STANDAR SATUAN HARGA (SSH)

HARGA HARGA
NO. URAIAN BAHAN SAT. BAHAN (Rp.) BAHAN (Rp.) TOKO A TOKO B TOKO C
APBDes RKM
1 2 3 4 5 6 7
A. BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA
1 Pasir Pasang m³ 202,000 180,000 180,000 180,000 180,000
2 Pasir Urug m3 168,400 150,000 150,000 160,000 150,000
3 Pasir Beton m3 246,900 220,000 220,000 220,000 220,000
4 Batu Belah 10/15 m³ 224,500 200,000 200,000 200,000 200,000
5 Batu Split 2/3 m3 246,900 220,000 220,000 220,000 220,000
6 Bata Merah bh 900 800 800 800 800
7 Semen Zak 61,700 55,000 55,000 55,000 55,000
8 Tanah Urugan / Tanah Merah m3 112,200 100,000 100,000 100,000 100,000
9 Cat kayu kg 44,900 40,000 40,000 40,000 40,000
10 Cat tembok kg 10,100 9,000 9,000 10,000 9,000
11 Cat besi kg 50,500 45,000 45,000 45,000 45,000
12 Ampelas lbr 2,200 2,000 2,000 3,000 2,000
13 Meni kayu kg 16,800 15,000 15,000 20,000 15,000
Meni Tembok kg 16,800 15,000 15,000 20,000 15,000
14 Dempul kayu/Lem Kayu kg 22,400 20,000 30,000 25,000 20,000
15 Minyak/Thinner cat ltr 11,200 10,000 10,000 12,000 11,000
16 Meni besi kg 18,000 16,000 16,500 16,000 16,500
17 Residu kg 5,600 5,000 5,000 5,000 5,000
18 Roster Beton bh 19,600 17,500 18,000 17,500 18,000
19 Semen Warna kg 8,400 7,500 7,500 7,500 7,500
20 Semen Putih kg 2,800 2,500 2,500 2,500 2,500
21 Buis Beton Dia. 100 cm bh 280,600 250,000 250,000 250,000 250,000
21 Air Buat Ngecor Liter 100 50 50 55 60
HARGA HARGA
NO. URAIAN BAHAN SAT. BAHAN (Rp.) BAHAN (Rp.) TOKO A TOKO B TOKO C
APBDes RKM
1 2 3 4 5 6 7
G. BAHAN KAYU BERIKUT BAHAN JADINYA
1 Kaso 5/7 II m3 2,469,400 2,200,000 2,200,000 2,200,000 2,200,000
2 Kaso 5/7 II Btg 13,500 12,000 12,000
3 Reng 3/4 Btg 8,400 7,500 7,750 7,500 8,000
4 Balok 8/12 m3 3,928,600 3,500,000 3,500,000 3,500,000 3,500,000
5 Balok Kayu Klas III m³ 1,683,700 1,500,000 1,500,000 1,500,000 1,500,000
6 Papan Terentang m³ 1,683,700 1,500,000 1,500,000 1,500,000 1,500,000
7 Papan 3,5x20x400 cm lbr 875,500 780,000 790,000 780,000 790,000
8 Asbes gelombang lbr 67,300 60,000 60,000 60,000 60,000
9 Nok Asbes gelombang lbr 55,000 49,000 49,000 49,000 49,000
10 Bambu dia 5 s/d 7 btg 14,000 12,500 12,500 12,500 12,500
11 Bambu dia 7 s/d 10 btg 20,200 18,000 18,000 18,000 18,000
12 Kayu Klas II m3 3,086,700 2,750,000 2,750,000 2,750,000 2,750,000
13 Kayu Terentang m3 2,598,500 2,315,000 2,320,000 2,315,000 2,320,000
14 Kait Angin bh 9,000 8,000 8,000 8,000 8,000

H. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi holow 40 20 08 btg 39,300 35,000 35,000 35,000 35,000
2 Kawat pengikat kg 13,500 12,000 12,000 12,000 12,000
3 Besi siku kg 13,500 12,000 12,000 12,000 12,000
4 Kawat Duri m' 13,500 12,000 12,000 12,000 12,000
5 Kawat Tembaga kg 33,700 30,000 30,000 30,000 30,000
6 Plat Strip dia. 3 mm - 3 cm btg 11,200 10,000 10,000 10,000 10,000
7 Plat Strip dia. 3 mm - 4 cm btg 15,700 14,000 14,000 14,000 14,000
8 Besi Beton Ø 12 mm Btg 123,500 110,000 110,000 110,000 110,000
Besi Beton Ø 10 mm Btg 80,800 72,000 72,000 72,000 72,000
9 Besi Beton Ø 8 mm Btg 61,700 55,000 55,000 55,000 55,000
10 Kawat beton Kg 16,800 15,000 15,000 15,000 15,000
11 Besi holow 40 40 08 btg 67,300 60,000 61,000 60,000 60,000
12 Plat Besi tipis 0,5 s/d 10 mm keatas kg 13,500 12,000 12,000 12,000 12,000
13 Lem Kuning kg 33,700 30,000 30,000 30,000 30,000
14 Lem Fox kg 18,500 16,500 17,000 16,500 16,500
15 Besi Cor kg 15,700 14,000 14,000 15,000 15,000
DAFTAR HARGA SATUAN UPAH

A. DAFTAR HARGA SATUAN UPAH


HARGA UPAH+PAJAK HARGA UPAH
NO. URAIAN PEKERJA HARGA SAT. (Rp.)
APBDES (Rp.) (Rp.)
1 Tukang Cat/Pelitur Terampil 101,000 90,000 HOK
2 Tukang Besi 101,000 90,000 HOK
3 Tukang Kayu 101,000 90,000 HOK
4 Tukang Batu 101,000 90,000 HOK
5 Pekerja 89,800 80,000 HOK
DAFTAR HARGA PIPA DAN ACCESSORIES PIPA PVC
BERDASARKAN KUALITAS PIPA PER METER
TABEL HARGA FITTING PVC
Diameter HARGA RKM SUPLIER PIPA (Rp./M)
No. KETERANGAN
Inch mm (Rp.) Paralon Supralon Maspion
PIPA PVC KUALITAS AW
1 5/8 13
2 1/2 16
3 3/4 20

PIPA PVC KUALITAS S-10


4 1/2 16 6,133 6,750 6,133 SCJ
5 3/4 20 9,417 10,550 9,417 SCJ
6 1 25 10,583 11,600 10,583 12,180 SCJ
7 1⅟ ₄ 30 15,500 16,950 15,500 17,980 SCJ
8 1½ 40 24,067 26,600 24,067 28,440 SCJ

PIPA PVC KUALITAS S-12,5


8 3/4 20 - - SCJ
9 1 25 - - SCJ
10 1⅟ ₄ 30 - - - SCJ
11 1½ 40 - SCJ
12 2 50 30,970 35,700 30,950 39,050 RRJ
13 2½ 65 64,600 72,400 64,600 78,630 RRJ
14 3 75 93,750 105,950 93,750 115,530 RRJ
15 4 100 200,267 226,500 200,267 243,730 RRJ
16 5 125 - - - RRJ
17 6 150 - - - - RRJ
18 8 200 - - - RRJ
Diameter HARGA RKM SUPLIER PIPA (Rp./M)
No.
Inch mm (Rp.) A B C KETERANGAN
1 1½ 50 39,600 43,600 40,770 39,600 SCJ
2 2 63 56,070 59,900 57,510 56,070 RRJ
3 2½ 75 - - - - RRJ

Harga Dari Suplyer Yang diterima TKM Bulan Maret


Keterangan : Diameter (Ø) < 50 mm Sistim Sambungan Solvent Cement
Diameter (Ø) >= 50 mm Sistim Sambungan Rubber Ring Joint (RRJ)
Harga Sudah Discount 12,5%

HARGA PIPA DAN ACCESSORIES


TABEL HARGA FITTING PVC
Diameter KNIE TEE GATE VALVE STOP KRAN KRAN AIR
No.
Inch 90⁰/(Rp.) 45⁰/(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 5/8 - - - - - -
2 1/2 2,750 1,650 8,250 - 44,000 25,850
3 3/4 7,150 2,200 9,900 - - -
4 1 19,250 16,500 14,300 82,500
5 1⅟ ₄ - 5,500 30,250 - 166,100
6 1½ 24,200 19,800 48,950 159,500
7 2 33,000 29,700 117,700 313,500
8 2½ 15,400 7,150 183,700 - 933,350
9 3 49,500 38,500 342,100 1,787,500 495,000
10 4 53,900 55,000 4,284,500 2,574,000 -
11 5 161,150 - 17,011,500 - -
12 6 232,650 74,800 5,450,500 - -
13 8 196,900 161,150 313,500 - -

TABEL HARGA PIPA GI (GALVANIS IRON) 6 METER


Diameter MEDIUM A MEDIUM B SOCKET
No.
Inch mm (Rp.)/Btng (Rp.)/meter (Rp.)/Btng (Rp.)/meter (Rp.)
1 4 100 1,544,400 257,400 1,287,000 214,500 91,000
2 3 75 1,133,000 189,200 1,081,300 181,500 65,000
3 2 50 875,600 146,300 721,050 121,000 57,000
4 1½ 40
5 1 25

Keterangan : Socket Terbuat dari Hancuran

TABEL HARGA REDUCER PVC


HARGA REDUCER (Rp.) SOCKET (Rp.) DOP
No.
Ø (Inch) SNI AW Ø (Inch) VALVE FAUCET (Rp.)
1 8" x 6" 1/2 4,400
2 6" x 5" 964,700 334,620 3/4 7,150
3 5" x 4" 941,050 269,500 1 7,700
4 4" x 3" 266,200 36,300 1,1/4 13,750
5 3" x 2½" 113,850 18,700 1,1/2 258,500
6 3" x 2" 100,650 203,500 2 440,000
7 3" x 1½" - 148,500 2,1/2 67,650
8 3" x 1" - 93,500 3 101,200
9 2½" x 2" 75,350 88,000 4
10 2" x 1½" 44,550 82,500
11 2" x 1" 25,850 55,000
12 1½" x 1" 25,850 13,200
13 1" x ¾" 9,900 13,200
14 1" x ½" 7,700 8,250
15 3/4" x 1/2" 5,500 104,500

TABEL HARGA ACCESSORIES (FITTING) LAINNYA


HARGA
No. JENIS BARANG KETERANGAN

HARGA PIPA DAN ACCESSORIES


No. JENIS BARANG KETERANGAN
(Rp.)
1 Cheke Valve 4" 1,441,000
2 Cheke Valve 3" 883,300
3 Cheke Valve 2½" 697,400
4 Cheke Valve 2" 440,000
5 Cheke Valve 1½" 258,500
6 Clame Sadle 4" x 3/4" 126,500 PVC Maspion
7 Clame Sadle 3" x 3/4" 66,000 PVC Maspion
8 Clame Sadle 2" x 3/4" 44,000 PVC Maspion
9 TORN AIR Kapasitas 11 M3 17,102,800 Profil Tank
10 TORN AIR Kapasitas 2 M3 3,150,950 Profil Tank
11 Katup Plampung 3/4" 143,000 Merk ONDA
12 Katup Plampung 1/2" 84,700 Merk ONDA
13 Water Meter 3/4" 457,600 Merk ONDA
14 Water Meter 1/2" 300,300 Merk ONDA
15 Flange (All) Socket RRJ (ISO) Ø 4" Ø 3" Ø 2"
372,000 325,000 152,500

Catatan :

HARGA PIPA DAN ACCESSORIES


Network Table - Nodes Network Table - Links
Elevation Base Demand
Pressure Length Diameter Flow
Node ID m LPS m Link ID m mm LPS
Junc 2 311 0 0.56 Pipe 1 50 75 2.6
Junc 3 310 0 1.36 Pipe 2 25 75 2.6
Junc 4 309 0.2 1.92 Pipe 3 50 75 2.6
Junc 5 308 0 2.6 Pipe 4 30 75 2.4
Junc 7 301 0.2 6.92 Pipe 6 120 50 0.8
Junc 8 294 0.2 13.13 Pipe 7 120 50 0.6
Junc 9 291 0 15.87 Pipe 8 65 50 0.6
Junc 10 295 0 11.66 Pipe 9 33 40 0.4
Junc 11 292 0.2 14.33 Pipe 10 90 25 0.2
Junc 12 276 0.2 27.88 Pipe 11 70 50 0.6
Junc 13 307 0 3.39 Pipe 12 65 50 0.6
Junc 14 307 0 3.28 Pipe 13 65 50 0.6
Junc 15 306 0.2 4.1 Pipe 14 30 40 0.4
Junc 16 301 0 8.83 Pipe 16 30 40 0.2
Junc 17 295 0.2 14.41 Pipe 17 82 25 0.2
Junc 18 292 0 17.33 Pipe 21 50 25 0.2
Junc 19 290 0.2 18.11 Pipe 22 50 25 0.2
Junc 20 302 0 4.81 Pipe 23 50 25 0.2
Junc 21 303 0.2 3 Pipe 24 50 25 0.2
Junc 22 303 0 7.07 Pipe 25 30 40 0.4
Junc 23 307 0.2 2.26 Pipe 26 50 25 0.2
Junc 25 301 0.2 6.1 Pipe 27 50 25 0.2
Junc 26 300 0.2 7.62 Pipe 28 25 75 1.8
Junc 27 295 0 10.85 Pipe 29 57 50 1.6
Junc 28 294 0.2 10.77 Pipe 30 50 25 0.2
Junc 29 305 0 5.41 Pipe 31 42 40 0.4
Junc 24 312 1.5 0 Pump 5 #N/A #N/A 1.5
Resvr 1 312 #N/A 0
Resvr 6 222 #N/A 0
Velocity Pipa Transmisi 3" 2" 1.5" 1"
m/s 0 0 753 0 meter
0.59
0.59 Pipa Distribusi 3" 2" 1.5" 1"
0.59 180 497 165 522 meter
0.54
0.41 3" 2" 1.5" 1" 130
0.31 Total Pipa 180 497 918 522 meter 135
0.31 6 6 6 6 130
0.32 30.00 82.83 153.00 87.00 Batang 67
0.41 181
0.31 TOTAL 2117 METER 522 140
0.31 130
0.31 130
0.32 EDIT 3" 2" 1.5" 1" 55
0.16 60 130 180 173 BATANG 60
0.41 6 6 6 6 157
0.41 3258 360 780 1080 1038 METER 100
0.41 100
0.41 100
0.41 100
0.32 60
0.41 100
0.41 100
0.41 50
0.81 115
0.41 100
0.32 85
0
0.5
65
67
65
33
90
70
65
65
27
30
78
50
50
50
50
30
50
50
25
57
50
42
Take Of Sheet
Perhitungan Volume SAB Desa : Nagaratengah
KEGIATAN PAMISMAS Kecamatan : Cineam

NO PERHITUNGAN VOLUME GAMBAR


1 BRONCAPTERING
A GALIAN TANAH
Panjang x Lebar x Tinggi = Volume
2.5 x 1.3 x 2 = 6.50 M3

B URUGAN TANAH
Pekerjaan Galian x 0.25 = Volume Satuan
6.50 x 0.25 = 1.63 M3

C PONDASI BATU KALI


Panjang x Lebar x Tinggi = Volume Satuan
7.6 x 0.6 x 0.5 = 2.28 M3

D DINDING BATU KALI


Panjang x Luas Trapesium = Volume Satuan
7.6 x 0.3 + 0.6 x 1.95 Denah Broncaptering
2

7.6 x 0.88 = 6.67 M3

E BETON
- Lantai Kerja
Panjang x Lebar x Tebal = Volume Satuan
2.5 x 1.3 x 0.1 = 0.33 M3
- Plat Lantai
Panjang x Lebar x Tebal = Volume Satuan
2.5 x 1.3 x 0.2 = 0.65 M3
- Kolom 15/15
Panjang x Lebar x Tinggi x Jumlah Kolom Potongan Broncaptering
0.15 x 0.15 x 2 x 4 = 0.18 M3
- Balok 15/25
Panjang x Lebar x Tinggi
9.6 x 0.15 x 0.25 = 0.36 M3
- Plat Tutup
Panjang x Lebar x Tebal =
2.5 x 1.3 x 0.15 = 0.49 M3

F PEKERJAAN PEMBESIAN
- Plat Lantai
Pembesian Ø 8
-Ø8 2.6 / 0.15 x 2 = 35.00 Buah
2.1 x 35.00 = 73.5 m'
2.1 / 0.15 x 2 = 28.00 m'
2.6 x 28.00 = 72.8 m'
TOTAL = 146.30 m'
= 13.00 batang
Panjang Besi x Berat Jenis Besi
146.30 x 0.395 = 57.79 Kg

- Kolom 15/15
Pembesian Tulangan Ø 8
-Ø8 = 4 x 2 x 4 = 32.00 m'
Panjang Besi x Berat Jenis Besi
32.00 x 0.395 = 12.64 Kg
3.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 2 / 0.15 + 1
= 13.33 + 1 = 15.00
4 x 0.2 = 0.8 m'
0.8 x 15.00 x 6 buah
= 72.00 m'
= 72.00 x 0.395 Kg
NO PERHITUNGAN VOLUME GAMBAR
= 28.44 Kg
= 6.00 Batang
- Balok 15/25
Pembesian Tulangan Ø 8
-Ø8 = 4 x 9.6 = 38.40 m'
Panjang Besi x Berat Jenis Besi
38.40 x 0.395 = 0 Kg
0.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 9.6 / 0.15 + 1
= 64.00 + 1 = 65.00 Buah
Kebutuhan (2 x 0.1) + (2 x 0.2) = 0.6 m'
0.60 x 65.00 x 0.395 m'
= 39.00 x 0.395 = 0.00 Kg
= 0.00 Batang
Plat Tutup
Pembesian Ø 8
-Ø8 = 2.5 / 0.15 = 16.67 Buah
16.67 x 1.3 = 21.66666666667 m'
1.3 / 0.15 = 8.67 Buah
8.67 x 2.5 = 21.66666666667 m'
Total = 43.33333333333
= 43.33333333333 x 0.395
= 17.11666666667 Kg
= 4.0 Batang
G PEKERJAAN BEKISTING
- Kolom 15/15
Bekisting
(4 x 0.25) x 2 x 4 = 8 M2
- Balok 15/25
Bekisting
9.6 x 0.4 = 0 M2
- Plat Tutup
Bekisting
2.5 x 1.3 = 3.25 M2

H PLESTERAN + ACIAN
Bidang Dalam
Panjang x Lebar = Volume Satuan
(2 x 2)+(2 x 1.5) x 1.85 = 12.95 M2
Bidang Luar
Panjang x Lebar = Volume Satuan
(2 x 2.6)+(2 x 2.1) x 1 = 9.40 M2
Plat Tutup
Panjang x Lebar
2.5 x 1.3 = 3.25 M2
Total
B. Luar + P. Lantai + Plat Tutup = 25.60 M2

I PENGECATAN
Bidang Luar
Panjang x Lebar = Volume
(2 x 2.6)+(2 x 2.1) x 1 = 9.4 M2
Plat Tutup
Panjang x Lebar
2.5 x 1.3 = 3.25 M2
Jumlah
B. Luar + P. Lantai = 12.65 M2

J BOX KATUP
Lantai Kerja
0.05 x 1 x 1 = 0.05 M3
Pas. Batu Bata
1.2 x 1 x 3 bidang = 3.6 M2
Plesteran dan Acian
1 x 1 x 3 bidang = 3.00 M2
NO PERHITUNGAN VOLUME GAMBAR

= 3.00 x 2
= 6.00 M2
Pengecatan
3.00 M2

2 BAK PENGUMPUL
A GALIAN TANAH
Panjang x Lebar x Tinggi = Volume Satuan
2.4 x 3 x 4 = 28.8 M3
B PASIR
Panjang x Lebar x Tinggi = Volume Satuan
2.4 x 3 x 0.05 = 0.36 M3
C LANTAI KERJA
Panjang x Lebar x Tinggi = Volume Satuan
2.4 x 3 x 0.15 = 1.08 M3
D KOLOM
- Beton
Panjang x Lebar x Tinggi x Jumlah Kolom
0.2 x 0.2 x 3.5 x 4 = 0.56 m3
- Pembesian Tulangan Ø 10
- Ø 10 = 4 x 3.5 x 4 = 56 m1
Panjang Besi x Berat Jenis Besi
56 x 0.62 = 34.72 KG
- Pembesian Sengkang Ø 8
-Ø8 = 14 / 0.15 + 1
= 93.3333333 + 1 = 94.33333333333 Buah
0,16+0,16+0,16+0,16+0,06 = 0.6 M
0.7 x 94.3333333333 x 0.395
= 66.0333333 x 0.395 = 26.08316666667
- Bekisting
4 X 2.85 x 0.8 = 9.12 M2
E DINDING BETON Denah Bak Pengumpul
- Beton
Panjang x Lebar x Tebal = Volume Satuan
9.6 x 2.4 x 0.15 = 3.456 M3
- Pembesian Ø 10
Panjang
x Lebar = Volume
Jarak
9.6
x 2.4 = 153.60 M3
0.15
153.60 x 0.62 = 95.23 KG

Lebar
x Jarak = Volume
Jarak
2.4
x 9.6 = 153.6 M3
0.15
153.60 x 0.62 = 95.23 KG
- Bekisting
2 X 9.6 x 2.85 = 54.72 m3
F BALOK Potongan Bak Pengumpul
- Beton
Panjang x Lebar x Tinggi = Volume Satuan
9.6 x 0.15 x 0.2 = 0.288 M3
- Pembesian Tulangan Ø 10
- Ø 12 = 4 x 9.6 = 38.4 M1
Panjang Besi x Berat Jenis Besi - KG Besi
38.4 x 0.62 = 23.808 KG
- Pembesian Sengkang Ø 8
-Ø8 = 9.6 / 0.15 + 1
= 54 + 1 = 55 Buah
Kebutuhan 0,16+0,16+0,11+0,11+0,06 = 0.6 M
0.6 x 55 x 0.395
= 33 x 0.395 = 13.035 Kg
- Bekisting
9.6 x 0.4 = 3.84 m2
G PLAT LANTAI
- Beton
NO PERHITUNGAN VOLUME GAMBAR
Panjang x Lebar x Tinggi = Volume Satuan
2.4 x 3 x 0.5 = 3.6 M3
- Pembesian Ø 10
Panjang
x Lebar = Volume
Jarak
2.4
x 3 = 48.00 M3
0.15
48.00 x 0.62 = 29.76 KG

Lebar
x Jarak = Volume
Jarak
2.4
x 3 = 48.00 M3
0.15
48.00 x 0.62 = 29.76 KG
- Bekisting Bawah
2.4 x 3 = 7.2 m2
- Bekisting Samping
9.6 x 0.12 = 1.152 m2
H ACIAN
- Dinding Luar
Panjang x Lebar = Volume Satuan
9.6 x 0.65 = 6.24 M2
- Plat Lantai
Panjang x Lebar = Volume Satuan
2 x 2 = 4 M2
- Jumlah
B. Luar + P. Lantai = 10.24 M2
I PENGECATAN
- Dinding Luar
Panjang x Lebar = Volume Satuan
8 x 0.65 = 5.2 M2
- Plat Lantai
Panjang x Lebar = Volume Satuan
2 x 2 = 4 M2
- Jumlah
B. Luar + P. Lantai = 9.2 M2
J BOX KATUP
- Lantai Kerja
0.05 x 0.6 x 0.6 = 0.018 M3
- Pas. Batu Bata
0.15 x 3 = 0.45 M3
- Lantai Kerja
0.15 x 3 x 2 = 0.9 M2

3 RESERVOIR

A GALIAN TANAH
Galian Reservoir
Panjang x Lebar x Tinggi = Volume Satuan
x x = 0.00 M3
Galian Pondasi Telapak
Panjang x Lebar x Tinggi = Volume Satuan
1 x 1.9 x 1.5 = 2.85 M3
= 2.85 x 6 buah
= 17.10 M3
TOTAL = 17.10 M3

B URUGAN TANAH
Galian Tanah x 0.25 = Volume Satuan
17.10 x 0.25 = 4.27 M3

C PASANGAN BATU BATA DINDING SEKAT


Panjang x Lebar = Volume Satuan
2.5 x 2.45 = 6.125 M2

D BETON
- Pondasi Telapak
0.25 x 6 buah = Volume Satuan V. PONDASI = 0.25
NO PERHITUNGAN VOLUME GAMBAR
0.25 x 6 = 1.5 M 3

- Lantai Kerja
Panjang x Lebar x Tebal = Volume Satuan
1 x 1 x 0.1 = 0.10 M3
- Plat Lantai
Panjang x Lebar x Tebal = Volume Satuan
4.5 x 2 x 0.25 = 2.25 M3
- Sloof 15/25
Panjang x Lebar x Tebal = Volume Satuan
14.28 x 0.15 x 0.25 = 0.54 M3
- Ringbalk 15/25
Panjang x Lebar x Tebal = Volume Satuan
14.28 x 0.15 x 0.25 = 0.54 M3
- Kolom 30/30
Panjang x Lebar x Tinggi = Volume Satuan
0.30 x 0.3 x 2.8 = 0.25 M3
= 0.25 x 6 buah
= 1.512 M3
- Kolom Praktis 25/25
Panjang x Lebar x Tinggi = Volume Satuan
0.25 x 0.25 x 2.36 = 0.15 M3
= 0.15 x 4 buah
= M3
- Dinding Reservoir
Panjang x Lebar x Tebal = Volume Satuan
4.57 x 2.36 x 0.25 = 7.55 M3 Dinding dikali tinggi
- Plat Tutup
Panjang x Lebar x Tebal = Volume Satuan
1.00 x 1 x 0.1 = 0.10 M3

