No Pekerjaan Volume Koef Jumlah

1 Pasangan dinding Batako


Batako 98 m2 13 bh 1,225
Pasir 98 m2 0 m3 4
Semen 98 m2 15 kg 1,486

2 Sloof
Pasir 1 m3 1 m3 1
Semen 1 m3 336,000 kg 352,800
Kerikil 1 m3 1 m3 1
Besi 8mm 1 m3 10,500 kg 11,025
Bendrat 1 m3 3,000 kg 3,150
Papan 1 m3 0 m3 0

3 Kolom
Pasir 1 m3 1 m3 0
Semen 1 m3 336,000 kg 232,848
Kerikil 1 m3 1 m3 1
Besi 8mm 1 m3 10,500 kg 7,277
Bendrat 1 m3 3,000 kg 2,079

4 Kuda-kuda
Pasir 1 m3 1 m3 1
Semen 1 m3 336,000 kg 432,432
Kerikil 1 m3 1 m3 1
Besi 8mm 1 m3 10,500 kg 13,514
Bendrat 1 m3 3,000 kg 3,861

2 Sloof
Pasir 1 m3 1 m3 0
Semen 1 m3 336,000 kg 264,600
Kerikil 1 m3 1 m3 1
Besi 8mm 1 m3 10,500 kg 8,269
Bendrat 1 m3 3,000 kg 2,363

Total
Batako 1,225 x 3,000
Pasir 6 x 210,000
Semen 32 x 55,000
Kerikil 3 x 300,000
Besi 8mm 9 x 62,000
Bendrat 11 x 20,000
Total

bh 1,225 bh
m3 4 m3
kg 40 37 zak

m3 1 m3
kg 40 8,820 zak
m3 1 m3
kg 5 2,326 btg
kg 3,150 kg
m3 0 m3

m3 0 kg
kg 40 5,821 m3
m3 1 m3
kg 5 1,535 btg
kg 2,079 kg

m3 1 kg
kg 40 10,811 m3
m3 1 m3
kg 5 2,851 btg
kg 3,861 kg

m3 0 kg
kg 40 6,615 0
m3 1 m3
kg 5 1,744 btg
kg 2,363 kg

= 3,675,000.00
= 1,182,016.50
= 1,760,000.00
= 927,652.50
= 558,000.00
= 220,000.00
8,322,669