Total : 21,491.60 37,720.00 59,211.60

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup 12,000.00 1,320.00
0.3640 lbr Kalsiboard 4.5 mm 130,000.00 47,320.00
0.1000 oh Pekerja 130,648.00 13,064.80
0.0500 oh Tukang Kayu 168,535.92 8,426.80
Total : 21,491.60 48,640.00 70,131.60

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
1.0000 bh Kloset duduk/ monoblok - -
6% x harga kloset Perlengkapan -
3.3000 oh Pekerja 130,648.00 431,138.40
1.1000 oh Tukang batu 162,003.52 178,203.87
Total : 609,342.27 - 609,342.27

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen 345,000.00 345,000.00
6.0000 kg Semen Portland - -
0.0100 m3 Pasir Pasang 650,000.00 6,500.00
1.0000 oh Pekerja 130,648.00 130,648.00
1.5000 oh Tukang batu 162,003.52 243,005.28
Total : 373,653.28 351,500.00 725,153.28

3 MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir 2,783,772.00 2,783,772.00
6% x harga Urin Perlengkapan 167,026.32
6.0000 kg Semen Portland - -
0.0100 m3 Pasir Pasang 650,000.00 6,500.00
1.0000 oh Pekerja 130,648.00 130,648.00
1.0000 oh Tukang batu 162,003.52 162,003.52
Total : 292,651.52 2,957,298.32 3,249,949.84

4 MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel 725,000.00 725,000.00
12% x harga wast Perlengkapan 87,000.00
6.0000 kg Semen Portland - -
0.0100 m3 Pasir Pasang 650,000.00 6,500.00
1.2000 oh Pekerja 130,648.00 156,777.60
1.4500 oh Tukang batu 162,003.52 234,905.10
Total : 391,682.70 818,500.00 1,210,182.70

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass 345,000.00 345,000.00
18% x harga wast Perlengkapan 62,100.00
1.8000 oh Pekerja 130,648.00 235,166.40
2.7000 oh Tukang batu 162,003.52 437,409.50
Total : 672,575.90 407,100.00 1,079,675.90
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


1.2000 m1 Pipa galvanis 54,166.67 65,000.00
35% x harga pipa Perlengkapan 18,958.33
0.0540 oh Pekerja 130,648.00 7,054.99
0.0900 oh Tukang Pipa 168,535.92 15,168.23
Total : 22,223.22 83,958.33 106,181.56

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


1.2000 M' Pipa galvanis 191,666.67 230,000.00
35% x harga pipa Perlengkapan 67,083.33
0.1080 Oh Pekerja 130,648.00 14,109.98
0.1800 Oh Tukang Pipa 168,535.92 30,336.47
Total : 44,446.45 297,083.33 341,529.78

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


1.2000 m1 Pipa PVC 6,250.00 7,500.00
35% x harga pipa Perlengkapan 2,187.50
0.0360 oh Pekerja 130,648.00 4,703.33
0.0600 oh Tukang Pipa 168,535.92 10,112.16
Total : 14,815.48 9,687.50 24,502.98

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


1.2000 m1 Pipa PVC 9,250.00 11,100.00
35% x harga pipa Perlengkapan 3,237.50
0.0540 oh Pekerja 130,648.00 7,054.99
0.0900 oh Tukang Pipa 168,535.92 15,168.23
Total : 22,223.22 14,337.50 36,560.72

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


1.2000 m1 Pipa PVC 24,375.00 29,250.00
35% x harga pipa Perlengkapan 8,531.25
0.0810 oh Pekerja 130,648.00 10,582.49
0.1350 oh Tukang Pipa 168,535.92 22,752.35
Total : 33,334.84 37,781.25 71,116.09

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air 70,000.00 70,000.00
0.0250 bh Seal tape 15,000.00 375.00
0.0100 oh Pekerja 130,648.00 1,306.48
0.1000 oh Tukang Pipa 168,535.92 16,853.59
Total : 18,160.07 70,375.00 88,535.07

XI PEKERJAAN BESI DAN ALUMINIUM


(SNI 7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF 19,000.00 21,850.00
0.0060 oh Pekerja 130,648.00 783.89
0.0600 oh Tukang besi 168,535.92 10,112.16
Total : 10,896.04 21,850.00 32,746.04

2 1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako 30,000.00 33,000.00
10.0000 bh Paku biasa 1 cm - 2,5 cm 12,000.00 120,000.00
7.0000 m' Besi strip 8,712.00 60,984.00
0.2000 oh Pekerja 130,648.00 26,129.60
0.2000 oh Tukang besi 168,535.92 33,707.18
Total : 59,836.78 213,984.00 273,820.78