E PEKERJAAN PEMBESIAN
- Pondasi Telapak 1 Unit
Tiang Pondasi Telapak
Pembesian Ø 12
- Ø 12 = 4 x 1.5 = 6 m'
= 6 x 0.89
= 5.34 Kg
= 1.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 1.5 / 0.15 = 10 + 1
= 11 buah
4 x 0.25 = 1 m'
= 11 x 1
= 11 m'
= 11 x 0.39
= 4.29 Kg
= 1.00 Batang
Telapak Pondasi
- Ø 12 0.3 + 1 x 0.2 = 0.13
2
= 0.13 / 0.15 = 0.87 + 1
= 2.00 buah
= 4 x 1 = 4.00
= 8 x 2.00 = 16.00 m'
= 16.00 x 2
= 32.00 m'
= 32.00 x 0.89
= 28.48 Kg
= 1 x 0.3 x 1 = 0.3
= 0.3 / 0.15 = 2 + 1
= 3 buah
4 x 1 = 4 + 0.05
= 4.05 x 3 buah
= 12.15 x 2 lapis
= 24.30 x 0.89
= 21.63 Kg
Total Pembesian Pondasi Telapak
NO PERHITUNGAN VOLUME GAMBAR
- Ø 12 = 5.34 + 28.48 + 21.63
= 55.45 x 6 unit
= 332.68 Kg
= 32.00 Batang
-Ø8 = 4.29 x 6 unit
= 25.74 Kg
= 4.00 Batang
- Plat Lantai
Pembesian Ø 10
- Ø 10 = 4.50 / 0.15 = 30.00 + 1
= 31.00 buah
2 x 31.00 = 62 m'
= 62.00 m'
2 x 62.00 = 124.00 m'
= 11.00 Batang
2.00 / 0.15 = 13.33 + 1
= 15.00 buah
4.50 x 15.00 = 67.50 m'
= 67.50 m'
2 x 67.50 = 135.00 m'
= 12.00 Batang
= 124.00 + 135.00 X 0.62
= 160.58 Kg
= 22.00 Batang
- Sloof 15/25
Pembesian Tulangan Ø 10
- Ø 10 = 4 x 14.28 = 57.12 m'
Panjang Besi x Berat Jenis Besi
57.12 x 0.62 = 35.4144 Kg
= 5.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 14.28 / 0.15 + 1
= 95.20 + 1 = 97.00 Buah
Kebutuhan (2 x 0.1) + (2 x 0.2) = 0.6 m'
0.60 x 97.00 x 0.395
= 58.20 x 0.395 = 22.99 Kg
= 5.00 Batang
- Ringbalk 15/25
Pembesian Tulangan Ø 8
-Ø8 = 4 x 14.28 = 57.12 m'
Panjang Besi x Berat Jenis Besi
57.12 x 95.232 = 5439.65184 Kg
= 5.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 14.28 / 0.15 + 1
= 95.20 + 1 = 97.00 Buah
Kebutuhan (2 x 0.1) + (2 x 0.2) = 0.6 m'
0.60 x 97.00 x 0.395
= 58.20 x 0.395 = 22.99 Kg
= 5.00 Batang
- Kolom 30/30
Pembesian Tulangan Ø 12
- Ø 12 = 4 x 2.8 x 6 = 67.20 m'
Panjang Besi x Berat Jenis Besi
67.20 x 0.89 = 59.808 Kg
= 6.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 2.8 / 0.15 + 1
= 18.67 + 1 = 20.00
4 x 0.25 = 1 m'
1 x 20.00 x 6 buah
= 120.00 m'
= 120.00 x 0.395 Kg
= 47.40 Kg
= 4.00 Batang
- Kolom Praktis 25/25
Pembesian Tulangan Ø 10
- Ø 10 = 4 x 2.36 x 4 = 37.76 m'
NO PERHITUNGAN VOLUME GAMBAR
Panjang Besi x Berat Jenis Besi
37.76 x 0.62 = Kg
= 4.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 2.36 / 0.15 + 1
= 15.73 + 1 = 17.00
4 x 0.2 = 0.8 m'
0.8 x 17.00 x 4 buah
= 54.40 m'
= 54.40 x 0.395 Kg
= Kg
= 5.00 Batang
- Dinding Reservoir
Pembesian Ø 10 Panjang dinding 4.5 meter
- Ø 10 = 1.00 / 0.15 = 6.67 + 1
= 8.00 buah
2.45 x 8.00 = 19.6 m'
= 19.60 m'
2 x 19.60 = 39.20 m'
= 4.00 Batang
2.45 / 0.15 = 16.33 + 1
= 18.00 buah
1.00 x 18.00 = 18.00 m'
= 18.00 m'
2 x 18.00 = 36.00 m'
= 3.00 Batang
= 39.20 + 36.00 X 0.62
= 46.62 x 2 dinding
= 93.248 Kg
= 7.00 Batang x 2 Dinding
= 14.00 Batang
Pembesian Ø 10 Panjang dinding 2.5 meter
- Ø 10 = 1.00 / 0.15 = 6.67 + 1
= 8.00 buah
2.45 X 8.00 = 19.6 m'
= 19.60 m'
2 x 19.60 = 39.20 m'
= 4.00 Batang
2.45 / 0.15 = 16.33 + 1
= 18.00 buah
1.00 x 18.00 = 18.00 m'
= 18.00 m'
2 x 18.00 = 36.00 m'
= 3.00 Batang
= 39.20 + 36.00 X 0.62
= 46.62 x 2 dinding
= 93.248 Kg
= 7.00 Batang x 2 Dinding
= 14.000 Batang
TOTAL PEMBESIAN DINDING = 93.248 + 93.248
= 186.496 Kg
= 28.00 Batang
- Plat Tutup
Pembesian Ø 8
-Ø8 = 1.00 / 0.15 = 6.67 + 1
= 8.00 buah
1 x 8.00 = 8 m'
= 8.00 m'
= 8.00 m'
= 1.00 Batang
1.00 / 0.15 = 6.67 + 1
= 8.00 buah
1.00 x 8.00 = 8.00 m'
= 8.00 m'
= 8.00 m'
= 1.00 Batang
= 8.00 + 8.00 X 95.232
NO PERHITUNGAN VOLUME GAMBAR
= 1523.71 Kg
= 2.00 Batang
E PEKERJAAN BEKISTING
- Pondasi Telapak
Tiang pondasi telapak = 4 x 0.3 x 1
= 1.2 x 6 buah
= 7.2 M2
- Plat Lantai = 0.2 x (2x5)+(2x2)
= 0.2 x 14
= 2.8 M2
- Sloof 15/25 = (2x0.25) x (2x5.5)+(2x2.5)
= 0.5 x 16
= 8 M2
- Ringbalk 15/25 = (2x0.25) x (2x5.5)+(2x2.5)
= 0.5 x 16
= 8 M2
- Kolom 30/30 = (4x0.3) x 2.45
= 1.2 x 2.45
= 2.94 x 6
= 17.64 M2
- Kolom Praktis 25/25 = (4x0.25) x 2.45
= 1 x 2.45
= 2.45 x 6
= 14.7 M2
- Dinding Reservoir Panjang dinding 5 m
= 2.15 x 5 x 2 dinding
= 21.5 x 2 lapis
= 43.0 M2
Panjang dinding 5 m
= 2.15 x 2 x 2 dinding
= 8.6 x 2 lapis
= 17.2 M2
TOTAL DINDING = 43.0 + 17.2
= 60.2 M2
- Plat Tutup = 5 x 2 +
= 10 + (0.15X(2X5.5)+2X2.5)
= 10 + 2.4
= 12.4 M2

F PLESTERAN DAN ACIAN


Plesteran Dalam = Panjang x Lebar
= (2x5)+(2x2) x 2.45
= 14 x 2.45
= 34.3 M2
Plesteran Luar = Panjang x Lebar
= (2x5.)+(2x2.5) x 1.3
= 16 x 1.3
= 20.8 M2
Plat Tutup = Panjang x Lebar
= 5.5 x 2.5
= 13.75 M2

G PENGECATAN
Pengecatan = 20.8 + 13.75
= 34.55 M2

H BOX KATUP
Lantai Kerja
1.45 x 0.79 x 0.2 = 0.2291 M3
Pas. Batu Bata
1.45 x 0.79 x 0.5 bidang = 0.57275 M2
Plesteran dan Acian
1.45 x 0.79 x 0.5 bidang = 0.57 M2

= 0.57 x 2
= 1.15 M2
NO PERHITUNGAN VOLUME GAMBAR
Pengecatan
0.57 M2

3 RUMAH PANEL
A Kolom Praktis 15/15
- Beton
Panjang x Lebar x Tinggi x Jumlah Kolom
0.15 x 0.15 x 1.9 x 4 = 0.171 m3
- Pembesian Tulangan Ø 8
-Ø8 = 4 x 1.9 x 4 = 30.4 m1
Panjang Besi x Berat Jenis Besi
30.4 x 0.395 = 12.008 KG
- Pembesian Sengkang Ø 8
-Ø8 = 7.6 / 0.15 + 1
= 50.6666667 + 1 = 51.66666666667 Buah
0,11+0,11+0,11+0,11+0,06 = 0.5 M
0.5 x 55 x 0.395 Denah Rumah Panel
= 27.5 x 0.395 = 10.8625
- Bekisting
4 X 2 x 0.6 = 4.8 M2
B Pas Dinding Batu Bata
Panjang x Lebar x Tebal = Volume Satuan
3.5 x 2 = 7 m2
C BALOK
- Beton
Panjang x Lebar x Tinggi = Volume Satuan
6.4 x 0.15 x 0.2 = 0.192 M3
- Pembesian Tulangan Ø 8
-Ø8 = 4 x 6.4 = 25.6 M1
Panjang Besi x Berat Jenis Besi - KG Besi
25.6 x 0.395 = 10.112 KG
- Pembesian Sengkang Ø 8
-Ø8 = 6.4 / 0.15 + 1
= 42.6666667 + 1 = 34 Buah Potongan Rumah Panel
Kebutuhan 0,11+0,11+0,11+0,11+0,06 = 0.5 M
0.6 x 34 x 0.395
= 20.4 x 0.395 = 8.058 Kg
- Bekisting
8 x 0.4 = 3.2 m2
D PLAT DAK BETON
- Beton
Panjang x Lebar x Tinggi = Volume Satuan
1.8 x 1.6 x 0.15 = 0.432 M3
- Pembesian Ø 8
Panjang
x Lebar = Volume
Jarak
1
x 1.5 = 10.00 M3
0.15
10.00 x 0.395 = 3.95 KG

Lebar
x Jarak = Volume
Jarak
1.5
x 1 = 10.00 M3
0.15
10.00 x 0.395 = 3.95 KG
- Bekisting Bawah
1 x 1.5 = 1.5 m2
- Bekisting Samping
5 x 0.12 = 0.6 m2
E PLESTERAN
- Dinding Luar
Panjang x Lebar = Volume Satuan
7.6 x 2.4 = 18.24 M2
- Dinding Dalam
Panjang x Lebar = Volume Satuan
7.6 x 2.1 = 15.96 M2
- Jumlah
NO PERHITUNGAN VOLUME GAMBAR
B. Luar + B. Dalam = 34.2 M2
F PENGECATAN
- Dinding Luar
Panjang x Lebar = Volume Satuan
7.6 x 2.4 = 18.24 M2
- Plat Lantai
Panjang x Lebar = Volume Satuan
7.6 x 2 = 15.2 M2
- Jumlah
B. Luar + P. Lantai = 33.44 M2
3 JAMBAN SEKOLAH
A GALIAN TANAH
Jamban = 0.4 x (3x2) + (1x3)
= 3.6 x 0.8
= 2.88 M3
Septictank
= 2.5 x 2.5 x 2
= 12.5 M3
B PONDASI BATU BELAH
= 9 x (0.3+0.6)/2 x 0.8
= 9 x 0.36
= 3.24 M3
C BETON
Sloof 15/20
= 9 x 0.15 x 0.2
= 0.27 M3
Kolom 15/15
= 6 x 2 x 0.15 x 0.15
= 0.27 M3
Ringbalk 15/20
= 0.15 x 0.2 x 14.4
= 0.432 M3
Plat Tutup
= 4 x 2.3 x 0.1
= 0.92 M3
Lantai Kerja Septictank
= 2.5 x 2.5 x 0.10
= 0.625 M3
Dinding Septictank
= 2 x 2 x 0.1
= 0.4 x 7 Dinding
= 2.8 M3
D PEMBESIAN
Sloof 15/20
Tulangan Besi Ø 8 mm
= 4 x 9
= 36 x 0.395 = 14.22 Kg 10 656 54.633333 57.365
Tulangan Sengkang Besi Ø 8 mm 8 169 14.083333 14.7875
= (2 x 0.15) + (2 x 0.2) + 0.05
= 0.75 M'
= 9 / 0.15 = 60 Buah
= 60 x 0.75
= 45 x 0.395
= 17.78 Kg
Kolom 15/15
Tulangan Besi Ø 8 mm
= 6 x 4 x 2
= 48 x 0.395 = 18.96 Kg
Tulangan Besi Ø 8 mm
= (4 x 0.15) + 0.05
= 0.65 M'
= 12 / 0.15 = 80 Buah
= 80 x 0.65
= 52 x 0.395
= 20.54 Kg
Ringbalk 15/20
Tulangan Besi Ø 8 mm
NO PERHITUNGAN VOLUME GAMBAR
= 4 x 14.4
= 57.6 x 0.395 = 22.752 Kg
Tulangan Besi Ø 8 mm
= (2 x 0.15) + (2 x 0.2) + 0.05
= 0.75 M'
= 14.4 / 0.15 = 96 Buah
= 96 x 0.75
= 72 x 0.395
= 28.44 Kg
Plat Tutup
= 4 / 0.15 x 2.30
= 61 M'
= 2.3 / 0.15 x 4.00
= 61 M'
= 122 x 0.395
= 48.19 Kg
Septictank Tulangan Besi Ø 8 mm
= 2 / 0.15 = 14 Buah
= 14 x 2
= 28 M'
= 2 / 0.15 = 14 Buah
= 14 x 2
= 28 M'
Panjang = 56 M'
= 56 x 7 Dinding
= 392 M'
= 392 x 0.395
= 155 Kg
E BEKISTING
Sloof 15/20 = 0.2 x 2 x 9
= 3.6 M2
Kolom 15/15 = 4 x 0.15
= 0.60 x 2 x 6
= 7.2 M2
Ringbalk15/20 = 0.2 x 2 x 14.4
= 5.76 M2
Plat Tutup = 4 x 2.30
= 9.2 M2
Septictank = 2 x 2 x 7
= 28 M2
F DINDING PASANGAN BATU BATA
Jamban = 9 x 2 - (Luas Pintu dan Jendela)
= 18 - 2
= 16 M2
Sekat = 1.5 x 0.8
= 1.2 M2
G PLESTERAN DAN ACIAN
= 17.2 M2
H PENGECATAN
= 17.2 M2
I PEMASANGAN KERAMIK
Keramik Lantai = 1.8 x 3
= 5.4 M2
Keramik Dinding = 1.2 x 9
= 10.8 M2

2 TEMPAT CUCI TANGAN UMUM ≈


a PAS BATU BATA
- Dinding
Panjang x Lebar = Volume Satuan
0.66 x 0.25 = 0.165 m2
Dikali 2 Unit
2 x 0.165 = 0.33 m2
f PLESTERAN
- Dinding
Panjang x Lebar = Volume Satuan
0.66 x 0.25 = 0.165 M2
NO PERHITUNGAN VOLUME GAMBAR
Dikali 2 Unit
2 x 0.165 = 0.33 m2
g PENGECATAN
- Dinding
Panjang x Lebar = Volume Satuan Tempat Cuci Tangan
0.66 x 0.25 = 0.165 M2
Dikali 2 Unit
2 x 0.165 = 0.33 m2
d Perlengkapan TCT
Kran Air Ø 1/2" 6 Bh
SDD Ø 1/2" 6 Bh
Tee Ø 1/2" 6 Bh
Pipa PVC AW Ø 1/2" 6 Btg
Knee Ø 1/2" 6 Bh
Double Naple Ø 1/2" 1 Bh
Water Meter Ø 1/2" 1 Bh
Stop Kran Ø 1/2" 1 Bh
Socket Drat Luar Ø 3/4" x 1/2" 1 Bh
Clame Sudle Ø 1" - Ø ³/₄" 1 Bh
Tempat Cuci Tangan 6 Bh
Leher Angsa 6 Bh
Reduser PVC Ø 1" - Ø ³/₄" 6 Bh
Pipa PVC AW Ø 1" 6 Bh
Knee Ø 1" 6 Bh
Tee Ø 1" 6 Bh
Tutup Plat 1 Bh
2 TEMPAT CUCI TANGAN SEKOLAH
a PAS BATU BATA
- Dinding
Panjang x Lebar = Volume Satuan
1 x 0.8 = 0.8 m2
Dikali 6 Unit
6 x 0.8 = 4.8 m2
b PLESTERAN
- Dinding
Panjang x Lebar = Volume Satuan
1 x 0.8 = 0.8 M2
Dikali 6 Unit
6 x 0.8 = 4.8 m2
c PENGECATAN
- Dinding
Panjang x Lebar = Volume Satuan Tempat Cuci Tangan
1 x 0.8 = 0.8 M2
Dikali 6 Unit
6 x 0.8 = 4.8 m2
d Perlengkapan TCT
Kran Air Ø 1/2" 6 Bh
SDD Ø 1/2" 6 Bh
Tee Ø 1/2" 6 Bh
Pipa PVC AW Ø 1/2" 6 Btg
Knee Ø 1/2" 6 Bh
Double Naple Ø 1/2" 1 Bh
Water Meter Ø 1/2" 1 Bh
Stop Kran Ø 1/2" 1 Bh
Socket Drat Luar Ø 3/4" x 1/2" 1 Bh
Clame Sudle Ø 1" - Ø ³/₄" 1 Bh
Tempat Cuci Tangan 6 Bh
Leher Angsa 6 Bh
Reduser PVC Ø 1" - Ø ³/₄" 6 Bh
Pipa PVC AW Ø 1" 6 Bh
Knee Ø 1" 6 Bh
Tee Ø 1" 6 Bh
Tutup Plat 1 Bh
Take Of Sheet
Perhitungan Volume SAB Desa : Nagaratengah
KEGIATAN PAMISMAS Kecamatan : Cineam

NO PERHITUNGAN VOLUME GAMBAR


1 BRONCAPTERING
A GALIAN TANAH
Panjang x Lebar x Tinggi = Volume
2.6 x 2.1 x 1.8 = 9.83 M3

B URUGAN TANAH
Pekerjaan Galian x 0.25 = Volume Satuan
9.83 x 0.25 = 2.46 M3

C PONDASI BATU KALI


Panjang x Lebar x Tinggi = Volume Satuan
9.4 x 0.6 x 0.5 = 2.82 M3

D DINDING BATU KALI


Panjang x Luas Trapesium = Volume Satuan
9.4 x 0.3 + 0.6 x 1.95 Denah Broncaptering
2

9.4 x 0.88 = 8.25 M3

E BETON
- Lantai Kerja
Panjang x Lebar x Tebal = Volume Satuan
2.6 x 2.1 x 0.1 = 0.55 M3
- Plat Lantai
Panjang x Lebar x Tebal = Volume Satuan
2 x 1.5 x 0.2 = 0.60 M3
- Kolom 15/15
Panjang x Lebar x Tinggi x Jumlah Kolom Potongan Broncaptering
0.15 x 0.15 x 2.8 x 4 = 0.252 M3
- Balok 15/25
Panjang x Lebar x Tinggi
11.5 x 0.15 x 0.25 = 0.43 M3
- Plat Tutup
Panjang x Lebar x Tebal =
2.6 x 2.1 x 0.15 = 0.82 M3

F PEKERJAAN PEMBESIAN
- Plat Lantai
Pembesian Ø 8
-Ø8 2.6 / 0.15 x 2 = 35.00 Buah
2.1 x 35.00 = 73.5 m'
2.1 / 0.15 x 2 = 28.00 m'
2.6 x 28.00 = 72.8 m'
TOTAL = 146.30 m'
= 13.00 batang
Panjang Besi x Berat Jenis Besi
146.30 x 0.395 = 57.79 Kg

- Kolom 15/15
Pembesian Tulangan Ø 8
-Ø8 = 4 x 2.8 x 4 = 44.80 m'
Panjang Besi x Berat Jenis Besi
44.80 x 0.395 = 17.696 Kg
4.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 2.8 / 0.15 + 1
= 18.67 + 1 = 20.00
NO PERHITUNGAN VOLUME GAMBAR
4 x 0.2 = 0.8 m'
0.8 x 20.00 x 6 buah
= 96.00 m'
= 96.00 x 0.395 Kg
= 37.92 Kg
= 8.00 Batang
- Balok 15/25
Pembesian Tulangan Ø 8
-Ø8 = 4 x 11.5 = 46.00 m'
Panjang Besi x Berat Jenis Besi
46.00 x 0.395 = 0 Kg
0.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 11.5 / 0.15 + 1
= 76.67 + 1 = 78.00 Buah
Kebutuhan (2 x 0.1) + (2 x 0.2) = 0.6 m'
0.60 x 78.00 x 0.395 m'
= 46.80 x 0.395 = 0.00 Kg
= 0.00 Batang
Plat Tutup
Pembesian Ø 8
-Ø8 = 2.6 / 0.15 = 17.33 Buah
17.33 x 2.1 = 36.4 m'
2.1 / 0.15 = 14.00 Buah
14.00 x 2.6 = 36.4 m'
Total = 72.8
= 72.8 x 0.395
= 28.756 Kg
= 7.0 Batang
G PEKERJAAN BEKISTING
- Kolom 15/15
Bekisting
(4 x 0.25) x 2.8 x 4 = 11.2 M2
- Balok 15/25
Bekisting
11.5 x 0.4 = 0 M2
- Plat Tutup
Bekisting
2.6 x 2.1 = 5.46 M2

H PLESTERAN + ACIAN
Bidang Dalam
Panjang x Lebar = Volume Satuan
(2 x 2)+(2 x 1.5) x 1.85 = 12.95 M2
Bidang Luar
Panjang x Lebar = Volume Satuan
(2 x 2.6)+(2 x 2.1) x 1 = 9.40 M2
Plat Tutup
Panjang x Lebar
2.6 x 2.1 = 5.46 M2
Total
B. Luar + P. Lantai + Plat Tutup = 27.81 M2

I PENGECATAN
Bidang Luar
Panjang x Lebar = Volume
(2 x 2.6)+(2 x 2.1) x 1 = 9.4 M2
Plat Tutup
Panjang x Lebar
2.6 x 2.1 = 5.46 M2
Jumlah
B. Luar + P. Lantai = 14.86 M2
NO PERHITUNGAN VOLUME GAMBAR
J BOX KATUP
Lantai Kerja
0.05 x 1 x 1 = 0.05 M3
Pas. Batu Bata
1.2 x 1 x 3 bidang = 3.6 M2
Plesteran dan Acian
1 x 1 x 3 bidang = 3.00 M2

= 3.00 x 2
= 6.00 M2
Pengecatan
3.00 M2

2 BAK PENGUMPUL
A GALIAN TANAH
Panjang x Lebar x Tinggi = Volume Satuan
2 x 2 x 2.8 = 11.2 M3
B PASIR
Panjang x Lebar x Tinggi = Volume Satuan
2 x 2 x 0.05 = 0.2 M3
C LANTAI KERJA
Panjang x Lebar x Tinggi = Volume Satuan
2 x 2 x 0.15 = 0.6 M3
D KOLOM
- Beton
Panjang x Lebar x Tinggi x Jumlah Kolom
0.2 x 0.2 x 2.85 x 4 = 0.456 m3
- Pembesian Tulangan Ø 10
- Ø 10 = 4 x 2.85 x 4 = 45.6 m1
Panjang Besi x Berat Jenis Besi
45.6 x 0.62 = 28.272 KG
- Pembesian Sengkang Ø 8
-Ø8 = 11.4 / 0.15 + 1
= 76 + 1 = 77 Buah
0,16+0,16+0,16+0,16+0,06 = 0.6 M
0.7 x 77 x 0.395
= 53.9 x 0.395 = 21.2905
- Bekisting
4 X 2.85 x 0.8 = 9.12 M2
E DINDING BETON Denah Bak Pengumpul
- Beton
Panjang x Lebar x Tebal = Volume Satuan
8 x 2.85 x 0.15 = 3.42 M3
- Pembesian Ø 10
Panjang
x Lebar = Volume
Jarak
8
x 2.85 = 152.00 M3
0.15
152.00 x 0.62 = 94.24 KG

Lebar
x Jarak = Volume
Jarak
2.85
x 8 = 152 M3
0.15
152.00 x 0.62 = 94.24 KG
- Bekisting
2 X 8 x 2.85 = 45.6 m3
F BALOK Potongan Bak Pengumpul
- Beton
Panjang x Lebar x Tinggi = Volume Satuan
8 x 0.15 x 0.2 = 0.24 M3
- Pembesian Tulangan Ø 10
- Ø 12 = 4 x 8 = 32 M1
NO PERHITUNGAN VOLUME GAMBAR
Panjang Besi x Berat Jenis Besi - KG Besi
32 x 0.62 = 19.84 KG
- Pembesian Sengkang Ø 8
-Ø8 = 8 / 0.15 + 1
= 54 + 1 = 55 Buah
Kebutuhan 0,16+0,16+0,11+0,11+0,06 = 0.6 M
0.6 x 55 x 0.395
= 33 x 0.395 = 13.035 Kg
- Bekisting
8 x 0.4 = 3.2 m2
G PLAT LANTAI
- Beton
Panjang x Lebar x Tinggi = Volume Satuan
2 x 2 x 0.12 = 0.48 M3
- Pembesian Ø 10
Panjang
x Lebar = Volume
Jarak
2
x 2 = 26.67 M3
0.15
26.67 x 0.62 = 16.53 KG

Lebar
x Jarak = Volume
Jarak
2
x 2 = 26.67 M3
0.15
26.67 x 0.62 = 16.53 KG
- Bekisting Bawah
2 x 2 = 4 m2
- Bekisting Samping
8 x 0.12 = 0.96 m2
H ACIAN
- Dinding Luar
Panjang x Lebar = Volume Satuan
8 x 0.65 = 5.2 M2
- Plat Lantai
Panjang x Lebar = Volume Satuan
2 x 2 = 4 M2
- Jumlah
B. Luar + P. Lantai = 9.2 M2
I PENGECATAN
- Dinding Luar
Panjang x Lebar = Volume Satuan
8 x 0.65 = 5.2 M2
- Plat Lantai
Panjang x Lebar = Volume Satuan
2 x 2 = 4 M2
- Jumlah
B. Luar + P. Lantai = 9.2 M2
J BOX KATUP
- Lantai Kerja
0.05 x 0.6 x 0.6 = 0.018 M3
- Pas. Batu Bata
0.15 x 3 = 0.45 M3
- Lantai Kerja
0.15 x 3 x 2 = 0.9 M2

3 RESERVOIR

A GALIAN TANAH
Galian Reservoir
Panjang x Lebar x Tinggi = Volume Satuan
5.5 x 2.5 x 1.7 = 23.38 M3
Galian Pondasi Telapak
Panjang x Lebar x Tinggi = Volume Satuan
NO PERHITUNGAN VOLUME GAMBAR
1 x 1 x 1.5 = 1.50 M 3

= 1.50 x 6 buah
= 9.00 M3
TOTAL = 32.38 M3

B URUGAN TANAH
Galian Tanah x 0.25 = Volume Satuan
32.38 x 0.25 = 8.09 M3

C PASANGAN BATU BATA DINDING SEKAT


Panjang x Lebar = Volume Satuan
2.5 x 2.45 = 6.125 M2

D BETON
- Pondasi Telapak
0.25 x 6 buah = Volume Satuan
0.25 x 6 = 1.5 M3
- Lantai Kerja
Panjang x Lebar x Tebal = Volume Satuan
5.5 x 2.5 x 0.15 = 2.06 M3
- Plat Lantai
Panjang x Lebar x Tebal = Volume Satuan
5 x 2 x 0.25 = 2.50 M3
- Sloof 15/25
Panjang x Lebar x Tebal = Volume Satuan
16.00 x 0.15 x 0.25 = 0.60 M3
- Ringbalk 15/25
Panjang x Lebar x Tebal = Volume Satuan
16.00 x 0.15 x 0.25 = 0.60 M3
- Kolom 30/30
Panjang x Lebar x Tinggi = Volume Satuan
0.30 x 0.3 x 3 = 0.27 M3
= 0.27 x 6 buah
= 1.62 M3
- Kolom Praktis 25/25
Panjang x Lebar x Tinggi = Volume Satuan
0.25 x 0.25 x 2.45 = 0.15 M3
= 0.15 x 4 buah
= 0.6125 M3
- Dinding Reservoir
Panjang x Lebar x Tebal = Volume Satuan
16.00 x 2.45 x 0.25 = 9.80 M 3

