Ukuran Lantai Precast

0.25 3.115 0.25 1.2 0.25 3.115 0.25


0.1 3.315 0.1 0.1 1.4 0.1 0.1 3.315 0.1

3.7 3.7 3.7


0.925 0.925 0.925

Wiremesh M8
Lt.Kamar 5.4 L= 0.9 m 2.333333 2 18 Lbr
2.1 P= 4.175 m 1.293413 1

Lt.Koridor 5.4 L= 0.9 m 2 6 Lbr


2.1 P= 2.26 m 2 @Rp. 680,000.00
26 Lbr 17,680,000.00

2.785
0.1 2.985 0.1

3.7
0.925

Lt.Dapur 5.4 L= 0.9 m 2 2 Lbr


2.1 P= 3.845 m 1.404421

Beton Ready Mix K-225


6 4 2 0
0.518 3.108 m3 0.518 1 1.554 3 1.036 1
9 8 6 4
1.22655 11.03895 m3 1.22655 1 2.4531 2 2.4531 2 4.906
1 0
1.10445 1.10445 m3 1.10445 1
15.2514 m3
15 m3 2.849 4.0071 3.4891 4.906 15.2514 m3
3 4 3.5 5

@Rp. 750,000.00
11,438,550.00
Cetakan Beton
Besi Sloof Dia 12 Dia 10
Mekintang 6 8.5 54.5 m 272.5 22.70833333333 130.5
3.5 261
Memanjang 4 19 76 m 380 31.66666666667 21.75
54.375 22 Btg
55 Btg
@ Rp. 97,000.00 @ Rp. 74,000.00
5,335,000.00 1,628,000.00
Besi St-1 5,335,000.00
Besi St-2 Melintang 6 8.5 54.5 m 218 18.16666666667
3.5
Memanjang 4 19 76 m 304 25.33333333333
43.5
45 Btg
4,365,000.00
15,035,000.00

Dia 8 29.55 30 Btg


3.5 0.875 23
5.833333
@ Rp. 47,000.00 1.75
4,230,000.00 8.75

Kolom 27 Bh 0.19 Lbr


5.5 8 97000 0.24 Pjg
99 9,603,000.00 0.86
Begel 5m 0.9
0.24 25
0.96 5.4
1 25 47000 8.1
56.25 57 2,679,000.00 13.5 m 310.5 25.875
1.5 0.375 7
2.5
Biaya Besi = 50,855,000.00 0.75
3.75

0.19 Lbr
0.24 Pjg
0.86
0.9

2.7
3.6
6.3 m 44.1 3.675
Semen 50 Kg 0.016 m3 3.1 t/m3
Pasir 2.67 0.04 m3
Kerikil 3.40 0.05 m3
0.113177 m3

Sloof 19 0.075 5.7 m3


4
8.5 0.075 8.2875 m3
13
1.4 0.075 0.8925 m3
8.5
14.88 m3
Semen 89.28 sak 90 Sak @Rp. 62,000.00 5,580,000.00
Pasir 0.31 m3 4.61 m3 @Rp. 600,000.00 600,000.00
Kerikil 0.39 m3 5.80 m3 @Rp. 600,000.00 600,000.00
6,780,000.00
Story-1 6,780,000.00
Story-2 6,780,000.00
20,340,000.00
Kolom 0.3 0.09 27 Bh Semen 72.9 73 Sak 4,526,000.00
Tinggi 5 0.45 12.15 m3 Pasir 0.31 3.7665 1 600,000.00
Kerikil 0.39 4.7385 1 600,000.00
5,726,000.00

Biaya Beton = 37,504,550.00

Tapak Pondasi 80x80x25

Besi Tapak Beton


0.8 0.74 0.8
0.25 0.19 0.25
1.86 0.16
10 18.6 27 4.32 m3
27 41.85 0.3
42 Btg 27 2.43 m3
6.75 m3
Besi Stek
2 6 Semen 40.5 41 Sak 2,542,000.00
27 324 Pasir 0.31 2.0925 1/2 Truk 300,000.00
27 Btg Kerikil 0.39 2.6325 1/2 Truk 300,000.00
3,142,000.00
Total 69 Btg
6,693,000.00
Total Harga Struktur 98,194,550.00
Rekapitulasi Bahan Material

Besi Sloof
Dia 12 55 Btg @ Rp. 97,000.00 5,335,000.00
Dia 10 22 Btg @ Rp. 74,000.00 1,628,000.00
Dia 8 30 Btg @ Rp. 47,000.00 1,410,000.00

Besi Lt.1
Dia 12 55 Btg @ Rp. 97,000.00 5,335,000.00
Dia 8 30 Btg @ Rp. 47,000.00 1,410,000.00

Besi Ring Balok


Dia 12 45 Btg @ Rp. 97,000.00 4,365,000.00
Dia 8 30 Btg @ Rp. 47,000.00 1,410,000.00

Besi Pondasi Tapak + Stek


Dia 12 69 Btg @ Rp. 97,000.00 6,693,000.00
Dia 8 10 Btg @ Rp. 47,000.00 470,000.00

Besi Kolom
Dia 12 99 Btg @ Rp. 97,000.00 9,603,000.00
Dia 8 57 Btg @ Rp. 47,000.00 2,679,000.00

Besi Lantai
Wire- M8 26 Lbr @ Rp. 680,000.00 17,680,000.00

Semen 343 Sak @ Rp. 62,000.00 21,266,000.00


Pasir 5 Truck @ Rp. 600,000.00 3,000,000.00
Krikil 5 Truck @ Rp. 600,000.00 3,000,000.00
K-225 15.5 m3 @ Rp. 750,000.00 11,625,000.00

96,909,000.00