I PEKERJAAN PERSIAPAN
1 Pembersihan 180.00 m2
2 Bowplank Pengukuran 58.00 m1
II PEKERJAAN BETON
1 Galian Tanah Pondasi Tapak 70 x 70 dan Batu Belah 27.01 m3
2 Pondasi tapak uk. 70 x 70 x 25cm 1.23 m3
3 Kolom 25 x 25 0.78 m3
4 Sloof 20 x 30 1.74 m3
IV PEKERJAAN DINDING
1 Pasang dinding hebel 330.00 m2
2 Plester aci 660.00 m2
V PEKERJAAN ATAP
1 Penutup atap Spandek 234.00 m2
2 Nok 20.00 m1
SUB TOTAL PEKERJAAN ATAP
VI PEKERJAAN LANTAI
1 Floor lantai 21.60 m3
2 Aci lantai 180.00 m2
3 Cat lantai teknokote 180.00 m2
4,500 810,000.00
24,000 1,392,000.00
2,202,000.00
65,000 1,755,325.00
3,200,000 3,920,000.00
3,200,000 2,500,000.00
3,200,000 5,568,000.00
11,988,000.00
65,000 2,600,000.00
18,000 3,417,750.00
18,000 7,108,920.00
18,000 3,412,656.00
18,000 38,400,000.00
18,000 15,795,000.00
18,000 14,616,000.00
18,000 10,824,000.00
18,000 288,000.00
6,500 884,000.00
7,500,000 7,500,000.00
475,000 72,200,000.00
350 1,758,644.53
178,804,970.53
96,000 31,680,000.00
65,000 42,900,000.00
74,580,000.00
110,000 25,740,000.00
45,000 900,000.00
26,640,000.00
-
875,000 18,900,000.00
20,000 3,600,000.00
28,500 5,130,000.00
27,630,000.00
322,722,633