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat 35,000.00 36,750.00
0.0150 kg Paku biasa 0,5" - 1" 12,000.00 180.00
0.0190 m3 Kayu papan kelas II/III - -
0.1500 oh Pekerja 130,648.00 19,597.20
0.4000 oh Tukang besi 168,535.92 67,414.37
Total : 87,011.57 36,930.00 123,941.57

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa 150,000.00 150,000.00
0.0100 oh Pekerja 130,648.00 1,306.48
0.5000 oh Tukang besi 168,535.92 84,267.96
Total : 85,574.44 150,000.00 235,574.44

2 1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu - -
0.0150 oh Pekerja 130,648.00 1,959.72
0.1500 oh Tukang besi 168,535.92 25,280.39
Total : 27,240.11 - 27,240.11
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela 35,000.00 35,000.00
0.0100 oh Pekerja 130,648.00 1,306.48
0.1000 oh Tukang besi 168,535.92 16,853.59
Total : 18,160.07 35,000.00 53,160.07

4 1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin 25,000.00 25,000.00
0.0150 oh Pekerja 130,648.00 1,959.72
0.1500 oh Tukang besi 168,535.92 25,280.39
Total : 27,240.11 25,000.00 52,240.11

5 1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot 35,000.00 35,000.00
0.0200 oh Pekerja 130,648.00 2,612.96
0.2000 oh Tukang besi 168,535.92 33,707.18
Total : 36,320.14 35,000.00 71,320.14

6 1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca 147,326.69 162,059.36
0.0150 oh Pekerja 130,648.00 1,959.72
0.1500 oh Tukang besi 168,535.92 25,280.39
Total : 27,240.11 162,059.36 189,299.47

XIII PEK. PENUTUP LANTAI DAN DINDING


(SNI 7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.8700 bh Keramik 30 x 30 cm 6,000.00 71,220.00
10.0000 kg Semen Portland - -
0.0450 m3 Pasir Pasang 650,000.00 29,250.00
1.5000 kg Semen warna/semen grouting 35,000.00 52,500.00
0.7000 oh Pekerja 130,648.00 91,453.60
0.3500 oh Tukang batu 162,003.52 56,701.23
Total : 148,154.83 152,970.00 301,124.83

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm 2,800.00 74,200.00
10.4000 kg Semen Portland - -
0.0450 m3 Pasir Pasang 650,000.00 29,250.00
1.6200 kg Semen warna/semen grouting 35,000.00 56,700.00
0.7000 oh Pekerja 130,648.00 91,453.60
0.3500 oh Tukang batu 162,003.52 56,701.23
Total : 148,154.83 160,150.00 308,304.83

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm 6,000.00 19,980.00
1.1400 kg Semen Portland - -
0.0030 m3 Pasir Pasang 650,000.00 1,950.00
0.1000 kg Semen warna/semen grouting 35,000.00 3,500.00
0.0900 oh Pekerja 130,648.00 11,758.32
0.0900 oh Tukang batu 162,003.52 14,580.32
Total : 26,338.64 25,430.00 51,768.64
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
26.5000 bh Keramik 20 x 20 cm 2,800.00 74,200.00
9.3000 kg Semen Portland - -
0.0180 m3 Pasir Pasang 650,000.00 11,700.00
1.9400 kg Semen warna/semen grouting 35,000.00 67,900.00
0.9000 oh Pekerja 130,648.00 117,583.20
0.4500 oh Tukang batu 162,003.52 72,901.58
Total : 190,484.78 153,800.00 344,284.78

5 1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II - -
0.0500 kg Paku sekrup 3,5' - -
0.1200 oh Pekerja 130,648.00 15,677.76
0.1200 oh Tukang kayu 168,535.92 20,224.31
Total : 35,902.07 - 35,902.07

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni 68,750.00 13,750.00
0.1500 kg Dempul 68,750.00 10,312.50
0.1700 kg Cat dasar 62,500.00 10,625.00
0.2600 kg Cat Penutup 2x 75,000.00 19,500.00
0.0700 oh Pekerja 130,648.00 9,145.36
0.0090 oh Tukang cat 168,535.92 1,516.82
Total : 10,662.18 54,187.50 64,849.68
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis 95,000.00 14,250.00
0.0500 kg Dempul 68,750.00 3,437.50
0.1000 lbr Amplas 10,000.00 1,000.00
0.0100 bh Kuas 35,000.00 350.00
0.1600 oh Pekerja 130,648.00 20,903.68
0.1600 oh Tukang cat 168,535.92 26,965.75
Total : 47,869.43 19,037.50 66,906.93
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir 15,000.00 1,500.00
0.1000 kg Cat dasar 62,500.00 6,250.00
0.2600 kg Cat Penutup 2x 15,800.00 4,108.00
0.0200 oh Pekerja 130,648.00 2,612.96
0.0630 oh Tukang cat 168,535.92 10,617.76
Total : 13,230.72 11,858.00 25,088.72

