Nomor : 225/SP-PKM/III/23 Kepada Yth

Hal : Penawaran Harga PT.ARMADA HAGA GRAHA

NO DESKRIPSI SAT QTY HARGA SAT JUMLAH

1 PONDASI STONE CRUISER


Galian m3 114.8 75,000 8,610,000
Urugan m3 76.9 50,000 3,845,500
Pasang Batu Kali 1:5 m3 30.8 625,000 19,225,000
Beton sistemix 1:2:3 m3 45.9 2,625,000 120,513,750
2 ASPHAL MIXING PLANT
Galian m3 87.1 75,000 6,535,500
Urugan m3 26.1 50,000 1,307,000
Pasang Batu Kali 1:5 m3 71.8 625,000 44,875,000
Beton sistemix 1:2:3 m3 150.6 2,625,000 395,193,750
3 CONCRATE MIXING PLANT
Galian m3 18.3 75,000 1,372,500
Urugan Tanah Kembali m3 66.4 50,000 3,321,500
Beton sistemix 1:2:3 m3 36.3 2,625,000 95,287,500
4 OPRITAN SCP
Galian m3 138.0 75,000 10,350,000
Urugan Sirtu m3 1228.5 225,000 276,412,500
Pasang Batu belah 1 : 5 m3 358.8 750,000 269,100,000
Beton sistemix 1:2:3 m3 20.5 2,625,000 53,707,500
Pipa sulin2 pvc 2' m1 210.6 45,000 9,477,000
5 OPRITAN AMP DAN CMP
Galian m3 75.0 75,000 5,625,000
Urugan Sirtu m3 585.0 225,000 131,625,000
Pasang Batu belah 1 : 5 m3 126.0 750,000 94,500,000
Beton sistemix 1:2:3 m3 8.5 2,625,000 22,207,500
Pipa sulin2 pvc 2' m1 60.0 45,000 2,700,000
6 RUANG OPERATOR SCP
Pertisi seng rangkai besi holo m2 26.4 140,000 3,696,000
Atap galvanum 0.3 mm m2 17.5 140,000 2,450,000
Pintu seng unit 1.0 150,000 150,000
Jendela unit 1.0 500,000 500,000
Lantai rabat 5 cm m2 7.5 45,000 337,500
JUMLAH 1,582,925,000