HARGA
NO JENIS PEKERJAAN VOLUME SATUAN
SATUAN TOTAL
I TOWER FLYING FOX
1 TOWER A tinggi 10 m
A Pekerjaan Beton
1 Pondasi, Sloof, PD Stall 6.72 m3 4,000,000.00 26,880,000.00
B Pekerjaan Baja
1 Angkur 64.00 bh 150,000.00 9,600,000.00
2 Baja H 300.300.12.19 4,512.00 kg 19,000.00 85,728,000.00
3 Baja WF 300.150.6,5.9 878.40 kg 19,000.00 16,689,600.00
4 Tangga 815.32 kg 19,000.00 15,491,080.00
5 Rangka Atap baja ringan + zingcalum 5.00 m2 250,000.00 1,250,000.00
B Pekerjaan Baja
1 Angkur 64.00 bh 150,000.00 9,600,000.00
2 Baja H 300.300.12.19 4,136.00 kg 19,000.00 78,584,000.00
3 Baja WF 300.150.6,5.9 878.40 kg 19,000.00 16,689,600.00
4 Tangga 741.20 kg 19,000.00 14,082,800.00
5 Rangka Atap baja ringan + zingcalum 5.00 m2 250,000.00 1,250,000.00
B Pekerjaan Baja
1 Angkur 64.00 bh 150,000.00 9,600,000.00
2 Baja H 300.300.12.19 3,760.00 kg 19,000.00 71,440,000.00
3 Baja WF 300.150.6,5.9 878.40 kg 19,000.00 16,689,600.00
4 Tangga 667.08 kg 19,000.00 12,674,520.00
5 Rangka Atap baja ringan + zingcalum 5.00 m2 250,000.00 1,250,000.00
B Pekerjaan Baja
1 Angkur 224.00 bh 150,000.00 33,600,000.00
3 Baja Pipa 12" 2,518.45 kg 19,000.00 47,850,550.00
4 Bordes 445.20 kg 19,000.00 8,458,800.00
5 Tangga 333.90 kg 19,000.00 6,344,100.00
B Pekerjaan Drainase
1 Beton U 20 cm 100.00 m1 155,000.00 15,500,000.00
1 PEKERJAAN AREA PARKIR
A Pekerjaan Beton
1 Pembetonan t=12cm 132.00 m3 2,500,000.00 330,000,000.00
B Pekerjaan Drainase
1 Beton U 20 cm 120.00 m1 155,000.00 18,600,000.00
521.62 293.7
474.20 267
426.78 240.3
300 30
#REF!
2 40 80
4 20 80 160