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar 62,500.00 7,500.00
0.1800 kg Cat Penutup 2x 15,800.00 2,844.00
0.0280 oh Pekerja 130,648.00 3,658.14
0.0420 oh Tukang cat 168,535.92 7,078.51
Total : 10,736.65 10,344.00 21,080.65

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi 75,000.00 7,500.00
0.0100 lbr Kuas 35,000.00 350.00
0.0200 oh Pekerja 130,648.00 2,612.96
0.2000 oh Tukang cat 168,535.92 33,707.18
Total : 36,320.14 7,850.00 44,170.14

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi 85,000.00 25,500.00
0.0060 oh Pekerja 130,648.00 783.89
0.0600 oh Tukang cat 168,535.92 10,112.16
Total : 10,896.04 25,500.00 36,396.04

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur 80,000.00 41,760.00
2.0000 lbr Amplas 10,000.00 20,000.00
0.0600 oh Pekerja 130,648.00 7,838.88
0.0600 oh Tukang cat 168,535.92 10,112.16

Total : 17,951.04 61,760.00 79,711.04

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok - -
8.4000 kg Semen 50 Kg - -
Upah Kerja ( Lumpsum) 359,074.00 359,074.00
Total : 359,074.00 - 359,074.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan - -
8.4000 kg Semen 50 Kg - -
Upah Kerja ( Lumpsum) 192,836.00 192,836.00
Total : 192,836.00 - 192,836.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan - -
4.2000 kg Semen 50 Kg - -
Upah Kerja ( Lumpsum) 192,836.00 192,836.00
Total : 192,836.00 - 192,836.00

4 1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras - -
4.2000 kg Semen 50 Kg - -
Upah Kerja ( Lumpsum) 192,836.00 192,836.00
Total : 192,836.00 - 192,836.00

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok - -
4.4917 bh Batu paras - -
5.2500 kg Semen 50 Kg - -
Upah Kerja ( Lumpsum) 192,836.00 192,836.00
Total : 192,836.00 - 192,836.00

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok - -
4.2000 kg Semen 50 Kg - -
Upah Kerja ( Lumpsum) 383,674.00 383,674.00
Total : 383,674.00 - 383,674.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras - -
4.2000 kg Semen 50 Kg - -
Upah Kerja ( Lumpsum) 383,674.00 383,674.00
Total : 383,674.00 - 383,674.00

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok - -
4.4917 bh Batu paras - -
5.2500 kg Semen 50 Kg - -
Upah Kerja ( Lumpsum) 280,000.00 280,000.00
Total : 280,000.00 - 280,000.00

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 - -
0.2500 oh Tukang Batu 162,003.52 40,500.88
0.5000 oh Pekerja 130,648.00 65,324.00
Total : 105,824.88 - 105,824.88
2 Paving 10 x 20 cm tebal 6 cm K350 - 105,824.88 - 105,824.88
4 Paving 10 x 20 cm tebal 8 cm K225 - 105,824.88 - 105,824.88
5 Paving 10 x 20 cm tebal 8 cm K350 - 105,824.88 - 105,824.88
7 Paving 20 x 20 cm tebal 6 cm K225 - 105,824.88 - 105,824.88
8 Paving 20 x 20 cm tebal 6 cm K350 - 105,824.88 - 105,824.88
10 Paving 20 x 20 cm tebal 8 cm K225 - 105,824.88 - 105,824.88
11 Paving 20 x 20 cm tebal 8 cm K350 - 105,824.88 - 105,824.88
12 Paving 20 x 20 cm tebal 8 cm K425 - 105,824.88 - 105,824.88
14 Paving 20 x 20 cm tebal 10 cm K225 - 105,824.88 - 105,824.88
15 Paving 20 x 20 cm tebal 10 cm K350 - 105,824.88 - 105,824.88
16 Paving 20 x 20 cm tebal 10 cm K425 - 105,824.88 - 105,824.88
18 Paving Tiga Berlian tebal 6 cm K225 - 105,824.88 - 105,824.88
19 Paving Tiga Berlian tebal 6 cm Standar - 105,824.88 - 105,824.88

20 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block - -
0.0690 m3 Pasir Urug - -
0.5000 oh Tukang Batu 162,003.52 81,001.76
1.0000 oh Pekerja 130,648.00 130,648.00
Total : 211,649.76 - 211,649.76