- Plat Tutup
Panjang x Lebar x Tebal = Volume Satuan
5.50 x 2.5 x 0.15 = 2.06 M3

E PEKERJAAN PEMBESIAN
- Pondasi Telapak 1 Unit
Tiang Pondasi Telapak
Pembesian Ø 12
- Ø 12 = 4 x 1.5 = 6 m'
= 6 x 0.89
= 5.34 Kg
= 1.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 1.5 / 0.15 = 10 + 1
= 11 buah
4 x 0.25 = 1 m'
= 11 x 1
= 11 m'
= 11 x 0.39
= 4.29 Kg
NO PERHITUNGAN VOLUME GAMBAR
= 1.00 Batang
Telapak Pondasi
- Ø 12 0.3 + 1 x 0.2 = 0.13
2
= 0.13 / 0.15 = 0.87 + 1
= 2.00 buah
= 4 x 1 = 4.00
= 8 x 2.00 = 16.00 m'
= 16.00 x 2
= 32.00 m'
= 32.00 x 0.89
= 28.48 Kg
= 1 x 0.3 x 1 = 0.3
= 0.3 / 0.15 = 2 + 1
= 3 buah
4 x 1 = 4 + 0.05
= 4.05 x 3 buah
= 12.15 x 2 lapis
= 24.30 x 0.89
= 21.63 Kg
Total Pembesian Pondasi Telapak
- Ø 12 = 5.34 + 28.48 + 21.63
= 55.45 x 6 unit
= 332.68 Kg
= 32.00 Batang
-Ø8 = 4.29 x 6 unit
= 25.74 Kg
= 4.00 Batang
- Plat Lantai
Pembesian Ø 10
- Ø 10 = 5.00 / 0.15 = 33.33 + 1
= 35.00 buah
2 x 35.00 = 70 m'
= 70.00 m'
2 x 70.00 = 140.00 m'
= 12.00 Batang
2.00 / 0.15 = 13.33 + 1
= 15.00 buah
5.00 x 15.00 = 75.00 m'
= 75.00 m'
2 x 75.00 = 150.00 m'
= 13.00 Batang
= 140.00 + 150.00 X 0.62
= 179.80 Kg
= 25.00 Batang
- Sloof 15/25
Pembesian Tulangan Ø 10
- Ø 10 = 4 x 16.00 = 64.00 m'
Panjang Besi x Berat Jenis Besi
64.00 x 0.62 = 39.68 Kg
= 6.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 16 / 0.15 + 1
= 106.67 + 1 = 108.00 Buah
Kebutuhan (2 x 0.1) + (2 x 0.2) = 0.6 m'
0.60 x 108.00 x 0.395
= 64.80 x 0.395 = 25.60 Kg
= 6.00 Batang
- Ringbalk 15/25
Pembesian Tulangan Ø 8
-Ø8 = 4 x 16.00 = 64.00 m'
Panjang Besi x Berat Jenis Besi
64.00 x 94.24 = 6031.36 Kg
NO PERHITUNGAN VOLUME GAMBAR
= 6.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 16 / 0.15 + 1
= 106.67 + 1 = 108.00 Buah
Kebutuhan (2 x 0.1) + (2 x 0.2) = 0.6 m'
0.60 x 108.00 x 0.395
= 64.80 x 0.395 = 25.60 Kg
= 6.00 Batang
- Kolom 30/30
Pembesian Tulangan Ø 12
- Ø 12 = 4 x 3 x 6 = 72.00 m'
Panjang Besi x Berat Jenis Besi
72.00 x 0.89 = 64.08 Kg
= 6.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 3 / 0.15 + 1
= 20.00 + 1 = 21.00
4 x 0.25 = 1 m'
1 x 21.00 x 6 buah
= 126.00 m'
= 126.00 x 0.395 Kg
= 49.77 Kg
= 5.00 Batang
- Kolom Praktis 25/25
Pembesian Tulangan Ø 10
- Ø 10 = 4 x 2.45 x 4 = 39.20 m'
Panjang Besi x Berat Jenis Besi
39.20 x 0.62 = 24.304 Kg
= 4.00 Batang
Pembesian Sengkang Ø 8
-Ø8 = 2.45 / 0.15 + 1
= 16.33 + 1 = 18.00
4 x 0.2 = 0.8 m'
0.8 x 18.00 x 4 buah
= 57.60 m'
= 57.60 x 0.395 Kg
= 22.75 Kg
= 5.00 Batang
- Dinding Reservoir
Pembesian Ø 10 Panjang dinding 5.5 meter
- Ø 10 = 5.50 / 0.15 = 36.67 + 1
= 38.00 buah
2.45 x 38.00 = 93.1 m'
= 93.10 m'
2 x 93.10 = 186.20 m'
= 16.00 Batang
2.45 / 0.15 = 16.33 + 1
= 18.00 buah
5.50 x 18.00 = 99.00 m'
= 99.00 m'
2 x 99.00 = 198.00 m'
= 17.00 Batang
= 186.20 + 198.00 X 0.62
= 238.20 x 2 dinding
= 476.408 Kg
= 33.00 Batang x 2 Dinding
= 66.00 Batang
Pembesian Ø 10 Panjang dinding 2.5 meter
- Ø 10 = 2.50 / 0.15 = 16.67 + 1
= 18.00 buah
2.45 X 18.00 = 44.1 m'
= 44.10 m'
2 x 44.10 = 88.20 m'
NO PERHITUNGAN VOLUME GAMBAR
= 8.00 Batang
2.45 / 0.15 = 16.33 + 1
= 18.00 buah
2.50 x 18.00 = 45.00 m'
= 45.00 m'
2 x 45.00 = 90.00 m'
= 8.00 Batang
= 88.20 + 90.00 X 0.62
= 110.48 x 2 dinding
= 220.968 Kg
= 16.00 Batang x 2 Dinding
= 32.000 Batang
TOTAL PEMBESIAN DINDING = 476.408 + 220.968
= 697.376 Kg
= 98.00 Batang
- Plat Tutup
Pembesian Ø 8
-Ø8 = 5.50 / 0.15 = 36.67 + 1
= 38.00 buah
2.5 x 38.00 = 95 m'
= 95.00 m'
= 95.00 m'
= 8.00 Batang
2.50 / 0.15 = 16.67 + 1
= 18.00 buah
5.50 x 18.00 = 99.00 m'
= 99.00 m'
= 99.00 m'
= 9.00 Batang
= 95.00 + 99.00 X 94.24
= 18282.56 Kg
= 17.00 Batang
E PEKERJAAN BEKISTING
- Pondasi Telapak
Tiang pondasi telapak = 4 x 0.3 x 1
= 1.2 x 6 buah
= 7.2 M2
- Plat Lantai = 0.2 x (2x5)+(2x2)
= 0.2 x 14
= 2.8 M2
- Sloof 15/25 = (2x0.25) x (2x5.5)+(2x2.5)
= 0.5 x 16
= 8 M2
- Ringbalk 15/25 = (2x0.25) x(2x5.5)+(2x2.5)
= 0.5 x 16
= 8 M2
- Kolom 30/30 = (4x0.3) x 2.45
= 1.2 x 2.45
= 2.94 x 6
= 17.64 M2
- Kolom Praktis 25/25 = (4x0.25) x 2.45
= 1 x 2.45
= 2.45 x 6
= 14.7 M2
- Dinding Reservoir Panjang dinding 5 m
= 2.15 x 5 x 2 dinding
= 21.5 x 2 lapis
= 43.0 M2
Panjang dinding 5 m
= 2.15 x 2 x 2 dinding
= 8.6 x 2 lapis
= 17.2 M2
TOTAL DINDING = 43.0 + 17.2
NO PERHITUNGAN VOLUME GAMBAR
= 60.2 M 2

- Plat Tutup = 5 x 2 +
= 10 + (0.15X(2X5.5)+2X2.5)
= 10 + 2.4
= 12.4 M2

F PLESTERAN DAN ACIAN


Plesteran Dalam = Panjang x Lebar
= (2x5)+(2x2) x 2.45
= 14 x 2.45
= 34.3 M2
Plesteran Luar = Panjang x Lebar
= (2x5.)+(2x2.5) x 1.3
= 16 x 1.3
= 20.8 M2
Plat Tutup = Panjang x Lebar
= 5.5 x 2.5
= 13.75 M2

G PENGECATAN
Pengecatan = 20.8 + 13.75
= 34.55 M2

H BOX KATUP
Lantai Kerja
0.05 x 1 x 1 = 0.05 M3
Pas. Batu Bata
1.2 x 1 x 3 bidang = 3.6 M2
Plesteran dan Acian
1 x 1 x 3 bidang = 3.00 M2

= 3.00 x 2
= 6.00 M2
Pengecatan
3.00 M2

3 RUMAH PANEL
A Kolom Praktis 15/15
- Beton
Panjang x Lebar x Tinggi x Jumlah Kolom
0.15 x 0.15 x 2 x 4 = 0.18 m3
- Pembesian Tulangan Ø 8
-Ø8 = 4 x 2 x 4 = 32 m1
Panjang Besi x Berat Jenis Besi
32 x 0.395 = 12.64 KG
- Pembesian Sengkang Ø 8
-Ø8 = 8 / 0.15 + 1
= 53.3333333 + 1 = 54.333333 Buah
0,11+0,11+0,11+0,11+0,06 = 0.5 M
0.5 x 55 x 0.395 Denah Rumah Panel
= 27.5 x 0.395 = 10.8625
- Bekisting
4 X 2 x 0.6 = 4.8 M2
B Pas Dinding Batu Bata
Panjang x Lebar x Tebal = Volume Satuan
5 x 2 = 10 m2
C BALOK
- Beton
Panjang x Lebar x Tinggi = Volume Satuan
5 x 0.15 x 0.2 = 0.15 M3
- Pembesian Tulangan Ø 8
NO PERHITUNGAN VOLUME GAMBAR
-Ø8 = 4 x 5 = 20 M1
Panjang Besi x Berat Jenis Besi - KG Besi
20 x 0.395 = 7.9 KG
- Pembesian Sengkang Ø 8
-Ø8 = 5 / 0.15 + 1
= 33.3333333 + 1 = 34 Buah Potongan Rumah Panel
Kebutuhan 0,11+0,11+0,11+0,11+0,06 = 0.5 M
0.6 x 34 x 0.395
= 20.4 x 0.395 = 8.058 Kg
- Bekisting
8 x 0.4 = 3.2 m2
D PLAT DAK BETON
- Beton
Panjang x Lebar x Tinggi = Volume Satuan
1 x 1.5 x 0.12 = 0.18 M3
- Pembesian Ø 8
Panjang
x Lebar = Volume
Jarak
1
x 1.5 = 10.00 M3
0.15
10.00 x 0.395 = 3.95 KG

Lebar
x Jarak = Volume
Jarak
1.5
x 1 = 10.00 M3
0.15
10.00 x 0.395 = 3.95 KG
- Bekisting Bawah
1 x 1.5 = 1.5 m2
- Bekisting Samping
5 x 0.12 = 0.6 m2
E PLESTERAN
- Dinding Luar
Panjang x Lebar = Volume Satuan
4 x 2 = 8 M2
- Dinding Dalam
Panjang x Lebar = Volume Satuan
4 x 2 = 8 M2
- Jumlah
B. Luar + B. Dalam = 16 M2
F PENGECATAN
- Dinding Luar
Panjang x Lebar = Volume Satuan
4 x 2 = 8 M2
- Plat Lantai
Panjang x Lebar = Volume Satuan
4 x 2 = 8 M2
- Jumlah
B. Luar + P. Lantai = 16 M2
3 JAMBAN SEKOLAH
A GALIAN TANAH
Jamban = 0.4 x (3x2) + (1x3)
= 3.6 x 0.8
= 2.88 M3
Septictank
= 2.5 x 2.5 x 2
= 12.5 M3
B PONDASI BATU BELAH
= 9 x (0.3+0.6)/2 x 0.8
= 9 x 0.36
= 3.24 M3
C BETON
Sloof 15/20
= 9 x 0.15 x 0.2
NO PERHITUNGAN VOLUME GAMBAR
= 0.27 M 3

Kolom 15/15
= 6 x 2 x 0.15 x 0.15
= 0.27 M3
Ringbalk 15/20
= 0.15 x 0.2 x 14.4
= 0.432 M3
Plat Tutup
= 4 x 2.3 x 0.1
= 0.92 M3
Lantai Kerja Septictank
= 2.5 x 2.5 x 0.10
= 0.625 M3
Dinding Septictank
= 2 x 2 x 0.1
= 0.4 x 7 Dinding
= 2.8 M3
D PEMBESIAN
Sloof 15/20
Tulangan Besi Ø 8 mm
= 4 x 9
= 36 x 0.395 = 14.22 Kg 10 656 54.633333 57.365
Tulangan Sengkang Besi Ø 8 mm 8 169 14.083333 14.7875
= (2 x 0.15) + (2 x 0.2) + 0.05
= 0.75 M'
= 9 / 0.15 = 60 Buah
= 60 x 0.75
= 45 x 0.395
= 17.78 Kg
Kolom 15/15
Tulangan Besi Ø 8 mm
= 6 x 4 x 2
= 48 x 0.395 = 18.96 Kg
Tulangan Besi Ø 8 mm
= (4 x 0.15) + 0.05
= 0.65 M'
= 12 / 0.15 = 80 Buah
= 80 x 0.65
= 52 x 0.395
= 20.54 Kg
Ringbalk 15/20
Tulangan Besi Ø 8 mm
= 4 x 14.4
= 57.6 x 0.395 = 22.752 Kg
Tulangan Besi Ø 8 mm
= (2 x 0.15) + (2 x 0.2) + 0.05
= 0.75 M'
= 14.4 / 0.15 = 96 Buah
= 96 x 0.75
= 72 x 0.395
= 28.44 Kg
Plat Tutup
= 4 / 0.15 x 2.30
= 61 M'
= 2.3 / 0.15 x 4.00
= 61 M'
= 122 x 0.395
= 48.19 Kg
Septictank Tulangan Besi Ø 8 mm
= 2 / 0.15 = 14 Buah
= 14 x 2
= 28 M'
= 2 / 0.15 = 14 Buah
NO PERHITUNGAN VOLUME GAMBAR
= 14 x 2
= 28 M'
Panjang = 56 M'
= 56 x 7 Dinding
= 392 M'
= 392 x 0.395
= 155 Kg
E BEKISTING
Sloof 15/20 = 0.2 x 2 x 9
= 3.6 M2
Kolom 15/15 = 4 x 0.15
= 0.60 x 2 x 6
= 7.2 M2
Ringbalk15/20 = 0.2 x 2 x 14.4
= 5.76 M2
Plat Tutup = 4 x 2.30
= 9.2 M2
Septictank = 2 x 2 x 7
= 28 M2
F DINDING PASANGAN BATU BATA
Jamban = 9 x 2 - (Luas Pintu dan Jendela)
= 18 - 2
= 16 M2
Sekat = 1.5 x 0.8
= 1.2 M2
G PLESTERAN DAN ACIAN
= 17.2 M2
H PENGECATAN
= 17.2 M2
I PEMASANGAN KERAMIK
Keramik Lantai = 1.8 x 3
= 5.4 M2
Keramik Dinding = 1.2 x 9
= 10.8 M2

Tutup Plat ≈2 Bh
2 TEMPAT CUCI TANGAN UMUM
a PAS BATU BATA
- Dinding
Panjang x Lebar = Volume Satuan
1 x 0.8 = 0.8 m2
Dikali 2 Unit
2 x 0.8 = 1.6 m2
f PLESTERAN
- Dinding
Panjang x Lebar = Volume Satuan
1 x 0.8 = 0.8 M2
Dikali 2 Unit
2 x 0.8 = 1.6 m2
g PENGECATAN
- Dinding
Panjang x Lebar = Volume Satuan Tempat Cuci Tangan
1 x 0.8 = 0.8 M2
Dikali 2 Unit
2 x 0.8 = 1.6 m2
d Perlengkapan TCT
Kran Air Ø 1/2" 6 Bh
SDD Ø 1/2" 6 Bh
Tee Ø 1/2" 6 Bh
Pipa PVC AW Ø 1/2" 6 Btg
Knee Ø 1/2" 6 Bh
Double Naple Ø 1/2" 1 Bh
Water Meter Ø 1/2" 1 Bh
Stop Kran Ø 1/2" 1 Bh
NO PERHITUNGAN VOLUME GAMBAR
Socket Drat Luar Ø 3/4" x 1/2" 1 Bh
Clame Sudle Ø 1" - Ø ³/₄" 1 Bh
Tempat Cuci Tangan 6 Bh
Leher Angsa 6 Bh
Reduser PVC Ø 1" - Ø ³/₄" 6 Bh
Pipa PVC AW Ø 1" 6 Bh
Knee Ø 1" 6 Bh
Tee Ø 1" 6 Bh
Tutup Plat 1 Bh
2 TEMPAT CUCI TANGAN SEKOLAH
a PAS BATU BATA
- Dinding
Panjang x Lebar = Volume Satuan
1 x 0.8 = 0.8 m2
Dikali 6 Unit
6 x 0.8 = 4.8 m2
b PLESTERAN
- Dinding
Panjang x Lebar = Volume Satuan
1 x 0.8 = 0.8 M2
Dikali 6 Unit
6 x 0.8 = 4.8 m2
c PENGECATAN
- Dinding
Panjang x Lebar = Volume Satuan Tempat Cuci Tangan
1 x 0.8 = 0.8 M2
Dikali 6 Unit
6 x 0.8 = 4.8 m2
d Perlengkapan TCT
Kran Air Ø 1/2" 6 Bh
SDD Ø 1/2" 6 Bh
Tee Ø 1/2" 6 Bh
Pipa PVC AW Ø 1/2" 6 Btg
Knee Ø 1/2" 6 Bh
Double Naple Ø 1/2" 1 Bh
Water Meter Ø 1/2" 1 Bh
Stop Kran Ø 1/2" 1 Bh
Socket Drat Luar Ø 3/4" x 1/2" 1 Bh
Clame Sudle Ø 1" - Ø ³/₄" 1 Bh
Tempat Cuci Tangan 6 Bh
Leher Angsa 6 Bh
Reduser PVC Ø 1" - Ø ³/₄" 6 Bh
Pipa PVC AW Ø 1" 6 Bh
Knee Ø 1" 6 Bh
Tee Ø 1" 6 Bh
Tutup Plat 1 Bh
ANALISA SATUAN PEKERJAAN

DESA : Nagaratengah
KECAMATAN : Cineam

No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

1 BRONCAPTERING
A GALIAN TANAH M3 6.50
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 4.88

B URUGAN TANAH M3 1.63


Pengurugan Kembali 1 m³ Galian Tanah
Pekerja OH 0.500 0.81

E PEKERJAAN BETON
Beton K 175 M3 2.00
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 0.55
Pekerja OH 1.650 3.30
Batu Split 2/3 M 3
0.762 1.53
Pasir Beton M 3
0.563 1.13
Semen Zak 6.520 13.06
Beton K 200 M3 0.68
Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Tukang OH 0.275 0.19
Pekerja OH 1.650 1.13
Semen Zak 7.040 4.81
Pasir Beton M3 0.522 0.36
Batu Split 2/3 M 3
0.764 0.52
Beton Tumbuk M 3
0.55
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.15
Pekerja OH 1.650 0.90
Batu Split 2/3 M 3
0.740 0.40
Pasir Beton M3 0.621 0.34
Semen Zak 4.940 2.70

F PEKERJAAN PEMBESIAN Kg 115.99


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 8.12
Pekerja OH 0.070 8.12
Besi beton
(polos/ulir)
- Ø 10 Kg 1.050 7.55 7.93
-Ø8 Kg 1.050 6.67 7.00
Kawat Beton Kg 0.150 17.40

G PEKERJAAN BEKISTING
Kolom M2 11.25
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 3.71
Pekerja OH 0.660 7.43
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Kayu kelas III M3 0.040 0.45


Paku 5 - 12 cm Kg 0.400 4.50
Minyak bekisting Liter 0.200 2.25
Balok kayu kelas II M 3
0.015 0.17
Plywood 9 mm Lbr 0.350 3.94
Dolken kayu Ø 8-10/400 cm Batang 2.000 22.50

H PLESTERAN + ACIAN
PLESTERAN M2 12.95
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 1.94
Pekerja OH 0.300 3.89
Pasir Pasang M3 0.023 0.30
Semen Zak 0.156 2.01
Acian M2 9.40
Pemasangan 1 m2 acian.
Tukang OH 0.100 0.94
Pekerja OH 0.200 1.88
Semen Zak 0.065 0.61

I PENGECATAN M2 12.65
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 0.80
Pekerja OH 0.020 0.25
Plamuur Kg 0.100 1.27
Cat dasar Tembok Kg 0.100 1.27
Cat Penutup Tembok Kg 0.260 3.29
2 BAK PENGUMPUL
A GALIAN TANAH M3 28.80
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 21.60

B URUGAN TANAH M3 21.60


Pengurugan Kembali 1 m³ Galian Tanah
Pekerja OH 0.500 10.80

D PEKERJAAN BETON
Beton K 175 M3 54.72
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 15.05
Pekerja OH 1.650 90.29
Batu Split 2/3 M3 0.762 41.71
Pasir Beton M3 0.563 30.81
Semen Zak 6.520 356.77
Beton K 200 M3 0.70
Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Tukang OH 0.275 0.19
Pekerja OH 1.650 1.15
Semen Zak 7.040 4.90
Pasir Beton M3 0.522 0.36
Batu Split 2/3 M3 0.764 0.53
Beton Tumbuk M3 0.60
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)


Tukang OH 0.275 0.17
Pekerja OH 1.650 0.99
Batu Split 2/3 M3 0.740 0.44
Pasir Beton M3 0.621 0.37
Semen Zak 4.940 2.96

E PEKERJAAN PEMBESIAN Kg 33.46


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 2.34
Pekerja OH 0.070 2.34
Besi beton
(polos/ulir)
- Ø 10 Kg 1.050 26.97 28.31
-Ø8 Kg 1.050 3.43 3.60
Kawat Beton Kg 0.150 5.02

F PEKERJAAN BEKISTING
Kolom M2 4.56
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 1.50
Pekerja OH 0.660 3.01
Kayu kelas III M3 0.040 0.18
Paku 5 - 12 cm Kg 0.400 1.82
Minyak bekisting Liter 0.200 0.91
Balok kayu kelas II M3 0.015 0.07
Plywood 9 mm Lbr 0.350 1.60
Dolken kayu Ø 8-10/400 cm Batang 2.000 9.12
Balok M2 1.92
Pemasangan 1 m2 bekisting untuk balok
Tukang OH 0.330 0.63
Pekerja OH 0.660 1.27
Kayu kelas III M3 0.040 0.08
Paku 5 - 12 cm Kg 0.400 0.77
Minyak bekisting Liter 0.200 0.38
Balok kayu kelas II M3 0.018 0.03
Plywood 9 mm Lbr 0.350 0.67
Dolken kayu Ø 8-10/400 cm Batang 2.000 3.84
Plat Tutup M2 31.54
Pemasangan 1 m2 bekisting untuk lantai
Tukang OH 0.330 10.41
Pekerja OH 0.660 20.81
Kayu kelas III M3 0.040 1.26
Paku 5 - 12 cm Kg 0.400 12.61
Minyak bekisting Liter 0.200 6.31
Balok kayu kelas II M3 0.015 0.47
Plywood 9 mm Lbr 0.350 11.04
Dolken kayu Ø 8-10/400 cm Batang 6.000 189.22

G PLESTERAN + ACIAN
PLESTERAN M2 10.24
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.


Tukang OH 0.150 1.54
Pekerja OH 0.300 3.07
Pasir Pasang M3 0.023 0.24
Semen Zak 0.156 1.59
Acian M2 10.24
Pemasangan 1 m2 acian.
Tukang OH 0.100 1.02
Pekerja OH 0.200 2.05
Semen Zak 0.065 0.67

H PENGECATAN M2 10.24
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 0.65
Pekerja OH 0.020 0.20
Plamuur Kg 0.100 1.02
Cat dasar Tembok Kg 0.100 1.02
Cat Penutup Tembok Kg 0.260 2.66

3 RESERVOIR
` GALIAN TANAH M3 17.10
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 12.83

B URUGAN TANAH M3 4.27


Pengurugan Kembali 1 m³ Galian Tanah
Pekerja OH 0.500 2.14

C PEKERJAAN BATU BATA M2 6.13


Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Tukang OH 0.100 0.61
Pekerja OH 0.300 1.84
Bata merah Buah 70.000 428.75
Semen portland Zak 0.287 1.76
Pasir Pasang M3 0.040 0.25

D PEKERJAAN BETON
Beton K 200 M3 3.73
Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Tukang OH 0.275 1.03
Pekerja OH 1.650 6.16
Semen Zak 7.040 26.28
Pasir Beton M3 0.522 1.95
Batu Split 2/3 M3 0.764 2.85
Beton K 175 M3 14.08
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 3.87
Pekerja OH 1.650 23.24
Batu Split 2/3 M3 0.762 10.73
Pasir Beton M3 0.563 7.93
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Semen Zak 6.520 91.82


Beton Tumbuk M3 2.11
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.58
Pekerja OH 1.650 3.49
Batu Split 2/3 M3 0.740 1.56
Pasir Beton M3 0.621 1.31
Semen Zak 4.940 10.44

E PEKERJAAN PEMBESIAN Kg 186.50


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 13.05
Pekerja OH 0.070 13.05
Besi beton
(polos/ulir)
- Ø 12 Kg 1.050 39.68 41.66
- Ø 10 Kg 1.050 94.12 98.82
-Ø8 Kg 1.050 25.14 26.39
Kawat Beton Kg 0.150 27.97

F PEKERJAAN BEKISTING
Pondasi M2 7.20
Tukang OH 0.260 1.87
Pekerja OH 0.520 3.74
Kayu kelas III M3 0.040 0.29
Paku 5 - 10 cm kg 0.300 2.16
Minyak bekisting Liter 0.100 0.72
Kolom M2 17.64
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 5.82
Pekerja OH 0.660 11.64
Kayu kelas III M3 0.040 0.71
Paku 5 - 12 cm Kg 0.400 7.06
Minyak bekisting Liter 0.200 3.53
Balok kayu kelas II M3 0.015 0.26
Plywood 9 mm Lbr 0.350 6.17
Dolken kayu Ø 8-10/400 cm Batang 2.000 35.28
Balok M2 8.00
Pemasangan 1 m2 bekisting untuk balok
Tukang OH 0.330 2.64
Pekerja OH 0.660 5.28
Kayu kelas III M3 0.040 0.32
Paku 5 - 12 cm Kg 0.400 3.20
Minyak bekisting Liter 0.200 1.60
Balok kayu kelas II M3 0.018 0.14
Plywood 9 mm Lbr 0.350 2.80
Dolken kayu Ø 8-10/400 cm Batang 2.000 16.00
Dinding M2 60.20
Pemasangan 1 m2 bekisting untuk dinding
Tukang OH 0.330 19.87
Pekerja OH 0.660 39.73
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Kayu kelas III M3 0.030 1.81


Paku 5 - 12 cm Kg 0.400 24.08
Minyak bekisting Liter 0.200 12.04
Balok kayu kelas II M3 0.020 1.20
Plywood 9 mm Lbr 0.350 21.07
Dolken kayu Ø 8-10/400 cm Batang 3.000 180.60
Penjaga jarak bekisting / spacer Buah 4.000 240.80
Plat Tutup M2 12.40
Pemasangan 1 m2 bekisting untuk lantai
Tukang OH 0.330 4.09
Pekerja OH 0.660 8.18
Kayu kelas III M3 0.040 0.50
Paku 5 - 12 cm Kg 0.400 4.96
Minyak bekisting Liter 0.200 2.48
Balok kayu kelas II M3 0.015 0.19
Plywood 9 mm Lbr 0.350 4.34
Dolken kayu Ø 8-10/400 cm Batang 6.000 74.40

G PLESTERAN DAN ACIAN


PLESTERAN M2 68.85
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 10.33
Pekerja OH 0.300 20.66
Pasir Pasang M3 0.023 1.58
Semen Zak 0.156 10.71
Acian M2 68.85
Pemasangan 1 m2 acian.
Tukang OH 0.1000 6.89
Pekerja OH 0.2000 13.77
Semen Zak 0.0650 4.48

H PENGECATAN M2 34.55
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 2.18
Pekerja OH 0.020 0.69
Plamuur Kg 0.100 3.46
Cat dasar Tembok Kg 0.100 3.46
Cat Penutup Tembok Kg 0.260 8.98

3 RUMAH PANEL
A PEKERJAAN BATU BATA M2 7.00
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Tukang OH 0.100 0.70
Pekerja OH 0.300 2.10
Bata merah Buah 70.000 490.00
Semen portland Zak 0.287 2.01
Pasir Pasang M3 0.040 0.28

B PEKERJAAN BETON
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Beton K 175 M3 0.17


Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 0.05
Pekerja OH 1.650 0.28
Batu Split 2/3 M3 0.762 0.13
Pasir Beton M3 0.563 0.10
Semen Zak 6.520 1.11

C PEKERJAAN PEMBESIAN Kg 1.82


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 0.13
Pekerja OH 0.070 0.13
Besi beton
(polos/ulir)
- Ø 10 Kg 1.050 0.79 0.83
-Ø8 Kg 1.050 1.89 1.99
Kawat Beton Kg 0.150 0.27

D PEKERJAAN BEKISTING
Kolom M2 1.20
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 0.40
Pekerja OH 0.660 0.79
Kayu kelas III M3 0.040 0.05
Paku 5 - 12 cm Kg 0.400 0.48
Minyak bekisting Liter 0.200 0.24
Balok kayu kelas II M3 0.015 0.02
Plywood 9 mm Lbr 0.350 0.42
Dolken kayu Ø 8-10/400 cm Batang 2.000 2.40
Balok M2 0.80
Pemasangan 1 m2 bekisting untuk balok
Tukang OH 0.330 0.26
Pekerja OH 0.660 0.53
Kayu kelas III M3 0.040 0.03
Paku 5 - 12 cm Kg 0.400 0.32
Minyak bekisting Liter 0.200 0.16
Balok kayu kelas II M3 0.018 0.01
Plywood 9 mm Lbr 0.350 0.28
Dolken kayu Ø 8-10/400 cm Batang 2.000 1.60
Plat Tutup M2 0.53
Pemasangan 1 m2 bekisting untuk lantai
Tukang OH 0.330 0.17
Pekerja OH 0.660 0.35
Kayu kelas III M3 0.040 0.02
Paku 5 - 12 cm Kg 0.400 0.21
Minyak bekisting Liter 0.200 0.11
Balok kayu kelas II M3 0.015 0.01
Plywood 9 mm Lbr 0.350 0.18
Dolken kayu Ø 8-10/400 cm Batang 6.000 3.15

E PLESTERAN + ACIAN
PLESTERAN M2 68.40
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Tukang OH 0.150 10.26


Pekerja OH 0.300 20.52
Pasir Pasang M3 0.023 1.57
Semen Zak 0.156 10.64
Acian M2 68.40
Pemasangan 1 m2 acian.
Tukang OH 0.100 6.84
Pekerja OH 0.200 13.68
Semen Zak 0.065 4.45

F PENGECATAN M2 66.88
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 4.21
Pekerja OH 0.020 1.34
Plamuur Kg 0.100 6.69
Cat dasar Tembok Kg 0.100 6.69
Cat Penutup Tembok Kg 0.260 17.39

4 PENGADAAN PIPA
A PENGADAAN PIPA M3 -
Pipa PVC Ø 3 Inch S-12,5 M' 180.00 1,182.00
Pipa PVC Ø 2 Inch S-12,5 M' 497.00 864.00
Pipa PVC Ø 1½ Inch S-10 M' 918.00 504.00
Pipa PVC Ø 1 Inch S-10 M' 522.00 666.00

5 PEMASANGAN PIPA
A GALIAN PIPA M3 206.23
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 154.67

B URUGAN TANAH M3 97.38


Pengurugan Kembali 1 m³ Galian Tanah
Pekerja OH 0.500 48.69

C### M' -
Pemasangan 1 m pipa PVC Ø 110 mm
Tukang OH 0.053 -
Pekerja OH 0.105 -

D Pipa PVC Ø 3 Inch S-12,5 M' 180.00


Pemasangan 1 m pipa PVC Ø 90 mm
Tukang OH 0.047 8.46
Pekerja OH 0.094 16.92

E Pipa PVC Ø 2 Inch S-12,5 M' 497.00


Pemasangan 1 m pipa PVC Ø 63 mm
Tukang OH 0.041 20.38
Pekerja OH 0.081 40.26

F Pipa PVC Ø 1½ Inch S-10 M' 918.00


Pemasangan 1 m pipa PVC Ø 63 mm
Tukang OH 0.041 37.64
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Pekerja OH 0.081 74.36

G Pipa PVC Ø 1 Inch S-10 M' 522.00


Pemasangan 1 m pipa PVC Ø 63 mm
Tukang OH 0.041 21.40
Pekerja OH 0.081 42.28

4 JAMBAN SEKOLAH
A GALIAN TANAH M3 15.38
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 11.54

B PEKERJAAN PASANGAN BATU KALI M3 3.24


Pemasangan 1 m³ pondasi batu belah campuran 1SP : 4PP
Tukang OH 0.750 2.43
Pekerja OH 1.500 4.86
Batu Belah 10/20 M3 1.200 3.89
Pasir Pasang M3 0.520 1.68
Semen Zak 3.260 10.56

C PEKERJAAN BETON
Beton K 175 M3 4.69
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 1.29
Pekerja OH 1.650 7.74
Batu Split 2/3 M3 0.762 3.58
Pasir Beton M3 0.563 2.64
Semen Zak 6.520 30.59
Beton Tumbuk M3 0.63
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.17
Pekerja OH 1.650 1.03
Batu Split 2/3 M3 0.740 0.46
Pasir Beton M3 0.621 0.39
Semen Zak 4.940 3.09

D PEKERJAAN PEMBESIAN Kg 16.29


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 1.14
Pekerja OH 0.070 1.14
Besi beton
(polos/ulir)
- Ø 10 Kg 1.050 25.90 27.19
-Ø8 Kg 1.050 6.68 7.01
Kawat Beton Kg 0.150 2.44

E PEKERJAAN BEKISTING
Kolom M2 0.90
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 0.30
Pekerja OH 0.660 0.59
Kayu kelas III M3 0.040 0.04
Paku 5 - 12 cm Kg 0.400 0.36
Minyak bekisting Liter 0.200 0.18
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Balok kayu kelas II M3 0.015 0.01


Plywood 9 mm Lbr 0.350 0.31
Dolken kayu Ø 8-10/400 cm Batang 2.000 1.80
Balok M2 1.17
Pemasangan 1 m2 bekisting untuk balok
Tukang OH 0.330 0.39
Pekerja OH 0.660 0.77
Kayu kelas III M3 0.040 0.05
Paku 5 - 12 cm Kg 0.400 0.47
Minyak bekisting Liter 0.200 0.23
Balok kayu kelas II M3 0.018 0.02
Plywood 9 mm Lbr 0.350 0.41
Dolken kayu Ø 8-10/400 cm Batang 2.000 2.34
Plat Tutup M2 4.65
Pemasangan 1 m2 bekisting untuk lantai
Tukang OH 0.330 1.53
Pekerja OH 0.660 3.07
Kayu kelas III M3 0.040 0.19
Paku 5 - 12 cm Kg 0.400 1.86
Minyak bekisting Liter 0.200 0.93
Balok kayu kelas II M3 0.015 0.07
Plywood 9 mm Lbr 0.350 1.63
Dolken kayu Ø 8-10/400 cm Batang 6.000 27.90

F PEKERJAAN BATU BATA M2 17.20


Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Tukang OH 0.100 1.72
Pekerja OH 0.300 5.16
Bata merah Buah 70.000 1,204.00
Semen portland Zak 0.287 4.94
Pasir Pasang M3 0.040 0.69

G PLESTERAN + ACIAN
PLESTERAN M2 17.20
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 2.58
Pekerja OH 0.300 5.16
Pasir Pasang M3 0.023 0.40
Semen Zak 0.156 2.67
Acian M2 17.20
Pemasangan 1 m2 acian.
Tukang OH 0.100 1.72
Pekerja OH 0.200 3.44
Semen Zak 0.065 1.12

H PENGECATAN M2 17.20
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 1.08
Pekerja OH 0.020 0.34
Plamuur Kg 0.100 1.72
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Cat dasar Tembok Kg 0.100 1.72


Cat Penutup Tembok Kg 0.260 4.47

I PEMASANGAN KERAMIK LANTAI (20X20) M2 5.40


Memasang 1 m2 lantai keramik ukuran (20 x 20) cm
Tukang OH 0.350 1.89
Pekerja OH 0.700 3.78
Keramik Buah 26.500 143.10
Pasir Pasang M3 0.045 0.24
Semen Zak 0.208 1.12

J PEMASANGAN KERAMIK LANTAI (20X20) M2 10.80


Memasang 1 m2 lantai keramik ukuran (20 x 20) cm
Tukang OH 0.350 3.78
Pekerja OH 0.700 7.56
Keramik Buah 26.500 286.20
Pasir Pasang M3 0.045 0.49
Semen Zak 0.208 2.25

6 TEMPAT CUCI TANGAN


A PEKERJAAN BATU BATA M2 0.33
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Tukang OH 0.100 0.03
Pekerja OH 0.300 0.10
Bata merah Buah 70.000 23.10
Semen portland Zak 0.287 0.09
Pasir Pasang M 3
0.040 0.01

B PEKERJAAN BETON
Beton K 175 M3 0.09
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 1.29
Pekerja OH 1.650 7.74
Batu Split 2/3 M3 0.762 0.07
Pasir Beton M3 0.563 0.05
Semen Zak 6.520 0.59
Beton Tumbuk M3 0.15
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.04
Pekerja OH 1.650 0.25
Batu Split 2/3 M3 0.740 0.11
Pasir Beton M3 0.621 0.09
Semen Zak 4.940 0.74

D PEKERJAAN PEMBESIAN Kg 1.35


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 0.09
Pekerja OH 0.070 0.09
Besi beton
(polos/ulir)
-Ø8 Kg 1.050 1.35 1.42
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Kawat Beton Kg 0.150 0.20

D PLESTERAN DAN ACIAN


PLESTERAN M2 0.33
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 0.05
Pekerja OH 0.300 0.10
Pasir Pasang M3 0.023 0.01
Semen Zak 0.156 0.05
Acian M2 0.33
Pemasangan 1 m2 acian.
Tukang OH 0.100 0.03
Pekerja OH 0.200 0.07
Semen Zak 0.065 0.02

E PENGECATAN M2 0.33
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 0.02
Pekerja OH 0.020 0.01
Plamuur Kg 0.100 0.03
Cat dasar Tembok Kg 0.100 0.03
Cat Penutup Tembok Kg 0.260 0.09
ANALISA SATUAN PEKERJAAN

DESA : Nagaratengah
KECAMATAN : Cineam

No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

1 BRONCAPTERING
A GALIAN TANAH M3 9.83
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 7.37

B URUGAN TANAH M3 2.46


Pengurugan Kembali 1 m³ Galian Tanah
Pekerja OH 0.500 1.23

C PEKERJAAN PASANGAN BATU KALI M3 11.07


Pemasangan 1 m³ pondasi batu belah campuran 1SP : 4PP
Tukang OH 0.750 8.30
Pekerja OH 1.500 16.60
Batu Belah 10/20 M3 1.200 13.28
Pasir Pasang M 3
0.520 5.76
Semen Zak 3.260 36.08

E PEKERJAAN BETON
Beton K 175 M3 2.02
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 0.56
Pekerja OH 1.650 3.33
Batu Split 2/3 M 3
0.762 1.54
Pasir Beton M 3
0.563 1.14
Semen Zak 6.520 13.16
Beton K 200 M 3
0.68
Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Tukang OH 0.275 0.19
Pekerja OH 1.650 1.13
Semen Zak 7.040 4.81
Pasir Beton M 3
0.522 0.36
Batu Split 2/3 M 3
0.764 0.52
Beton Tumbuk M3 0.55
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.15
Pekerja OH 1.650 0.90
Batu Split 2/3 M 3
0.740 0.40
Pasir Beton M3 0.621 0.34
Semen Zak 4.940 2.70

F PEKERJAAN PEMBESIAN Kg 14.22


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 1.00
Pekerja OH 0.070 1.00
Besi beton
(polos/ulir)
- Ø 10 Kg 1.050 7.55 7.93
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

-Ø8 Kg 1.050 6.67 7.00


Kawat Beton Kg 0.150 2.13

G PEKERJAAN BEKISTING
Kolom M2 4.17
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 1.37
Pekerja OH 0.660 2.75
Kayu kelas III M 3
0.040 0.17
Paku 5 - 12 cm Kg 0.400 1.67
Minyak bekisting Liter 0.200 0.83
Balok kayu kelas II M 3
0.015 0.06
Plywood 9 mm Lbr 0.350 1.46
Dolken kayu Ø 8-10/400 cm Batang 2.000 8.33

H PLESTERAN + ACIAN
PLESTERAN M2 27.81
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 4.17
Pekerja OH 0.300 8.34
Pasir Pasang M3 0.023 0.64
Semen Zak 0.156 4.33
Acian M2 27.81
Pemasangan 1 m2 acian.
Tukang OH 0.100 2.78
Pekerja OH 0.200 5.56
Semen Zak 0.065 1.81

I PENGECATAN M2 14.86
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 0.94
Pekerja OH 0.020 0.30
Plamuur Kg 0.100 1.49
Cat dasar Tembok Kg 0.100 1.49
Cat Penutup Tembok Kg 0.260 3.86
2 BAK PENGUMPUL
A GALIAN TANAH M3 11.20
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 8.40

B URUGAN TANAH M3 8.40


Pengurugan Kembali 1 m³ Galian Tanah
Pekerja OH 0.500 4.20

D PEKERJAAN BETON
Beton K 175 M3 3.42
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 0.94
Pekerja OH 1.650 5.64
Batu Split 2/3 M3 0.762 2.61
Pasir Beton M3 0.563 1.93
Semen Zak 6.520 22.30
Beton K 200 M3 0.70
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Tukang OH 0.275 0.19
Pekerja OH 1.650 1.15
Semen Zak 7.040 4.90
Pasir Beton M3 0.522 0.36
Batu Split 2/3 M3 0.764 0.53
Beton Tumbuk M3 0.60
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.17
Pekerja OH 1.650 0.99
Batu Split 2/3 M3 0.740 0.44
Pasir Beton M3 0.621 0.37
Semen Zak 4.940 2.96

E PEKERJAAN PEMBESIAN Kg 29.09


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 2.04
Pekerja OH 0.070 2.04
Besi beton
(polos/ulir)
- Ø 10 Kg 1.050 26.97 28.31
-Ø8 Kg 1.050 3.43 3.60
Kawat Beton Kg 0.150 4.36

F PEKERJAAN BEKISTING
Kolom M2 4.56
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 1.50
Pekerja OH 0.660 3.01
Kayu kelas III M3 0.040 0.18
Paku 5 - 12 cm Kg 0.400 1.82
Minyak bekisting Liter 0.200 0.91
Balok kayu kelas II M3 0.015 0.07
Plywood 9 mm Lbr 0.350 1.60
Dolken kayu Ø 8-10/400 cm Batang 2.000 9.12
Balok M2 1.60
Pemasangan 1 m2 bekisting untuk balok
Tukang OH 0.330 0.53
Pekerja OH 0.660 1.06
Kayu kelas III M3 0.040 0.06
Paku 5 - 12 cm Kg 0.400 0.64
Minyak bekisting Liter 0.200 0.32
Balok kayu kelas II M3 0.018 0.03
Plywood 9 mm Lbr 0.350 0.56
Dolken kayu Ø 8-10/400 cm Batang 2.000 3.20
Plat Tutup M2 25.28
Pemasangan 1 m2 bekisting untuk lantai
Tukang OH 0.330 8.34
Pekerja OH 0.660 16.68
Kayu kelas III M3 0.040 1.01
Paku 5 - 12 cm Kg 0.400 10.11
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Minyak bekisting Liter 0.200 5.06


Balok kayu kelas II M3 0.015 0.38
Plywood 9 mm Lbr 0.350 8.85
Dolken kayu Ø 8-10/400 cm Batang 6.000 151.68

G PLESTERAN + ACIAN
PLESTERAN M2 9.20
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 1.38
Pekerja OH 0.300 2.76
Pasir Pasang M3 0.023 0.21
Semen Zak 0.156 1.43
Acian M2 9.20
Pemasangan 1 m2 acian.
Tukang OH 0.100 0.92
Pekerja OH 0.200 1.84
Semen Zak 0.065 0.60

H PENGECATAN M2 9.20
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 0.58
Pekerja OH 0.020 0.18
Plamuur Kg 0.100 0.92
Cat dasar Tembok Kg 0.100 0.92
Cat Penutup Tembok Kg 0.260 2.39

3 RESERVOIR
` GALIAN TANAH M3 32.38
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 24.28

B URUGAN TANAH M3 8.09


Pengurugan Kembali 1 m³ Galian Tanah
Pekerja OH 0.500 4.05

C PEKERJAAN BATU BATA M2 9.73


Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Tukang OH 0.100 0.97
Pekerja OH 0.300 2.92
Bata merah Buah 70.000 680.75
Semen portland Zak 0.287 2.79
Pasir Pasang M3 0.040 0.39

D PEKERJAAN BETON
Beton K 200 M3 3.73
Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Tukang OH 0.275 1.03
Pekerja OH 1.650 6.16
Semen Zak 7.040 26.28
Pasir Beton M3 0.522 1.95
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Batu Split 2/3 M3 0.764 2.85


Beton K 175 M3 15.56
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 4.28
Pekerja OH 1.650 25.68
Batu Split 2/3 M3 0.762 11.86
Pasir Beton M3 0.563 8.76
Semen Zak 6.520 101.47
Beton Tumbuk M3 2.11
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.58
Pekerja OH 1.650 3.49
Batu Split 2/3 M3 0.740 1.56
Pasir Beton M3 0.621 1.31
Semen Zak 4.940 10.44

E PEKERJAAN PEMBESIAN Kg 158.93


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 11.13
Pekerja OH 0.070 11.13
Besi beton
(polos/ulir)
- Ø 12 Kg 1.050 39.68 41.66
- Ø 10 Kg 1.050 94.12 98.82
-Ø8 Kg 1.050 25.14 26.39
Kawat Beton Kg 0.150 23.84

F PEKERJAAN BEKISTING
Pondasi M2 3.60
Tukang OH 0.260 0.94
Pekerja OH 0.520 1.87
Kayu kelas III M3 0.040 0.14
Paku 5 - 10 cm kg 0.300 1.08
Minyak bekisting Liter 0.100 0.36
Kolom M2 16.17
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 5.34
Pekerja OH 0.660 10.67
Kayu kelas III M3 0.040 0.65
Paku 5 - 12 cm Kg 0.400 6.47
Minyak bekisting Liter 0.200 3.23
Balok kayu kelas II M3 0.015 0.24
Plywood 9 mm Lbr 0.350 5.66
Dolken kayu Ø 8-10/400 cm Batang 2.000 32.34
Balok M2 8.00
Pemasangan 1 m2 bekisting untuk balok
Tukang OH 0.330 2.64
Pekerja OH 0.660 5.28
Kayu kelas III M3 0.040 0.32
Paku 5 - 12 cm Kg 0.400 3.20
Minyak bekisting Liter 0.200 1.60
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Balok kayu kelas II M3 0.018 0.14


Plywood 9 mm Lbr 0.350 2.80
Dolken kayu Ø 8-10/400 cm Batang 2.000 16.00
Dinding M2 30.10
Pemasangan 1 m2 bekisting untuk dinding
Tukang OH 0.330 9.93
Pekerja OH 0.660 19.87
Kayu kelas III M3 0.030 0.90
Paku 5 - 12 cm Kg 0.400 12.04
Minyak bekisting Liter 0.200 6.02
Balok kayu kelas II M3 0.020 0.60
Plywood 9 mm Lbr 0.350 10.54
Dolken kayu Ø 8-10/400 cm Batang 3.000 90.30
Penjaga jarak bekisting / spacer Buah 4.000 120.40
Plat Tutup M2 7.60
Pemasangan 1 m2 bekisting untuk lantai
Tukang OH 0.330 2.51
Pekerja OH 0.660 5.02
Kayu kelas III M3 0.040 0.30
Paku 5 - 12 cm Kg 0.400 3.04
Minyak bekisting Liter 0.200 1.52
Balok kayu kelas II M3 0.015 0.11
Plywood 9 mm Lbr 0.350 2.66
Dolken kayu Ø 8-10/400 cm Batang 6.000 45.60

G PLESTERAN DAN ACIAN


PLESTERAN M2 74.85
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 11.23
Pekerja OH 0.300 22.46
Pasir Pasang M3 0.023 1.72
Semen Zak 0.156 11.64
Acian M2 74.85
Pemasangan 1 m2 acian.
Tukang OH 0.1000 7.49
Pekerja OH 0.2000 14.97
Semen Zak 0.0650 4.87

H PENGECATAN M2 37.55
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 2.37
Pekerja OH 0.020 0.75
Plamuur Kg 0.100 3.76
Cat dasar Tembok Kg 0.100 3.76
Cat Penutup Tembok Kg 0.260 9.76

3 RUMAH PANEL
A PEKERJAAN BATU BATA M2 10.00
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Tukang OH 0.100 1.00
Pekerja OH 0.300 3.00
Bata merah Buah 70.000 700.00
Semen portland Zak 0.287 2.87
Pasir Pasang M3 0.040 0.40

B PEKERJAAN BETON
Beton K 175 M3 0.36
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 0.10
Pekerja OH 1.650 0.59
Batu Split 2/3 M3 0.762 0.27
Pasir Beton M3 0.563 0.20
Semen Zak 6.520 2.35

C PEKERJAAN PEMBESIAN Kg 4.74


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 0.33
Pekerja OH 0.070 0.33
Besi beton
(polos/ulir)
- Ø 10 Kg 1.050 0.79 0.83
-Ø8 Kg 1.050 1.89 1.99
Kawat Beton Kg 0.150 0.71

D PEKERJAAN BEKISTING
Kolom M2 1.20
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 0.40
Pekerja OH 0.660 0.79
Kayu kelas III M3 0.040 0.05
Paku 5 - 12 cm Kg 0.400 0.48
Minyak bekisting Liter 0.200 0.24
Balok kayu kelas II M3 0.015 0.02
Plywood 9 mm Lbr 0.350 0.42
Dolken kayu Ø 8-10/400 cm Batang 2.000 2.40
Balok M2 0.80
Pemasangan 1 m2 bekisting untuk balok
Tukang OH 0.330 0.26
Pekerja OH 0.660 0.53
Kayu kelas III M3 0.040 0.03
Paku 5 - 12 cm Kg 0.400 0.32
Minyak bekisting Liter 0.200 0.16
Balok kayu kelas II M3 0.018 0.01
Plywood 9 mm Lbr 0.350 0.28
Dolken kayu Ø 8-10/400 cm Batang 2.000 1.60
Plat Tutup M2 0.53
Pemasangan 1 m2 bekisting untuk lantai
Tukang OH 0.330 0.17
Pekerja OH 0.660 0.35
Kayu kelas III M3 0.040 0.02
Paku 5 - 12 cm Kg 0.400 0.21
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Minyak bekisting Liter 0.200 0.11


Balok kayu kelas II M3 0.015 0.01
Plywood 9 mm Lbr 0.350 0.18
Dolken kayu Ø 8-10/400 cm Batang 6.000 3.15

E PLESTERAN + ACIAN
PLESTERAN M2 16.00
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 2.40
Pekerja OH 0.300 4.80
Pasir Pasang M3 0.023 0.37
Semen Zak 0.156 2.49
Acian M2 16.00
Pemasangan 1 m2 acian.
Tukang OH 0.100 1.60
Pekerja OH 0.200 3.20
Semen Zak 0.065 1.04

F PENGECATAN M2 16.00
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 1.01
Pekerja OH 0.020 0.32
Plamuur Kg 0.100 1.60
Cat dasar Tembok Kg 0.100 1.60
Cat Penutup Tembok Kg 0.260 4.16

4 PENGADAAN PIPA
A PENGADAAN PIPA M3 -
Pipa PVC Ø 3 Inch S-12,5 M' 180.00 1,182.00
Pipa PVC Ø 2 Inch S-12,5 M' 497.00 864.00
Pipa PVC Ø 1½ Inch S-10 M' 918.00 504.00
Pipa PVC Ø 1 Inch S-10 M' 522.00 666.00

5 PEMASANGAN PIPA
A GALIAN PIPA M3 206.23
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 154.67

B URUGAN TANAH M3 97.38


Pengurugan Kembali 1 m³ Galian Tanah
Pekerja OH 0.500 48.69

C### M' -
Pemasangan 1 m pipa PVC Ø 110 mm
Tukang OH 0.053 -
Pekerja OH 0.105 -

D Pipa PVC Ø 3 Inch S-12,5 M' 180.00


Pemasangan 1 m pipa PVC Ø 90 mm
Tukang OH 0.047 8.46
Pekerja OH 0.094 16.92
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

E Pipa PVC Ø 2 Inch S-12,5 M' 497.00


Pemasangan 1 m pipa PVC Ø 63 mm
Tukang OH 0.041 20.38
Pekerja OH 0.081 40.26

F Pipa PVC Ø 1½ Inch S-10 M' 918.00


Pemasangan 1 m pipa PVC Ø 63 mm
Tukang OH 0.041 37.64
Pekerja OH 0.081 74.36

G Pipa PVC Ø 1 Inch S-10 M' 522.00


Pemasangan 1 m pipa PVC Ø 63 mm
Tukang OH 0.041 21.40
Pekerja OH 0.081 42.28

4 JAMBAN SEKOLAH
A GALIAN TANAH M3 15.38
Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Pekerja OH 0.750 11.54

B PEKERJAAN PASANGAN BATU KALI M3 3.24


Pemasangan 1 m³ pondasi batu belah campuran 1SP : 4PP
Tukang OH 0.750 2.43
Pekerja OH 1.500 4.86
Batu Belah 10/20 M3 1.200 3.89
Pasir Pasang M3 0.520 1.68
Semen Zak 3.260 10.56

C PEKERJAAN BETON
Beton K 175 M3 4.69
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 1.29
Pekerja OH 1.650 7.74
Batu Split 2/3 M3 0.762 3.58
Pasir Beton M3 0.563 2.64
Semen Zak 6.520 30.59
Beton Tumbuk M3 0.63
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.17
Pekerja OH 1.650 1.03
Batu Split 2/3 M3 0.740 0.46
Pasir Beton M3 0.621 0.39
Semen Zak 4.940 3.09

D PEKERJAAN PEMBESIAN Kg 16.29


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 1.14
Pekerja OH 0.070 1.14
Besi beton
(polos/ulir)
- Ø 10 Kg 1.050 25.90 27.19
-Ø8 Kg 1.050 6.68 7.01
Kawat Beton Kg 0.150 2.44
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

E PEKERJAAN BEKISTING
Kolom M2 0.90
Pemasangan 1 m2 bekisting untuk kolom
Tukang OH 0.330 0.30
Pekerja OH 0.660 0.59
Kayu kelas III M3 0.040 0.04
Paku 5 - 12 cm Kg 0.400 0.36
Minyak bekisting Liter 0.200 0.18
Balok kayu kelas II M3 0.015 0.01
Plywood 9 mm Lbr 0.350 0.31
Dolken kayu Ø 8-10/400 cm Batang 2.000 1.80
Balok M2 1.17
Pemasangan 1 m2 bekisting untuk balok
Tukang OH 0.330 0.39
Pekerja OH 0.660 0.77
Kayu kelas III M3 0.040 0.05
Paku 5 - 12 cm Kg 0.400 0.47
Minyak bekisting Liter 0.200 0.23
Balok kayu kelas II M3 0.018 0.02
Plywood 9 mm Lbr 0.350 0.41
Dolken kayu Ø 8-10/400 cm Batang 2.000 2.34
Plat Tutup M2 4.65
Pemasangan 1 m2 bekisting untuk lantai
Tukang OH 0.330 1.53
Pekerja OH 0.660 3.07
Kayu kelas III M3 0.040 0.19
Paku 5 - 12 cm Kg 0.400 1.86
Minyak bekisting Liter 0.200 0.93
Balok kayu kelas II M3 0.015 0.07
Plywood 9 mm Lbr 0.350 1.63
Dolken kayu Ø 8-10/400 cm Batang 6.000 27.90