21 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat 12,000.00 14,400.00
9.2800 zak Semen - -
0.2000 m3 Pasir pasang 650,000.00 130,000.00
0.2500 oh Tukang Batu 162,003.52 40,500.88
0.6250 oh Pekerja 130,648.00 81,655.00
Total : 122,155.88 144,400.00 266,555.88
22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 - -
0.4500 zak Semen 50 Kg - -
0.0023 m3 Pasir Pasang 650,000.00 1,495.00
0.3500 oh Tukang Batu 162,003.52 56,701.23
0.9500 oh Pekerja 130,648.00 124,115.60
Total : 180,816.83 1,495.00 182,311.83
23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) - 180,816.83 130,000.00 310,816.83
24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) - 180,816.83 130,000.00 310,816.83

25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 85,000.00 24,140.00
0.0710 kg Thiner 60,000.00 4,260.00
0.0300 oh Tukang Cat 168,535.92 5,056.08
0.1500 oh Pekerja 130,648.00 19,597.20
Total : 24,653.28 28,400.00 53,053.28
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 22,000.00 176,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 28,000.00 84,000.00
2.0000 bh Tee dos clipsal 20 mm hitam 10,000.00 20,000.00
15.0000 bj Klem clipsal 20 mm hitam 2,000.00 30,000.00
3.0000 bj Sock clipsal 20 mm hitam 3,000.00 9,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,000.00 6,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 325,000.00 350,000.00

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 50,000.00 500,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 28,000.00 84,000.00
1.0000 bh Tee dos clipsal 20 mm hitam 10,000.00 10,000.00
15.0000 bj Klem clipsal 20 mm hitam 2,000.00 30,000.00
4.0000 bj Sock clipsal 20 mm hitam 3,000.00 12,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,000.00 6,000.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam - -
1.0000 ttk Biaya pasang 25,000.00 25,000.00 25,000.00
Total : 25,000.00 667,000.00 692,000.00

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone - -
8.0000 bt Pipa Clipsal 20 mm putih 28,000.00 224,000.00
1.0000 bh Tee dos clipsal 20 mm putih 10,000.00 10,000.00
25.0000 bj Klem clipsal 20 mm putih 2,000.00 50,000.00
5.0000 bj Sock clipsal 20 mm putih 3,000.00 15,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,000.00 6,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 305,000.00 330,000.00

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof - -
6.0000 bt Pipa Clipsal 20 mm putih 28,000.00 168,000.00
2.0000 bh Tee dos clipsal 20 mm putih 10,000.00 20,000.00
20.0000 bj Klem clipsal 20 mm putih 2,000.00 40,000.00
6.0000 bj Sock clipsal 20 mm putih 3,000.00 18,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,000.00 6,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 252,000.00 277,000.00

Mengetahui
Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina
NIP. 196110101994032001
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN SWAKLOLA
TAHUN 2022

NO URAIAN PEKERJAAN HARGA


1 2 3
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp. #REF!
2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK Rp. 29,918.39
3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN Rp. #REF!
4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT Rp. #REF!
5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU Rp. 428,451.88
6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN Rp. 13,064.80
7 1 M2 PEMBUATAN BEDENG BURUH Rp. #REF!
8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM Rp. 50,560.78
9 1 M2 PEMBUATAN STEGGER DARI BAMBU Rp. 15,126.41
10 1 M2 PEMBUATAN JALAN SEMENTARA Rp. #REF!
11 1 M3 BONGKARAN BETON BERTULANG Rp. 871,030.22
12 1 M3 BONGKARAN DINDING TEMBOK BATU TELA Rp. 871,030.22

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER Rp. 97,986.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER Rp. 117,583.20
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER Rp. 137,180.40
4 1 M3 GALIAN TANAH KERAS DALAM 1METER Rp. 130,648.00
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp. 195,972.00
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER Rp. 156,777.60
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER Rp. 6,532.40
8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER Rp. 43,113.84
9 1 M3 URUGAN KEMBALI Rp. -
10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) Rp. 39,194.40
11 1 M3 URUGAN PASIR Rp. 39,194.40
12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM Rp. 19,597.20
13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan Rp. 242,662.00
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN Rp. 245,324.00
15 1 M3 URUGAN LIMESTONE PADAT Rp. 32,662.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU KALI CAMP. 1 PC : 3 PS Rp. 992,724.64
2 1 M3 BATU KALI CAMP. 1 PC : 4 PS Rp. 1,015,474.64
3 1 M3 BATU KALI CAMP. 1 PC : 5 PS Rp. 1,031,074.64
4 1 M3 BATU KALI CAMP. 1 PC : 6 PS Rp. 1,042,124.64
5 1 M3 BATU KALI CAMP. 1 PC : 8 PS Rp. 1,057,074.64
6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI Rp. #REF!
7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M Rp. #REF!
8 1 M3 PASANGAN BATU KOSONG Rp. 827,486.81

IV PEKERJAAN DINDING (SNI 6897 : 2008)


1 1 M2 PASANGAN BATA RINGAN CAMP. 1 PC : 2 PS Rp. 162,789.50
2 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 3 PS Rp. 169,939.50
3 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 4 PS Rp. 171,239.50
4 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 5 PS Rp. 177,089.50
NO URAIAN PEKERJAAN HARGA
1 2 3
5 1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 6 PS Rp. 190,089.50
6 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 2 PS Rp. 80,094.75
7 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 3 PS Rp. 81,394.75
8 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 4 PS Rp. 83,344.75
9 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 5 PS Rp. 84,644.75
10 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 6 PS Rp. 87,244.75
11 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 8 PS Rp. 87,894.75
12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) Rp. 289,917.38
13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI Rp. 263,057.71
14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM Rp. 2,778,144.75
15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU Rp. 21,491.60

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM Rp. 73,894.93
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM Rp. 76,494.93
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM Rp. 78,444.93
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM Rp. 79,094.93
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp. 80,394.93
6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM Rp. 81,044.93
7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM Rp. 82,344.93
8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM Rp. 102,209.90
9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp. 104,809.90
10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM Rp. 105,459.90
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM Rp. 107,409.90
12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM Rp. 108,059.90
13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM Rp. 83,703.25
14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS Rp. 59,294.75
15 1 M2 FINISHING SIAR PASANGAN DINDING BATU TELA (=20 M') Rp. 31,747.46
16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') Rp. 14,815.48
17 1 M2 FINISHING SIAR PASANGAN BATUKALI/BELAH ADUKAN 1PC : 2 PS Rp. 71,294.93
18 1 M2 PEKERJAAN ACIAN Rp. 16,853.59

VI PEKERJAAN KAYU (SNI 3434 : 2008)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I (KARp. 4,588,790.32
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III Rp. 3,952,534.56
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II (KAYU Rp. 224,289.52
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III (KA Rp. 224,289.52
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II (KAYU BE Rp. 683,755.76
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II (K Rp. 537,504.61
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II Rp. 683,755.76
8 MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA TERTUTUP,
KAYU KELAS II (Lebar Sampai 90 Cm) Rp. 884,715.76
9 MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS I/II Rp. 757,464.61
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II Rp. 429,406.00
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I Rp. 687,464.61
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE,
KAYU KELAS II Rp. 811,743.05
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS
I,II,III Bentang 6 M' Rp. 2,854,903.04
NO URAIAN PEKERJAAN HARGA
1 2 3
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp. 4,572,793.59
15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp. 1,753,693.82
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II Rp. 37,918.39
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II Rp. 37,918.39
18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp. 42,302.07
19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III Rp. 76,557.98
20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III Rp. 84,690.38
21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II Rp. 49,971.98
22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II Rp. 48,371.98
23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III Rp. 100,238.36
MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA
24 KAYU KELAS II Rp. 265,238.36
MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA
25 KAYU KELAS II Rp. 357,251.15
26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I Rp. 385,703.46
27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM Rp. 97,506.39

VII PEKERJAAN BETON ( SNI 7394:2008)


1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR Rp. #REF!
2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR Rp. #REF!
3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR Rp. #REF!
4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 169,321.85
5 1 M2 PASANG BEKISTING UNTUK PONDASI Rp. 113,256.30
6 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 113,256.30
7 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 302,594.53
8 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 302,594.53
9 1 M2 PASANG BEKISTING UNTUK LANTAI Rp. 390,594.53
10 1 M2 PASANG BEKISTING UNTUK DINDING Rp. 332,594.53
11 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 301,844.53
12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp. 39,024.00
13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) Rp. #REF!
14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) Rp. #REF!
15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) Rp. #REF!
16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING) Rp. #REF!
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING Rp. #REF!
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) Rp. #REF!
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING) Rp. #REF!
20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) Rp. #REF!
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) Rp. #REF!

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG Rp. #REF!
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT Rp. #REF!
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG Rp. #REF!
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM Rp. 76,212.07
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M Rp. 32,041.42
6 1 M2 PEKERJAAN ATAP SIRAP Rp. 70,221.55
7 1 M2 PEKERJAAN ATAP NOK SIRAP Rp. 74,384.98
8 1 M2 PASANG ATAP ALANG-ALANG 3 M1 Rp. 26,129.60
9 1 M2 PEKERJAAN ATAP SENG GELOMBANG Rp. 26,429.92
NO URAIAN PEKERJAAN HARGA
1 2 3
10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL Rp. 77,403.40
11 1 M1 PASANG NOK SENG GELOMBANG Rp. 43,174.71