F PEKERJAAN BATU BATA M2 17.20


Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Tukang OH 0.100 1.72
Pekerja OH 0.300 5.16
Bata merah Buah 70.000 1,204.00
Semen portland Zak 0.287 4.94
Pasir Pasang M3 0.040 0.69

G PLESTERAN + ACIAN
PLESTERAN M2 17.20
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 2.58
Pekerja OH 0.300 5.16
Pasir Pasang M3 0.023 0.40
Semen Zak 0.156 2.67
Acian M2 17.20
Pemasangan 1 m2 acian.
Tukang OH 0.100 1.72
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Pekerja OH 0.200 3.44


Semen Zak 0.065 1.12

H PENGECATAN M2 17.20
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 1.08
Pekerja OH 0.020 0.34
Plamuur Kg 0.100 1.72
Cat dasar Tembok Kg 0.100 1.72
Cat Penutup Tembok Kg 0.260 4.47

I PEMASANGAN KERAMIK LANTAI (20X20) M2 5.40


Memasang 1 m2 lantai keramik ukuran (20 x 20) cm
Tukang OH 0.350 1.89
Pekerja OH 0.700 3.78
Keramik Buah 26.500 143.10
Pasir Pasang M3 0.045 0.24
Semen Zak 0.208 1.12

J PEMASANGAN KERAMIK LANTAI (20X20) M2 10.80


Memasang 1 m2 lantai keramik ukuran (20 x 20) cm
Tukang OH 0.350 3.78
Pekerja OH 0.700 7.56
Keramik Buah 26.500 286.20
Pasir Pasang M3 0.045 0.49
Semen Zak 0.208 2.25

6 TEMPAT CUCI TANGAN


A PEKERJAAN BATU BATA M2 1.80
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Tukang OH 0.100 0.18
Pekerja OH 0.300 0.54
Bata merah Buah 70.000 126.00
Semen portland Zak 0.287 0.52
Pasir Pasang M 3
0.040 0.07

B PEKERJAAN BETON
Beton K 175 M3 0.09
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Tukang OH 0.275 1.29
Pekerja OH 1.650 7.74
Batu Split 2/3 M3 0.762 0.07
Pasir Beton M3 0.563 0.05
Semen Zak 6.520 0.59
Beton Tumbuk M3 0.15
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
Tukang OH 0.275 0.04
Pekerja OH 1.650 0.25
Batu Split 2/3 M3 0.740 0.11
Pasir Beton M3 0.621 0.09
No Uraian Pekerjaan Satuan Koefisian Volume Upah Bahan

Semen Zak 4.940 0.74

D PEKERJAAN PEMBESIAN Kg 1.35


Pembesian 10 kg dengan Besi Polos atau Besi Ulir
Tukang OH 0.070 0.09
Pekerja OH 0.070 0.09
Besi beton
(polos/ulir)
-Ø8 Kg 1.050 1.35 1.42
Kawat Beton Kg 0.150 0.20

D PLESTERAN DAN ACIAN


PLESTERAN M2 6.00
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm.
Tukang OH 0.150 0.90
Pekerja OH 0.300 1.80
Pasir Pasang M3 0.023 0.14
Semen Zak 0.156 0.93
Acian M 2
6.00
Pemasangan 1 m2 acian.
Tukang OH 0.100 0.60
Pekerja OH 0.200 1.20
Semen Zak 0.065 0.39

E PENGECATAN M2 6.00
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tukang OH 0.063 0.38
Pekerja OH 0.020 0.12
Plamuur Kg 0.100 0.60
Cat dasar Tembok Kg 0.100 0.60
Cat Penutup Tembok Kg 0.260 1.56
RENCANA ANGGARAN BIAYA ( RAB )
Desa : Nagaratengah
Kecamatan : Cineam
Kabupaten : Tasikmalaya 9.24491031 2.24491031
Provinsi : Jawa Barat
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan

A SARANA AIR BERSIH (SAB)


1 BRONCAPTERING 2,483,550 7,953,118 2,467,356 3,790,176 6,273,726 10,420,474
A GALIAN TANAH 6.50 M3 438,750 - - - 438,750 -
Pekerja 4.88 4.88 - - HOK 90,000 - 438,750 - - - 438,750 -

B URUGAN TANAH 1.63 M 3


73,125 - - - 73,125 -
Pekerja 0.81 0.81 - - HOK 90,000 - 73,125 - - - 73,125 -

C PEKERJAAN PASANGAN BATU KALI 11.07 M3 1,394,000 202,265 2,467,356 143,399 1,537,399 2,669,621
Tukang 5.30 4.00 - 1.30 HOK 110,000 - 440,000 - - 143,151 583,151 -
Pekerja 10.60 10.60 - 0.00 HOK 90,000 - 954,000 - - 248 954,248 -
Batu Belah 10/20 8.28 - 8.65 - M3 - 200,000 - - 1,729,027 - - 1,729,027
Pasir Pasang 2.76 - 2.76 - M3 - 180,000 - - 496,012 - - 496,012
Semen 8.08 3.68 4.41 - Zak - 55,000 - 202,265 242,317 - - 444,582

D PEKERJAAN BETON 3.23 M 3


577,675 2,071,540 - - 577,675 2,071,540
Tukang 0.89 0.89 - - HOK 110,000 - 97,760 - - - 97,760 -
Pekerja 5.33 5.33 - - HOK 90,000 - 479,915 - - - 479,915 -
Batu Split 2/3 2.45 2.45 - - M3 - 220,000 - 539,482 - - - 539,482
Pasir Beton 1.82 1.82 - - M3 - 220,000 - 401,059 - - - 401,059
Semen 20.56 20.56 - - Zak - 55,000 - 1,130,999 - - - 1,130,999

E PEKERJAAN PEMBESIAN 115.99 Kg - 1,216,683 - 1,623,792 1,623,792 1,216,683


Tukang 0 8.12 - - 8.12 HOK 110,000 - - - - 893,086 893,086 -
Pekerja 0 8.12 - - 8.12 HOK 90,000 - - - - 730,707 730,707 -
Besi beton
(polos/ulir)
0 - Ø 10 7.93 7.93 - - Batang - 72,000 - 570,663 - - - 570,663
-Ø8 7.00 7.00 - - Batang - 55,000 - 385,054 - - - 385,054
Kawat Beton 17.40 17.40 - - Kg - 15,000 - 260,967 - - - 260,967

F PEKERJAAN BEKISTING 11.25 M2 - 1,564,875 - 1,076,625 1,076,625 1,564,875


Tukang 3.71 - - 3.71 HOK 110,000 - - - - 408,375 408,375 -
Pekerja 7.43 - - 7.43 HOK 90,000 - - - - 668,250 668,250 -
Kayu kelas III 0.45 0.45 - - M3 - 1,200,000 - 540,000 - - - 540,000
Paku 5 - 12 cm 4.50 4.50 - - Kg - 14,000 - 63,000 - - - 63,000
Balok kayu kelas II 0.17 0.17 - - M3 - 1,900,000 - 320,625 - - - 320,625
Plywood 9 mm 3.94 3.94 - - Lbr - 120,000 - 472,500 - - - 472,500
Dolken kayu Ø 8-10/400 cm 22.50 22.50 - - Batang - 7,500 - 168,750 - - - 168,750

G PLESTERAN + ACIAN 22.35 M 2


- 197,987 - 835,925 835,925 197,987
Tukang 2.88 - - 2.88 HOK 110,000 - - - - 317,075 317,075 -
Pekerja 5.77 - - 5.77 HOK 90,000 - - - - 518,850 518,850 -
Pasir Pasang 0.30 0.30 - - M3 - 180,000 - 53,613 - - - 53,613
Semen 2.62 2.62 - - Zak - 55,000 - 144,374 - - - 144,374
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
H PENGECATAN 12.65 M2 - 111,067 - 110,435 110,435 111,067
Tukang 0.80 - - 0.80 HOK 110,000 - - - - 87,665 87,665 -
Pekerja 0.25 - - 0.25 HOK 90,000 - - - - 22,770 22,770 -
Plamuur 1.27 1.27 - - Kg - 10,200 - 12,903 - - - 12,903
Cat dasar Tembok 1.27 1.27 - - Kg - 20,400 - 25,806 - - - 25,806
Cat Penutup Tembok 3.29 3.29 - - Kg - 22,000 - 72,358 - - - 72,358

I AKSESORIS BANGUNAN - 2,588,700 - - - 2,588,700


Pipa Overflow - 199,200 - - - 199,200
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Knee GI Ø 2 Inch 1.00 1.00 - - Buah - 33,300 - 33,300 - - - 33,300
SDL PVC Ø 2 Inch 1.00 1.00 - - Buah - 20,000 - 20,000 - - - 20,000
Pipa Outlet - 1,080,000 - - - 1,080,000
Pipa Dinding GI Ø 3 Inch 2.00 2.00 - - M' - 210,000 - 420,000 - - - 420,000
SDD PVC Ø 3 Inch 1.00 1.00 - - Buah - 45,000 - 45,000 - - - 45,000
Stopkran Ø 3 Inch 1.00 1.00 - - Buah - 615,000 - 615,000 - - - 615,000
Pipa Ventilasi - 389,500 - - - 389,500
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Tee GI Ø 2 Inch 1.00 1.00 - - Buah - 67,000 - 67,000 - - - 67,000
Double Naple GI Ø 2 Inch 2.00 2.00 - - Buah - 55,000 - 110,000 - - - 110,000
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
Tutup Plat 1.00 1.00 - - Buah - 500,000 - 500,000 - - - 500,000
Alat Pelindung Diri - 420,000 - - - 420,000
1. Masker Kain 12.00 12.00 - - Buah - 10,000 - 120,000 - - - 120,000
2. Sarung Tangan Kain 12.00 12.00 - - Buah - 25,000 - 300,000 - - - 300,000

2 BAK PENGUMPUL 5,045,134 7,587,087 20,025,669 11,313,088 16,358,222 27,612,756


A GALIAN TANAH 28.80 M3 1,944,000 - - - 1,944,000 -
Pekerja 21.60 21.60 - - HOK 90,000 - 1,944,000 - - - 1,944,000 -

B URUGAN TANAH 21.60 M3 972,000 - - - 972,000 -


Pekerja 10.80 10.80 - - HOK 90,000 - 972,000 - - - 972,000 -

C PEKERJAAN BETON 56.02 M 3


- - 17,713,536 10,012,860 10,012,860 17,713,536
Tukang 15.40 - - 15.40 HOK 110,000 - - - - 1,694,484 1,694,484 -
Pekerja 92.43 - - 92.43 HOK 90,000 - - - - 8,318,376 8,318,376 -
Batu Split 2/3 42.68 - 42.68 - M3 - 220,000 - - 9,390,554 - - 9,390,554
Pasir Beton 31.54 - 31.54 - M3 - 220,000 - - 6,939,058 - - 6,939,058
Semen 25.16 - 25.16 - ZAK - 55,000 - - 1,383,923 - - 1,383,923

D PEKERJAAN PEMBESIAN 33.46 Kg - - 2,312,133 468,433 468,433 2,312,133


Tukang 0 2.34 - - 2.34 HOK 110,000 - - - - 257,638 257,638 -
Pekerja 0 2.34 - - 2.34 HOK 90,000 - - - - 210,795 210,795 -
Besi beton
(polos/ulir)
0 - Ø 10 28.31 - 28.31 - Batang - 72,000 - - 2,038,620 - - 2,038,620
-Ø8 3.60 - 3.60 - Batang - 55,000 - - 198,230 - - 198,230
Kawat Beton 5.02 - 5.02 - Kg - 15,000 - - 75,284 - - 75,284

E PEKERJAAN BEKISTING 38.02 M 2


2,129,134 5,423,490 - - 2,129,134 5,423,490
Tukang 7.34 7.34 - - HOK 110,000 - 807,602 - - - 807,602 -
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Pekerja 14.68 14.68 - - HOK 90,000 - 1,321,531 - - - 1,321,531 -
Kayu kelas III 1.52 1.52 - - M3 - 1,200,000 - 1,824,768 - - - 1,824,768
Paku 5 - 12 cm 7.21 7.21 - - Kg - 14,000 - 100,890 - - - 100,890
Balok kayu kelas II 0.58 0.58 - - M3 - 1,900,000 - 1,094,400 - - - 1,094,400
Plywood 9 mm 13.31 13.31 - - Lbr - 120,000 - 1,596,672 - - - 1,596,672
Dolken kayu Ø 8-10/400 cm 107.57 107.57 - - Batang - 7,500 - 806,760 - - - 806,760

F PLESTERAN + ACIAN 10.24 M2 - 166,590 - 742,400 742,400 166,590


Tukang 2.56 - - 2.56 HOK 110,000 - - - - 281,600 281,600 -
Pekerja 5.12 - - 5.12 HOK 90,000 - - - - 460,800 460,800 -
Pasir Pasang 0.24 0.24 - - M3 - 180,000 - 42,394 - - - 42,394
Semen 2.26 2.26 - - ZAK - 55,000 - 124,197 - - - 124,197

G PENGECATAN 10.24 M2 - 89,907 - 89,395 89,395 89,907


Tukang 0.65 - - 0.65 HOK 110,000 - - - - 70,963 70,963 -
Pekerja 0.20 - - 0.20 HOK 90,000 - - - - 18,432 18,432 -
Plamuur 1.02 1.02 - - Kg - 10,200 - 10,445 - - - 10,445
Cat dasar Tembok 1.02 1.02 - - Kg - 20,400 - 20,890 - - - 20,890
Cat Penutup Tembok 2.66 2.66 - - Kg - 22,000 - 58,573 - - - 58,573

H AKSESORIS BANGUNAN - 1,907,100 - - - 1,907,100


Pipa Inlet - 398,400 - - - 398,400
Pipa Dinding GI Ø 2 Inch 2.00 2.00 - - M' - 145,900 - 291,800 - - - 291,800
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
SDD PVC Ø 2 Inch 2.00 2.00 - - Buah - 20,000 - 40,000 - - - 40,000
Pipa Overflow - 199,200 - - - 199,200
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Knee GI Ø 2 Inch 1.00 1.00 - - Buah - 33,300 - 33,300 - - - 33,300
SDL PVC Ø 2 Inch 1.00 1.00 - - Buah - 20,000 - 20,000 - - - 20,000
Pipa Ventilasi - 389,500 - - - 389,500
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Tee GI Ø 2 Inch 1.00 1.00 - - Buah - 67,000 - 67,000 - - - 67,000
Double Naple GI Ø 2 Inch 2.00 2.00 - - Buah - 55,000 - 110,000 - - - 110,000
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
Tutup Plat 1.00 1.00 - - Buah - 500,000 - 500,000 - - - 500,000
Alat Pelindung Diri - 420,000 - - - 420,000
1. Masker Kain 12.00 12.00 - - Buah - 10,000 - 120,000 - - - 120,000
2. Sarung Tangan Kain 12.00 12.00 - - Buah - 25,000 - 300,000 - - - 300,000

3 ELEVATED RESERVOIR 7,270,000 43,173,446 5,116,166 6,139,376 13,409,376 48,289,611


A GALIAN TANAH 17.10 M3 450,000 - - 1,735,313 2,185,313 -
Pekerja 12.83 5.00 - 19.28 HOK 90,000 - 450,000 - - 1,735,313 2,185,313 -

B URUGAN TANAH 4.27 M3 360,000 - - 4,219 364,219 -


Pekerja 2.14 4.00 - 0.05 HOK 90,000 - 360,000 - - 4,219 364,219 -

D PEKERJAAN BETON 3.73 M3 1,230,000 9,530,621 3,332,533 2,332,066 3,562,066 12,863,153


Tukang 5.48 3.00 - 2.48 HOK 110,000 - 330,000 - - 272,811 602,811 -
Pekerja 32.88 10.00 - 22.88 HOK 90,000 - 900,000 - - 2,059,255 2,959,255 -
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Batu Split 2/3 15.15 - 15.15 - M3 - 220,000 - - 3,332,533 - - 3,332,533
Pasir Beton 11.19 11.19 - - M3 - 220,000 - 2,461,396 - - - 2,461,396
Semen 128.53 128.53 - - M3 - 55,000 - 7,069,225 - - - 7,069,225

E PEKERJAAN PEMBESIAN 186.50 Kg 1,090,000 16,999,097 - 1,520,944 2,610,944 16,999,097


Tukang 13.05 5.00 - 8.05 HOK 110,000 - 550,000 - - 886,019 1,436,019 -
Pekerja 13.05 6.00 - 7.05 HOK 90,000 - 540,000 - - 634,925 1,174,925 -
Besi beton
- - - - - -
(polos/ulir)
- Ø 12 41.66 38.00 - - Batang - 120,000 - 4,560,000 - - - 4,560,000
- Ø 10 98.82 128.00 - - Batang - 72,000 - 9,216,000 - - - 9,216,000
-Ø8 26.39 54.00 - - Batang - 55,000 - 2,970,000 - - - 2,970,000
Kawat Beton 27.97 16.87 - - Kg - 15,000 - 253,097 - - - 253,097

F PEKERJAAN BEKISTING 105.44 M2 2,180,000 7,901,628 742,500 102,399 2,282,399 8,644,128


Tukang 34.29 10.00 - 0.35 HOK 110,000 - 1,100,000 - - 38,841 1,138,841 -
Pekerja 68.58 12.00 - 0.71 HOK 90,000 - 1,080,000 - - 63,558 1,143,558 -
Kayu kelas III 3.62 2.32 - - M3 - 1,200,000 - 2,781,360 - - - 2,781,360
Paku 5 - 12 cm 36.50 25.83 - - Kg - 14,000 - 361,592 - - - 361,592
Balok kayu kelas II 1.80 1.10 - - M3 - 1,900,000 - 2,094,845 - - - 2,094,845
Plywood 9 mm 34.38 21.65 - - Lbr - 120,000 - 2,598,540 - - - 2,598,540
Dolken kayu Ø 8-10/400 cm 231.88 8.71 99.00 - Batang - 7,500 - 65,291 742,500 - - 807,791

G PLESTERAN DAN ACIAN 137.70 M2 1,960,000 275,000 869,933 116,625 2,076,625 1,144,933
Tukang 17.21 8.00 - 0.71 HOK 110,000 - 880,000 - - 78,375 958,375 -
Pekerja 34.43 12.00 - 0.43 HOK 90,000 - 1,080,000 - - 38,250 1,118,250 -
Pasir Pasang 1.58 - 1.72 - M3 - 180,000 - - 309,879 - - 309,879
Semen 15.18 5.00 10.18 - Zak - 55,000 - 275,000 560,054 - - 835,054

H PENGECATAN 34.55 M2 - - 171,200 327,812 327,812 171,200


Tukang 2.18 - - 2.37 HOK 110,000 - - - - 260,222 260,222 -
Pekerja 0.69 - - 0.75 HOK 90,000 - - - - 67,590 67,590 -
Plamuur 3.46 - 2.00 - Kg - 10,200 - - 20,400 - - 20,400
Cat dasar Tembok 3.46 - 2.00 - Kg - 20,400 - - 40,800 - - 40,800
Cat Penutup Tembok 8.98 - 5.00 - Kg - 22,000 - - 110,000 - - 110,000

I Aksesoris Bangunan - 7,907,100 - - - 7,907,100


Pipa Inlet - 378,400 - - - 378,400
Pipa Dinding GI Ø 2 Inch 2.00 2.00 - - M' - 145,900 - 291,800 - - - 291,800
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
SDL PVC Ø 2 Inch 1.00 1.00 - - Buah - 20,000 - 20,000 - - - 20,000
Pipa Overflow - 1,199,900 - - - 1,199,900
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Knee GI Ø 2 Inch 4.00 4.00 - - Buah - 33,300 - 133,200 - - - 133,200
Pipa Bypass PVC Ø 2 Inch 12.00 12.00 - - M' - 32,150 - 385,800 - - - 385,800
SDL PVC Ø 2 Inch 2.00 2.00 - - Buah - 20,000 - 40,000 - - - 40,000
Stop Kran Ø 2 Inch 1.00 1.00 - - Buah - 495,000 - 495,000 - - - 495,000
Pipa Outlet - 3,468,400 - - - 3,468,400
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Pipa Dinding GI Ø 4 Inch 1.00 1.00 - - M' - 257,400 - 257,400 - - - 257,400
SDL PVC Ø 4 Inch 2.00 2.00 - - Buah - 91,000 - 182,000 - - - 182,000
Gate Valve GI Ø 4 Inch 1.00 1.00 - - Buah - 3,029,000 - 3,029,000 - - - 3,029,000
Pipa Penguras - 1,125,000 - - - 1,125,000
Pipa Dinding GI Ø 3 Inch 2.00 2.00 - - M' - 210,000 - 420,000 - - - 420,000
SDD PVC Ø 3 Inch 2.00 2.00 - - Buah - 45,000 - 90,000 - - - 90,000
Stop Kran Ø 3 Inch 1.00 1.00 - - Buah - 615,000 - 615,000 - - - 615,000
Pipa Ventilasi - 535,400 - - - 535,400
Pipa Dinding GI Ø 2 Inch 2.00 2.00 - - M' - 145,900 - 291,800 - - - 291,800
Tee GI Ø 2 Inch 1.00 1.00 - - Buah - 67,000 - 67,000 - - - 67,000
Double Naple GI Ø 2 Inch 2.00 2.00 - - Buah - 55,000 - 110,000 - - - 110,000
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
Tutup Plat 2.00 2.00 - - Buah - 600,000 - 1,200,000 - - - 1,200,000
Alat Pelindung Diri - 560,000 - - - 560,000
1. Masker Kain 16.00 16.00 - - Buah - 10,000 - 160,000 - - - 160,000
2. Sarung Tangan Kain 16.00 16.00 - - Buah - 25,000 - 400,000 - - - 400,000

4 RUMAH PANEL 6,106,509 51,880,070 - - 6,106,509 51,880,070


A PEKERJAAN BATU BATA 7.00 M2 266,000 553,049 - - 266,000 553,049
Tukang 0.70 0.70 - - HOK 110,000 - 77,000 - - - 77,000 -
Pekerja 2.10 2.10 - - HOK 90,000 - 189,000 - - - 189,000 -
Bata merah 490.00 490.00 - - Buah - 800 - 392,000 - - - 392,000
Semen portland 2.01 2.01 - - Zak - 55,000 - 110,649 - - - 110,649
Pasir Pasang 0.28 0.28 - - M3 - 180,000 - 50,400 - - - 50,400

B PEKERJAAN BETON 0.17 M3 30,566 111,174 - - 30,566 111,174


Tukang 0.05 0.05 - - HOK 110,000 - 5,173 - - - 5,173 -
Pekerja 0.28 0.28 - - HOK 90,000 - 25,393 - - - 25,393 -
Batu Split 2/3 0.13 0.13 - - M3 - 220,000 - 28,675 - - - 28,675
Pasir Beton 0.10 0.10 - - M3 - 220,000 - 21,179 - - - 21,179
Semen 1.11 1.11 - - ZAK - 55,000 - 61,321 - - - 61,321

C PEKERJAAN PEMBESIAN 1.82 Kg 25,438 294,331 - - 25,438 294,331


Tukang 0 0.13 0.13 - - HOK 110,000 - 13,991 - - - 13,991 -
Pekerja 0 0.13 0.13 - - HOK 90,000 - 11,447 - - - 11,447 -
Besi beton
(polos/ulir)
0 - Ø 10 0.83 0.83 - Batang - 72,000 - 59,724 - - - 59,724
-Ø8 4.19 4.19 - - Batang - 55,000 - 230,519 - - - 230,519
Kawat Beton 0.27 0.27 - - Kg - 15,000 - 4,088 - - - 4,088

D PEKERJAAN BEKISTING 2.53 M2 241,643 371,538 - - 241,643 371,538


Tukang 0.83 0.83 - - HOK 110,000 - 91,658 - - - 91,658 -
Pekerja 1.67 1.67 - - HOK 90,000 - 149,985 - - - 149,985 -
Kayu kelas III 0.10 0.10 - - M3 - 1,200,000 - 121,200 - - - 121,200
Paku 5 - 12 cm 1.01 1.01 - - Kg - 14,000 - 14,140 - - - 14,140
Balok kayu kelas II 0.04 0.04 - - M3 - 1,900,000 - 76,523 - - - 76,523
Plywood 9 mm 0.88 0.88 - - Lbr - 120,000 - 106,050 - - - 106,050
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Dolken kayu Ø 8-10/400 cm 7.15 7.15 - - Batang - 7,500 - 53,625 - - - 53,625

E PLESTERAN + ACIAN 136.80 M2 4,959,000 1,112,772 - - 4,959,000 1,112,772


Tukang 17.10 17.10 - - HOK 110,000 - 1,881,000 - - - 1,881,000 -
Pekerja 34.20 34.20 - - HOK 90,000 - 3,078,000 - - - 3,078,000 -
Pasir Pasang 1.57 1.57 - - M3 - 180,000 - 283,176 - - - 283,176
Semen 15.08 15.08 - - ZAK - 55,000 - 829,596 - - - 829,596

F PENGECATAN 66.88 M2 583,862 587,206 - - 583,862 587,206


Tukang 4.21 4.21 - - HOK 110,000 - 463,478 - - - 463,478 -
Pekerja 1.34 1.34 - - HOK 90,000 - 120,384 - - - 120,384 -
Plamuur 6.69 6.69 - - Kg - 10,200 - 68,218 - - - 68,218
Cat dasar Tembok 6.69 6.69 - - Kg - 20,400 - 136,435 - - - 136,435
Cat Penutup Tembok 17.39 17.39 - - Kg - 22,000 - 382,554 - - - 382,554

G PERLENGKAPAN POMPA 1.00 PAKET - 48,850,000 - - - 48,850,000


Instalasi Listrik 1.00 1.00 - - Paket - 12,000,000 - 12,000,000 - - - 12,000,000
Box Panel 2.00 2.00 - - Unit - 2,500,000 - 5,000,000 - - - 5,000,000
Pompa Submersible 1.00 1.00 - - Paket - 28,000,000 - 28,000,000 - - - 28,000,000
Kabel Elektroda 10.00 10.00 - - Meter - 10,000 - 100,000 - - - 100,000
Kabel On Off 10.00 10.00 - - Meter - 15,000 - 150,000 - - - 150,000
Kabel Radar 250.00 250.00 - - Meter - 10,000 - 2,500,000 - - - 2,500,000
Check Valve 1.00 1.00 - - Buah - 350,000 - 350,000 - - - 350,000
SDL PVC 2.00 2.00 - - Buah - 55,000 - 110,000 - - - 110,000
Knee PVC 4.00 4.00 - - Buah - 35,000 - 140,000 - - - 140,000
Radar Air 1.00 1.00 - - Buah - 150,000 - 150,000 - - - 150,000
Alat Pelindung Diri
1. Masker Kain 10.00 10.00 - - Buah - 10,000 - 100,000 - - - 100,000
2. Sarung Tangan Kain 10.00 10.00 - - Buah - 25,000 - 250,000 - - - 250,000

5 PENGADAAN PIPA (BLM) 2,117.00 1,937.00 M' - 59,884,790 - - - 59,884,790


Pipa PVC Ø 3 Inch S-12,5 180.00 180.00 - - M' - 93,750 - 16,875,000 - - - 16,875,000
Pipa PVC Ø 2 Inch S-12,5 497.00 497.00 - - M' - 30,970 - 15,392,090 - - - 15,392,090
Pipa PVC Ø 1½ Inch S-10 918.00 918.00 - - M' - 24,067 - 22,093,200 - - - 22,093,200
Pipa PVC Ø 1 Inch S-10 522.00 522.00 - - M' - 10,583 - 5,524,500 - - - 5,524,500