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ETERNIT, TEBAL 4 MM, 5 MM DAN 6 MM Rp. 121,746.95
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/4MM Rp. 105,878.39
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING Rp. 239,667.14
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL Rp. 16,543.20
5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA Rp. 184,108.53
6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM Rp. 59,211.60
7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM Rp. 70,131.60

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK Rp. 609,342.27
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN Rp. 725,153.28
3 MEMASANG 1 BUAH URINOIR Rp. 3,249,949.84
4 MEMASANG 1 BUAH WASHTAFEL KIA Rp. 1,210,182.70
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 Rp. 1,079,675.90
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp. 106,181.56
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp. 341,529.78
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5" Rp. 24,502.98
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 36,560.72
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4" Rp. 71,116.09
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp. 88,535.07

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)


1 1 KG PASANG RANGKA ATAP BAJA Rp. 32,746.04
2 1 M2 PASANG JENDELA NAKO Rp. 273,820.78
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 Rp. 123,941.57

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA Rp. 235,574.44
2 1 PS PASANG ENGSEL PINTU Rp. 27,240.11
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU Rp. 53,160.07
4 1 BH PASANG KAIT ANGIN Rp. 52,240.11
5 1 BH PASANG KUNCI SLOT Rp. 71,320.14
6 1 M2 PASANG KACA, TEBAL 3 - 5 MM Rp. 189,299.47

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM Rp. 301,124.83
2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. 308,304.83
3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM Rp. 51,768.64
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM Rp. 344,284.78
5 1 M1 PASANG PLIN KAYU 2 X 10 CM Rp. 35,902.07

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, Rp. 64,849.68
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS Rp. 66,906.93
NO URAIAN PEKERJAAN HARGA
1 2 3
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, Rp. 25,088.72
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP Rp. 21,080.65
5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI Rp. 44,170.14
6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI Rp. 36,396.04
7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR Rp. 79,711.04

XV PEKERJAAN TETEMPELAN STYLE BALI


1 1 M2 PASANGAN BATA GOSOK 2 MUKA Rp. 359,074.00
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Rp. 192,836.00
3 1 M2 PASANGAN BATA GOSOK 1 MUKA Rp. 192,836.00
4 1 M2 PASANGAN PARAS 1 MUKA Rp. 192,836.00
5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Rp. 192,836.00
6 1 M2 PASANGAN BATA GOSOK DIUKIR Rp. 383,674.00
7 1 M2 PASANGAN PARAS DIUKIR Rp. 383,674.00
8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp. 280,000.00

XVI PEKERJAAN LANDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp. 105,824.88
2 Paving 10 x 20 cm tebal 6 cm K350 Rp. 105,824.88
3 Paving 10 x 20 cm tebal 8 cm K225 Rp. 105,824.88
4 Paving 10 x 20 cm tebal 8 cm K350 Rp. 105,824.88
5 Paving 20 x 20 cm tebal 6 cm K225 Rp. 105,824.88
6 Paving 20 x 20 cm tebal 6 cm K350 Rp. 105,824.88
7 Paving 20 x 20 cm tebal 8 cm K225 Rp. 105,824.88
8 Paving 20 x 20 cm tebal 8 cm K350 Rp. 105,824.88
9 Paving 20 x 20 cm tebal 8 cm K425 Rp. 105,824.88
10 Paving 20 x 20 cm tebal 10 cm K225 Rp. 105,824.88
11 Paving 20 x 20 cm tebal 10 cm K350 Rp. 105,824.88
12 Paving 20 x 20 cm tebal 10 cm K425 Rp. 105,824.88
13 Paving Tiga Berlian tebal 6 cm K225 Rp. 105,824.88
14 1 M2 PASANGAN GRASS BLOCK Rp. 211,649.76
15 1 M2 PASANGAN KORAL SIKAT Rp. 266,555.88
16 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 182,311.83
17 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Rp. 310,816.83
18 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp. 310,816.83
19 1 M2 PENGECATAN KANSTEIN Rp. 53,053.28

XVII PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp. 350,000.00
2 1 TITIK INSTALASI AC Rp. 692,000.00
3 1 TITIK INSTALASI TELEPHONE Rp. 330,000.00
4 1 TITIK INSTALASI MATV Rp. 277,000.00

Kepala Dinas Cipta Karya


Kabupaten Badung
NO URAIAN PEKERJAAN HARGA
1 2 3
Ir. Ni Luh Putu Dessy Dharmayanty, M.T
Pembina
NIP. 196110101994032001
DAFTAR HARGA SATUAN BAHAN TAMBAHAN
BULAN APRIL TAHUN 2010
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA SATUAN