6 ACCESORIS PIPA 1.00 PAKET - 4,250,400 - - - 4,250,400


Tee Ø 3 Inch 1.00 1.00 - - Buah - 342,100 - 342,100 - - - 342,100
Tee Ø 2 Inch 1.00 1.00 - - Buah - 117,700 - 117,700 - - - 117,700
Tee Ø 1½ Inch 1.00 1.00 - - Buah - 58,900 - 58,900 - - - 58,900
Tee Ø 1 Inch 4.00 4.00 - - Buah - 22,300 - 89,200 - - - 89,200
Bend 90⁰ PVC RRJ Ø 3 Inch 3.00 3.00 - - Buah - 87,600 - 262,800 - - - 262,800
Bend 90⁰ PVC RRJ Ø 2 Inch 5.00 5.00 - - Buah - 53,400 - 267,000 - - - 267,000
Knee 90⁰ Ø 1½ Inch 5.00 5.00 - - Buah - 33,300 - 166,500 - - - 166,500
Reduser Ø 4 Inch - Ø 3 Inch 1.00 1.00 - - Buah - 240,000 - 240,000 - - - 240,000
Reduser Ø 3 Inch - Ø 2 Inch 2.00 2.00 - - Buah - 100,650 - 201,300 - - - 201,300
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Reduser Ø 3 Inch - Ø 1 Inch 1.00 1.00 - - Buah - 66,600 - 66,600 - - - 66,600
Reduser Ø 2 Inch - Ø 1½ Inch 2.00 2.00 - - Buah - 44,550 - 89,100 - - - 89,100
Reduser Ø 2 Inch - Ø 1 Inch 2.00 2.00 - - Buah - 25,850 - 51,700 - - - 51,700
Reduser Ø 1½ Inch - Ø 1 Inch 2.00 2.00 - - Buah - 25,850 - 51,700 - - - 51,700
Stopkran Ø 2 Inch 2.00 2.00 - - Buah - 697,400 - 1,394,800 - - - 1,394,800
Flange Socket Ø 3" 2.00 2.00 - - Buah - 220,500 - 441,000 - - - 441,000
Flange Spigot Ø 3" 2.00 2.00 - - Buah - 205,000 - 410,000 - - - 410,000
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan

7 PERLENGKAPAN PIPA 1.00 PAKET - 750,000 - - - 750,000


Solven Cement 10.00 10.00 - - Kaleng - 75,000 - 750,000 - - - 750,000

8 PEMASANGAN PIPA 2,117.00 M' 6,520,000 - - 37,250,017 43,770,017 -


A GALIAN PIPA 206.23 M3 720,000 - - 13,200,255 13,920,255 -
Pekerja 154.67 8.00 - 146.67 HOK 90,000 - 720,000 - - 13,200,255 13,920,255 -

B URUGAN TANAH 97.38 M 3


450,000 - - 3,932,302 4,382,303 -
Pekerja 48.69 5.00 - 43.69 HOK 90,000 - 450,000 - - 3,932,302 4,382,303 -

C PEMASANGAN PIPA 2,117.00 M' 5,350,000 - - 20,117,459 25,467,459 -


Tukang 87.88 20.00 - 69.31 HOK 110,000 - 2,200,000 - - 7,623,929 9,823,929 -
Pekerja 173.82 35.00 1.00 138.82 HOK 90,000 - 3,150,000 - - 12,493,530 15,643,530 -

9 ALAT PELINDUNG DIRI PEKERJA 1.00 PAKET - 1,402,500 - - - 1,402,500


A APD PEKERJA - 1,402,500 - - - 1,402,500
Thermometer Gun 1.00 1.00 - - Buah - 750,000 - 750,000 - - - 750,000
Hand Sanitizer 1.00 1.00 - - Botol - 250,000 - 250,000 - - - 250,000
Desinfektan 1.00 1.00 - - Buah - 350,000 - 350,000 - - - 350,000
Botol Spray 7.00 7.00 - - Buah - 7,500 - 52,500 - - - 52,500

B SARANA SANITASI 10,916,356 42,907,941 - - 10,916,356 42,907,941


1 SARANA CUCI TANGAN DI SARANA UMUM 400,000 2,705,600 - - 400,000 2,705,600
Perlengkapan TCT 2.00 400,000 2,495,600 - - 400,000 2,495,600
Kran Air Ø 1/2" 2.00 2.00 - - Buah - 22,500 - 45,000 - - - 45,000
SDD Ø 1/2" 2.00 2.00 - - Buah - 4,400 - 8,800 - - - 8,800
Tee Ø 1/2" 4.00 4.00 - - Buah - 2,750 - 11,000 - - - 11,000
Pipa PVC AW Ø 1/2" 16.00 16.00 - - Batang - 30,000 - 480,000 - - - 480,000
Knee Ø 1/2" 4.00 4.00 - - Buah - 2,750 - 11,000 - - - 11,000
Double Naple Ø 1/2" 2.00 2.00 - - Buah - 22,500 - 45,000 - - - 45,000
Stop Kran Ø 1/2" 2.00 2.00 - - Buah - 35,000 - 70,000 - - - 70,000
Socket Drat Luar Ø 3/4" x 1/2" 2.00 2.00 - - Buah - 4,400 - 8,800 - - - 8,800
Clame Sudle Ø 1" - Ø ³/₄" 2.00 2.00 - - Buah - 32,000 - 64,000 - - - 64,000
Tempat Cuci Tangan 2.00 2.00 - - Buah - 500,000 - 1,000,000 - - - 1,000,000
Leher Angsa 2.00 2.00 - - Buah - 50,000 - 100,000 - - - 100,000
Reduser PVC Ø 1" - Ø ³/₄" 2.00 2.00 - - Buah - 15,000 - 30,000 - - - 30,000
Pipa PVC AW Ø 1" 8.00 8.00 - - Batang - 55,000 - 440,000 - - - 440,000
Knee Ø 1" 2.00 2.00 - - Buah - 25,000 - 50,000 - - - 50,000
Tee Ø 1" 2.00 2.00 - - Buah - 66,000 - 132,000 - - - 132,000
Upah Pasang 2.00 2.00 - - Paket 200,000 - 400,000 - - - 400,000 -
Alat Pelindung Diri - 210,000 - - - 210,000
1. Masker Kain 6.00 6.00 - - Buah - 10,000 - 60,000 - - - 60,000
2. Sarung Tangan Kain 6.00 6.00 - - Buah - 25,000 - 150,000 - - - 150,000

2 SARANA JAMBAN SEKOLAH 7,415,956 37,025,736 - - 7,415,956 37,025,736


A GALIAN TANAH 15.38 M3 1,038,150 - - - 1,038,150 -
Pekerja 11.54 11.54 - - HOK 90,000 - 1,038,150 - - - 1,038,150 -
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
B PEKERJAAN PASANGAN BATU KALI 3.24 M3 704,700 1,661,796 - - 704,700 1,661,796
Tukang 2.43 2.43 - - Buah 110,000 - 267,300 - - - 267,300 -
Pekerja 4.86 4.86 - - Buah 90,000 - 437,400 - - - 437,400 -
Batu Belah 10/20 3.89 3.89 - - M3 - 200,000 - 777,600 - - - 777,600
Pasir Pasang 1.68 1.68 - - M3 - 180,000 - 303,264 - - - 303,264
Semen 10.56 10.56 - - M3 - 55,000 - 580,932 - - - 580,932

C PEKERJAAN BETON 5.32 M3 950,414 3,407,371 - - 950,414 3,407,371


Tukang 1.46 1.46 - - Buah 110,000 - 160,839 - - - 160,839 -
Pekerja 8.77 8.77 - - Buah 90,000 - 789,575 - - - 789,575 -
Batu Split 2/3 4.04 4.04 - - M3 - 220,000 - 888,546 - - - 888,546
Pasir Beton 3.03 3.03 - - M3 - 220,000 - 666,461 - - - 666,461
Semen 33.68 33.68 - - M3 - 55,000 - 1,852,364 - - - 1,852,364

D PEKERJAAN PEMBESIAN 16.29 Kg 228,002 1,139,344 - - 228,002 1,139,344


Tukang 0 1.14 1.14 - - Buah 110,000 - 125,401 - - - 125,401 -
Pekerja 0 1.14 1.14 - - Buah 90,000 - 102,601 - - - 102,601 -
Besi beton
(polos/ulir)
0 - Ø 10 10.55 10.55 - - Batang - 72,000 - 759,388 - - - 759,388
-Ø8 6.79 6.79 - - Batang - 55,000 - 373,313 - - - 373,313
Kawat Beton 0.44 0.44 - - Kg - 15,000 - 6,643 - - - 6,643

E PEKERJAAN BEKISTING 6.72 M2 799,634 1,080,921 - - 799,634 1,080,921


Tukang 3.64 3.64 - - Buah 110,000 - 400,466 - - - 400,466 -
Pekerja 4.44 4.44 - - Buah 90,000 - 399,168 - - - 399,168 -
Kayu kelas III 0.27 0.27 - - M3 - 1,200,000 - 322,560 - - - 322,560
Paku 5 - 12 cm 2.69 2.69 - - Kg - 14,000 - 37,632 - - - 37,632
Balok kayu kelas II 0.10 0.10 - - M3 - 1,900,000 - 198,189 - - - 198,189
Plywood 9 mm 2.35 2.35 - - Lbr - 120,000 - 282,240 - - - 282,240
Dolken kayu Ø 8-10/400 cm 32.04 32.04 - - Batang - 7,500 - 240,300 - - - 240,300

F PEKERJAAN BATU BATA 17.20 M2 653,600 1,358,920 - - 653,600 1,358,920


Tukang 1.72 1.72 - - HOK 110,000 - 189,200 - - - 189,200 -
Pekerja 5.16 5.16 - - HOK 90,000 - 464,400 - - - 464,400 -
Bata merah 1,204.00 1,204.00 - - Buah - 800 - 963,200 - - - 963,200
Semen portland 4.94 4.94 - - Zak - 55,000 - 271,880 - - - 271,880
Pasir Pasang 0.69 0.69 - - M3 - 180,000 - 123,840 - - - 123,840

G PLESTERAN + ACIAN 34.40 M2 1,247,000 279,820 - - 1,247,000 279,820


Tukang 4.30 4.30 - - HOK 110,000 - 473,000 - - - 473,000 -
Pekerja 8.60 8.60 - - HOK 90,000 - 774,000 - - - 774,000 -
Pasir Pasang 0.40 0.40 - - M3 - 180,000 - 71,208 - - - 71,208
Semen 3.79 3.79 - - Zak - 55,000 - 208,612 - - - 208,612

H PENGECATAN 17.20 M2 150,156 151,016 - - 150,156 151,016


Tukang 1.08 1.08 - - HOK 110,000 - 119,196 - - - 119,196 -
Pekerja 0.34 0.34 - - HOK 90,000 - 30,960 - - - 30,960 -
Plamuur 1.72 1.72 - - Kg - 10,200 - 17,544 - - - 17,544
Cat dasar Tembok 1.72 1.72 - - Kg - 20,400 - 35,088 - - - 35,088
Cat Penutup Tembok 4.47 4.47 - - Kg - 22,000 - 98,384 - - - 98,384

I PEMASANGAN KERAMIK LANTAI DAN DIND 16.20 M2 1,644,300 21,671,548 - - 1,644,300 21,671,548
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Tukang 5.67 5.67 - - HOK 110,000 - 623,700 - - - 623,700 -
Pekerja 11.34 11.34 - - HOK 90,000 - 1,020,600 - - - 1,020,600 -
Keramik 429.30 429.30 - - Dus - 50,000 - 21,465,000 - - - 21,465,000
Pasir Pasang 0.73 0.73 - - M3 - 180,000 - 131,220 - - - 131,220
Semen 1.37 1.37 - - Zak - 55,000 - 75,328 - - - 75,328

J Aksesoris Pelengkap Jamban 1.00 Paket - 6,275,000 - - - 6,275,000


Watermeter 1.00 1.00 - - Buah - 235,000 - 235,000 - - - 235,000
Pipa PVC 4 Inch 8.00 8.00 - - M' - 15,000 - 120,000 - - - 120,000
Pipa PVC 1/2 inch 20.00 20.00 - - M - 6,000 - 120,000 - - - 120,000
Kran Air 1/2 inch 2.00 2.00 - - Buah - 25,000 - 50,000 - - - 50,000
Pintu + Kusen Sliding door 2.00 2.00 - - Buah - 750,000 - 1,500,000 - - - 1,500,000
Closet Duduk 2.00 2.00 - - Buah - 1,500,000 - 3,000,000 - - - 3,000,000
Pipa Ventilasi Septictank 1.00 1.00 - - Buah - 250,000 - 250,000 - - - 250,000
HandRail 1.00 1.00 - - Paket - 1,000,000 - 1,000,000 - - - 1,000,000

2 SARANA TEMPAT CUCI TANGAN DI S 2.00 UNIT 3,100,400 3,176,605 - - 3,100,400 3,176,605
A PEKERJAAN BATU BATA 0.33 M2 136,800 284,425 - - 136,800 284,425
Tukang 0.36 0.36 - - HOK 110,000 - 39,600 - - - 39,600 -
Pekerja 1.08 1.08 - - HOK 90,000 - 97,200 - - - 97,200 -
Bata merah 252.00 252.00 - - Buah - 800 - 201,600 - - - 201,600
Semen portland 1.03 1.03 - - Zak - 55,000 - 56,905 - - - 56,905
Pasir Pasang 0.14 0.14 - - M3 - 180,000 - 25,920 - - - 25,920

B PEKERJAAN BETON 0.48 M3 1,731,015 288,342 - - 1,731,015 288,342


Tukang 2.66 2.66 - - HOK 110,000 - 292,941 - - - 292,941 -
Pekerja 15.98 15.98 - - HOK 90,000 - 1,438,074 - - - 1,438,074 -
Batu Split 2/3 0.36 0.36 - - M3 - 220,000 - 79,024 - - - 79,024
Pasir Beton 0.29 0.29 - - M3 - 220,000 - 63,260 - - - 63,260
Semen 2.66 2.66 - - M3 - 55,000 - 146,058 - - - 146,058

C PEKERJAAN PEMBESIAN 2.70 Kg 37,825 335,254 - - 37,825 335,254


Tukang 0 0.19 0.19 - - HOK 110,000 - 20,804 - - - 20,804 -
Pekerja 0 0.19 0.19 - - HOK 90,000 - 17,021 - - - 17,021 -
Besi beton
(polos/ulir)
-Ø8 5.98 5.98 - - Batang - 55,000 - 329,175 - - - 329,175
Kawat Beton 0.41 0.41 - - Kg - 15,000 - 6,079 - - - 6,079

D PLESTERAN + ACIAN 1.32 M2 870,000 195,223 - - 870,000 195,223


Tukang 3.00 3.00 - - HOK 110,000 - 330,000 - - - 330,000 -
Pekerja 6.00 6.00 - - HOK 90,000 - 540,000 - - - 540,000 -
Pasir Pasang 0.28 0.28 - - M3 - 180,000 - 49,680 - - - 49,680
Semen 2.65 2.65 - - Zak - 55,000 - 145,543 - - - 145,543

E PENGECATAN 0.66 M2 104,760 105,360 - - 104,760 105,360


Tukang 0.76 0.76 - - HOK 110,000 - 83,160 - - - 83,160 -
Pekerja 0.24 0.24 - - HOK 90,000 - 21,600 - - - 21,600 -
Plamuur 1.20 1.20 - - Kg - 10,200 - 12,240 - - - 12,240
Cat dasar Tembok 1.20 1.20 - - Kg - 20,400 - 24,480 - - - 24,480
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Cat Penutup Tembok 3.12 3.12 - - Kg - 22,000 - 68,640 - - - 68,640

F AKSESORIS TCT 1.00 PAKET 220,000 1,968,000 - - 220,000 1,968,000


Kran Air Ø 1/2" 2.00 2.00 - - - 30,000 - 60,000 - - - 60,000
Pipa PVC AW Ø 1/2" 32.00 32.00 - - - 2,750 - 88,000 - - - 88,000
Knee Ø 1/2" 8.00 8.00 - - - 15,000 - 120,000 - - - 120,000
Stop Kran Ø 1/2" 2.00 2.00 - - - 45,000 - 90,000 - - - 90,000
Tempat Cuci Tangan 2.00 2.00 - - - 500,000 - 1,000,000 - - - 1,000,000
Leher Angsa 2.00 2.00 - - - 55,000 - 110,000 - - - 110,000
Handrail 2.00 2.00 - - - 250,000 - 500,000 - - - 500,000
Upah Pasang 2.00 2.00 - - 110,000 - 220,000 - - - 220,000 -
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
C KESEHATAN 1,000,000 1,274,500 - - 1,000,000 1,274,500
1 PHBS DIMASYARAKAT 1,000,000 1,274,500 - - 1,000,000 1,274,500
A PHBS DI MASYARAKAT 1.00 1.00 - - PAKET 750,000 1,168,500 750,000 1,168,500 - - 750,000 1,168,500
B PHBS DI SEKOLAH 1.00 1.00 - - PAKET 250,000 106,000 250,000 106,000 - - 250,000 106,000

D PENINGKATAN KAPASITAS 5,250,000 3,240,000 - - 5,250,000 3,240,000


A PELATIHAN KKM/SATLAK 1.00 1.00 - - PAKET 2,200,000 1,463,000 2,200,000 1,463,000 - - 2,200,000 1,463,000
B PELATIHAN DISABILITAS 1.00 1.00 - - PAKET 750,000 381,000 750,000 381,000 - - 750,000 381,000
C PELATIHAN KPSPAMS 1.00 1.00 - - PAKET 2,300,000 1,396,000 2,300,000 1,396,000 - - 2,300,000 1,396,000

E OERASIONAL KKM/SATLAK 2,700,000 6,863,000 - - 2,700,000 6,863,000


A OPERASIONAL KKM/SATLAK 1.00 1.00 - - PAKET 2,700,000 6,863,000 2,700,000 6,863,000 - - 2,700,000 6,863,000

JUMLAH 47,291,549 231,166,852 27,609,190 58,492,657 105,784,206 258,776,042


PROSENTASE INVESTASI 76.38% 7.57% 16.04%
364,560,248
NILAI RKM DI BULATKAN 278,458,401 27,609,190 58,492,657
REKAPITULASI BIAYA PEMBANGUNAN JARINGAN AIR BERSIH & SANITASI
DESA NAGARATENGAH KECAMATAN CINEAM KABUPATEN TASIKMALAYA

No. URAIAN VOLUME DANA BLM DANA MASYARAKAT TOTAL


SATUAN
BLM UPAH (Rp.) BAHAN (Rp.) IN-CASH (Rp.) IN - KIND (Rp.) (Rp.)

A. SARANA AIR BERSIH


1 BRONCAPTERING 1.00 Unit 2,483,550 7,953,118 2,467,356 3,790,176 16,694,199
2 BAK PENGUMPUL 1.00 Unit 5,045,134 7,587,087 20,025,669 11,313,088 43,970,978
3 ELEVATED RESERVOIR 1.00 Paket 7,270,000 43,173,446 5,116,166 6,139,376 61,698,988
4 RUMAH PANEL 1.00 Unit 6,106,509 51,880,070 - - 57,986,579
5 PENGADAAN PIPA (BLM) 2117.00 Meter - 59,884,790 - - 59,884,790
6 ACCESORIS PIPA 1.00 Paket - 4,250,400 - - 4,250,400
7 PERLENGKAPAN PIPA 1.00 Paket - 750,000 - - 750,000
8 PEMASANGAN PIPA 2117.00 Meter 6,520,000 - - 37,250,017 43,770,017
9 ALAT PELINDUNG DIRI PEKERJA 1.00 Paket - 1,402,500 - - 1,402,500

B. SARANA SANITASI
1 SARANA CUCI TANGAN DI SARANA UMUM 2.00 Unit 400,000 2,705,600 - - 3,105,600
2 SARANA JAMBAN SEKOLAH 2 Unit 5,169,426 14,590,866 - - 19,760,292
3 SARANA TEMPAT CUCI TANGAN DI SEKOLAH 3.00 Unit 4,650,600 4,764,907 - - 9,415,508

C. KESEHATAN
1 PHBS Masyarakat 1 Paket 510,000 793,500 - - 1,303,500
2 Pemeriksaan Kualitas Air 1 Paket 240,000 375,000 - - 615,000

D. PENINGKATAN KAPASITAS
1 PELATIHAN KKM/SATLAK 1 Paket 2,200,000 1,463,000 - - 3,663,000
2 PELATIHAN DISABILITAS 1 Paket 750,000 381,000 - - 1,131,000
3 PELATIHAN KPSPAMS 1 Paket 2,300,000 1,396,000 - - 3,696,000

E. ADMINISTRASI PROYEK
1 Operasional KKM 1 Paket 2,700,000.00 6,863,000.00 - - 9,563,000.00

JUMLAH 46,345,219 210,214,284 27,609,190 58,492,657 342,661,351


PROSENTASE INVESTASI 74.87% 8.06% 17.07%

NILAI RKM DIBULATKAN 342,661,351

REKAP RAB
RENCANA ANGGARAN BIAYA ( RAB )
Desa : Nagaratengah
Kecamatan : Cineam
Kabupaten : Tasikmalaya 9.24491031 2.24491031
Provinsi : Jawa Barat
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan

A SARANA AIR BERSIH (SAB)


1 BRONCAPTERING 2,568,580 6,700,319 2,467,356 2,886,967 5,455,546 9,167,675
A GALIAN TANAH 9.83 M3 663,390 - - - 663,390 -
Pekerja 7.37 7.37 - - HOK 90,000 - 663,390 - - - 663,390 -

B URUGAN TANAH 2.46 M 3


110,565 - - - 110,565 -
Pekerja 1.23 1.23 - - HOK 90,000 - 110,565 - - - 110,565 -

C PEKERJAAN PASANGAN BATU KALI 11.07 M3 1,394,000 202,265 2,467,356 143,399 1,537,399 2,669,621
Tukang 5.30 4.00 - 1.30 HOK 110,000 - 440,000 - - 143,151 583,151 -
Pekerja 10.60 10.60 - 0.00 HOK 90,000 - 954,000 - - 248 954,248 -
Batu Belah 10/20 8.28 - 8.65 - M3 - 200,000 - - 1,729,027 - - 1,729,027
Pasir Pasang 2.76 - 2.76 - M3 - 180,000 - - 496,012 - - 496,012
Semen 8.08 3.68 4.41 - Zak - 55,000 - 202,265 242,317 - - 444,582

D PEKERJAAN BETON 3.25 M 3


400,625 1,623,094 - - 400,625 1,623,094
Tukang 0.89 0.89 - - HOK 110,000 - 98,260 - - - 98,260 -
Pekerja 3.36 3.36 - - HOK 90,000 - 302,365 - - - 302,365 -
Batu Split 2/3 1.46 1.46 - - M3 - 220,000 - 322,249 - - - 322,249
Pasir Beton 1.83 1.83 - - M3 - 220,000 - 403,103 - - - 403,103
Semen 16.32 16.32 - - Zak - 55,000 - 897,742 - - - 897,742

E PEKERJAAN PEMBESIAN 14.22 Kg - 1,026,986 - 199,025 199,025 1,026,986


Tukang 0 1.00 - - 1.00 HOK 110,000 - - - - 109,464 109,464 -
Pekerja 0 1.00 - - 1.00 HOK 90,000 - - - - 89,561 89,561 -
Besi beton
(polos/ulir)
0 - Ø 10 10.00 10.00 - - Batang - 72,000 - 720,000 - - - 720,000
-Ø8 5.00 5.00 - - Batang - 55,000 - 275,000 - - - 275,000
Kawat Beton 2.13 2.13 - - Kg - 15,000 - 31,986 - - - 31,986

F PEKERJAAN BEKISTING 4.17 M2 - 874,374 - 398,591 398,591 874,374


Tukang 1.37 - - 1.37 HOK 110,000 - - - - 151,190 151,190 -
Pekerja 2.75 - - 2.75 HOK 90,000 - - - - 247,401 247,401 -
Kayu kelas III 0.17 0.17 - - M3 - 1,200,000 - 199,920 - - - 199,920
Paku 5 - 12 cm 1.67 1.67 - - Kg - 14,000 - 23,324 - - - 23,324
Balok kayu kelas II 0.33 0.33 - - M3 - 1,900,000 - 632,700 - - - 632,700
Plywood 9 mm 0.06 0.06 - - Lbr - 120,000 - 7,497 - - - 7,497
Dolken kayu Ø 8-10/400 cm 1.46 1.46 - - Batang - 7,500 - 10,933 - - - 10,933

G PLESTERAN + ACIAN 55.62 M2 - 287,430 - 2,016,225 2,016,225 287,430


Tukang 6.95 - - 6.95 HOK 110,000 - - - - 764,775 764,775 -
Pekerja 13.91 - - 13.91 HOK 90,000 - - - - 1,251,450 1,251,450 -
Pasir Pasang 0.64 0.64 - - M3 - 180,000 - 115,133 - - - 115,133
Semen 3.13 3.13 - - Zak - 55,000 - 172,296 - - - 172,296
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
H PENGECATAN 14.86 M2 - 97,471 - 129,728 129,728 97,471
Tukang 0.94 - - 0.94 HOK 110,000 - - - - 102,980 102,980 -
Pekerja 0.30 - - 0.30 HOK 90,000 - - - - 26,748 26,748 -
Plamuur 1.49 1.49 - - Kg - 10,200 - 15,157 - - - 15,157
Cat dasar Tembok 1.49 1.49 - - Kg - 20,400 - 30,314 - - - 30,314
Cat Penutup Tembok 2.36 2.36 - - Kg - 22,000 - 51,999 - - - 51,999

I AKSESORIS BANGUNAN - 2,588,700 - - - 2,588,700


Pipa Overflow - 199,200 - - - 199,200
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Knee GI Ø 2 Inch 1.00 1.00 - - Buah - 33,300 - 33,300 - - - 33,300
SDL PVC Ø 2 Inch 1.00 1.00 - - Buah - 20,000 - 20,000 - - - 20,000
Pipa Outlet - 1,080,000 - - - 1,080,000
Pipa Dinding GI Ø 3 Inch 2.00 2.00 - - M' - 210,000 - 420,000 - - - 420,000
SDD PVC Ø 3 Inch 1.00 1.00 - - Buah - 45,000 - 45,000 - - - 45,000
Stopkran Ø 3 Inch 1.00 1.00 - - Buah - 615,000 - 615,000 - - - 615,000
Pipa Ventilasi - 389,500 - - - 389,500
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Tee GI Ø 2 Inch 1.00 1.00 - - Buah - 67,000 - 67,000 - - - 67,000
Double Naple GI Ø 2 Inch 2.00 2.00 - - Buah - 55,000 - 110,000 - - - 110,000
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
Tutup Plat 1.00 1.00 - - Buah - 500,000 - 500,000 - - - 500,000
Alat Pelindung Diri - 420,000 - - - 420,000
1. Masker Kain 12.00 12.00 - - Buah - 10,000 - 120,000 - - - 120,000
2. Sarung Tangan Kain 12.00 12.00 - - Buah - 25,000 - 300,000 - - - 300,000

2 BAK PENGUMPUL 1,621,572 6,643,745 5,261,245 2,751,218 4,372,790 11,904,990


A GALIAN TANAH 11.20 M3 396,000 - - - 396,000 -
Pekerja 4.40 4.40 - - HOK 90,000 - 396,000 - - - 396,000 -

B URUGAN TANAH 8.40 M3 180,000 - - - 180,000 -


Pekerja 2.00 2.00 - - HOK 90,000 - 180,000 - - - 180,000 -

C PEKERJAAN BETON 4.72 M 3


- - 2,757,496 842,985 842,985 2,757,496
Tukang 1.30 - - 1.30 HOK 110,000 - - - - 142,659 142,659 -
Pekerja 7.78 - - 7.78 HOK 90,000 - - - - 700,326 700,326 -
Batu Split 2/3 3.58 - 3.58 - M3 - 220,000 - - 788,114 - - 788,114
Pasir Beton 2.66 - 2.66 - M3 - 220,000 - - 585,458 - - 585,458
Semen 25.16 - 25.16 - ZAK - 55,000 - - 1,383,923 - - 1,383,923

D PEKERJAAN PEMBESIAN 29.09 Kg - - 2,503,750 407,329 407,329 2,503,750


Tukang 0 2.04 - - 2.04 HOK 110,000 - - - - 224,031 224,031 -
Pekerja 0 2.04 - - 2.04 HOK 90,000 - - - - 183,298 183,298 -
Besi beton
(polos/ulir)
0 - Ø 10 28.06 - 28.06 - Batang - 72,000 - - 2,020,080 - - 2,020,080
-Ø8 7.60 - 7.60 - Batang - 55,000 - - 418,206 - - 418,206
Kawat Beton 4.36 - 4.36 - Kg - 15,000 - - 65,464 - - 65,464

E PEKERJAAN BEKISTING 31.44 M 2


1,045,572 4,460,024 - 753,588 1,799,160 4,460,024
Tukang 6.20 6.20 - - HOK 110,000 - 682,440 - - - 682,440 -
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Pekerja 12.41 4.03 - 8.37 HOK 90,000 - 363,132 - - 753,588 1,116,720 -
Kayu kelas III 1.26 1.26 - - M3 - 1,200,000 - 1,509,120 - - - 1,509,120
Paku 5 - 12 cm 4.58 4.58 - - Kg - 14,000 - 64,064 - - - 64,064
Balok kayu kelas II 0.48 0.48 - - M3 - 1,900,000 - 905,160 - - - 905,160
Plywood 9 mm 11.00 11.00 - - Lbr - 120,000 - 1,320,480 - - - 1,320,480
Dolken kayu Ø 8-10/400 cm 88.16 88.16 - - Batang - 7,500 - 661,200 - - - 661,200

F PLESTERAN + ACIAN 18.40 M2 - 195,845 - 667,000 667,000 195,845


Tukang 2.30 - - 2.30 HOK 110,000 - - - - 253,000 253,000 -
Pekerja 4.60 - - 4.60 HOK 90,000 - - - - 414,000 414,000 -
Pasir Pasang 0.21 0.21 - - M3 - 180,000 - 38,088 - - - 38,088
Semen 2.87 2.87 - - ZAK - 55,000 - 157,757 - - - 157,757

G PENGECATAN 9.20 M2 - 80,776 - 80,316 80,316 80,776


Tukang 0.58 - - 0.58 HOK 110,000 - - - - 63,756 63,756 -
Pekerja 0.18 - - 0.18 HOK 90,000 - - - - 16,560 16,560 -
Plamuur 0.92 0.92 - - Kg - 10,200 - 9,384 - - - 9,384
Cat dasar Tembok 0.92 0.92 - - Kg - 20,400 - 18,768 - - - 18,768
Cat Penutup Tembok 2.39 2.39 - - Kg - 22,000 - 52,624 - - - 52,624

H AKSESORIS BANGUNAN - 1,907,100 - - - 1,907,100


Pipa Inlet - 398,400 - - - 398,400
Pipa Dinding GI Ø 2 Inch 2.00 2.00 - - M' - 145,900 - 291,800 - - - 291,800
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
SDD PVC Ø 2 Inch 2.00 2.00 - - Buah - 20,000 - 40,000 - - - 40,000
Pipa Overflow - 199,200 - - - 199,200
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Knee GI Ø 2 Inch 1.00 1.00 - - Buah - 33,300 - 33,300 - - - 33,300
SDL PVC Ø 2 Inch 1.00 1.00 - - Buah - 20,000 - 20,000 - - - 20,000
Pipa Ventilasi - 389,500 - - - 389,500
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Tee GI Ø 2 Inch 1.00 1.00 - - Buah - 67,000 - 67,000 - - - 67,000
Double Naple GI Ø 2 Inch 2.00 2.00 - - Buah - 55,000 - 110,000 - - - 110,000
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
Tutup Plat 1.00 1.00 - - Buah - 500,000 - 500,000 - - - 500,000
Alat Pelindung Diri - 420,000 - - - 420,000
1. Masker Kain 12.00 12.00 - - Buah - 10,000 - 120,000 - - - 120,000
2. Sarung Tangan Kain 12.00 12.00 - - Buah - 25,000 - 300,000 - - - 300,000

3 ELEVATED RESERVOIR 7,270,000 41,594,324 4,521,399 6,111,799 13,381,799 46,115,723


A GALIAN TANAH 32.38 M3 450,000 - - 1,735,313 2,185,313 -
Pekerja 24.28 5.00 - 19.28 HOK 90,000 - 450,000 - - 1,735,313 2,185,313 -

B URUGAN TANAH 8.09 M3 360,000 - - 4,219 364,219 -


Pekerja 4.05 4.00 - 0.05 HOK 90,000 - 360,000 - - 4,219 364,219 -

C PEKERJAAN BATU BATA 9.73 M2 - - 734,306 189,550 189,550 734,306


Tukang 0.97 - - 0.97 HOK 110,000 - - - - 106,975 106,975 -
Pekerja 2.92 - - 0.92 HOK 90,000 - - - - 82,575 82,575 -
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Bata merah 580.75 - 680.75 - Buah - 750 - - 510,563 - - 510,563
Semen portland 2.79 - 2.79 - Zak - 55,000 - - 153,723 - - 153,723
Pasir Pasang 0.39 - 0.39 - M3 - 180,000 - - 70,020 - - 70,020

D PEKERJAAN BETON 21.41 M3 1,230,000 7,993,899 2,260,689 2,500,882 3,730,882 10,254,588


Tukang 5.89 3.00 - 2.89 HOK 110,000 - 330,000 - - 317,577 647,577 -
Pekerja 34.26 10.00 - 24.26 HOK 90,000 - 900,000 - - 2,183,305 3,083,305 -
Batu Split 2/3 10.28 - 10.28 - M3 - 220,000 - - 2,260,689 - - 2,260,689
Pasir Beton 7.04 7.04 - - M3 - 220,000 - 1,548,996 - - - 1,548,996
Semen 117.18 117.18 - - M3 - 55,000 - 6,444,903 - - - 6,444,903

E PEKERJAAN PEMBESIAN 158.93 Kg 1,090,000 16,999,097 - 1,135,000 2,225,000 16,999,097


Tukang 11.13 5.00 - 6.13 HOK 110,000 - 550,000 - - 673,750 1,223,750 -
Pekerja 11.13 6.00 - 5.13 HOK 90,000 - 540,000 - - 461,250 1,001,250 -
Besi beton
- - - - - -
(polos/ulir)
- Ø 12 38.00 38.00 - - Batang - 120,000 - 4,560,000 - - - 4,560,000
- Ø 10 128.00 128.00 - - Batang - 72,000 - 9,216,000 - - - 9,216,000
-Ø8 54.00 54.00 - - Batang - 55,000 - 2,970,000 - - - 2,970,000
Kawat Beton 10.87 16.87 - - Kg - 15,000 - 253,097 - - - 253,097

F PEKERJAAN BEKISTING 65.47 M2 2,180,000 7,901,628 742,500 102,399 2,282,399 8,644,128


Tukang 10.35 10.00 - 0.35 HOK 110,000 - 1,100,000 - - 38,841 1,138,841 -
Pekerja 12.71 12.00 - 0.71 HOK 90,000 - 1,080,000 - - 63,558 1,143,558 -
Kayu kelas III 2.32 2.32 - - M3 - 1,200,000 - 2,781,360 - - - 2,781,360
Paku 5 - 12 cm 25.83 25.83 - - Kg - 14,000 - 361,592 - - - 361,592
Balok kayu kelas II 1.10 1.10 - - M3 - 1,900,000 - 2,094,845 - - - 2,094,845
Plywood 9 mm 21.65 21.65 - - Lbr - 120,000 - 2,598,540 - - - 2,598,540
Dolken kayu Ø 8-10/400 cm 107.71 8.71 99.00 - Batang - 7,500 - 65,291 742,500 - - 807,791

G PLESTERAN DAN ACIAN 74.85 M2 1,960,000 275,000 612,705 116,625 2,076,625 887,705
Tukang 8.71 8.00 - 0.71 HOK 110,000 - 880,000 - - 78,375 958,375 -
Pekerja 12.43 12.00 - 0.43 HOK 90,000 - 1,080,000 - - 38,250 1,118,250 -
Pasir Pasang 1.72 - 1.72 - M3 - 180,000 - - 309,879 - - 309,879
Semen 10.51 5.00 5.51 - Zak - 55,000 - 275,000 302,826 - - 577,826

H PENGECATAN 37.55 M2 - - 171,200 327,812 327,812 171,200


Tukang 2.37 - - 2.37 HOK 110,000 - - - - 260,222 260,222 -
Pekerja 0.75 - - 0.75 HOK 90,000 - - - - 67,590 67,590 -
Plamuur 2.00 - 2.00 - Kg - 10,200 - - 20,400 - - 20,400
Cat dasar Tembok 2.00 - 2.00 - Kg - 20,400 - - 40,800 - - 40,800
Cat Penutup Tembok 5.00 - 5.00 - Kg - 22,000 - - 110,000 - - 110,000

I Aksesoris Bangunan - 7,864,700 - - - 7,864,700


Pipa Inlet - 378,400 - - - 378,400
Pipa Dinding GI Ø 2 Inch 2.00 2.00 - - M' - 145,900 - 291,800 - - - 291,800
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
SDL PVC Ø 2 Inch 1.00 1.00 - - Buah - 20,000 - 20,000 - - - 20,000
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Pipa Overflow - 1,199,900 - - - 1,199,900
Pipa Dinding GI Ø 2 Inch 1.00 1.00 - - M' - 145,900 - 145,900 - - - 145,900
Knee GI Ø 2 Inch 4.00 4.00 - - Buah - 33,300 - 133,200 - - - 133,200
Pipa Bypass PVC Ø 2 Inch 12.00 12.00 - - M' - 32,150 - 385,800 - - - 385,800
SDL PVC Ø 2 Inch 2.00 2.00 - - Buah - 20,000 - 40,000 - - - 40,000
Stop Kran Ø 2 Inch 1.00 1.00 - - Buah - 495,000 - 495,000 - - - 495,000
Pipa Outlet - 3,468,400 - - - 3,468,400
Pipa Dinding GI Ø 4 Inch 1.00 1.00 - - M' - 257,400 - 257,400 - - - 257,400
SDL PVC Ø 4 Inch 2.00 2.00 - - Buah - 91,000 - 182,000 - - - 182,000
Gate Valve GI Ø 4 Inch 1.00 1.00 - - Buah - 3,029,000 - 3,029,000 - - - 3,029,000
Pipa Penguras - 1,082,600 - - - 1,082,600
Pipa Dinding GI Ø 3 Inch 2.00 2.00 - - M' - 188,800 - 377,600 - - - 377,600
SDD PVC Ø 3 Inch 2.00 2.00 - - Buah - 45,000 - 90,000 - - - 90,000
Stop Kran Ø 3 Inch 1.00 1.00 - - Buah - 615,000 - 615,000 - - - 615,000
Pipa Ventilasi - 535,400 - - - 535,400
Pipa Dinding GI Ø 2 Inch 2.00 2.00 - - M' - 145,900 - 291,800 - - - 291,800
Tee GI Ø 2 Inch 1.00 1.00 - - Buah - 67,000 - 67,000 - - - 67,000
Double Naple GI Ø 2 Inch 2.00 2.00 - - Buah - 55,000 - 110,000 - - - 110,000
Knee GI Ø 2 Inch 2.00 2.00 - - Buah - 33,300 - 66,600 - - - 66,600
Tutup Plat 2.00 2.00 - - Buah - 600,000 - 1,200,000 - - - 1,200,000
Alat Pelindung Diri - 560,000 - - - 560,000
1. Masker Kain 16.00 16.00 - - Buah - 10,000 - 160,000 - - - 160,000
2. Sarung Tangan Kain 16.00 16.00 - - Buah - 25,000 - 400,000 - - - 400,000

4 RUMAH PANEL 2,051,977 51,132,893 - - 2,051,977 51,132,893


A PEKERJAAN BATU BATA 10.00 M2 380,000 790,070 - - 380,000 790,070
Tukang 1.00 1.00 - - HOK 110,000 - 110,000 - - - 110,000 -
Pekerja 3.00 3.00 - - HOK 90,000 - 270,000 - - - 270,000 -
Bata merah 700.00 700.00 - - Buah - 800 - 560,000 - - - 560,000
Semen portland 2.87 2.87 - - Zak - 55,000 - 158,070 - - - 158,070
Pasir Pasang 0.40 0.40 - - M3 - 180,000 - 72,000 - - - 72,000

B PEKERJAAN BETON 0.36 M 3


64,350 234,051 - - 64,350 234,051
Tukang 0.10 0.10 - - HOK 110,000 - 10,890 - - - 10,890 -
Pekerja 0.59 0.59 - - HOK 90,000 - 53,460 - - - 53,460 -
Batu Split 2/3 0.27 0.27 - - M3 - 220,000 - 60,368 - - - 60,368
Pasir Beton 0.20 0.20 - - M3 - 220,000 - 44,587 - - - 44,587
Semen 2.35 2.35 - - ZAK - 55,000 - 129,096 - - - 129,096

C PEKERJAAN PEMBESIAN 4.74 Kg 66,305 486,457 - - 66,305 486,457


Tukang 0 0.33 0.33 - - HOK 110,000 - 36,468 - - - 36,468 -
Pekerja 0 0.33 0.33 - - HOK 90,000 - 29,837 - - - 29,837 -
Besi beton
(polos/ulir)
0 - Ø 10 1.11 1.11 - - Batang - 220,000 - 245,282 - - - 245,282
-Ø8 4.19 4.19 - - Batang - 55,000 - 230,519 - - - 230,519
Kawat Beton 0.71 0.71 - - Kg - 15,000 - 10,656 - - - 10,656
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
D PEKERJAAN BEKISTING 2.53 M2 241,643 371,538 - - 241,643 371,538
Tukang 0.83 0.83 - - HOK 110,000 - 91,658 - - - 91,658 -
Pekerja 1.67 1.67 - - HOK 90,000 - 149,985 - - - 149,985 -
Kayu kelas III 0.10 0.10 - - M3 - 1,200,000 - 121,200 - - - 121,200
Paku 5 - 12 cm 1.01 1.01 - - Kg - 14,000 - 14,140 - - - 14,140
Balok kayu kelas II 0.04 0.04 - - M3 - 1,900,000 - 76,523 - - - 76,523
Plywood 9 mm 0.88 0.88 - - Lbr - 120,000 - 106,050 - - - 106,050
Dolken kayu Ø 8-10/400 cm 7.15 7.15 - - Batang - 7,500 - 53,625 - - - 53,625

E PLESTERAN + ACIAN 32.00 M2 1,160,000 260,298 - - 1,160,000 260,298


Tukang 4.00 4.00 - - HOK 110,000 - 440,000 - - - 440,000 -
Pekerja 8.00 8.00 - - HOK 90,000 - 720,000 - - - 720,000 -
Pasir Pasang 0.37 0.37 - - M3 - 180,000 - 66,240 - - - 66,240
Semen 3.53 3.53 - - ZAK - 55,000 - 194,058 - - - 194,058

F PENGECATAN 16.00 M2 139,680 140,480 - - 139,680 140,480


Tukang 1.01 1.01 - - HOK 110,000 - 110,880 - - - 110,880 -
Pekerja 0.32 0.32 - - HOK 90,000 - 28,800 - - - 28,800 -
Plamuur 1.60 1.60 - - Kg - 10,200 - 16,320 - - - 16,320
Cat dasar Tembok 1.60 1.60 - - Kg - 20,400 - 32,640 - - - 32,640
Cat Penutup Tembok 4.16 4.16 - - Kg - 22,000 - 91,520 - - - 91,520

G PERLENGKAPAN POMPA 1.00 PAKET - 48,850,000 - - - 48,850,000


Instalasi Listrik 1.00 1.00 - - Paket - 12,000,000 - 12,000,000 - - - 12,000,000
Box Panel 2.00 2.00 - - Unit - 2,500,000 - 5,000,000 - - - 5,000,000
Pompa Submersible 1.00 1.00 - - Paket - 28,000,000 - 28,000,000 - - - 28,000,000
Kabel Elektroda 10.00 10.00 - - Meter - 10,000 - 100,000 - - - 100,000
Kabel On Off 10.00 10.00 - - Meter - 15,000 - 150,000 - - - 150,000
Kabel Radar 250.00 250.00 - - Meter - 10,000 - 2,500,000 - - - 2,500,000
Check Valve 1.00 1.00 - - Buah - 350,000 - 350,000 - - - 350,000
SDL PVC 2.00 2.00 - - Buah - 55,000 - 110,000 - - - 110,000
Knee PVC 4.00 4.00 - - Buah - 35,000 - 140,000 - - - 140,000
Radar Air 1.00 1.00 - - Buah - 150,000 - 150,000 - - - 150,000
Alat Pelindung Diri
1. Masker Kain 10.00 10.00 - - Buah - 10,000 - 100,000 - - - 100,000
2. Sarung Tangan Kain 10.00 10.00 - - Buah - 25,000 - 250,000 - - - 250,000
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan

5 PENGADAAN PIPA (BLM) 2,117.00 M' - 59,884,790 - - - 59,884,790


Pipa PVC Ø 3 Inch S-12,5 180.00 180.00 - - M' - 93,750 - 16,875,000 - - - 16,875,000
Pipa PVC Ø 2 Inch S-12,5 497.00 497.00 - - M' - 30,970 - 15,392,090 - - - 15,392,090
Pipa PVC Ø 1½ Inch S-10 918.00 918.00 - - M' - 24,067 - 22,093,200 - - - 22,093,200
Pipa PVC Ø 1 Inch S-10 522.00 522.00 - - M' - 10,583 - 5,524,500 - - - 5,524,500

6 ACCESORIS PIPA 1.00 PAKET - 4,250,400 - - - 4,250,400


Tee Ø 3 Inch 1.00 1.00 - - Buah - 342,100 - 342,100 - - - 342,100
Tee Ø 2 Inch 1.00 1.00 - - Buah - 117,700 - 117,700 - - - 117,700
Tee Ø 1½ Inch 1.00 1.00 - - Buah - 58,900 - 58,900 - - - 58,900
Tee Ø 1 Inch 4.00 4.00 - - Buah - 22,300 - 89,200 - - - 89,200
Bend 90⁰ PVC RRJ Ø 3 Inch 3.00 3.00 - - Buah - 87,600 - 262,800 - - - 262,800
Bend 90⁰ PVC RRJ Ø 2 Inch 5.00 5.00 - - Buah - 53,400 - 267,000 - - - 267,000
Knee 90⁰ Ø 1½ Inch 5.00 5.00 - - Buah - 33,300 - 166,500 - - - 166,500
Reduser Ø 4 Inch - Ø 3 Inch 1.00 1.00 - - Buah - 240,000 - 240,000 - - - 240,000
Reduser Ø 3 Inch - Ø 2 Inch 2.00 2.00 - - Buah - 100,650 - 201,300 - - - 201,300
Reduser Ø 3 Inch - Ø 1 Inch 1.00 1.00 - - Buah - 66,600 - 66,600 - - - 66,600
Reduser Ø 2 Inch - Ø 1½ Inch 2.00 2.00 - - Buah - 44,550 - 89,100 - - - 89,100
Reduser Ø 2 Inch - Ø 1 Inch 2.00 2.00 - - Buah - 25,850 - 51,700 - - - 51,700
Reduser Ø 1½ Inch - Ø 1 Inch 2.00 2.00 - - Buah - 25,850 - 51,700 - - - 51,700
Stopkran Ø 2 Inch 2.00 2.00 - - Buah - 697,400 - 1,394,800 - - - 1,394,800
Flange Socket Ø 3" 2.00 2.00 - - Buah - 220,500 - 441,000 - - - 441,000
Flange Spigot Ø 3" 2.00 2.00 - - Buah - 205,000 - 410,000 - - - 410,000

7 PERLENGKAPAN PIPA 1.00 PAKET - 750,000 - - - 750,000


Solven Cement 10.00 10.00 - - Kaleng - 75,000 - 750,000 - - - 750,000

8 PEMASANGAN PIPA 2,117.00 M' 6,520,000 - - 37,250,017 43,770,017 -


A GALIAN PIPA 206.23 M3 720,000 - - 13,200,255 13,920,255 -
Pekerja 154.67 8.00 - 146.67 HOK 90,000 - 720,000 - - 13,200,255 13,920,255 -

B URUGAN TANAH 97.38 M3 450,000 - - 3,932,302 4,382,303 -


Pekerja 48.69 5.00 - 43.69 HOK 90,000 - 450,000 - - 3,932,302 4,382,303 -

C PEMASANGAN PIPA 2,117.00 M' 5,350,000 - - 20,117,459 25,467,459 -


Tukang 87.88 20.00 - 69.31 HOK 110,000 - 2,200,000 - - 7,623,929 9,823,929 -
Pekerja 173.82 35.00 1.00 138.82 HOK 90,000 - 3,150,000 - - 12,493,530 15,643,530 -

9 ALAT PELINDUNG DIRI PEKERJA 1.00 PAKET - 1,402,500 - - - 1,402,500


A APD PEKERJA - 1,402,500 - - - 1,402,500
Thermometer Gun 1.00 1.00 - - Buah - 750,000 - 750,000 - - - 750,000
Hand Sanitizer 1.00 1.00 - - Botol - 250,000 - 250,000 - - - 250,000
Desinfektan 1.00 1.00 - - Buah - 350,000 - 350,000 - - - 350,000
Botol Spray 7.00 7.00 - - Buah - 7,500 - 52,500 - - - 52,500
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan

B SARANA SANITASI 10,220,026 22,061,373 - - 10,220,026 22,061,373


1 SARANA CUCI TANGAN DI SARANA UMUM 400,000 2,705,600 - - 400,000 2,705,600
Perlengkapan TCT 2.00 400,000 2,495,600 - - 400,000 2,495,600
Kran Air Ø 1/2" 2.00 2.00 - - Buah - 22,500 - 45,000 - - - 45,000
SDD Ø 1/2" 2.00 2.00 - - Buah - 4,400 - 8,800 - - - 8,800
Tee Ø 1/2" 4.00 4.00 - - Buah - 2,750 - 11,000 - - - 11,000
Pipa PVC AW Ø 1/2" 16.00 16.00 - - Batang - 30,000 - 480,000 - - - 480,000
Knee Ø 1/2" 4.00 4.00 - - Buah - 2,750 - 11,000 - - - 11,000
Double Naple Ø 1/2" 2.00 2.00 - - Buah - 22,500 - 45,000 - - - 45,000
Stop Kran Ø 1/2" 2.00 2.00 - - Buah - 35,000 - 70,000 - - - 70,000
Socket Drat Luar Ø 3/4" x 1/2" 2.00 2.00 - - Buah - 4,400 - 8,800 - - - 8,800
Clame Sudle Ø 1" - Ø ³/₄" 2.00 2.00 - - Buah - 32,000 - 64,000 - - - 64,000
Tempat Cuci Tangan 2.00 2.00 - - Buah - 500,000 - 1,000,000 - - - 1,000,000
Leher Angsa 2.00 2.00 - - Buah - 50,000 - 100,000 - - - 100,000
Reduser PVC Ø 1" - Ø ³/₄" 2.00 2.00 - - Buah - 15,000 - 30,000 - - - 30,000
Pipa PVC AW Ø 1" 8.00 8.00 - - Batang - 55,000 - 440,000 - - - 440,000
Knee Ø 1" 2.00 2.00 - - Buah - 25,000 - 50,000 - - - 50,000
Tee Ø 1" 2.00 2.00 - - Buah - 66,000 - 132,000 - - - 132,000
Upah Pasang 2.00 2.00 - - Paket 200,000 - 400,000 - - - 400,000 -
Alat Pelindung Diri - 210,000 - - - 210,000
1. Masker Kain 6.00 6.00 - - Buah - 10,000 - 60,000 - - - 60,000
2. Sarung Tangan Kain 6.00 6.00 - - Buah - 25,000 - 150,000 - - - 150,000

2 SARANA JAMBAN SEKOLAH 5,169,426 14,590,866 - - 5,169,426 14,590,866


A GALIAN TANAH 15.38 M3 588,150 - - - 588,150 -
Pekerja 6.54 6.54 - - HOK 90,000 - 588,150 - - - 588,150 -

B PEKERJAAN PASANGAN BATU KALI 3.24 M3 504,700 1,276,796 - - 504,700 1,276,796


Tukang 1.43 1.43 - - Buah 110,000 - 157,300 - - - 157,300 -
Pekerja 3.86 3.86 - - Buah 90,000 - 347,400 - - - 347,400 -
Batu Belah 10/20 3.89 3.89 - - M3 - 200,000 - 777,600 - - - 777,600
Pasir Pasang 1.68 1.68 - - M3 - 180,000 - 303,264 - - - 303,264
Semen 3.56 3.56 - - M3 - 55,000 - 195,932 - - - 195,932

C PEKERJAAN BETON 5.32 M 3


680,414 2,128,901 - - 680,414 2,128,901
Tukang 1.46 1.46 - - Buah 110,000 - 160,839 - - - 160,839 -
Pekerja 5.77 5.77 - - Buah 90,000 - 519,574 - - - 519,574 -
Batu Split 2/3 4.04 4.04 - - M3 - 220,000 - 888,546 - - - 888,546
Pasir Beton 3.03 3.03 - - M3 - 220,000 - 666,461 - - - 666,461
Semen 10.43 10.43 - - M3 - 55,000 - 573,894 - - - 573,894

D PEKERJAAN PEMBESIAN 16.29 Kg 228,002 1,139,344 - - 228,002 1,139,344


Tukang 0 1.14 1.14 - - Buah 110,000 - 125,401 - - - 125,401 -
Pekerja 0 1.14 1.14 - - Buah 90,000 - 102,601 - - - 102,601 -
Besi beton
(polos/ulir)
0 - Ø 10 10.55 10.55 - - Batang - 72,000 - 759,388 - - - 759,388
-Ø8 6.79 6.79 - - Batang - 55,000 - 373,313 - - - 373,313
Kawat Beton 0.44 0.44 - - Kg - 15,000 - 6,643 - - - 6,643
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
E PEKERJAAN BEKISTING 6.72 M2 463,104 1,080,921 - - 463,104 1,080,921
Tukang 2.22 2.22 - - Buah 110,000 - 243,936 - - - 243,936 -
Pekerja 2.44 2.44 - - Buah 90,000 - 219,168 - - - 219,168 -
Kayu kelas III 0.27 0.27 - - M3 - 1,200,000 - 322,560 - - - 322,560
Paku 5 - 12 cm 2.69 2.69 - - Kg - 14,000 - 37,632 - - - 37,632
Balok kayu kelas II 0.10 0.10 - - M3 - 1,900,000 - 198,189 - - - 198,189
Plywood 9 mm 2.35 2.35 - - Lbr - 120,000 - 282,240 - - - 282,240
Dolken kayu Ø 8-10/400 cm 32.04 32.04 - - Batang - 7,500 - 240,300 - - - 240,300

F PEKERJAAN BATU BATA 17.20 M2 473,600 1,248,920 - - 473,600 1,248,920


Tukang 1.72 1.72 - - HOK 110,000 - 189,200 - - - 189,200 -
Pekerja 3.16 3.16 - - HOK 90,000 - 284,400 - - - 284,400 -
Bata merah 1,204.00 1,204.00 - - Buah - 800 - 963,200 - - - 963,200
Semen portland 2.94 2.94 - - Zak - 55,000 - 161,880 - - - 161,880
Pasir Pasang 0.69 0.69 - - M3 - 180,000 - 123,840 - - - 123,840