1 2 3 4

BATU
Batu Candi
1 20x20x2 m2 78,000.00
2 15x30x2 m2 78,000.00
3 20x30x2 m2 78,000.00
4 20x40x2 m2 80,000.00
5 30x30x2 m2 80,000.00
6 40x40x2 m2 105,000.00
7 30x60x2 m2 115,000.00
8 20x40x3 m2 135,000.00
9 30x30x3 m2 135,000.00
10 30x30x5 m2 165,000.00
11 40x40x5 m2 185,000.00

Palimanan putih
1 20x20x2 m2 65,000.00
2 20x30x2 m2 67,000.00
3 20x40x2 m2 68,000.00
4 20x40x3 m2 110,000.00
5 30x30x3 m2 110,000.00

Palimanan Serat Kuning


1 20x30 m2 75,000.00
2 20x40 m2 75,000.00
3 15x30 m2 75,000.00

Palimanan Cirebon
1 15x30x2 m2 72,000.00
2 20x30x2 m2 73,000.00
3 20x40x2 m2 75,000.00
4 30x30x2 m2 80,000.00

Alur Bali Green Lurus


1 20x30 m2 105,000.00
2 20x40 m2 105,000.00

Alur Bali Green Cukil


1 20x30 m2 105,000.00
2 20x40 m2 105,000.00
3 20x20 m2 105,000.00

Batu Bali Green


1 15x30 m2 75,000.00
2 20x30 m2 75,000.00
3 20x40 m2 75,000.00
4 40x40 m2 80,000.00

PARAS
Paras Kerobokan
1 20x40x3 Bj 6,000.00
2 20x40x5 Bj 8,000.00

Paras Kelating
1 20x40x3 Bj 6,000.00
2 20x40x5 Bj 8,000.00

Alur Andesit Lurus


1 20x40 m3 135,000.00
2 30x60 m3 140,000.00

Alur and cukil


1 20x40 m2 135,000.00
2 15x30 m2 135,000.00

Harga Barang dan Upah Hal. 145


NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
Alur And Gelombang m2 140,000.00
Alur And Gelombang lurus m2 140,000.00

Random Singaraja m2 25,000.00


Random Cirebon m2 65,000.00
Random Jember m2 45,000.00

Harga Barang dan Upah Hal. 146


LAMPIRAN
SUMBER DATA
NO KABUPATEN SUMBER DATA ALAMAT
1 Badung Utara - UD. Ubud Sari Jaya Jl. Raya Sangeh Petang
- UD. Surya Br. Plakan Sibang Kaja
- Dwi Putri Jl. Darmasaba - Lukluk

2 Badung Tengah - UD. Ron Anyar Jl. Raya Canggu, Kerobokan


- Mitra 10 Jl. Gatsu Barat
- PT. Budi Aluh Jl. Raya Kapal
- CV. Mertanadi Br. Perang Sempidi
- Karya Indah Jl. Raya Kapal

3 Badung Selatan - Indah Jaya Jl. Bay Pass Nusa Dua No. 69
- Dewa Brata Jl. Raya Kuta
- Mekar Abadi Bangunan Jl. Bay Pass Nusa Dua
DAFTAR HARGA SATUAN UPAH
TAHUN 2016
HARGA
NO NAMA BARANG SPESIFIKASI SATUAN
(Rp.)
1 2 3 4 5

1 Mandor Hari 156,960.00


2 Kepala Tukang Hari 143,880.00
3 Tukang Politur Hari 130,800.00
4 Tukang Batu Hari 117,720.00
5 Tukang kayu Hari 130,800.00
6 Tukang Besi Hari 130,800.00
7 Tukang cat Hari 130,800.00
8 Tukang gali/buruh/ pekerja Hari 98,100.00
9 Tukang Listrik Hari 130,800.00
10 Tukang Pipa/ Tukang Ledeng Hari 130,800.00
11 Tukang Aspal Hari 130,800.00
12 Tukang masak Aspal/pekerja Hari 98,100.00
13 Pekerja Hari 98,100.00
14 Tukang Ukir Hari 130,800.00
15 Operator Hari 130,800.00
16 Pembantu Operator Hari 98,100.00
17 Mekanik Hari 130,800.00
18 Pembantu Mekanik Hari 98,100.00
19 Pasang Atap Alang-Alang Hari 130,800.00
20 Pasang Bata Gosok Dua Muka M2 388,477.08
21 Pasang Bata Gosok Satu Muka M2 208,626.54
22 Pasang Batu Paras Diukir M2 415,165.80
23 Pasang Patu Paras Siap Diukir M2 359,701.08
24 Tukang Bongkar Begesting Hari 98,100.00

Catatan :