G PLESTERAN + ACIAN 34.40 M2 887,000 224,820 - - 887,000 224,820


Tukang 4.30 4.30 - - HOK 110,000 - 473,000 - - - 473,000 -
Pekerja 4.60 4.60 - - HOK 90,000 - 414,000 - - - 414,000 -
Pasir Pasang 0.40 0.40 - - M3 - 180,000 - 71,208 - - - 71,208
Semen 2.79 2.79 - - Zak - 55,000 - 153,612 - - - 153,612

H PENGECATAN 17.20 M 2
150,156 151,016 - - 150,156 151,016
Tukang 1.08 1.08 - - HOK 110,000 - 119,196 - - - 119,196 -
Pekerja 0.34 0.34 - - HOK 90,000 - 30,960 - - - 30,960 -
Plamuur 1.72 1.72 - - Kg - 10,200 - 17,544 - - - 17,544
Cat dasar Tembok 1.72 1.72 - - Kg - 20,400 - 35,088 - - - 35,088
Cat Penutup Tembok 4.47 4.47 - - Kg - 22,000 - 98,384 - - - 98,384

I PEMASANGAN KERAMIK LANTAI DAN DIND 16.20 M2 1,194,300 1,065,148 - - 1,194,300 1,065,148
Tukang 5.67 5.67 - - HOK 110,000 - 623,700 - - - 623,700 -
Pekerja 6.34 6.34 - - HOK 90,000 - 570,600 - - - 570,600 -
Keramik 17.17 17.17 - - Dus - 50,000 - 858,600 - - - 858,600
Pasir Pasang 0.73 0.73 - - M3 - 180,000 - 131,220 - - - 131,220
Semen 1.37 1.37 - - Zak - 55,000 - 75,328 - - - 75,328

J Aksesoris Pelengkap Jamban 1.00 Paket - 6,275,000 - - - 6,275,000


Watermeter 1.00 1.00 - - Buah - 235,000 - 235,000 - - - 235,000
Pipa PVC 4 Inch 8.00 8.00 - - M' - 15,000 - 120,000 - - - 120,000
Pipa PVC 1/2 inch 20.00 20.00 - - M - 6,000 - 120,000 - - - 120,000
Kran Air 1/2 inch 2.00 2.00 - - Buah - 25,000 - 50,000 - - - 50,000
Pintu + Kusen Sliding door 2.00 2.00 - - Buah - 750,000 - 1,500,000 - - - 1,500,000
Closet Duduk 2.00 2.00 - - Buah - 1,500,000 - 3,000,000 - - - 3,000,000
Pipa Ventilasi Septictank 1.00 1.00 - - Buah - 250,000 - 250,000 - - - 250,000
HandRail 1.00 1.00 - - Paket - 1,000,000 - 1,000,000 - - - 1,000,000

2 SARANA TEMPAT CUCI TANGAN DI S 3.00 UNIT 4,650,600 4,764,907 - - 4,650,600 4,764,907
A PEKERJAAN BATU BATA 5.40 M2 205,200 426,638 - - 205,200 426,638
Tukang 0.54 0.54 - - HOK 110,000 - 59,400 - - - 59,400 -
Pekerja 1.62 1.62 - - HOK 90,000 - 145,800 - - - 145,800 -
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
Bata merah 378.00 378.00 - - Buah - 800 - 302,400 - - - 302,400
Semen portland 1.55 1.55 - - Zak - 55,000 - 85,358 - - - 85,358
Pasir Pasang 0.22 0.22 - - M3 - 180,000 - 38,880 - - - 38,880

B PEKERJAAN BETON 0.72 M3 2,596,522 432,514 - - 2,596,522 432,514


Tukang 3.99 3.99 - - HOK 110,000 - 439,412 - - - 439,412 -
Pekerja 23.97 23.97 - - HOK 90,000 - 2,157,111 - - - 2,157,111 -
Batu Split 2/3 0.54 0.54 - - M3 - 220,000 - 118,536 - - - 118,536
Pasir Beton 0.43 0.43 - - M3 - 220,000 - 94,891 - - - 94,891
Semen 3.98 3.98 - - M3 - 55,000 - 219,087 - - - 219,087

C PEKERJAAN PEMBESIAN 4.05 Kg 56,738 502,881 - - 56,738 502,881


Tukang 0 0.28 0.28 - - HOK 110,000 - 31,206 - - - 31,206 -
Pekerja 0 0.28 0.28 - - HOK 90,000 - 25,532 - - - 25,532 -
Besi beton
(polos/ulir)
a Dana Masyarakat
Volume t Harga Satuan APBN Jumlah
No Uraian Kegiatan In-Cash In-Kind
u
Total APBN In-Cash In-Kind a Upah Bahan Upah Bahan Bahan Upah Upah Bahan
-Ø8 8.98 8.98 - - Batang - 55,000 - 493,762 - - - 493,762
Kawat Beton 0.61 0.61 - - Kg - 15,000 - 9,119 - - - 9,119

D PLESTERAN + ACIAN 36.00 M2 1,305,000 292,835 - - 1,305,000 292,835


Tukang 4.50 4.50 - - HOK 110,000 - 495,000 - - - 495,000 -
Pekerja 9.00 9.00 - - HOK 90,000 - 810,000 - - - 810,000 -
Pasir Pasang 0.41 0.41 - - M3 - 180,000 - 74,520 - - - 74,520
Semen 3.97 3.97 - - Zak - 55,000 - 218,315 - - - 218,315

E PENGECATAN 18.00 M2 157,140 158,040 - - 157,140 158,040


Tukang 1.13 1.13 - - HOK 110,000 - 124,740 - - - 124,740 -
Pekerja 0.36 0.36 - - HOK 90,000 - 32,400 - - - 32,400 -
Plamuur 1.80 1.80 - - Kg - 10,200 - 18,360 - - - 18,360
Cat dasar Tembok 1.80 1.80 - - Kg - 20,400 - 36,720 - - - 36,720
Cat Penutup Tembok 4.68 4.68 - - Kg - 22,000 - 102,960 - - - 102,960

F AKSESORIS TCT 1.00 PAKET 330,000 2,952,000 - - 330,000 2,952,000


Kran Air Ø 1/2" 3.00 3.00 - - - 30,000 - 90,000 - - - 90,000
Pipa PVC AW Ø 1/2" 48.00 48.00 - - - 2,750 - 132,000 - - - 132,000
Knee Ø 1/2" 12.00 12.00 - - - 15,000 - 180,000 - - - 180,000
Stop Kran Ø 1/2" 3.00 3.00 - - - 45,000 - 135,000 - - - 135,000
Tempat Cuci Tangan 3.00 3.00 - - - 500,000 - 1,500,000 - - - 1,500,000
Leher Angsa 3.00 3.00 - - - 55,000 - 165,000 - - - 165,000
Handrail 3.00 3.00 - - - 250,000 - 750,000 - - - 750,000
Upah Pasang 3.00 3.00 - - 110,000 - 330,000 - - - 330,000 -

C KESEHATAN 750,000 1,168,500 - - 1,000,000 1,274,500


1 PHBS DIMASYARAKAT 750,000 1,168,500 - - 1,000,000 1,274,500
A PHBS DI MASYARAKAT 1.00 1.00 - - PAKET 750,000 1,168,500 750,000 1,168,500 - - 750,000 1,168,500
B PHBS DI SEKOLAH 1.00 1.00 - - PAKET 250,000 106,000 250,000 106,000 250,000 106,000

D PENINGKATAN KAPASITAS 5,250,000 3,240,000 - - 5,250,000 3,240,000


A PELATIHAN KKM/SATLAK 1.00 1.00 - - PAKET 2,200,000 1,463,000 2,200,000 1,463,000 - - 2,200,000 1,463,000
B PELATIHAN DISABILITAS 1.00 1.00 - - PAKET 750,000 381,000 750,000 381,000 - - 750,000 381,000
C PELATIHAN KPSPAMS 1.00 1.00 - - PAKET 2,300,000 1,396,000 2,300,000 1,396,000 - - 2,300,000 1,396,000

E OERASIONAL KKM/SATLAK 2,700,000 6,863,000 - - 2,700,000 6,863,000


A OPERASIONAL KKM/SATLAK 1.00 1.00 - - PAKET 2,700,000 6,863,000 2,700,000 6,863,000 - - 2,700,000 6,863,000

JUMLAH 38,952,155 205,691,845 12,250,000 49,000,000 88,202,155 218,047,845


PROSENTASE INVESTASI 79.88% 4.00% 16.00%
306,250,000
NILAI RKM DI BULATKAN 244,644,000 12,250,000 49,000,000
REKAPITULASI BIAYA PEMBANGUNAN JARINGAN AIR BERSIH & SANITASI
DESA NAGARATENGAH KECAMATAN CINEAM KABUPATEN TASIKMALAYA

No. URAIAN VOLUME DANA BLM DANA MASYARAKAT TOTAL


SATUAN
BLM UPAH (Rp.) BAHAN (Rp.) IN-CASH (Rp.) IN - KIND (Rp.) (Rp.)

A. SARANA AIR BERSIH


1 BRONCAPTERING 1.00 Unit 2,568,580 6,700,319 2,467,356 2,886,967 14,623,222
2 BAK PENGUMPUL 1.00 Unit 1,621,572 6,643,745 5,261,245 2,751,218 16,277,780
3 ELEVATED RESERVOIR 1.00 Paket 7,270,000 41,594,324 4,521,399 6,111,799 59,497,522
4 RUMAH PANEL 1.00 Unit 2,051,977 51,132,893 - - 53,184,870
5 PENGADAAN PIPA (BLM) 2117.00 Meter - 59,884,790 - - 59,884,790
6 ACCESORIS PIPA 1.00 Paket - 4,250,400 - - 4,250,400
7 PERLENGKAPAN PIPA 1.00 Paket - 750,000 - - 750,000
8 PEMASANGAN PIPA 2117.00 Meter 6,520,000 - - 37,250,017 43,770,017
9 ALAT PELINDUNG DIRI PEKERJA 1.00 Paket - 1,402,500 - - 1,402,500

B. SARANA SANITASI
1 SARANA CUCI TANGAN DI SARANA UMUM 2.00 Unit 400,000 2,705,600 - - 3,105,600
2 SARANA JAMBAN SEKOLAH 1 Unit 5,169,426 14,590,866 - - 19,760,292
3 SARANA TEMPAT CUCI TANGAN DI SEKOLAH 3.00 Unit 4,650,600 4,764,907 - - 9,415,508

C. KESEHATAN
1 PHBS Masyarakat 1 Paket 500,000 758,500 - - 1,258,500
2 Pemeriksaan Kualitas Air 1 Paket 250,000 410,000 - - 660,000
3 PHBS di Sekolah 1 Paket 250,000 106,000 - - 356,000
D. PENINGKATAN KAPASITAS
1 PELATIHAN KKM/SATLAK 1 Paket 2,200,000 1,463,000 - - 3,663,000
2 PELATIHAN DISABILITAS 1 Paket 750,000 381,000 - - 1,131,000
3 PELATIHAN KPSPAMS 1 Paket 2,300,000 1,396,000 - - 3,696,000

E. ADMINISTRASI PROYEK
1 Operasional KKM 1 Paket 2,700,000.00 6,863,000.00 - - 9,563,000.00

JUMLAH 39,202,155 205,797,845 12,250,000 49,000,000 306,250,000


PROSENTASE INVESTASI 80.00% 4.00% 16.00%

NILAI RKM DIBULATKAN 306,250,000

REKAP RAB
RENCANA ANGGARAN BIAYA (RAB)
Desa : Girikencana Nomor RAB : 1
Kecamatan : Parungponteng Program : PAMSIMAS
Kabupaten : Tasikmalaya Kegiatan/Pekerjaan : Promkes
Propinsi : JAWA BARAT Jumlah Dusun :3

HARGA JUMLAH SUMBER DANA


NO JENIS KEGIATAN SAT VOL SASARAN PELAKSANA
SATUAN BIAYA BAHAN UPAH

A. Kegiatan Kesehatan Masyarakat


1 Pembentukan Tim Penggerak SBS
a. Materi Pengantar Set 5 15,000 75,000 75,000
Satlak UKK dan
Masyarakat
b. Plano Lembar 5 2,000 10,000 10,000 Masyarakat
c. Spidol besar Buah 2 8,000 16,000 16,000
d. Lakban kertas Buah 1 5,000 5,000 5,000

Sub Total 106,000 106,000 -


2 Promosi Kesehatan 5 Pilar STBM
a. Materi penyuluhan Set 5 15,000 75,000 75,000
b. Plano Lembar 5 2,000 10,000 10,000
Satlak UKK dan
Masyarakat
c. Spidol besar Buah 1 8,000 8,000 8,000 Masyarakat
d. Lakban kertas Buah 1 5,000 5,000 5,000
e. Transportasi Narasumber Paket 2 150,000 300,000 - 300,000

Sub Total 398,000 98,000 300,000


3 Pemicuan CLTS
a. Semen warna Bks 2 7,500 15,000 15,000
b. Tali rapia Gulung 1 5,000 5,000 5,000
c. Kertas Plano Lembar 5 2,000 10,000 10,000
d. Spidol Besar Buah 1 8,000 8,000 8,000
e. Spidol Kecil Set 1 12,000 12,000 12,000
f. kertas lipat/origami warna-warni Lembar 50 2,000 100,000 100,000
g. kertas metaplan (15x7,5cm) Lembar 50 2,000 100,000 100,000
Satlak UKK dan
Masyarakat
h. Penjepit Kertas Buah 1 15,000 15,000 15,000 Masyarakat
i. Transport Tim Pemicu Paket 2 150,000 300,000 300,000

Pleno Hasil Pemicuan


a. Sewa infokus Unit 1 100,000 100,000 100,000
b. Kertas Plano Lembar 10 2,000 20,000 20,000
c. Spidol Besar Buah 2 8,000 16,000 16,000
d. Transport Narasumber Paket 2 150,000 300,000 300,000

Sub Total 1,001,000 401,000 600,000


4 Media promosi dan informasi
Satlak UKK dan
a Stiker STBM/CTPS Lembar 30 7,500 225,000 225,000 Masyarakat
Masyarakat
c Poster STBM Lembar 3 75,000 225,000 225,000

Sub Total 450,000 450,000 -


5 Pemeriksaan Kualitas Air
b. Pemeriksaan Laboratorium Kimia (Bandung) Kali 1 375,000 375,000 375,000 Sanitarian
c. Transport pengambilan sampel Kali 1 240,000 240,000 240,000

Sub Total 615,000 375,000 240,000

6 Monitoring dan Pelaporan


a. Lembar monitoring (fotocopy) Lembar 150 500 75,000 75,000 Satlak UKK dan
Masyarakat
masyarakat
b. Dokumentasi dan pelaporan Paket 1 150,000 150,000 150,000

Sub Total 225,000 225,000 -


Total Kegiatan Kesehatan Masyarakat 2,795,000 1,655,000 1,140,000
RENCANA ANGGARAN BIAYA (RAB)

Desa : Girikencana Nomor RAB :2


Kecamatan : Parungponteng Program : PAMSIMAS
Kabupaten : Tasikmalaya Kegiatan/Pekerjaan : Pelatihan KKM/ Satlak Pamsimas
Propinsi : Jawa Barat Jumlah Peserta : 15 Orang
Dana Program
No Jenis Kegiatan Volume Unit Satuan Harga Satuan Jumlah Biaya
Upah Bahan
1 2 3 4 5 6 7 8
1 Pelatihan Administrasi Keuangan
a. ATK Pelatihan
1 Buku Tulis 5 Buah 7,500 37,500 37,500
2 Pulpen 5 Buah 2,500 12,500 12,500
3 Spidol Besar (Snowman) 2 Buah 15,000 30,000 30,000
4 Kertas Plano 10 Lembar 2,500 25,000 25,000
5 Lakban Hitam 2 Buah 15,000 30,000 30,000
6 Pengadaan Materi 6 Paket 20,000 120,000 120,000
Subtotal 255,000 255,000
b. Transportasi
1 Transportasi Nara Sumber 1 Orang 250,000 250,000 250,000
2 Transportasi Peserta 5 Orang 50,000 250,000 250,000
3 Konsumsi Pelatihan 7 Orang 20,000 140,000 140,000
Subtotal 640,000 640,000
Total 640,000 255,000 895,000
2. Pelatihan Teknik 10
a. ATK Pelatihan
1 Buku Tulis 5 Buah 7,500 37,500 37,500
2 Pulpen 5 Buah 2,500 12,500 12,500
3 Spidol Besar (Snowman) 2 Buah 15,000 30,000 30,000
4 Kertas Plano 10 Lembar 2,500 25,000 25,000
5 Lakban Hitam 2 Buah 15,000 30,000 30,000
6 Pengadaan Materi 6 Paket 20,000 120,000 120,000
Subtotal - 255,000 255,000
b. Transportasi
1 Transportasi Nara Sumber 1 Orang 250,000 250,000 250,000
2 Transportasi Peserta 5 Orang 50,000 250,000 250,000
3 Konsumsi Pelatihan 7 Orang 20,000 140,000 140,000
Subtotal 640,000 640,000
Total 640,000 255,000 895,000
3. Pelatihan Kesehatan di Masyarakat 5
a. ATK Pelatihan
1 Buku Tulis 5 Buah 7,500 37,500 37,500
2 Pulpen 5 Buah 2,500 12,500 12,500
3 Spidol Besar (Snowman) 2 Buah 15,000 30,000 30,000
4 Kertas Plano 10 Lembar 2,500 25,000 25,000
5 Lakban Hitam 2 Buah 15,000 30,000 30,000
6 Pengadaan Materi 6 Paket 20,000 120,000 120,000
Subtotal 255,000 255,000
b. Transportasi
1 Transportasi Nara Sumber 1 Orang 250,000 250,000 250,000
2 Transportasi Peserta 5 Orang 50,000 250,000 250,000
3 Konsumsi Pelatihan 7 Orang 20,000 140,000 140,000
Subtotal 640,000 640,000
Total 640,000 255,000 895,000
5. Perlengkapan Lainnya
1 Sarung Tangan 0 Buah 25,000 - -
1 Masker Kain 18 Buah 10,000 180,000 180,000
3 Hands Sanitizer 0 Botol 100,000 - -
4 Spanduk Pelatihan 0 Pcs 150,000 - -
Subtotal - 180,000 180,000
Total - 180,000 180,000
Grand Total (1,2,3,4) 1,920,000 945,000 2,865,000
RENCANA ANGGARAN BIAYA (RAB)

Desa : Girikencana Nomor RAB :3


Kecamatan : Parungponteng Program : PAMSIMAS
Kabupaten : Tasikmalaya Kegiatan/Pekerjaan : Pelatihan Disabilitas
Propinsi : Jawa Barat Jumlah Peserta : 5 Orang
Unit Harga Dana Proyek
No Jenis Kegiatan Volume Jumlah Biaya
Satuan Satuan Upah Bahan
1 2 3 4 5 6 7 10
1 Pelatihan Disabilitas
a. ATK Pelatihan
1. Buku Tulis/ Block Note 5 Buah 7,500 37,500 37,500
2. Pulpen 5 Buah 2,500 12,500 12,500
3. Pensil 5 Buah 2,000 10,000 10,000
4. Penghapus 5 Buah 1,500 7,500 7,500
5. Spidol Besar 2 Buah 15,000 30,000 30,000
6. Kertas Plano 20 Lembar 2,500 50,000 50,000
7. Klip Penjepit Plano 2 Buah 15,000 30,000 30,000
8. Penggandaan Materi 7 Paket 25,000 175,000 175,000
Subtotal 352,500 352,500
b. Transportasi
1. Transport Nara Sumber 2 Orang 250,000 500,000 500,000
2. Transport Peserta 5 Orang 50,000 250,000 250,000
3. Konsumsi Pelatihan 8 Orang 20,000 160,000 160,000
Subtotal 910,000 910,000
3 Alat Pelindung Diri
1 Masker Kain 8 Buah 10,000 80,000 80,000
Subtotal - 80,000 80,000
Total 910,000 432,500 1,342,500
RENCANA ANGGARAN BIAYA (RAB)

Desa : Girikencana Nomor RAB :4


Kecamatan : Parungponteng Program : PAMSIMAS
Kabupaten : Tasikmalaya Kegiatan/Pekerjaan : Pelatihan Badan Pengelola
Propinsi : Jawa Barat Jumlah Peserta : 15 Orang
Dana Program
No Jenis Kegiatan Volume Unit Satuan Harga Satuan Jumlah Biaya
Upah Bahan
1 2 3 4 5 6 7 10
1 Pelatihan Administrasi Keuangan 10
a. ATK Pelatihan
1 Buku Tulis 5 Buah 7,500 37,500 37,500
2 Pulpen 5 Buah 2,500 12,500 12,500
3 Spidol Besar (Snowman) 2 Buah 15,000 30,000 30,000
4 Kertas Plano 10 Lembar 2,500 25,000 25,000
5 Lakban Hitam 2 Buah 15,000 30,000 30,000
6 Pengadaan Materi 6 Paket 25,000 150,000 150,000
Subtotal 285,000 285,000
b. Transportasi
1 Transportasi Nara Sumber 1 Orang 250,000 250,000 250,000
2 Transportasi Peserta 5 Orang 50,000 250,000 250,000
3 Konsumsi Pelatihan 7 Orang 20,000 140,000 140,000
Subtotal 640,000 640,000
Total 640,000 285,000 925,000
2. Pelatihan Teknik 10
a. ATK Pelatihan
1 Buku Tulis 5 Buah 7,500 37,500 37,500
2 Pulpen 5 Buah 2,500 12,500 12,500
3 Spidol Besar (Snowman) 2 Buah 15,000 30,000 30,000
4 Kertas Plano 10 Lembar 2,500 25,000 25,000
5 Lakban Hitam 2 Buah 15,000 30,000 30,000
6 Pengadaan Materi 6 Paket 25,000 150,000 150,000
Subtotal - 285,000 285,000
b. Transportasi
1 Transportasi Nara Sumber 1 Orang 250,000 250,000 250,000
2 Transportasi Peserta 5 Orang 50,000 250,000 250,000
3 Konsumsi Pelatihan 7 Orang 20,000 140,000 140,000
Subtotal 640,000 640,000
Total 640,000 285,000 925,000
3. Pelatihan Kesehatan
a. ATK Pelatihan
1 Buku Tulis 5 Buah 7,500 37,500 37,500
2 Pulpen 5 Buah 2,500 12,500 12,500
3 Spidol Besar (Snowman) 2 Buah 15,000 30,000 30,000
4 Kertas Plano 10 Lembar 2,500 25,000 25,000
5 Lakban Hitam 2 Buah 15,000 30,000 30,000
6 Pengadaan Materi 6 Paket 25,000 150,000 150,000
Subtotal 285,000 285,000
b. Transportasi
1 Transportasi Nara Sumber 1 Orang 250,000 250,000 250,000
2 Transportasi Peserta 5 Orang 50,000 250,000 250,000
3 Konsumsi Pelatihan 7 Orang 20,000 140,000 140,000
Subtotal 640,000 640,000
Total 640,000 285,000 925,000
3. Alat Pelindung Diri
1 Sarung Tangan 0 Buah 25,000 - -
1 Masker Kain 18 Buah 10,000 180,000 180,000
3 Hands Sanitizer 0 Botol 100,000 - -
4 Spanduk Pelatihan 0 Pcs 150,000 - -
Subtotal - 180,000 180,000
Total - 180,000 180,000
Grand Total (1,2,3) 1,920,000 1,035,000 2,955,000
RENCANA ANGGARAN BIAYA (RAB)

Desa : Girikencana Nomor RAB :1


Kecamatan : Parungponteng Program : PAMSIMAS
Kabupaten : Tasikmalaya Kegiatan/Pekerjaan
: Operasional KKM/ Satlak Pamsimas

Propinsi : Jawa Barat Jumlah Minggu : 16 Minggu

Dana Program
No Jenis Kegiatan Volume Unit Satuan Harga Satuan InCash InKind Jumlah Biaya
Upah Bahan
A. Alat Tulis Kantor
1. Kertas A4 80 gr 2 Rim 48,000 96,000 - - 96,000
2. Kertas Karton Manila 2 Lembar 3,000 6,000 - - 6,000
3. Kertas Plano 2 Lembar 1,000 2,000 - - 2,000
4. Ballpoint 5 Buah 2,000 10,000 - - 10,000
5. Potlot 2B 5 Buah 2,000 10,000 - - 10,000
6. Karet Penghapus Kecil 5 Buah 2,500 12,500 - - 12,500
7. Mistar 30 cm 3 Buah 5,000 15,000 - - 15,000
8. Spidol Besar 4 Buah 7,500 30,000 - - 30,000
9. Spidol Kecil 8 Buah 2,000 16,000 - - 16,000
10. Kwitansi Sedang 5 Buah 3,000 15,000 - - 15,000
11. Kwitansi Besar 2 Buah 5,000 10,000 - - 10,000
12. Buku Polio isi 100 Lembar 3 Buah 14,000 42,000 - - 42,000
13. Cairan penghapus/ Type-X 1 Buah 20,000 20,000 - - 20,000
14. Amplop 1 Dus 12,000 15,500 - - 15,500
15. Hekter No. 10 1 Buah 15,000 15,000 - - 15,000
16. Paku Hekter No. 10 3 Dus 2,000 6,000 - - 6,000
17. Klip 3 Dus 2,000 6,000 - - 6,000
18. Gunting Besar 1 Buah 20,000 20,000 - - 20,000
19. Gunting Kecil 2 Buah 10,000 20,000 - - 20,000
20. Pisau Cutter Besar 1 Buah 15,000 15,000 - - 15,000
21. Pisau Cutter Kecil 2 Buah 5,000 10,000 - - 10,000
22. Isi Pisau Cutter Besar 2 Buah 5,000 10,000 - - 10,000
23. Isi Pisau Cutter Kecil 1 Buah 3,000 3,000 - - 3,000
24. Lem Takol Besar 2 Tube 5,000 10,000 - - 10,000
25. Penggandaan RKM 8 bundel 220,000 1,760,000 - - 1,760,000
26. Jepitan Kecil/ binder 2 Box 3,000 6,000 - - 6,000
27. Jepitan Besar/ binder 2 Box 12,000 24,000 - - 24,000
28. Map Plastik 4 Buah 7,500 30,000 - - 30,000
29. Map Ordner Standar 2 Buah 12,500 25,000 - - 25,000
30. PUNCH/ Pembolong Kertas 1 Buah 20,000 20,000 - - 20,000
31. Kalkulator 1 Buah 100,000 100,000 - - 100,000
32. Materai 6000 50 Lembar 7,000 350,000 - - 350,000
33. Materai 3000 40 Lembar 4,000 160,000 - - 160,000

Subtotal A 2,890,000 - - 2,890,000

B. Dokumentasi (Cetak foto) 100 Lembar 3,000 300,000 - - 300,000


C. Fotocopi /Penggandaan - - -
1 Penyusunan RKM 1 Paket 200 1,600,000 - - 1,600,000
2 Penyusunan Akhir 1 Paket 200 1,500,000 - - 1,500,000
3 Kegiatan KKM/Satlak 3 Kali 60,000 180,000 - - 180,000
Subtotal C 3,280,000 - - 3,280,000
D. Transportasi Operasional KKM -
1. Transportasi Belanja 16 Org 50,000 800,000 - - 800,000
2. Transportasi Ke Kabupaten
12 Org 100,000 1,200,000 - - 1,200,000
(Bank/ DPMU)
3. Transport KKM ke Bank 12 Org 50,000 600,000 600,000
4. Biaya Rapat/ Pertemuan 4 Kali 200,000 800,000 - - 800,000
Subtotal D 3,400,000 - - 3,400,000

E. Lain-Lain - - -

2. Papan Program 1 Buah 200,000 200,000 - - 200,000


3. Papan Informasi 1 Buah 150,000 150,000 - - 150,000
4. Spanduk Pelatihan 1 Buah 150,000 150,000 - - 150,000
Subtotal E - 500,000 -### - 500,000
Total (A,B,C,D,E) 3,400,000 6,970,000 10,370,000
-