Harga - harga hanya sebagai pedoman / pendukung


dalam perhitungan konstruksi ( tidak mengikat ).
UMP PROV. PAPUA BARAT 2016 2,237,000.00
SEKTOR PERTAMBANGAN MINYAK DAN GAS BUMI 2,943,000.00
SEKTOR PERTAMBANGAN KECUALI GALIAN C 2,507,000.00
SEKTOR KEHUTANAN, PERKEBUNAN, DAN
PERIKANAN 2,343,500.00
SEKTOR JASA KONSTRUKSI 2,452,500.00
Undang -undang no. 13 tahun 2003 tentang "ketenagakerjaan"
Jika dalam 1 hari bekerja selama 8 jam (5 hari kerja/ senin s/d jumat) maka dalam 1 bulan bekerja selama 21 hari
Jika dalam 1 hari bekerja selama 7 jam (6 hari kerja/ senin s/d sabtu) maka dalam 1 bulan bekerja selama 25 hari

Fakfak, 25 April 2016

PANITIA PENYUSUNAN STANDART HARGA SATUAN


TAHUN 2016

Sekretaris, Ketua,

RIZAL MINGGELE, ST LIZA NEIRASARI, ST


NIP. 19820701 200909 1 001 NIP. 19751016 200111 2 001

Mengetahui,
Plh. Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,

ANTHON UBRA, SE
NIP. 19580726 197807 1 001
ANTHON UBRA, SE
NIP. 19580726 197807 1 001
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TAHUN 2009

NO NAMA BARANG SATUAN HARGA


1 2 4 5
1 Gedeg Klas I m2
2 Genteng Beton bj
3 Genteng Bubungan Lokal bj
4 Genteng Bubungan Beton bj
5 Genteng Bubungan Karang Pilang bj
6 Genteng Bubungan Plentong bj
7 Genteng Kaca bj
8 Genteng Kodok bj
9 Genteng Lokal bj
10 Genteng Plentong bj
11 Genteng Plentong Dicat bj
12 Batu Bata Pasangan Kelas I bh
13 Batu Belah 15-30 cm m3
14 Batu Karang m3
15 Batu Lahar Merah Singaraja m3
16 Batu Padas bh
17 Batu Pipih Singaraja m3
18 Batu Pecah 0.5 - 1 cm m3
19 Batu Pecah 1 - 2 cm m3
20 Batu Pecah 2 - 3 cm (Manual, Mesin) m3
21 Batu Pecah 3 - 5 cm (Manual, Mesin) m3
22 Batu Pecah 5 - 7 cm (Manual) m3
23 Batu Pecah 7 - 10 cm m3
24 Besi Beton kg
25 Kayu Albesia Balok m3
26 Kayu Albesia Papan / Usuk m3
27 Kayu Bingkirai Balok m3
28 Kayu Bingkirai Papan / Usuk / Reng m3
29 Kayu Dolken (Pekerjaan Sementara) btg
30 Kayu Jati Balok m3
31 Kayu Jati Papan m3
32 Kayu Kamper Balok m3
33 Kayu Kamper Papan/ Usuk / Reng m3
34 Kayu Kruing Balok m3
35 Kayu Kruing Papan / Usuk / Reng m3
36 Kayu Meranti Balok m3
37 Kayu Meranti Papan / Usuk / Reng m3
38 Kayu Merbau Balok m3
39 Kayu Merbau Papan m3
40 Kayu Perancah / Begesting m3
41 Kayu Profil m1
42 Pasir Beton m3
43 Pasir Pasang m3
44 Pasir Urug m3
45 Semen PC 40 Kg kg
46 Semen PC 50 Kg kg
47 Semen warna/semen grouting kg
1481900
5400000
28000000
399400
1890000
534000

37,705,300

5400
Compatibility Report for SATUAN HARGA FEBRUARI 2019 acc -
LZ.xls
Run on 4/25/2019 11:52

The following features in this workbook are not supported by earlier


versions of Excel. These features may be lost or degraded when
opening this workbook in an earlier version of Excel or if you save this
workbook in an earlier file format.

Minor loss of fidelity # of


occurrences

Some formulas in this workbook are linked to other workbooks that 7


are closed. When these formulas are recalculated in earlier versions
of Excel without opening the linked workbooks, characters beyond
the 255-character limit cannot be returned.
Bahan 10'!D46
Bahan 10'!D51
Kayu'!E35
Kayu'!E38
Kayu'!E53
Beton tlg'!E35
Beton tlg'!E53

Some cells or styles in this workbook contain formatting that is not 335
supported by the selected file format. These formats will be converted
to the closest format available.

One or more objects in this workbook such as shapes, WordArt, or 1


text boxes may allow text to overflow the object boundaries. Earlier
versions of Excel do not recognize this option and will hide
overflowing text.
Rekap'!A1:L252
Version

Excel 97-2003

Excel 97-2003

Excel 97-2003

Excel 97-2003

Excel 97-2003

You might also like